Attachment 1- Statement of Work.pdf

PDF 737 KB Posted

Attached to
P-19 Firetruck Power Divider Repair
Solicitation number
FA302225Q0315
Issued by

About this file

This Statement of Work (SOW) is for the repair of a power divider unit on a 2008 Oshkosh Striker 1500-gallon Aircraft Rescue Fire Fighting Vehicle (asset number AF08L00861) assigned to the 14 Logistics Readiness Squadron (LRS) at Columbus Air Force Base. The contractor is required to provide all necessary management, personnel, tools, equipment, and labor to remove, repair, and reinstall the power divider unit using industry standard repair practices and manufacturer specifications. The work includes removing body and drivetrain components, performing repairs or replacements to faulty unit components, reinstalling the unit, and verifying its satisfactory function.

The SOW specifies a 60-calendar day period of performance from the date of award, with the government open to considering alternate completion dates. The 14 LRS will arrange vehicle transportation to and from the maintenance shop, and the contractor must comply with security requirements at the base. The contractor shall offer a warranty consistent with standard commercial practice and can perform the work at any retailer in the continental United States. The solicitation is identified by the contract number FA302225Q0315, with an effective date of 25 June 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

Repair Power Divider unit on 08L00861, a 2008 model Oshkosh Striker 1500-gallon Aircraft Rescue Fire

Fighting Vehicle

14 LRS

25 June 2025

FA302225Q0315- Attachment 1

STATEMENT OF WORK TABLE OF CONTENTS

SECTION PAGE

1 DESCRIPTION OF SERVICES 3

2 SERVICES SUMMARY 3

3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 3

4 GENERAL INFORMATION 3

5 APPENDIX A 4

1. DESCRIPTION OF SERVICES

The contractor shall provide all management, personnel, tools, supplies, equipment, and labor necessary to remove, repair and reinstall the power divider unit of the asset IAW the SOW. This requirement is for the repair of AF08L00861, a 2008 Oshkosh Striker 1500-gallon Aircraft Rescue Fire Fighting Vehicle.

1.1 Requirements. The contractor shall provide all equipment, labor and materials required to repair the malfunctioning power divider unit of AF08L00861, using industry standard repair practices IAW manufacturer’s specifications and this SOW. Any damages caused by the contractor due to maintenance actions will be the responsibility of the vendor. No other repairs will be made without the approval of the 14 LRS Vehicle Management Flight.

1.2 Maintenance Standards. Contractor shall contact the manufacturer or other authorized service provider for any commercial maintenance manuals, specifications, parts lists, or technical assistance required for task.

2. SERVICES SUMMARY

Remove all body components required to access power divider unit, as applicable.

Remove drivetrain components as necessary to facilitate repair actions.

Perform repairs/replacement to any faulty unit components (clutches, couplers, gaskets, etc.).

Reinstall power divider unit into chassis.

Reinstall any previously removed body components.

Operate and verify satisfactory function of power divider and related systems.

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

N/A

4. GENERAL INFORMATION

4.1 Security Requirements. The contractor shall comply with all security requirements identified by Security Forces at the contractor access point of Columbus AFB to be escorted to the asset location.

4.2 Delivery. The 14 LRS will be responsible for arranging transport of the vehicle to and from the shop for maintenance and the return of the asset to Columbus AFB, unless cost of vendor transport is comparable.

4.3 Warranty. Contractor shall offer the Government a warranty consistent with standard commercial practice.

4.4 Place of Performance. All work performed in accordance with this SOW shall not be limited to mileage; SOW is open to any retailer in the continental U.S.

4.5 Period of Performance. The contractor shall complete the repair/refurbishment of the equipment within 60 calendar days after date of award. The Government will consider alternate completion dates.

4.6 Remedy for non-performance. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.

5. APPENDIX A

ACRONYMS AND ABBREVIATIONS LIST

Acronym/Abbreviation Definition

AFB Air Force Base

IAW In Accordance With

File details come from the government source that posted it. Updated .