Attachment 1 - Statement of Work.docx
DOCX document 56 KB Posted
- Attached to
- Sandia District Vehicle Gate Replacement
- Solicitation number
- 127EAX26Q0090
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for a vehicle gate replacement project at the USDA Forest Service's Cibola National Forest and National Grassland Sandia District office in Tijeras, New Mexico. The contractor must provide all personnel, equipment, tools, materials, and supervision necessary to install a motorized vehicle gate on the south side of the district building. The gate shall match existing fence sections in appearance, utilize lightweight materials, span a maximum of 50 feet with a maximum load capacity of 2,000 pounds, and be powered by a chain-fed Lift Master motor equipped with pressure loops for automatic opening on the east side of the gate. The existing motor has failed due to being underpowered for the heavy gate and high traffic volume; the roadway serves as the only access route to the maintenance yards and the sole fire response avenue for Type 6 Fire crews.
The contractor is responsible for all mobilization, demobilization, bonds, and taxes. Key deliverables include a Proposed Project Plan due within five business days of contract award, weekly status reports due every Friday by 3:00 PM MST, and as-built drawings due upon project completion. The work consists of three main tasks: mobilization, removal of the existing gate and motor with proper disposal, and installation of the new 50-foot motorized vehicle gate in the current location. The gate must integrate with existing card reader and keypad equipment, meet or exceed current equipment standards per UFC 4-022-03 Physical Security Toolbox guidelines, and be capable of withstanding multiple daily opening and closing cycles. No materials will be government-furnished. The Sandia District office operates Monday through Friday from 8:00 AM to 4:30 PM, and all access must be coordinated with the Contracting Officer and Contracting Officer Representative. The contractor must demonstrate working knowledge of parking lot projects, fencing, and installation methods, with documentation of key personnel responsible for the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX26Q0090_Amd_0002.pdf | ||
| Amendment 2 Attachment 3 - Wage Determination Updated.pdf | ||
| Amendment 2 Attachment 1 - Statement of Work Updated.docx | DOCX document | |
| 127EAX26Q0090_Amd_0001.pdf | ||
| 127EAX26Q0090 Vehicle Gate Replacement.pdf | ||
| Attachment 2 - Schedule of Items.docx | DOCX document | |
| Attachment 3 - Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 3 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
Project Cibola NF & NG Sandia District Vehicle Gate Replacement
General Information
1.0 Scope of Work
The contractor shall provide all personnel, equipment, tools, materials, supervision and other items and non-personal services necessary to install the exterior motorized vehicle gate on the south side of building on the road leading to the back east side of property that houses maintenance shops, fire offices and fire apparatus. The gate shall match the existing sections of fence on either side of the vehicle gate in appearance. The gate shall be powerful enough to withstand multiple opening and shutting actions throughout the day and shall be connected to the card reader equipment that is already existing on the Northwest side of gate.
2.0 Background
Sandia district office has a vehicle gate constructed of heavy steal framework and slats that roll on a metal rail located on the pavement in the roadway. Gate is motorized and powered by a motor that is linked to the card reader/key code pad located on the northwest corner of the gate. This gate is now non-operational due to the motor burning out because of the motor being underpowered for such a heavy gate and the high traffic volume of the roadway. This roadway serves as the only way in and out of the district’s maintenance yards and serves as the only Fire response avenue for the Type 6 Fire crews stationed at the Sandia district office.
Contractor Requirements
3.0 Technical Requirements / Tasks
· Motor is a chain fed ½ HP Lift Master Motor.
· Max gate span of 50 ft. Max load of 2000 lbs.
· Gate shall be constructed of light weight materials to match the surrounding fence in appearance.
· Mechanical Components shall meet or exceed current equipment.
· Motor shall be equipped with pressure loops to automatically open gate on the east side of gate exiting the property.
· Motor shall work with the existing card reader/keypad to enter the property.
4.0 Government Furnished
No Materials will be furnished by the Forest Service. The Sandia District office will be open Monday through Friday, 8 am to 4:30pm. Any access shall be coordinated with the Contracting Officer and Contracting Officer Representative.
5.0 Deliverables / Schedule
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Proposed Project Plan |
| Defining the responsibilities, timeline, risks, and milestones of contract objectives. Ref. Subtask 4.1.3 |
| No later than five (5) business days after contract award |
| 2 |
| Weekly Status Report |
| Report documenting tasks & issues weekly. Ref Task 5.1 |
| Weekly, every Friday, by 3:00 PM MST until the contract expires |
| 3 |
| As-built Drawings |
| An as-built drawing documenting location of Remodeled parking lot, including new fence and gate locations. |
| After Project Completion |
Task 1: Mobilization The Task Shall cover all mobilization, demobilization, bonds, and taxes by the contractor.
Task 2: Removal of Existing Gate and Motor Removal and proper disposal of old fencing materials.
Task 3: Install Motorized Vehicle Gate Contractors shall provide materials, labor, and equipment cost for fence extension. Installation of 50 ft Long Motorized Vehicle gate to match existing fence. Gate is to be replaced in current location. As per UFC 4-022-03/Physical Security Toolbox: Fences and Gates (usda.gov)
6.0 Travel
Work shall be performed on site at the Cibola NF and NG Sandia District in Tijeras, New Mexico. Any travel arrangements will need to be made for timely completion of work and will be the responsibility of the contractor.
7.0 Contractor’s Key Personnel
Contractor should demonstrate a working knowledge of Parking Lot projects and methods including fencing, building decommissioning, and installation of asphalt and concrete. Submit a copy of documentation for the personal responsible for the work.