Attachment 1 - Statement of Work.docx
DOCX document 10 MB Posted
- Solicitation number
- 127EAX26Q0082
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for roof replacement on three historic structures located at the U.S. Forest Service Wilderness Ranger District in Mimbres, New Mexico. The project requires complete roof replacement on the Big House (metal roofing system), Smaller House (synthetic cedar-look shakes), and Shower/Laundry Building (synthetic cedar-look shakes), with all work performed in coordination with State Historic Preservation Office (SHPO) requirements and in accordance with the Secretary of the Interior's Standards. All roofing materials, components, and associated products must be manufactured in the United States per the Buy American Act, and the contractor must provide domestic materials certification upon request. The contractor is responsible for furnishing all labor, materials, equipment, and supervision necessary to complete the project within 21 days of the start date.
The Statement of Work specifies comprehensive technical requirements including compliance with the 2021 New Mexico Building Code, NMAC roofing assembly standards, and the New Mexico Energy Conservation Code (R49 minimum ceiling/attic insulation). The contractor must submit material samples and mock-ups for Contracting Officer's Representative approval prior to procurement, including metal panel profiles and colors for the Big House and synthetic shake samples matching the CeDUR Shake "Walden" color reference for the other structures. Detailed scope includes decking inspection and up to 10 percent replacement at contractor expense, synthetic underlayment and ice/water membrane installation, corrosion-resistant flashing (minimum 0.019-inch thickness), gutter installation with historically compatible profiles, and comprehensive site cleanup standards requiring daily debris removal and final magnetic sweeping of building perimeters and parking areas. The contractor must provide a minimum two-year workmanship warranty plus manufacturer warranties, photographic documentation at each project stage (within three days of completion), and as-built documentation. The contractor bears responsibility for any damage to Forest Service property caused during performance and must ensure qualified personnel with roofing and historic structure experience are designated for on-site supervision and daily project oversight.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roof_Replacement_Bidder_QA_Review.docx | DOCX document | |
| Site Visit Sign-in.pdf | ||
| Questions and Answers.docx | DOCX document | |
| 127EAX26Q0082 Wilderness Ranger District Roof Replacement.pdf | ||
| 127EAX26Q0082 Wilderness Ranger District Roof Replacement.pdf | ||
| Attachment 2 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 3 - Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 9 |
| 5.0 Deliverables | 9 |
| 6.0 Travel | 9 |
| 7.0 Contractor’s Key Personnel | 9 |
| 8.0 Security Requirements | 10 |
| Attachment | 10 |
Project Wilderness Ranger District 3 Roof Replacements General Information
1.0 Scope of Work
The U.S. Forest Service, Wilderness Ranger District (Mimbres, NM), requires full roof replacement on three historic structures:
1. Big House — Metal roofing system (contractor‑provided; profile must match historic appearance)
2. Smaller House — Synthetic cedar‑look shakes (contractor‑provided; profile must match historic appearance)
3. Shower/Laundry Building — Synthetic cedar‑look shakes (contractor‑provided; profile must match historic appearance) All work shall preserve the historic character of the structures in coordination with SHPO, in accordance with the Secretary of the Interior’s Standards, and National Park Service Preservation Brief 4 (roofing in historic structures)
2.0 Background
The Wilderness Ranger District maintains several historic administrative and support facilities located in Mimbres, New Mexico, that contribute to the historic character and operational continuity of the site. The existing roofing systems on the Big House, Smaller House, and Shower/Laundry Building have reached the end of their service life and are exhibiting deterioration, weathering, and reduced long-term reliability. Roof replacement is necessary to protect the structures from continued moisture intrusion, preserve the integrity of the buildings, and maintain safe and functional occupancy.
Because these structures possess historic character and are subject to heritage preservation considerations, the replacement roofing systems must maintain the historic visual appearance of the original structures while incorporating durable modern materials and installation methods. All work shall be performed in coordination with applicable SHPO requirements and in a manner consistent with the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
The project includes installation of a historically appropriate metal roofing system on the Big House and synthetic cedar-look shake roofing systems on the Smaller House and Shower/Laundry Building. Synthetic shake materials shall closely replicate the historic cedar shake appearance, including profile, texture, exposure, and color characteristics, while providing improved durability, fire resistance, and reduced maintenance requirements appropriate for Forest Service facilities.
The intent of this project is to preserve the historic architectural character of the site while ensuring the buildings remain weather-tight, code-compliant, operationally functional, and maintainable for long-term Forest Service use.
Contractor Requirements
3.0 Technical Requirements / Tasks
Codes, Standards & Regulatory Compliance The contractor shall comply with:
A. New Mexico State Codes
· 2021 New Mexico Building Code, incorporating NM‑amended IRC/IBC provisions for reroofing and roof assemblies.
· NMAC 14.7.3.17 — Roofing assemblies (weather protection, minimum flashing thickness 0.019", drain/scupper metal pans, taper boards, minimum slopes)
· New Mexico Energy Conservation Code (2021) — Requires R‑49 minimum ceiling/attic insulation
B. Federal Requirements
· USFS Directives & Manuals for construction, safety, heritage compliance, and building maintenance, including 36 CFR provisions applicable to federal buildings and USFS as the Authority Having Jurisdiction (AHJ) when local permits do not apply.
· USFS Built Environment Image Guide (visual and architectural character preservation)
C. Made in USA / Domestic Materials Requirement All roofing materials, components, and associated products furnished under this contract shall be manufactured in the United States in compliance with applicable federal domestic preference requirements, including the Buy American Act (41 U.S.C. §§ 8301–8305), unless otherwise specifically approved in writing by the Contracting Officer. This requirement includes, but is not limited to, roofing panels, shingles, synthetic shakes, fasteners, flashing, underlayment, metal trim, sealants, and related accessories.
The Contractor shall provide documentation verifying country of origin for materials upon request by the Government. Substitution of foreign-manufactured materials without prior written approval from the Contracting Officer may result in rejection of materials, removal and replacement at the Contractor’s expense, or other remedies available under the contract.
D. SHPO Requirements
· Synthetic cedar shake roofing materials for the Smaller House and Shower/Laundry Building shall be contractor‑furnished and contractor‑installed. Materials shall meet SHPO historic appearance requirements and must closely match the appearance, exposure, profile, texture, and color of the approved CeDUR™ Shake reference sample provided by the Government. The reference standard is the CeDUR™ Shake profile in the 'Walden' color style, or an extremely similar equivalent approved by the Contracting Officer’s Representative. Substitutions must be nearly identical in appearance and historic character preservation.
· Maintain historic visual appearance: material type, thickness, exposure, color, profile, shape, and installation pattern must match the historic character as documented or observed.
· Provide all material samples and mock-ups (metal panel profile, color, gloss; synthetic shake layout; flashing finish) for COR approval prior to procurement.
General Work Requirements (All Structures) Demolition & Decking Inspection
· Remove existing roofing down to decking.
· Document substrate with photographs to be provided to COR.
· Provide up to 10% decking replacement as part of contract; >10% requires CO approval.
· Decking replaced in‑kind (matching thickness, pitch).
Underlayment & Ice/Water Protection
· Install synthetic underlayment meeting IRC/NMAC performance requirements.
· Install self‑adhered ice/water membrane at eaves, valleys, transitions, and penetrations where required by NM‑amended IRC tables and manufacturer requirements/industry standards.
Flashing
· Flashing shall be corrosion‑resistant metal ≥ 0.019 in (No. 26 galvanized) per NMAC
· Install at eaves, rakes, valleys, roof‑wall intersections, chimneys, vents, and all transitions.
· Use historically appropriate profiles and minimize visible shiny metal to match Ventilation
· Maintain ventilation clearances at eaves/ridges; install baffles if required.
Insulation
· Remove degraded insulation where required.
· Install loose‑fill insulation to R‑49 minimum, with uniform density and depth, avoiding ventilation obstruction Gutter Installation (All Buildings Requiring It) Based on contractor estimates and NM code drainage standards, gutters are included where applicable.
Contractor shall:
1. Furnish and install gutter systems on all designated roof edges.
2. Use historically compatible profiles (e.g., half‑round or ogee/K‑style only if historically appropriate).
3. Downspouts shall be placed to avoid character‑defining façade features.
4. Gutters/downspouts must meet industry standards for slope, fastening, and water management.
5. Seal all joints and terminations for watertightness.
6. Match colors to minimize visibility and comply with USFS BEIG (Built Environment Image Guide).
Site Protection & Cleanup
· Protect windows, siding, vegetation, utilities.
· Daily Cleanup Standards
· A. Site Condition at End of Each Workday
· Contractor shall remove all loose construction debris generated that day, including:
• Removed roofing materials
• Fasteners, nails, screws, underlayment scraps
• Flashing trimmings
• Packaging materials
• Insulation scraps
• General trash
· All debris shall be collected, bagged, or containerized so it cannot be scattered by wind or foot traffic overnight.
· Walkable surfaces, entryways, and access routes must be swept or blown clean to remove nails, sharp fragments, insulation fibers, or dust.
· Contractor shall secure and neatly stage materials, tools, and equipment to:
• Prevent hazards to Forest Service employees or the public
• Protect materials from weather or wildlife
• Maintain a professional appearance consistent with USFS site expectations
· Any roofing debris that falls onto landscaping, walkways, porches, parking pads, or adjacent structures must be removed before the contractor leaves the site.
· Magnetic sweepers must be run daily around building perimeters, walking paths, and parking areas to remove nails or metal fragments.
· Jobsite waste shall be placed in contractor‑provided dumpsters, trailers, or disposal containers and may not be stored on the ground longer than one workday unless weather prevents removal.
· Final Cleanup Standards
· A. Completion of Work Before Inspection
· Contractor shall remove all construction‑related debris, materials, and waste generated by the project
· Contractor shall perform a full ground‑level magnetic sweep of:
• Entire building perimeter
• Walkways
• Parking areas
• Any workspace or staging area used during construction
· Contractor shall sweep or blow off all porches, decks, sidewalks, patios, entryways, and paved surfaces to remove dust, leaves, insulation fibers, fasteners, and all remaining debris.
· All scrap material, including but not limited to:
• Old roofing materials
• Flashing scrap
• Underlayment remnants
• Damaged or unused new materials
• Packaging
• Cutoffs from metal, shakes, or trims shall be removed from Forest Service property and disposed of off‑site in accordance with state/local requirements
· Gutters (where installed) shall be free of:
• Metal shavings
• Nails
• Underlayment scraps
• Dust and debris from installation
· Contractor shall remove all temporary protection materials, tarps, coverings, and staging structures.
· All contractor equipment, tools, ladders, generators, trailers, and storage containers must be removed from the premises.
· No construction materials may remain stored on‑site after final cleanup (apart from any leftover/additoinal synthetic shake materials.)
· Final Cleanup Standard:
· The site must be left in clean, safe, broom‑swept condition that equals or exceeds the condition found at project start.
· The area must be ready for unrestricted Forest Service use.
· Final cleanup must be completed prior to final inspection and acceptance by the Forest Service.
Structure‑Specific Scope of Work
Big House — Metal Roof (SHPO‑Approved Metal System) A. Material Selection (Historically appropriate metal only) Contractor must propose historically appropriate metal profiles such as:
· Standing seam (narrow seam, low‑gloss finish)
· Historically scaled corrugated (narrow corrugation, non-industrial) Submittals shall include:
· Panel profile dimensions
· Seam spacing
· Metal thickness
· Coating type (Kynar or similar low‑gloss)
· Color chip
· Sample panel (for COR review) B. Installation Requirements
· Install panels, ridge caps, trim, flashing, and closures per manufacturer and NM code.
· Use compatible fasteners with neoprene washers; no galvanic conflicts.
· Seal penetrations, laps, and terminations.
· Observe minimum slope for chosen system (≥3:12 for many systems).
· Restore historic eave/edge appearance.
C. Gutter Installation
· Provide gutters sized for roof area and local rainfall.
· Install downspouts at locations minimizing historic impact.
· Match trim color.
· Ensure proper drainage away from foundation.
D. Insulation
· Remove degraded insulation where required.
· Install loose‑fill insulation to R‑49 minimum, with uniform density and depth, avoiding ventilation obstruction E. Decking Demolition & Decking Inspection
· Remove existing roofing down to decking.
· Document substrate with photographs to be provided to COR.
· Provide up to 10% decking replacement as part of contract; >10% requires CO approval.
· Decking replaced in‑kind (matching thickness, pitch).
Smaller House — Synthetic Cedar‑Look Shakes A. Installation Material Requirements
· Contractor shall furnish all synthetic cedar shake roofing materials, accessories, trims, starter courses, ridge caps, and related components.
· Roofing material shall closely match the approved SHPO reference sample provided by the Government.
· Acceptable standard: CeDUR™ Shake synthetic cedar shake in 'Walden' color profile, or an equivalent product approved by the Contracting Officer Representative.
· Equivalent products must maintain substantially similar color, texture, shake profile, dimensions, exposure pattern, and low‑gloss historic cedar appearance.
· Contractor shall provide physical samples and product literature for approval prior to material procurement.
· Install synthetic shake material according to manufacturer requirements:
· Required fastener type and pattern
· Course exposure
· Starter courses
· Ridge caps and trim
B. Underlayment & Flashing
· Synthetic underlayment; ice/water barrier at vulnerable areas.
· Replace all flashing with corrosion‑resistant minimum 0.019 in metal.
C. Gutter Installation
· Install gutters per §4.6.
· Use historically compatible color and profile.
D. Insulation
· Remove degraded insulation where required.
· Install loose‑fill insulation to R‑49 minimum, with uniform density and depth, avoiding ventilation obstruction E. Decking Demolition & Decking Inspection
· Remove existing roofing down to decking.
· Document substrate with photographs to be provided to COR.
Shower/Laundry Building — Synthetic Cedar‑Look Shakes A. Installation Material Requirements
· Contractor shall furnish all synthetic cedar shake roofing materials, accessories, trims, starter courses, ridge caps, and related components.
· Roofing material shall closely match the approved SHPO reference sample provided by the Government.
· Acceptable standard: CeDUR™ Shake synthetic cedar shake in 'Walden' color profile, or an equivalent product approved by the Contracting Officer Representative.
· Equivalent products must maintain substantially similar color, texture, shake profile, dimensions, exposure pattern, and low‑gloss historic cedar appearance.
· Contractor shall provide physical samples and product literature for approval prior to material procurement.
· Install synthetic shake material according to manufacturer requirements:
· Required fastener type and pattern
· Course exposure
· Starter courses
· Ridge caps and trim
B. Underlayment & Flashing
· Synthetic underlayment; ice/water barrier at vulnerable areas.
· Replace all flashing with corrosion‑resistant minimum 0.019 in metal.
C. Gutter Installation
· Install gutters per §4.6.
· Use historically compatible color and profile.
D. Insulation
· Remove degraded insulation where required.
Install loose‑fill insulation to R‑49 minimum, with uniform density and depth, avoiding ventilation obstruction
E. Decking Demolition & Decking Inspection
· Remove existing roofing down to decking.
· Document substrate with photographs to be provided to COR.
Historic Character Protections
· Retain historic roofline, eave shapes, and detailing.
· Minimize visible flashing and modern profiles.
· Use low‑gloss finishes that blend with surrounding Forest Service facilities.
Inspections & Quality Assurance
· Required checkpoints:
1. Tear‑off & deck inspection
2. Underlayment & flashing installation
3. Insulation installation (R‑49 verification)
4. Final roof assembly State inspection requirements for reroofs include deck inspection and final inspection; USFS will enforce equivalent documentation.
Submittals Contractor shall submit:
· Metal roof samples (Big House)
· Synthetic shake installation plan
· Flashing metal certification (0.019" minimum)
· Ventilation plan
· Insulation brand, R‑value, installation method
· Gutter materials, profile, color
· Photographic documentation for each inspection point, and at key points during the project.
Warranty
· 2‑year workmanship warranty minimum.
- Manufacturer warranties for the metal system and synthetic shake system
Damage to Government Property The Contractor shall be responsible for any damage caused by contractor personnel, subcontractors, equipment, materials, or operations to U.S. Forest Service property during performance of the contract. This includes, but is not limited to, damage to buildings, roofing systems, siding, windows, utilities, walkways, landscaping, government vehicles, drainage features, and other site infrastructure. The Contractor shall repair or replace damaged property at no additional cost to the Government and to the satisfaction of the Contracting Officer or designated Forest Service representative.
4.0 Government Furnished
The government will not furnish anything for this project.
5.0 Deliverables
The following are the documentation/code compliance aspect of the project:
· Photographic logs (deck, flashing, underlayment, insulation, final)- delivered no more than 3 days after each respective stage of the project.
· Manufacturer warranties
· As‑built documentation
· TECO forms or equivalent (fastener/sheet metal certs) when applicable The following are the major deliverables:
The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following deliverables:
1. Complete replacement of the Big House roof with a historically appropriate metal roofing system meeting applicable code, manufacturer, and SHPO requirements.
1. Complete replacement of the Smaller House roof with contractor-furnished synthetic cedar-look shakes matching approved SHPO appearance standards and meeting all applicable code and manufacturer requirements.
1. Complete replacement of the Shower/Laundry Building roof with contractor-furnished synthetic cedar-look shakes matching approved SHPO appearance standards and meeting all applicable code and manufacturer requirements.
1. All roofing systems shall be fully weather-tight, code-compliant, properly flashed and ventilated, historically compatible, with new insulation, and ready for unrestricted Forest Service use upon project completion.
These major deliverables shall be delivered/completed no more than 21 days after project start date.
6.0 Travel
The government will not pay for travel for this project.
7.0 Contractor’s Key Personnel
The Contractor shall provide qualified personnel with sufficient experience in roofing installation, historic structure work, and project supervision to successfully complete the project. At a minimum, the Contractor shall designate a primary on-site supervisor responsible for daily project oversight, coordination with the Forest Service, quality control, safety compliance, and ensuring all work is performed in accordance with contract requirements, applicable codes, manufacturer specifications, and SHPO requirements. Key personnel substitutions shall be communicated to the Contracting Officer or COR in advance whenever practicable.
8.0 Security Requirements
The project site is located on federal property under the jurisdiction of the U.S. Forest Service. Contractor personnel shall comply with all applicable federal, Forest Service, and site-specific safety and security requirements while on government property. The Contractor shall control access to work areas, secure tools, materials, and equipment at the end of each workday, and prevent unauthorized access to the project site. Contractor personnel shall not interfere with Forest Service operations, employees, residents, or visitors. All personnel shall conduct themselves in a professional manner and comply with directions provided by the Contracting Officer, COR, or designated Forest Service representatives. The U.S. Forest Service shall not be responsible for loss, theft, vandalism, or damage to contractor-owned tools, equipment, materials, vehicles, trailers, or personal property brought onto government property for performance of this contract. The Contractor is solely responsible for securing all property, materials, and equipment associated with the project during and after working hours. Any property left on-site shall be at the Contractor’s own risk.
Attachment Pumphouse Photos:
Big House Photos:
Small House Photos:
CeDUR synthetic shake example:
image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg