This is a Performance Work Statement (PWS) for installation of louvers, gutters, fans, and electrical work at two USDA ARS barns (EC16 Headgate Barn and EC23 Growsafe Barn) in El Reno, Oklahoma. The work requires installing 12 chain-pull activated louvers (36"x72") in the north wall of EC16, installing gutters on EC16's south side to match EC23, and installing 8 industrial overhead fans (4 per barn) comparable to "Super Duty Fans" model SD5V with stainless steel blades. Each fan requires its own controller mounted on the north wall and complete electrical installation including breakers, wiring, and conduit.
The contractor must provide all labor, tools, equipment, transportation, and supervision, while complying with ARS Facilities Design Standards and relevant codes. Work must be completed within 45 days of award notice. A mandatory site visit is scheduled for January 21, 2025 at 10:00 AM CT, and quotes are due by February 3, 2025 at 8:00 AM CT. The project includes a one-year warranty for workmanship, and the contractor must submit a site-specific safety and health plan. The opportunity falls under NAICS code 236220 with a $45 million small business size standard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA ARS OCPARC – El Reno 7207 W. Cheyenne St.
El Reno, OK 73036
Performance Work Statement BD. EC16 & EC23 (Headgate & GrowSafe Barns) louver, gutter and fan install to include electrical needs.
SECTION 01010 ‐ SCOPE OF WORK
A. GENERAL: It is the intent of these general conditions, specifications, together with the contract, to include all labor, materials, equipment, transportation, permits and fees, temporary protection and supervision necessary to complete the required work. All work shall be done under the direction of, and completion to the satisfaction of the Contracting Officer.
1. Project Description:
Louver, Gutter, fan and electrical needs installation in BD. EC16 & EC23 (Headgate & GrowSafe Barns) at the USDA, ARS, OCPARC El Reno, located at 7207 W. Cheyenne Street, El Reno, OK 73036.
Provide and install quantity of 12, 36in. X 72in. chain pull activated louvers into the North wall of BD. EC16 (headgate barn).
Provide and install gutters on the South facing side of BD. EC16 (Headgate barn) to match existing gutters on BD. EC23 (Growsafe barn).
Provide and Install 8 new (4 in each barn), industrial type, overhead fans equal or comparable to “Super Duty Fans” model: SD5V with the stainless‐steel blade set.
BD. EC16 (Headgate) – Each fan to be installed above and centered between 2 of the 16 livestock holding pins (2‐3, 6‐7, 10‐11, 14‐15).
BD. EC23 (Growsafe) ‐Each fan to be installed above and centered between 2 of the 8 livestock holding pins (1‐2, 3‐4, 5‐6, 7‐8).
Each fan will have its own controller to be mounted conveniently on the North wall, in line with the fan it controls.
Provide and install all electrical needs from the breaker panel to each fan and fan controller, including appropriate circuit breakers, wire, and conduit.
Work includes:
1‐1. Provide and install 12 new chain pull activated louvers in the North wall of BD. EC16
(Headgate barn). Louvers will be 36in. X 72in. and mounted horizontally. 8 louvers will be centered and spaced evenly throughout the top section of the wall, and the other 4 will be spaced evenly, between 2 of each of the top 8, in the middle section of the wall.
1‐2. Louvers should be installed with trim to match that of the existing louvers on BD. EC23 (Growsafe barn).
include electrical needs.
1‐3. Provide and install gutters and down spouts on South side of BD. EC16 (Headgate barn) to match existing gutters and down spouts on South side of BD. EC23 (Growsafe barn).
1‐4. Provide and Install 8 new fans (4 in each barn) equal or comparable to “Super Duty Fans” model: SD5V with the stainless‐steel blade set. Install should conform with manufacturers recommendation for height/distance between fan/floor and fan/ceiling.
The equal or comparable fan, SD5V, is recommended at least 10ft from the floor and at least 3 ft from the ceiling.
1‐5. Provide and install new electrical circuits for each fan. (breakers, wire, conduit)
1‐6. Provide and install independent fan controllers conveniently on the North wall across from each fan.
1‐7. Provide and install all electrical needs between each fan and controller.
1‐8. Test fans and controllers for proper operation.
1‐9. Provide all applicable warranty paperwork.
1‐10. Clean up jobsite. Off‐site disposal is the contractor’s responsibility.
The contractor shall furnish all labor, tools, equipment, transportation to the job site, and supervision for the job indicated above. The contractor shall furnish all material except material listed in the government furnished material section of this document.
2. Government Furnished Equipment: None
3. Site Visit/Pre Bid Meeting : TBD
4. Codes and Standards: Construction shall comply with the requirements of ARS Facilities Design Standards Manual 242.1, ARS Energy Management Plan 134.2 and all other applicable federal, state and local code requirements as well as current industry standards, (ie. UBC, UPC, NFPA, UL, ASTM, ACI, NEC, NEMA., etc,) and health and safety codes, in effect at the time of contract award. ARS Design and construction manuals can be found on the website under “P&P and Manuals” at http://www.afm.ars.usda.gov/facilities/pplist‐FD.htm.
5. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, Contractor shall obtain items and take those actions in accordance with include electrical needs.
the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the responsibility of the Contractor.
6. Application: It shall be the responsibility of the Contractor to perform all work in accordance with the manufacturers’ recommendations and Industry Standards. If any item specified herein and/or on the drawings conflicts with applicable codes and recommendations, the contractor shall bring it to the attention of the Contracting Officer for immediate resolution.
SECTION 01050 ‐ FIELD ENGINEERING/INSPECTION OF SITE
A. The Contractor shall be responsible for verifying site conditions, making quantity take‐offs, obtaining accurate measurement of existing conditions, and performing any act or operation which may be necessary to properly bid the work and complete the same as depicted and specified. Failure to verify the existing site conditions shall not relieve the Contractor of the responsibility to complete the work as required.
SECTION 01300 ‐ SUBMITTALS
A. Manufacturer's descriptive literature sufficient to determine conformance of the proposed product to the contract requirements shall be submitted to the CO for review and approval. The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
B. Installation procedures supplied by the manufacturer.
SECTION 01400 ‐ QUALITY CONTROL
A. GENERAL: To satisfy the requirement for Quality Control, the work performed under this contract shall be subject to continuous audit by the Location Site Monitor (LSM). Quality control is the exclusive responsibility of the Contractor.
B. FINAL ACCEPTANCE: Acceptance of the completed work will be based upon its conformance to the contract.
C. WARRANTY: The warranty period for workmanship shall be for one (1) year from the date the government accepts the work.
SECTION 01525 ‐ SAFETY REQUIREMENTS
A. The Contractor shall implement, and provide to the Contracting Officer (CO) for review, a site specific, SITE SAFETY AND HEALTH PLAN in accordance with all local, state and federal regulations. The plan shall address, at a minimum all responsible parties by name, all safety/health hazards, personal protective equipment and other hazard controls, all required training, emergency procedures, and other required information to perform the include electrical needs.
work. The plan shall be implemented by contractor supervisor signature. Two copies shall be provided to the Contracting Officer and one copy will be maintained at the site. In the event of changing site conditions or hazards, the plan shall be appended in writing and a copy of the change provided to the CO and COR.
SECTION 01545 ‐ PROTECTION OF WORK AND PROPERTY
A. The Contractor shall protect the work, the site, and all existing property and structures within the limit of construction activities or that may be affected thereby until acceptance of the work.
Any damage to property shall be repaired at the Contractor’s expense, to pre‐damaged condition to the satisfaction of the COR.
B. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for protection and security.
SECTION 01560 ‐ TEMPORARY FACILITIES
A. Temporary utilities (water and electricity) will be furnished to the Contractor by the Government, if so requested. Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through is own negligence.
B. Should the Contractor require any power or utility shutdown during construction, he shall receive approval for such shutdown from the LSM three working days prior to this need.
SECTION 01600 ‐ MATERIALS AND EQUIPMENT
A. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer's latest standard design.
B. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplier and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage of any kind whatsoever to the materials and equipment. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the CO/LSM.
D. EXECUTION:
(a) The Contractor shall provide the necessary tools, equipment, labor, coordination, and related materials necessary for the completion of work.
include electrical needs.
(b) Erection techniques employed by the Contractor must be in accordance with the manufacturing company's suggested erection procedures. Work is expected to be completed no later than 45 days after notice of award.
SECTION 01710 ‐ CLEANING
Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the
LSM.
SECTION 01711 – WARRANTY
Submit data concerning the standard one year warranty for workmanship, including the warranty period (dates), and warranty contacts with names, addresses and telephone numbers.
Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one‐year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.