ATTACHMENT 1 - Specifications - Vol 1.pdf

PDF 5 MB Posted

Attached to
Y1DA--Construct Mental Health Outpatient Bldg. 52 (Minor) Construction - Fargo
Solicitation number
36C77623B0075
Issued by

About this file

This document outlines the specifications for a construction project to build a new mental health outpatient building at the VA Medical Center in Fargo, North Dakota. Key details include safety and compliance requirements for the project, such as developing an Accident Prevention Plan and Activity Hazard Analyses. It also specifies training requirements for staff like OSHA 30-hour certification for competent persons, and PPE rules. Procedures are defined for inspections, accident reporting, and coordination with infection control. Electrical work must follow NFPA and OSHA standards, and hot work requires permitting.

View the file

Other files

File Type Posted
SF 1442 Page 2 - Signature Page.pdf PDF
Technical Questions - FINAL - Fargo 11-20-23.pdf PDF
36C77623B0075 0002.pdf PDF
Section 01 45 00 Quality Control.pdf PDF
36C77623B0075 0001.pdf PDF
ATTACHMENT 18 - Construction Wage Rates - Cass 10-20-23.pdf PDF
Site Visit Sign-in Sheet - Fargo 10-24-23.pdf PDF
ATTACHMENT 6 - Drawings - Architectural - Vol 3.pdf PDF
ATTACHMENT 15 - Drawings - Structural Vol 4.pdf PDF
ATTACHMENT 19 - Site Visit Instructions.pdf PDF
ATTACHMENT 11 - Drawings - Mechanical-Plumbing.pdf PDF
ATTACHMENT 14 - Drawings - Structural Vol 3.pdf PDF
ATTACHMENT 10 - Drawings - Landscape.pdf PDF
ATTACHMENT 3 - Drawings - General.pdf PDF
ATTACHMENT 16 - Contractor Core Work Hours.pdf PDF
ATTACHMENT 18 - Construction Wage Rates - Cass 7-7-23.pdf PDF
ATTACHMENT 2 - Specifications - Vol 2.pdf PDF
ATTACHMENT 13 - Drawings - Structural Vol 2.pdf PDF
36C77623B0075 - 10-12-23.pdf PDF
ATTACHMENT 17 - Limitations on Subcontracting - Construction.docx DOCX document
ATTACHMENT 4 - Drawings - Architectural - Vol 1.pdf PDF
ATTACHMENT 9 - Drawings - Fire Protection.pdf PDF
ATTACHMENT 5 - Drawings - Architectural - Vol 2.pdf PDF
ATTACHMENT 7 - Drawings - Civil.pdf PDF
ATTACHMENT 12 - Drawings - Structural Vol 1.pdf PDF
ATTACHMENT 8 - Drawings - Electrical.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Veterans Affairs VA Medical Center

Project Number 437-316

Construct Mental Health Outpatient Bldg 52 Addition

2101 Elm Street Fargo ND 58102

PROJECT SPECIFICATIONS

100% Bid Documents Package Volume 1

May 26, 2023

(VEG 21.05)

750 W. HAMPDEN AVE. #300

ENGLEWOOD, CO 80110

Ph (720) 550-6307

MO

SE JS ACOBS

56381

MMO

OBBSS

5555555555555555555555555555555555555555555555555555555555555555555555555555555555555556381 12/01/2205/26/23

05/25/2023 05/25/2023

(Div 00-02)

(Div 03-14)

STRUCTURAL

05-01-21

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21 01 00 01 Pre-Construction Risk Assessment (PCRA) Form 01 00 02 ISLM Evaluation Form 01 32 16.15 Project Schedules 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 07-20 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 01-21 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 01-21 03 45 00 Precast Architectural Concrete 01-21

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17 04 24 50 Thin Brick Panel Systems 10-22

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18 05 31 00 Steel Decking 01-21 05 40 00 Cold-Formed Metal Framing 01-21 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Enclosure Commissioning 01-21 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 16 16 Crystalline Waterproofing - Custom 07 21 13 Thermal Insulation 01-21 07 21 30 Pre-Engineered Building Insulation 10-22 07 22 00 Roof and Deck Insulation 01-21 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 01-21 07 40 00 Roofing and Siding Panels - Insulated 01-21 07 41 13 Standing Seam Roof Panels 10-22 07 53 23 EPDM Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 10-22

DIVISION 08 - OPENINGS

08 00 01 Blast Performance Requirements 07-22 08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 33 00 Coiling Doors and Grilles 01-21 08 33 00.1 Side Coiling Security Grilles (Custom) 10-22 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 51 13 Aluminum Windows and Accessory Windows 10-22 08 51 13.13 Aluminum Accessory Windows 10-22 08 56 19 Pass Windows 01-21 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 62 53 Walk-off Mats 10-22 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

09 69 00 Carpeting 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 22 39 Continuously Hinged Partition 10-22 10 26 00 Wall and Door Protection 01-21 10 28 00 Restroom Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 73 16 Aluminum Canopy System-CUSTOM

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18 12 48 13 Entrance Floor Mats and Frames 10-22

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14– CONVEYING EQUIPEMENT

14 24 12 New Hydraulic Elevator 08-20

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 30 13 Electric-Driven Fire Pumps 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 11 23 Facility Natural-Gas Piping 04-20 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 52 25 Low-Pressure Water Heating Boilers 04-20 23 64 00 Packaged Water Chillers 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

26 29 11 Motor Controllers 01-18 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 51 16 Public Address and Mass Notification Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 13 16 Decorative Concrete Paving 32 17 23 Pavement Markings 08-16 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17

DIVISION 34 – TRANSPORTATION – NOT USED

00 01 10-6

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 48 – Electrical Power Generation – NOT USED

Appendix A – Geotechnical Report

10-06-22

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

PART 1 -

1.1

1.2

1.3

1.4

1.6

1.7

1.8

1.10

1.11

1.12

1.13

1.14

1.15

1.16

1.17

1.18

1.19

1.20

1.21

1.22

1.23

1.24

1.25

1.26

1.27

1.28

1.29

1.30

1.31

1.32

1.33

1.34

1.35

1.36

PRE-CONSTRUCTION RISK ASSESSMENT (PCRA)

Project # Project Title: Est. Start Date:

Area of Construction: Est. Duration:

Contractor/Supervisor:

PCRA Completed by:

SAFETY/ENGINEERING

Y N If YES, CIRCLE ILSM from list below or describe other intervention

Will exits or exit egress routes from occupied areas change? A, E, H, J, L Will the construction area have less than two remote exits? A, E, H, J, L Will there be excessive distance to exit? A, E, H, J, L Will access to Emergency Services become blocked or obstructed? A, B, I, J, L Will any part of the fire protection systems (detection, notification or suppression) be shut down or impaired for >4 hours in a 24-hour period? C, E, H, I, K

Will smoke or firewalls be breached? A, E, G, H Will any temporary construction partitions be built? D Will the project result in the accumulation of construction debris? E, F, G, H Will construction affect grounds safety (pits, storage, equipment, etc.)? H Will construction present other life safety hazards? H, J Will protection of hazardous areas be compromised? H

INTERVENTION

A. Ensure Alternate Egress Routes B. Ensure Alternate Emergency Access C. Fire Department Notification D. Ensure Smoke-Tight Temporary Construction

E. Additional Fire Fighting Equipment F. Control Combustible Loads G. Conduct 2 Fire Drills Per Shift in All Areas H. Increase Hazard Surveillance Rounds

I. Additional Training of Emergency Personnel J. Ensure Additional Employee Education K. Institute a Fire Watch w/documentation L. Post temporary signage

Y N CONSTRUCTION ACTIVITY If YES, describe intervention

Will there be any anticipated utility shutdowns? (Communications, electrical, heating/cooling, HVAC, medical gases, vacuum, water, server) Will noise levels be excessive?

Will vibration levels be excessive?

Will additional security measures be implemented?

Additional Requirements:

PATIENT SAFETY COORDINATOR

Y N CONSTRUCTION ACTIVITY

Does this project involve a patient care area either directly or adjacent to?

List:

Do areas involved have knowledge of construction?

List:

Does this project alter patient access building/patient care area, either temporarily or permanently?

If YES, indicate intervention:

Access

1. The new/temporary access path should be intuitive, i.e. easy to follow.

2. Signage should be adequate for decreased visual acuity and at appropriate viewing levels for both ambulating and w/c bound individuals.

3. The access path should be smooth, without tripping hazards.

4. The access path should be handicap accessible.

Constructi on Area/ Materials

1. Construction areas should not be accessible by unauthorized personnel.

2. Construction areas should be visually identified.

3. Construction materials and tools should be moved and stored appropriately to preclude unauthorized access?

Critical clinical alarms shall be functional and audible within and adjacent to the construction zone? Including but not limited to:

Critical Alarms a. Emergency CODE Systems

b. Medical Gas Alarms (Oxygen, Air, Suction)

c. Wander guard technology

d. Vital Sign Monitoring/Telemetry Systems

e. Medication//Nutrition Pumps

f. Nurse Call Systems

Additional Requirements:

INFECTION CONTROL RISK ASSESSMENT

INFECTION CONTROL COORDINATOR

Y N CONSTRUCTION ACTIVITY TYPE Y N PATIENT RISK GROUP (may modify as appropriate))

A: Inspection, non-invasive activity-includes, not limited to removal of ceiling tiles for inspection (1/50 sq ft), painting (not sanding), wall covering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

Low Risk- (ex Office Areas)

B: Small scale, short duration, moderate to high levels-includes but not limited to installation of telephone/computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled.

Medium Risk-(ex Cardiology, ECHO, Endoscopy, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy)

C: Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes but not limited to sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles, and casework; new wall construction; minor duct work or electrical work above the ceilings; major cabling activity; any activity which cannot be completed in a single work shift.

High Risk-(ex CCU, ER, Labor & Delivery, Laboratories (specimen), Newborn Nursery, Outpatient Surgery, Pediatrics, Pharmacy, Post Anesthesia care, Surgical Units)

D: Major duration and construction activities-Includes, but not limited to:

activities that require consecutive work shifts; requires heavy demolition or removal of a complete cabling system; new construction.

Highest Risk-(ex Any area caring for Immunocompromised patients, Burn Unit, Cardiac Cath Lab, Central Sterile Supply, ICU, Medical Unit, Negative pressure isolation rooms, Oncology, Operating rooms including C-section)

Patient Risk Group TYPE A TYPE B TYPE C TYPE D LOW Risk I II II III/IV MEDIUM Risk I II III IV HIGH Risk I II III/IV IV

Project Class

HIGHEST Risk II III/IV III/IV IV During Construction Project Upon Completion of Project

CLASS

I

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace any ceiling tile displaced for visual inspection.

CLASS

II

1. Include all items from Class I above

2. Provides active means to prevent air-borne dust from dispersing into atmosphere

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Place dust mat at access points of work area.

7. Contain construction waste before transport in tightly covered containers.

8. Isolate HVAC system in areas where work is being performed to prevent contamination of duct system.

1. Wipe surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.

CLASS

III

1. Include all items from Class I/II above

2. Involve Infection Control in design/planning before construction begins.

3. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

1. Include all items from Class I/II above

2. Do not remove barriers from work area until completed project is thoroughly cleaned as required by Chief, EMS and Infection Control Coordinator.

3. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

CLASS

IV

1. Include all items from Class I/II/III above

2. Involve Infection Control in design/planning before construction begins.

3. Seal holes, pipes, conduits, and punctures appropriately.

4. If exiting to a patient care area, construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

5. Walk-off mats are recommended to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.

1. Include all items from Class I/II/III above

ICRA PROJECT CLASS:

Y N RISK OF TB EXPOSURE TYPE OF RISK:

If yes, describe intervention:

Additional Requirements:

Patient Safety Coordinator/Date Infection Control Coordinator/Date

IH/Safety Date Project Engineer/Date

Ju ly

IL

SM

E

VA

LU

AT

IO

N

PR

O

JE

CT

LO

CA

TI

O N:

ST

AR

T

DA

TE

Ev al ua te d Ite m

YE

S

NO

Jo in t C om m iss io n

IL

SM

A dm in ist ra tiv e Ac tio ns

If an sw er is

Ye s”

, s ee a ct io ns re qu ire d to b e ta ke n Tr ai ni ng /R ev ie w

Da te

W ill a ny e xi t b e ob st ru ct ed

En su rin g un ob st ru ct ed e xi ts

W he n al te rn at iv e ex its ha ve b ee n de sig ne d, st af f m em be rs in a ffe ct ed a as m us t r ec ei ve a dd iti on al tr ai ni ng

Bu ild in gs o r a as un de r c on st ru ct io n m us t m ai nt ai n es ca pe ro ut es fo r co ns tr uc tio n w or ke rs a t a ll tim es

, a nd th e m ea ns o f ex iti ng co ns tr uc tio n ar ea s a re in sp ec te d da ily

Pe rs on ne l i n th e bu ild in g ill ce iv e tr ai ni ng o n al te rn at e ro ut es a nd e xi ts

Co ns tr uc tio n ar ea s w ill h av e de sig na te d an d m ar ke d ex its to b e cle ar a t a ll tim es if n ec es sa ry

Da te

Da te

W ill a ny e nt ra nc e be ob st ru ct ed to li m it th e ac ss to m er ge nc y se rv ice s?

En su rin g fre e an d un ob st ru ct ed a cc es s t o em er ge nc y se rv ice s a nd fo r f ire

, p ol ice , a nd o th er e m er ge nc y fo rc es

Th e co ns tr uc tio n pl an s w ill b e re vi ew ed to e ns ur e pr op er a cc es s an d w ill b e m ai nt ai ne d

Da te

W ill a ny fi re d et ec tio n or su pp re ss io n sy st em b e im pa ire d fo r > h ou rs in a ho ur p er io d?

En su rin g th at th e fir e de te ct io n an d su pp re ss io n sy st em s ar e in g oo d w or ki ng o rd er

A te m po ra ry b ut e qu iv al en t sy st em m us t b e pr ov id ed w he n an y fir e sy st em is im pa ire d.

T em po ra ry sy st em s m us t b e in sp ec te d an d te st ed m on th ly

Co nt ra ct or w ill b e br ie fe d sc he du le w or k to m in im ize ti m e sy st em s i m pa ire d an d no tif y ap pr op ria te o ffi ce s p rio r t o sy em in g im pa ire d

Da te

W ill co ns tr uc tio n be o pe n ot he r a re as w ith ou t a ny sm ok e tig ht b ar rie rs

En su rin g th at te m po ra ry co ns tr uc tio n pa rt iti on s a sm e tig ht a nd b ui lt of n on co m bu st ib le o f l im ite d co m bu st ib le m at er ia ls th at w ill n ot co nt rib ut e to th e de ve lo pm en t o r s pr ea d of fi re

Co nt ra ct or w ill b e br ie fe d at p re co ns tr uc tio n co nf er en ce o f re qu ire m en t

Da te

W ill fi re h az ar su bs ta nt ia lly h ig he r?

Pr ov id in g ad di tio na l f ire fig ht in g eq ui pm en t a nd tr ai ni ng af f i n its u se

Co nt ra ct or w ill b e br ie fe d at th e pr e-co ns tr uc tio n co nf er en ce fo r th e ne ed to p ro vi de a de qu at e fir ef ig ht in g eq ui pm en t a nd tr ai ni ng co ns tr uc tio n em pl oy ee s

Da te

W ill sm ok in g be p er m itt ed co tr uc tio n ar ea s?

Pr oh ib iti ng sm ok in g th ro ug ho ut th e or ga ni za tio n’ s bu ild in gs a nd in a nd n ea r c on st ru ct io n ar ea s.

Re fe r t o Fa rg o

VA

H

CS

Sm in g

Po lic y

Da te

W ill st or ag e, h ou se ke ep in g an d de br is re m ov al p ra ct ice s in cr ea se th e fir e lo ad

De ve lo pi ng a nd e nf or cin g st or ag e, h ou se ke ep in g, a br is re m ov al p ra ct ice s t ha t r ed uc e th e bu ild in g’ s fla m m ab le a nd co m bu st ib le fi re lo ad to th e lo w es t fe as ib le le ve l.

Co nt ra ct or w ill b e br ie fe at pr ec on st ru ct io n co nf er en ce o f re qu ire m en t

Da

Ev al ua te d Ite m

YE

S

NO

Jo in t C om m iss io n

IL

SM

A dm in ist ra tiv e Ac tio ns

If an sw er is

Ye s”

, s ee a ct io ire d to b e ta ke n Tr ai ni ng /R ev ie

Da

W ill th e fir e ha za rd in cr ea se ju st ify e xt ra fi re d ril ls?

Co nd uc tin g a m in im um o f t w o fir e dr ill s p er sh ift p er ar te r.

Sa fe ty D ep ar tm en t w ill e va lu at e ef fe ct s o f w or k on li fe sa fe ty a rm in e if th er e is a ne ed cr ea se fr eq ue nc y of d ril ls

Da te

W ill h az ar do us co nd iti on s su bs ta nt ia lly in cr ea se in o r ar ou nd th e bu ild in gs ire e xt ra su rv ei lla nc e ac tiv iti es

In cr ea sin g ha za rd su rv ei lla nc e of b ui ld in gs

, g ro un ds

, a eq ui pm en t, w ith sp ec ia l a tt en tio n to e xc av at io ns co ns tr uc tio n ar ea s, co ns tr uc tio n st or ag e, a nd fi el d of fic es

A Fi re W at ch w ill b e im pl em en te d as n ee de d

Da te

W ill st ru ct ur al fe at ur es o f f ire sa fe ty b e im pa ire d?

Tr ai ni ng st af f t o co m pe ns at e fo r i m pa ire d st ru ct ur al o r co m pa rt m en ta liz at io n fe at ur es o f f ire sa fe ty

Pe rs on ne l i n th e bu ild in g ill iv e tr ai ni ng in re sp on se fo r l ife sa fe ty d ef ici en cie s i f n ec es sa ry

Da te

W ill th is pr oj ec t a ffe ct th e lif e sa fe ty fe at ur es o f a ll ar ea s?

Co nd uc tin g or ga ni za tio n w id e sa fe ty e du ca tio n pr og ra m s t o pr om ot e aw ar en es s o f L

SC

b ui ld in g de fic ie nc ie s, co ns tr uc tio n ha za rd s, an d

IL

SM

s.

St af f w ill b e m ad e aw ar of fic ie nc ie s, ha za rd s, an d in rim m ea su re s d ur in g pe rs on al co nt ac t, tr ai ni ng

, a nd

/o r i nf or m at io n ch an ne ls.

I

LS

M w ill b e po st ed b y pr oj ec t s ite

Da te

O th er Li fe S af et y Co co id er at io ns

If Ce ili ng

T ile s a re o ut fo r m or e th an h ou rs a fi re w at ch w ill b e im pl em en te d.

Da te

IL

SM

R eq ui d:

Y es N o

IL

SM

Is su e

Da te

Ev al ua tio n de te rm in es n o

IL

SM

n ee de d

X Pr ep ar ed b y

X Re vie we

By

01 32 16.15 - 1

SECTION 01 32 16.15

PROJECT SCHEDULES

PART 1- GENERAL

1.1 DESCRIPTION:

A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fulfillment of the contract requirements

(Project Schedule), and shall keep the Project Schedule up-to-date in accordance with the requirements of this section and shall utilize the plan for scheduling, coordinating and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications.

1.2 CONTRACTOR'S REPRESENTATIVE:

A. The Contractor shall designate an authorized representative responsible for the Project Schedule including preparation, review and progress reporting with and to the Contracting Officer's Representative (COR).

B. The Contractor's representative shall have direct project control and complete authority to act on behalf of the Contractor in fulfilling the requirements of this specification section.

C. The Contractor’s representative shall have the option of developing the project schedule within their organization or to engage the services of an outside consultant. If an outside scheduling consultant is utilized, Section 1.3 of this specification will apply.

1.3 CONTRACTOR'S CONSULTANT:

A. The Contractor shall submit a qualification proposal to the COR, within

10 days of bid acceptance. The qualification proposal shall include:

1. The name and address of the proposed consultant.

2. Information to show that the proposed consultant has the qualifications to meet the requirements specified in the preceding paragraph.

3. A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling services. These representative samples shall be of similar size and scope.

B. The Contracting Officer has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of the qualification proposal.

In case of disapproval, the Contractor shall resubmit another

01 32 16.15 - 2 consultant within 10 calendar days for renewed consideration. The

Contractor shall have their scheduling consultant approved prior to submitting any schedule for approval.

1.4 COMPUTER PRODUCED SCHEDULES

A. The contractor shall provide monthly, to the Department of Veterans

Affairs (VA), all computer-produced time/cost schedules and reports generated from monthly project updates. This monthly computer service will include: three copies of up to five different reports (inclusive of all pages) available within the user defined reports of the scheduling software approved by the Contracting Officer; a hard copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data; and the resulting monthly updated schedule in PDM format. These must be submitted with and substantively support the contractor’s monthly payment request and the signed look ahead report. The COR shall identify the five different report formats that the contractor shall provide.

B. The contractor shall be responsible for the correctness and timeliness of the computer-produced reports. The Contractor shall also responsible for the accurate and timely submittal of the updated project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.

C. The VA will report errors in computer-produced reports to the

Contractor’s representative within ten calendar days from receipt of reports. The Contractor shall reprocess the computer-produced reports and associated diskette(s), when requested by the Contracting Officer’s representative, to correct errors which affect the payment and schedule for the project.

1.5 THE COMPLETE PROJECT SCHEDULE SUBMITTAL

A. Within 45 calendar days after receipt of Notice to Proceed, the

Contractor shall submit for the Contracting Officer's review; three blue line copies of the interim schedule on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved

CPM schedule program. The submittal shall also include three copies of a computer-produced activity/event ID schedule showing project duration; phase completion dates; and other data, including event cost.

Each activity/event on the computer-produced schedule shall contain as a minimum, but not limited to, activity/event ID, activity/event description, duration, budget amount, early start date, early finish

01 32 16.15 - 3 date, late start date, late finish date and total float. Work activity/event relationships shall be restricted to finish-to-start or start-to-start without lead or lag constraints. Activity/event date constraints, not required by the contract, will not be accepted unless submitted to and approved by the Contracting Officer. The contractor shall make a separate written detailed request to the Contracting

Officer identifying these date constraints and secure the Contracting

Officer’s written approval before incorporating them into the network diagram. The Contracting Officer’s separate approval of the Project

Schedule shall not excuse the contractor of this requirement. Logic events (non-work) will be permitted where necessary to reflect proper logic among work events, but must have zero duration. The complete working schedule shall reflect the Contractor's approach to scheduling the complete project. The final Project Schedule in its original form shall contain no contract changes or delays which may have been incurred during the final network diagram development period and shall reflect the entire contract duration as defined in the bid documents.

These changes/delays shall be entered at the first update after the final Project Schedule has been approved. The Contractor should provide their requests for time and supporting time extension analysis for contract time as a result of contract changes/delays, after this update, and in accordance with Article, ADJUSTMENT OF CONTRACT

COMPLETION.

B. Within 30 calendar days after receipt of the complete project interim

Project Schedule and the complete final Project Schedule, the

Contracting Officer or his representative, will do one or both of the following:

1. Notify the Contractor concerning his actions, opinions, and objections.

2. A meeting with the Contractor at or near the job site for joint review, correction or adjustment of the proposed plan will be scheduled if required. Within 14 calendar days after the joint review, the Contractor shall revise and shall submit three blue line copies of the revised Project Schedule, three copies of the revised computer-produced activity/event ID schedule and a revised electronic file as specified by the Contracting Officer. The revised submission will be reviewed by the Contracting Officer and, if found to be as previously agreed upon, will be approved.

01 32 16.15 - 4

C. The approved baseline schedule and the computer-produced schedule(s) generated there from shall constitute the approved baseline schedule until subsequently revised in accordance with the requirements of this section.

D. The Complete Project Schedule shall contain the number of work activities and events that are appropriate for the project size.

1.6 WORK ACTIVITY/EVENT COST DATA

The Contractor shall cost load all work activities/events except procurement activities. The cumulative amount of all cost loaded work activities/events (including alternates) shall equal the total contract price. Prorate overhead, profit and general conditions on all work activities/events for the entire project length. The contractor shall generate from this information cash flow curves indicating graphically the total percentage of work activity/event dollar value scheduled to be in place on early finish, late finish. These cash flow curves will be used by the Contracting Officer to assist him in determining approval or disapproval of the cost loading. Negative work activity/event cost data will not be acceptable, except on VA issued contract changes.

The Contractor shall cost load work activities/events for period services, test, balance and adjust various systems in accordance with the provisions in Article, FAR 52.232 – 5 (PAYMENT UNDER

FIXED-PRICE CONSTRUCTION CONTRACTS) and VAAR 852.232 –Article 71

Including NAS-CPM for (PAYMENTS UNDER FIXED PRICE CONSTRUCTION).

In accordance with FAR 52.236 – 1 (PERFORMANCE OF WORK BY THE

CONTRACTOR) and VAAR 852.236 – 72 (PERFORMANCE OF WORK BY THE

CONTRACTOR), the Contractor shall submit, simultaneously with the cost per work activity/event of the construction schedule required by this

Section, a responsibility code for all activities/events of the project for which the Contractor's forces will perform the work.

The Contractor shall cost load work activities/events for all BID ITEMS including ASBESTOS ABATEMENT. The sum of each BID ITEM work shall equal the value of the bid item in the Contractors' bid.

1.7 PROJECT SCHEDULE REQUIREMENTS

A. Show on the project schedule the sequence of work activities/events required for complete performance of all items of work. The Contractor

Shall:

1. Show activities/events as:

01 32 16.15 - 5

a. Contractor's time required for submittal of shop drawings, templates, fabrication, delivery and similar pre-construction work.

b. Contracting Officer's and Architect-Engineer's review and approval of shop drawings, equipment schedules, samples, template, or similar items.

c. Interruption of VA Facilities utilities, delivery of Government furnished equipment, and rough-in drawings, project phasing and any other specification requirements.

d. Test, balance and adjust various systems and pieces of equipment, maintenance and operation manuals, instructions and preventive maintenance tasks.

e. VA inspection and acceptance activity/event with a minimum duration of five work days at the end of each phase and immediately preceding any VA move activity/event required by the contract phasing for that phase.

2. Show not only the activities/events for actual construction work for each trade category of the project, but also trade relationships to indicate the movement of trades from one area, floor, or building, to another area, floor, or building, for at least five trades who are performing major work under this contract.

3. Break up the work into activities/events of a duration no longer than 20 work days each or one reporting period, except as to non-construction activities/events (i.e., procurement of materials, delivery of equipment, concrete and asphalt curing) and any other activities/events for which the COTR may approve the showing of a longer duration. The duration for VA approval of any required submittal, shop drawing, or other submittals will not be less than

20 work days.

4. Describe work activities/events clearly, so the work is readily identifiable for assessment of completion. Activities/events labeled

"start," "continue," or "completion," are not specific and will not be allowed. Lead and lag time activities will not be acceptable.

5. The schedule shall be generally numbered in such a way to reflect either discipline, phase or location of the work.

B. The Contractor shall submit the following supporting data in addition to the project schedule:

01 32 16.15 - 6

1. The appropriate project calendar including working days and holidays.

2. The planned number of shifts per day.

3. The number of hours per shift.

Failure of the Contractor to include this data shall delay the review of the submittal until the Contracting Officer is in receipt of the missing data.

C. To the extent that the Project Schedule or any revised Project Schedule shows anything not jointly agreed upon, it shall not be deemed to have been approved by the COTR. Failure to include any element of work required for the performance of this contract shall not excuse the

Contractor from completing all work required within any applicable completion date of each phase regardless of the COTR’s approval of the

Project Schedule.

D. Compact Disk Requirements and CPM Activity/Event Record Specifications:

Submit to the VA an electronic file(s) containing one file of the data required to produce a schedule, reflecting all the activities/events of the complete project schedule being submitted.

1.8 PAYMENT TO THE CONTRACTOR:

A. Monthly, the contractor shall submit an application and certificate for payment using VA Form 10-6001a reflecting updated schedule activities and cost data in accordance with the provisions of the following

Article, PAYMENT AND PROGRESS REPORTING, as the basis upon which progress payments will be made pursuant to Article, FAR 52.232 – 5

(PAYMENT UNDER FIXED-PRICE CONSTRUCTION CONTRACTS) and VAAR 852.232 –

Article 71 Including NAS-CPM for (PAYMENTS UNDER FIXED PRICE

CONSTRUCTION). The Contractor shall be entitled to a monthly progress payment upon approval of estimates as determined from the currently approved updated project schedule. Monthly payment requests shall include: a listing of all agreed upon project schedule changes and associated data; and an electronic file (s) of the resulting monthly updated schedule.

B. Approval of the Contractor’s monthly Application for Payment shall be contingent, among other factors, on the submittal of a satisfactory monthly update of the project schedule.

1.9 PAYMENT AND PROGRESS REPORTING

A. Monthly schedule update meetings will be held on dates mutually agreed to by the COR and the Contractor. Contractor and their CPM consultant

01 32 16.15 - 7

(if applicable) shall attend all monthly schedule update meetings. The

Contractor shall accurately update the Project Schedule and all other data required and provide this information to the COTR three work days in advance of the schedule update meeting. Job progress will be reviewed to verify:

1. Actual start and/or finish dates for updated/completed activities/events.

2. Remaining duration for each activity/event started, or scheduled to start, but not completed.

3. Logic, time and cost data for change orders, and supplemental agreements that are to be incorporated into the Project Schedule.

4. Changes in activity/event sequence and/or duration which have been made, pursuant to the provisions of following Article, ADJUSTMENT OF

CONTRACT COMPLETION.

5. Completion percentage for all completed and partially completed activities/events.

6. Logic and duration revisions required by this section of the specifications.

7. Activity/event duration and percent complete shall be updated independently.

B. After completion of the joint review, the contractor shall generate an updated computer-produced calendar-dated schedule and supply the

Contracting Officer’s representative with reports in accordance with the Article, COMPUTER PRODUCED SCHEDULES, specified.

C. After completing the monthly schedule update, the contractor’s representative or scheduling consultant shall rerun all current period contract change(s) against the prior approved monthly project schedule.

The analysis shall only include original workday durations and schedule logic agreed upon by the contractor and COR for the contract change(s).

When there is a disagreement on logic and/or durations, the Contractor shall use the schedule logic and/or durations provided and approved by the COR. After each rerun update, the resulting electronic project schedule data file shall be appropriately identified and submitted to the VA in accordance to the requirements listed in articles 1.4 and

1.7. This electronic submission is separate from the regular monthly project schedule update requirements and shall be submitted to the COR within fourteen (14) calendar days of completing the regular schedule update. Before inserting the contract changes durations, care must be

01 32 16.15 - 8 taken to ensure that only the original durations will be used for the analysis, not the reported durations after progress. In addition, once the final network diagram is approved, the contractor must recreate all manual progress payment updates on this approved network diagram and associated reruns for contract changes in each of these update periods as outlined above for regular update periods. This will require detailed record keeping for each of the manual progress payment updates.

D. Following approval of the CPM schedule, the VA, the General Contractor, its approved CPM Consultant, and all subcontractors needed, as determined by the SRE, shall meet to discuss the monthly updated schedule. The main emphasis shall be to address work activities to avoid slippage of project schedule and to identify any necessary actions required to maintain project schedule during the reporting period. The Government representatives and the Contractor should conclude the meeting with a clear understanding of those work and administrative actions necessary to maintain project schedule status during the reporting period. This schedule coordination meeting will occur after each monthly project schedule update meeting utilizing the resulting schedule reports from that schedule update. If the project is behind schedule, discussions should include ways to prevent further slippage as well as ways to improve the project schedule status, when appropriate.

1.10 RESPONSIBILITY FOR COMPLETION

A. If it becomes apparent from the current revised monthly progress schedule that phasing or contract completion dates will not be met, the

Contractor shall execute some or all of the following remedial actions:

1. Increase construction manpower in such quantities and crafts as necessary to eliminate the backlog of work.

2. Increase the number of working hours per shift, shifts per working day, working days per week, the amount of construction equipment, or any combination of the foregoing to eliminate the backlog of work.

3. Reschedule the work in conformance with the specification requirements.

B. Prior to proceeding with any of the above actions, the Contractor shall notify and obtain approval from the COTR for the proposed schedule changes. If such actions are approved, the representative schedule revisions shall be incorporated by the Contractor into the Project

01 32 16.15 - 9

Schedule before the next update, at no additional cost to the

Government.

1.11 CHANGES TO THE SCHEDULE

A. Within 30 calendar days after VA acceptance and approval of any updated project schedule, the Contractor shall submit a revised electronic file

(s) and a list of any activity/event changes including predecessors and successors for any of the following reasons:

1. Delay in completion of any activity/event or group of activities/events, which may be involved with contract changes, strikes, unusual weather, and other delays will not relieve the

Contractor from the requirements specified unless the conditions are shown on the CPM as the direct cause for delaying the project beyond the acceptable limits.

2. Delays in submittals, or deliveries, or work stoppage are encountered which make rescheduling of the work necessary.

3. The schedule does not represent the actual prosecution and progress of the project.

4. When there is, or has been, a substantial revision to the activity/event costs regardless of the cause for these revisions.

B. CPM revisions made under this paragraph which affect the previously approved computer-produced schedules for Government furnished equipment, vacating of areas by the VA Facility, contract phase(s) and sub phase(s), utilities furnished by the Government to the Contractor, or any other previously contracted item, shall be furnished in writing to the Contracting Officer for approval.

C. Contracting Officer's approval for the revised project schedule and all relevant data is contingent upon compliance with all other paragraphs of this section and any other previous agreements by the Contracting

Officer or the VA representative.

D. The cost of revisions to the project schedule resulting from contract changes will be included in the proposal for changes in work as specified in FAR 52.243 – 4 (Changes, and will be based on the complexity of the revision or contract change, man hours expended in analyzing the change, and the total cost of the change.

E. The cost of revisions to the Project Schedule not resulting from contract changes is the responsibility of the Contractor.

01 32 16.15 - 10

1.12 ADJUSTMENT OF CONTRACT COMPLETION

A. The contract completion time will be adjusted only for causes specified in this contract. Request for an extension of the contract completion date by the Contractor shall be supported with a justification, CPM data and supporting evidence as the COTR may deem necessary for determination as to whether or not the Contractor is entitled to an extension of time under the provisions of the contract. Submission of proof based on revised activity/event logic, durations (in work days) and costs is obligatory to any approvals. The schedule must clearly display that the Contractor has used, in full, all the float time available for the work involved in this request. The Contracting

Officer's determination as to the total number of days of contract extension will be based upon the current computer-produced calendar-dated schedule for the time period in question and all other relevant information.

B. Actual delays in activities/events which, according to the computer- produced calendar-dated schedule, do not affect the extended and predicted contract completion dates shown by the critical path in the network, will not be the basis for a change to the contract completion date. The Contracting Officer will within a reasonable time after receipt of such justification and supporting evidence, review the facts and advise the Contractor in writing of the Contracting Officer's decision.

C. The Contractor shall submit each request for a change in the contract completion date to the Contracting Officer in accordance with the provisions specified under FAR 52.243 – 4 (Changes). The Contractor shall include, as a part of each change order proposal, a sketch showing all CPM logic revisions, duration (in work days) changes, and cost changes, for work in question and its relationship to other activities on the approved network diagram.

D. All delays due to non-work activities/events such as RFI’s, WEATHER, STRIKES, and similar non-work activities/events shall be analyzed on a month by month basis.

- - - E N D - - -

01 33 23 - 1

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This specification defines the general requirements and procedures for submittals. A submittal is information submitted for VA review to establish compliance with the contract documents.

B. Detailed submittal requirements are found in the technical sections of the contract specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective technical specifications at no additional cost to the government.

C. VA approval of a submittal does not relieve the Contractor of the responsibility for any error which may exist. The Contractor is responsible for fully complying with all contract requirements and the satisfactory construction of all work, including the need to check, confirm, and coordinate the work of all subcontractors for the project.

Non-compliant material incorporated in the work will be removed and replaced at the Contractor’s expense.

1.2 DEFINITIONS

A. Preconstruction Submittals: Submittals which are required prior to issuing contract notice to proceed or starting construction. For example, Certificates of insurance; Surety bonds; Site-specific safety plan; Construction progress schedule; Schedule of values; Submittal register; List of proposed subcontractors.

B. Shop Drawings: Drawings, diagrams, and schedules specifically prepared to illustrate some portion of the work. Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be integrated and coordinated.

C. Product Data: Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions, and brochures, which describe and illustrate size, physical appearance, and other characteristics of materials, systems, or equipment for some portion of the work. Samples of warranty language when the contract requires extended product warranties.

D. Samples: Physical examples of materials, equipment, or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged. Color

01 33 23 - 2 samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project. Field samples and mock-ups constructed to establish standards by which the ensuing work can be judged.

E. Design Data: Calculations, mix designs, analyses, or other data pertaining to a part of work.

F. Test Reports: Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work. Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

G. Certificates: Document required of Contractor, or of a manufacturer, supplier, installer, or subcontractor through Contractor. The purpose is to document procedures, acceptability of methods, or personnel qualifications for a portion of the work.

H. Manufacturer's Instructions: Pre-printed material describing installation of a product, system, or material, including special notices and MSDS concerning impedances, hazards, and safety precautions.

I. Manufacturer's Field Reports: Documentation of the testing and verification actions taken by manufacturer's representative at the job site on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must indicate whether the material, product, or system has passed or failed the test.

J. Operation and Maintenance Data: Manufacturer data that is required to operate, maintain, troubleshoot, and repair equipment, including manufacturer's help, parts list, and product line documentation. This data shall be incorporated in an operations and maintenance manual.

K. Closeout Submittals: Documentation necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a phase of construction on a multi-phase contract.

1.3 SUBMITTAL REGISTER

A. The submittal register will list items of equipment and materials for which submittals are required by the specifications. This list may not be all inclusive and additional submittals may be required by the specifications. The Contractor is not relieved from supplying submittals required by the contract documents but which have been omitted from the submittal register.

01 33 23 - 3

B. The submittal register will serve as a scheduling document for submittals and will be used to control submittal actions throughout the contract period.

C. The Contractor will provide the initial submittal register in electronic format. Thereafter, the Contractor shall track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the VA.

D. The Contractor shall update the submittal register as submittal actions occur and maintain the submittal register at the project site until final acceptance of all work by Contracting Officer.

E. The Contractor shall submit formal monthly updates to the submittal register in electronic format. Each monthly update shall document actual submission and approval dates for each submittal.

1.4 SUBMITTAL SCHEDULING

A. Submittals are to be scheduled, submitted, reviewed, and approved prior to the acquisition of the material or equipment.

B. Coordinate scheduling, sequencing, preparing, and processing of submittals with performance of work so that work will not be delayed by…