Attachment 1 - Specifications .pdf
PDF 159 KB Posted
- Attached to
- Solicitation - 12 GHz Vector Signal Generators
- Solicitation number
- NB676010-26-02013
About this file
This is a Requirements/Specification Document for a federal procurement issued by the National Institute of Standards and Technology (NIST), Communications Technology Laboratory, Quantum Communications Division.
NIST seeks to procure two (2) Vector Signal Generators with a frequency range of 100 MHz to 12 GHz to support microwave measurement science development for cryogenic quantum computing circuits and systems. Both units must be from the same manufacturer to ensure compatibility with remote programming, operation, and phase-locking capabilities. The equipment will be delivered to NIST-Boulder (325 Broadway, Boulder, CO 80305, Attn: Pete Hopkins, Mail Stop 676.01). Vendor requirements include possessing an Export Control Classification Number (ECCN) and an active Unique Entity Identification Number (UEI) registered on SAM.gov at the time of award. Electronic delivery requirements include software and electronic manuals. On-site inspection and acceptance will occur upon delivery, with detailed testing requirements specified in a separate Detailed Product Specifications document. The specification document references a separate detailed product specifications document that contains specific technical parameters and testing requirements but is not included in this submission. The document does not specify pricing terms, response dates, or award deadlines, as those details would be contained in the associated solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NB676010-26-02013 - RFQ.pdf | ||
| Attachment 3 - Provisions and Clauses.pdf | ||
| Attachment 2 - Detailed Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: 12 GHz Vector Signal Generator
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Quantum Communications Division Scalable Quantum Computing Group (676.01)
General Statement of Need:
The Scalable Quantum Computing Group is adding test capability as we develop microwave measurement science for cryogenic quantum computing circuits and systems. To perform measurements of these extremely sensitive electronic circuits, we require two (2) precision microwave vector signal generators. We require that both systems are from the same manufacturer for compatibility with remote programming and operation and with phase-locking.
Item Specifications and Quantities:
Item 1: Vector Signal Generator 100 MHz – 12 GHz
Quantity: 2 EACH
Specifications: See Detailed Product Specifications for 12 GHz Vector Signal Generator
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations
☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.]
☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery
☐ N/A
Shipping Address:
☒ NIST-Boulder ATTN: Pete Hopkins Mail Stop: 676.01 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address]
Shipping Criteria:
☐ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.]
☐ Direct Delivery to OU Building Required
[Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number]
☐ Building has Loading Dock Containerization Preference: [Enter Container Type]
Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
Click or tap to enter a date.
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media
☐ N/A [Enter Electronic Media Requirements by Item.]
☒ Software
☒ Electronic Manuals
☐ License Key
☐ Other:
[List Any Other Electronic Media Requirements]
☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site
☐ Rigging
☐ Uncrating / Unpackaging
☐ Removal of Packaging Material
☐ Equipment Set Up
☐ Start-Up Services
☐ Turnkey Installation
☐ Other:
[Enter Details]
NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations
☒ N/A
[List Site Specific Utility Considerations by Item]
☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V)
Maximum Current: [Enter max current draw] (A)
Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz)
NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P)
Environment: [Choose Environment]
Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance
☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)]
☒ On-Site
☐ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
☒ Other: See Detailed Product Specifications for testing requirements.
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees]
☐ On-Site
☐ Off-Site Location: [Enter Location(s)]
Is Trainee Travel Required: [Choose Answer]
Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other
[Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials]
☐ Training Materials to be Provided by Vendor:
[Describe Materials]
☐ Other
[Enter Other Training Requirements]
NOTE: SME shall be coordination POC.
Warranty
☐ N/A
Base Manufacturer Warranty is acceptable
Warranty Length: 1-Year
What is included?
☐ Labor ☐ Parts ☐ Travel
☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period
☐ 2 Option Periods
☐ 3 Option Periods
☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment
☐ Software Updates ☐ Manuals
☐ Other
[Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]
☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment
☐ Software Updates ☐ Manuals
☐ Other
[Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]
☐ 2 Option Periods
Government Furnished Material / Equipment
☒ N/A
List Any Government Furnished Material / Equipment Per Item]
☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item]
☐ Explain:
[Enter Justification / Requirement]
☐ Other:
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .