Attachment 1 - Specifications.pdf

PDF 4 MB Posted

Attached to
Amendment 0002: Earthquake Damage Repair at FAA's Anchorage Air Traffic Facility in Anchorage, Alaska
Solicitation number
697DCK-23-R-00369
Issued by

About this file

This request for offers (RFO) from the Federal Aviation Administration (FAA) solicits qualified contractors to submit offers for an earthquake damage repair project at its Air Route Traffic Control Center in Anchorage, Alaska. The project includes demolishing and replacing concrete aprons, repairing and replacing ceiling systems, demolishing and replacing ceilings, reinstalling acoustic panels and baffles, patching finishes, replacing HVAC equipment, adjusting ductwork and controls, replacing lighting fixtures, and commissioning new equipment. The estimated size of the project is between $500,000 and $1,000,000. Offerors must RSVP for an optional site visit by May 4 and the visit is scheduled for May 9. Questions are due by May 19 and offers are due by June 7. The work must be performed to minimize impacts to the 24/7 operations of the air traffic control facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Post-Earthquake Repair Project

Task Order 0007

100% Design Submittal Specifications

Anchorage ARTCC (ZAN) Anchorage, AK

February 2021

ANCHORAGE ARTCC (ZAN) JUNE 17, 2022

POST-EARTHQUAKE REPAIR PROJECT REV A

ANCHROAGE, ALASKA

TABLE OF CONTENTS 01 01 10 - 1

SECTION 00 01 10 – TABLE OF CONTENTS

DIVISION

SECTION TITLE

DIVISION 01 – GENERAL REQUIREMENTS

01 00 00 COVID-19 REQUIRMENTS FOR CONSTRUCTION

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 25 00 SUBSTITUTION PROCEDURES

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 35 29 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES

01 35 53 SECURITY PROCEDURES

01 45 00 QUALTIY CONTROL

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 61 00 COMMON PRODUCT REQUIREMENTS

01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS

01 73 00 EXECUTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT

01 74 23 FINAL CLEANING

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39 PROJECT RECORD DOCUMENTS

01 79 00 DEMONSTRATION AND TRAINING

DIVISION 02 – EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

DIVISION 03 – CONCRETE (NOT USED)

DIVISION 04 – MASONRY (NOT USED)

DIVISION 05 – METALS (NOT USED)

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES (NOT USED)

DIVISION 07 – THERMAL AND MOSITURE PROTECTION

07 92 00 JOINT SEALANTS

DIVISION 08 – OPENINGS (NOT USED)

DIVISION 09 – FINISHES

09 51 13 ACOUSTICAL PANEL CEILINGS

09 84 33 SOUND-ABSORBING WALL UNITS

09 91 23 INTERIOR PAINTING

ANCHROAGE, ALASKA

TABLE OF CONTENTS 01 01 10 - 2

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED)

DIVISION 21 – FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING (NOT USED)

DIVISION 23 – HEATING VENTING AND AIR CONDITIONING

23 05 00 COMMON WORK RESULTS FOR HVAC

23 05 23 GENERAL DUTY VALVES FOR HVAC PIPING

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVACE PIPING AND

EQUIPMENT

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 07 19 HVAC EQUIPMENT AND PIPING INSULATION

23 09 00 INSTRUMENTATION AND CONTROLS FOR HVAC

23 21 13 HYDRONIC PIPING

23 30 00 AIR DUCT ACCESSORIES

23 31 13 METAL DUCTS

23 36 00 AIR TERMINAL UNITS

23 37 13 DIFFUSERS, REGISTERS, AND GRILLES

DIVISION 26 – ELECTRICAL

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 48 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 09 23 LIGHTING CONTROL DEVICES

26 27 26 WIRING DEVICES

26 51 00 INTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 – EARTHWORK (NOT USED)

TABLE OF CONTENTS 01 01 10 - 3

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 13 13 CONCRETE APRON SLAB

END OF TABLE OF CONTENTS

COVID-19 REQUIREMENTS FOR CONSTRUCTION 01 00 00 - 1

SECTION 01 00 00 – COVID-19 REQUIREMENT FOR CONSTRUCTION

PART 1 - GENERAL

1.1 SUMMARY

A. This provides requirements that the Contractor must take to reduce the spread and/or exposure of COVID –19 on FAA contracts at Federal Aviation Administration (FAA) facilities.

B. This supplement for the COVID-19 pandemic does not supersede or contradict any memo or directive that the Contracting Officer has already provided. While the overall responses can vary by location and may change, the intent of this supplement is not to be contradictory. If the Contractor feels that it receives directions that contradicts this supplement or other memos sent by the Contracting Officer, immediately seek clarification. As a reminder, only the Contracting Officer is authorized to implement changes to the contract and/or approve anything that would result in a schedule or cost change.

1.2 COVID-19 SAFETY PLAN (CVSP). The CVSP must include, but is not limited to, the following.

A. COVID-19 Wellness Self-Check (See Appendix A), this is just a sample Wellness Self-check questionnaire. Refer to CDC and local guidance for latest symptoms self-check list.

1. Contractor employees, sub-contractors, and visitors must conduct and complete the wellness self-check form prior to reporting to the FAA facility and/or jobsite. The Contractor superintendent/COVID Safety Officer must review each form.

2. The person responsible for completing Wellness Self-Check has the authority to deny anyone entering the job site who displays any symptoms prior to entering the facility as well as authority to remove personnel showing symptoms after the beginning of the shift.

3. Complete the Wellness Self-Check immediately prior to accessing the site. Contractor shall indicate in their COVID-19 Safety Plan the location where Wellness Self-Check will be completed.

4. Contractor shall take same precaution for any deliveries entering FAA premises regardless of driver exiting truck or not.

5. CVSP shall include how the Contractor plans to handle delivery of product samples, batch tickets, and large project/shop drawings, and other items to the FAA.

B. COVID Exposure Reduction Plan

1. Face Covering Section. All Contractor employees, subcontractors, and visitors must wear a face covering when required by the FAA while on the jobsite and/or within a FAA facility. All face coverings, at a minimum, must adhere to the following.

a. Cover the nose and mouth

b. Fit snugly, but comfortably, against the side of the face

c. Be secured with ties or ear loops

d. Allow for breathing

e. Include multiple layers of fabric

COVID-19 REQUIREMENTS FOR CONSTRUCTION 01 00 00 - 2

2. Contractor shall identify in their CVSP, when use of social distancing and/or face covering is not practicable due to heat and/or confined space or other reasons and how they plan to mitigate those circumstances.

3. Hygiene Section. Contractor employees must practice good hygiene while within FAA facilities. These practices include, but are not limited to, the following.

a. Hand washing and hand sanitizing stations.

b. Disinfect frequently used items and surfaces as much as possible.

4. Physical Separation/Social Distancing Controls (6’ spacing between workers, where practicable)

5. Job exposures as defined by OSHA work type.

6. List of COVID Safety Personnel

7. COVID Informational posters/displays (Appendix B)

8. Contractor Communication Plan (if someone test positive or becomes ill at the work site)

9. Proper disposal of COVID PPE

10. Include state, county, and local guidelines specific to job location

11. Engineering controls

12. Use of shared tools

1.3 SITE ACCESS/EGRESS

A. The Contractor must meet with the FAA Contracting Officer Representative (COR) and local FAA management prior to the start of the project to establish the Contractors’ access and egress for the facility and/or job site.

B. If a Contractor, subcontractor, or visitor is not feeling well for any reason and COVID-19 symptoms exist, the individual must not come to the FAA facility and/or work site. The Contractor is expected to notify the FAA Contracting Officer (CO) and/or Contracting Officer’s Representative (COR) immediately of the situation and inform the FAA of any concerns regarding the work that was expected to be performed by that Contractor employee.

1.4 FAA NOTIFICATIONS

A. The Contractor is required to notify the FAA immediately when a suspected or confirmed case of COVID-19 involves an employee, subcontractor, or visitor who has visited the FAA facility and/or job site in the last 14 days, been in contact with someone that may have visited a FAA facility, and/or had contact with a FAA employee and/or another Contractor. Reporting must be submitted immediately and include the information outlined below to allow the FAA to make a timely and appropriate response. Report any cases to 9-AFN-ACQ-EM@faa.gov, with a courtesy copy to the CO and COR. The report must include, for each affected employee, the date of self-quarantine and whether the case is suspected or confirmed. Also indicate specifically where the individual visited, with whom they met, and the date of contact. To ensure privacy information is protected, please do not include specific information about the employee through email. Once received, a FAA official will contact you directly to obtain additional information regarding the case(s) to coordinate a proper response.

B. Medical documentation by an authorized medical professional that the Contractor/subcontractor no longer poses a transmission risk and is safe to re-enter the workplace.

mailto:EM@faa.gov

COVID-19 REQUIREMENTS FOR CONSTRUCTION 01 00 00 - 3

1.5 SUBMITTALS

A. COVID-19 Safety Plan

B. Cleaning supply SDSs

C. Hand Sanitizer SDSs

PART 2 - PRODUCTS

2.1 PRODUCTS

A. Hand sanitizer must be FDA approved.

B. Use EPA List N approved wipes.

PART 3 - EXECUTION

A. Shared use of trailer between FAA and Contractor personnel is not allowed.

B. All meetings shall have accommodations to attend virtually where practicable.

C. Contractor shall make use of floor plan or other methods to track all the personnel on job site including time entered and exited.

D. FAA is using data from the Center for Disease Control and Prevention (CDC) COVID-19 Community Level tool https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html to stay current with local COVID situation. If the situation takes a turn for worst, Contracting Officer may issue Stop Work Notice. FAA highly encourages Contractors to monitor the local COVID-19 via the website or other official data that is available.

E. Identify all the personnel coming outside of the State/local commuting area at least one week prior coming onto FAA facility.

F. Any breach to COVID-19 safety plan or other requirement listed in this document will result in removal of the person and/or issuing Stop Work Notice by Contracting Officer.

Appendix A Sample of Daily Questionnaire

Symptoms Yes No Fever Shortness of Breath Difficulty Breathing Chest Pain Chills Body Aches https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html

COVID-19 REQUIREMENTS FOR CONSTRUCTION 01 00 00 - 4

Sore Throat Headache Diarrhea Nausea/Vomiting Runny Nose Loss of Taste/Smell

Appendix B Example of COVID-19 Safety Poster

*** END OF SECTION *

ANCHROAGE, ALASKA

SUMMARY OF WORK 01 11 00 - 1

SECTION 01 11 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE OF WORK.

A. These Contract Documents cover the requirements of the Federal Aviation Administration (FAA), Alaskan Region, hereinafter referred to as the Government, for the work associated with the Air Route Traffic Control Center (ARTCC) Post Earthquake Repair Project, located at 700 North Boniface Parkway, Anchorage, Alaska. The FAA facility designation is ZAN.

B. Indoor work will be in the TechOps Wing, including the 3-Bay Expansion and Utility Bay, and the Ops Support Wing. Exterior work involves repairs to the concrete apron located outside of the 3-Bay Expansion, on the South Loop Road.

C. The work is at a secured, limited access facility that will be occupied during the work and will remain operational 24 hours a day, 7 days a week. The Contractor must not interfere with or disrupt air traffic operations. The work shall not discharge static electricity, damage, or interfere with other equipment at the facility, nor compromise security.

D. All workers on site must be U.S. citizens with proper government-issued photographic identification, such as a valid driver’s license.

1.2 SUMMARY OF WORK.

A. The following documents describe the work.

1. Division 1 General Requirement Specifications, which apply to all of the work.

2. Post Earthquake Repair Project Drawings and Divisions 2 – 32 Specifications, which apply to the demolition, repairs, and upgrades portions of the work.

B. The work includes the following.

1. Demolish and replace concrete apron located outside of the 3-Bay Expansion’s west wall, including appropriate slopes for drainage and installation of expansion joints for transitioning to existing concrete.

2. Repair ceiling systems in the 1st and 2nd floors of the Tech Ops Wing.

3. Demolish and replace ceilings in Room 184 and the 2nd floor of the TechOps Wing, including components required for seismic compliant suspended acoustical panel ceiling systems.

4. Reinstall and adjust acoustic wall panels, ceiling mounted acoustic baffles, sprinkler head escutcheon plates, and other miscellaneous items.

5. Patch and repair finishes to match existing.

6. Demolish and replace VAV-22, VAV-23, and VAV-28 located on the 2nd floor of the

TechOps Wing, including replacement of dampers, duct, piping, and damaged HVAC components.

7. Adjust duct, diffusers, bracings, penetrations, controls and power wiring for proper operations of HVAC equipment.

ANCHROAGE, ALASKA

SUMMARY OF WORK 01 11 00 - 2

8. Demolish and replace lighting fixtures in the 2nd floor of the TechOps Wing with LED fixtures and upgraded controls.

9. Test and commission new equipment.

C. Building contains hazardous materials (hazmat), such as asbestos containing material or lead based paint. No hazmat is expected to be within the work area. No hazmat products are to be brought, used, or installed on site.

D. Controls Subcontractor. Schneider Electric is to be subcontracted for building automation controls on this project.

E. Fire Alarm System Subcontractor. The Contractor shall subcontract with Honeywell for all fire alarm system and component work, including temporary relocation or removal of existing components required to complete the work.

F. The summaries above do not cover all aspects of the work. See drawings and specifications for more information.

1.3 DEFINITIONS

A. General. Basic Contract definitions are included in the Contract.

B. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

C. "Regulations": Laws, ordinances, statutes, and lawful orders issued by FAA as The Authority Having Jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

D. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

E. "Install": Unload, temporarily store, unpack, assemble, erect, place, anchor, apply, work to dimension, finish, cure, protect, clean, and similar operations at Project site.

F. "Provide": Furnish and install, complete and ready for the intended use.

G. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.4 INTENT OF CONTRACT DOCUMENTS

A. The Contract Documents (contract, specifications, and drawings) indicate the work to be performed for the project. All material, labor, equipment, tools, layout, and supervision must be furnished by the Contractor to complete the work and provide complete operating systems of good commercial grade and workmanship to industry standard. Contractor workmanship shall

ANCHROAGE, ALASKA

SUMMARY OF WORK 01 11 00 - 3

conform to all of the trades involved, and shall include all items of fabrication, construction, or installation regularly furnished or required for completion and successful operation as intended.

All Contractor work shall be performed by individuals skilled and experienced in their respective lines of work. The Contractor is responsible for the supervision, health and safety, inspection, and quality control of its own work, workers, work areas, and lower tiered subcontractors. Work shall be performed to ICC, NFPA, and FAA codes and standards, and manufacturers’ recommendations. All work performed and all materials and equipment used will be subject to approval by the Contracting Officer (CO). This includes, but is not be limited to, scheduling, submittals, construction, inspection, testing, and reporting.

B. Titles. Titles to divisions and sections of the specifications and notes and titles on drawings referring to subcontractors, division of work by trade, or type of work are used for convenience and do not imply any separate contractual arrangements of work assignments. Such separations into titles, divisions, sections, or notes should not be construed to establish limits between the Contractor and its subcontractors or vendors.

C. Standards. Reference to known standards within the Contract Documents means the latest edition in effect on the date of solicitation, unless specified otherwise.

D. Related Work/Requirements. Where the Contract Documents refer to related work in other sections or related requirements, the Contractor should not consider the list of related items to be all-inclusive. These lists are provided as a convenience for cross-reference and coordination.

E. Order of Preference. Generally, written words take precedence over drawings. Large scale drawings should govern small scale drawings. The Contractor should not use dimensions scaled from the drawings. The Contractor must verify all dimensions shown on the drawings by actual measurements in the field. Any discrepancy between the drawings and specifications and the existing conditions must be referred to the CO for resolution before any work affected is performed. The Contractor must compare all drawings and verify the figures before laying out the work and will be responsible for any errors that might have been avoided.

1.5 CONTRACT DOCUMENTS

A. Copies of Specifications and Drawings. Two, full size, hard copy sets and one electronic (pdf) copy of the Contract Specifications and Drawings will be furnished to the Contractor without charge, with the exception of applicable publications incorporated into the technical specifications by reference.

B. Specification and Drawing Review. The Contractor is responsible for complete knowledge and understanding of the Contract Documents throughout the life of the Contract. The Contractor must check the Contract Documents immediately upon their receipt and promptly notify the CO of any discrepancies.

C. Contracting Officer (CO) and Contracting Officer’s Representative (COR). The CO is the person designated to act on behalf of the Government in the performance of the Contract. The COR is the CO’s authorized representative. The COR is the point of contact for all work on site between the Contractor and the Government. The Contractor will coordinate all work through the COR, or will keep the COR informed when dealing directly with the CO, and the

ANCHROAGE, ALASKA

SUMMARY OF WORK 01 11 00 - 4

Government will coordinate through the COR to the Contractor, except in case of urgency or emergency.

1.6 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not provided or bound with the Contract Documents.

1. Where copies of standards are needed to perform a required construction activity, obtain copies directly from publication source.

1.7 MEASUREMENT AND PAYMENT

A. The Contract price constitutes full compensation for the Contractor for furnishing all plant, labor, materials, appurtenances, and incidentals, and performing all operations necessary to construct and complete the items in accordance with the Contract Documents. Payment for each item will be considered as full compensation, notwithstanding that not all features may be mentioned herein. No separate payment will be made for the work, services, or operations required by the Contractor, as specified in Division 1 General Requirements, to complete the project in accordance with the Contract Documents; all costs thereof will be considered as incidental to the work.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

*** END OF SECTION ***

ANCHROAGE, ALASKA

WORK RESTRICTIONS 01 14 00 - 1

SECTION 01 14 00 – WORK RESTRICTIONS

PART 1 - GENERAL

1.1 CONDUCT OF WORK

A. The work is at a critical government facility, which must remain operational 24 hours a day, 7 days a week. The Contractor must not interfere with or disrupt air traffic operations. The work shall not discharge static electricity, damage, or interfere with other equipment at the facility, and security shall not be compromised.

B. Security Requirements. This project is on a restricted entry site and no compromise of the security system in any nature or of any duration may be made without prior approval from the Contracting Officer (CO). Facility security personnel and the CO have the authority to remove anyone from the site, including anyone who is determined to be a security risk. See Specification 01 35 53 Security Procedures, including information about facility access badges.

C. Photography Permit. Photography is allowed on site only by permit from the facility. See Specification 01 35 53 Security Procedures.

D. General Area Requirements. The Contractor must confine operations, activities, storage of materials, and parking within the project boundaries and the approved staging and loading/unloading areas. No parking or material storage will be allowed within 20 feet of any exterior fence (see Specification 01 35 53 Security Procedures). The Contractor’s staging area is limited to the area designated by the COR, which will be reviewed and agreed on prior to site mobilization. Any additional space the Contractor deems necessary must be submitted to the COR for review and approval, or be obtained off site, at no additional cost to the Government.

E. Work Hours. Normal work hours are 8:00 a.m. to 5:00 p.m., Monday through Friday not including federal holidays. No work will be performed outside these hours without prior coordination and approval from the COR. If the Contractor intends to work other than normal work hours they must request approval from the COR at least 2 work days in advance, including for night, weekend, or holiday work. The Contractor shall notify the FAA if personnel will not report to the job site on a normal workday so that the FAA can plan accordingly.

F. FAA Maintenance Moratoriums. Unless allowed otherwise by the FAA, no work shall be scheduled or take place during scheduled or unscheduled moratoriums, including military exercises, such as Red Flag, and the week of and weekends preceding and following the Thanksgiving, Christmas, and New Year’s holidays. Only emergency work to restore critical services to the facility will be considered, and a moratorium waiver must be submitted and approved in advance. The moratorium period will not be counted against the Contract construction duration of the project. Verify exact dates with the COR and include moratorium dates in the Construction Schedule (see Specification 01 32 00 Construction Progress Documentation).

G. Deliveries. The Contractor must provide an individual, submitted to and approved by the COR, who will be responsible for arranging site access for periodic or unscheduled Contractor

ANCHROAGE, ALASKA

WORK RESTRICTIONS 01 14 00 - 2

deliveries. This individual must coordinate with the COR and facility security personnel, prior to the delivery, for site access of the delivery vehicle. Facility security personnel must be provided, at a minimum, with the name of the vendor, the driver’s name, and the purpose for site access. Delivery vehicles arriving at the gate without prior notice and acceptance will be denied access. Delivery vehicles shall only contain items being delivered to the FAA. The vehicle will not be allowed on site if it contains deliveries for recipients other than the FAA.

The Contractor assumes complete liability for the actions of delivery personnel and vehicles while on site.

H. Contractor Superintendent. The Contractor’s superintendent or foreman, or another responsible individual temporarily assigned to act as the superintendent or foreman, must be present on site at all times whenever work is being done, even if the only work being performed is by a subcontractor or is a delivery.

I. Contractor's Use of Premises. The Contractor must allow the Government complete access to all portions of the work site at any time. The Government has the right to search anything or anyone on the facility, including vehicles, containers, and personnel.

J. Idling Vehicles. Parked vehicle engines must not be left idling near air intakes, nor for longer than ten minutes for gasoline engines or two minutes for diesel engines elsewhere on site. Idling vehicles must not be left unattended.

K. Safety Barricades. The Contractor must provide safety cones, barricades, signs, and flag off work areas, including for overhead work and around openings. See Specification 01 35 29 Health, Safety, and Emergency Response Procedures.

L. Special Tool Restrictions. Powder-driven or powder-actuated fasteners, tools, and devices are not allowed on facility property. Not including vehicle engines, fuel (including natural gas, propane, gasoline, or diesel) powered tools and devices are only allowed with one week prior approval and scheduling with the COR. This restriction includes fuel-powered pumps, generators, welders, and air compressors, including those mounted on vehicles but with their own engines.

M. Outages. The Contractor must request in writing and coordinate any mechanical, water, sewer, electrical, or other utility outage at least two weeks in advance with the COR. Number of outages and their durations must be kept to a minimum. Outages could require the Contractor to work during other than normal hours at no additional cost to the Government.

N. De-Energizing Systems. Only the FAA will turn off, lock out, and tag out systems, not the Contractor, including to facility equipment, valves, and breakers. The FAA will lock out and tag out systems, and the Contractor may add their lock out and tag out on top of the FAA’s. The Contractor shall positively verify de-energization before working on individual systems.

O. Testing. The Contractor must notify the COR in writing at least three working days in advance of any testing.

ANCHROAGE, ALASKA

WORK RESTRICTIONS 01 14 00 - 3

1.2 SUPPLEMENTARY REQUIREMENTS

A. The following items are strictly prohibited on the facility.

1. Any unsafe act.

2. Explosives.

3. Guns or weapons.

4. Pets or animals.

5. Blocking facility driveways or entrances.

6. Allowing fumes or odors from the work to enter the facility (see 1.1.J. above).

7. Working on energized electrical circuits (see 1.1.M and 1.1.N above).

8. Fires or burning.

9. Use of forklifts, manlifts, loaders, or other self-propelled equipment unless equipped with a fire extinguisher.

10. Dripping or leaking vehicles or equipment.

11. Refueling of vehicles or equipment while hot.

12. Bringing any material of health, safety, or environmental concern on site without Safety

Data Sheets (SDSs) being readily available at the work site, and without spill containment materials in place and ready to catch spills, including while fueling or servicing vehicles or equipment.

13. Open flame, torching, or other hot work without a fire watch, fire extinguisher, and daily hot-work permit from the COR.

14. Performing any work on site without properly providing warning signs, safety cones, barricades, and flagging off exclusion areas (see 1.1.K above).

15. Performing any work on site without proper personal protective clothing and equipment, such as hard hats, safety glasses, hearing protection, high visibility vests, gloves, protective boots, etc.

16. Performing any work on electrical or mechanical systems before positively verifying that it is locked out and de-energized (see 1.1.N above).

17. Use of any tools or equipment without proper inspection before use, including at least daily inspections of equipment.

18. Use of any tools, equipment, or vehicles unless trained, experienced, certified (if applicable), and authorized by the Contractor, including to operate manlifts or forklifts.

19. Use of any electrical equipment or extension cords in wet conditions or if not in good condition, properly maintained, grounded, and with ground fault circuit interruption (GFCI) protection.

20. Working in an area without at least one 2-A:20-B:C minimum portable fire extinguisher in plain sight and within 50 feet of the work.

21. Working in an area where there is a risk of fire blocking the exit unless a second means of escape is provided in case of emergency.

22. Smoking except in designated areas that have safe receptacles for smoking materials, and that are located more than 50 feet from building entrances and air intakes.

23. Use of cell phones, tablets, or other similar devices while operating vehicles, forklifts, man lifts, loaders, or other self-propelled equipment.

24. Use of cell phones in prohibited (posted) areas of the facility, such as the Control Room.

B. Hot Work Permit. A hot work permit from the COR is required before any open flame, torching, or other hot work is performed. A separate permit is needed each day for each area of hot work. The Contractor shall provide fire extinguishers and fire watch for all hot work, and any necessary fire protection methods, such as fire resistant insulation blankets to contain the

ANCHROAGE, ALASKA

WORK RESTRICTIONS 01 14 00 - 4

hot work. The COR will coordinate with the facility to temporarily disable fire and smoke detectors where needed, and the Contractor shall ensure that fire and smoke detectors have been disabled before starting any hot work. Hot work should be performed in the morning so that fire watch monitoring after the hot work can be concluded before the end of normal work hours. Hot work permits shall be attached to the daily report for that day (see Specification 01 32 00- 2.2.A.13 Construction Progress Documentation).

C. Work in Occupied Areas. The work is to be implemented by the Contractor in a manner and with a schedule that minimizes impact to operational and occupied portions of the facility. It is anticipated that this work will be phased and conducted during off hours and/or on weekends (see Paragraph 1.1.E. above). The proposed methodology and schedule for this work is to be included on the Construction Schedule (see Specification 01 32 00 Construction Progress Documentation).

D. Prevention of Transference of Construction Noise, Dust, and Odors. The Contractor is to establish, to the satisfaction of the COR, and maintain provisions to prevent the transference of construction noise, dust, and odors from construction areas and activities to other areas of the facility. Such provisions could include sealing of existing and new openings in walls, floors and ceilings within the work areas, use of negative pressure air systems, etc. Three days before the Pre-Construction Meeting, the Contractor must submit to the COR for review and approval proposed methodologies for preventing transference of construction noise, dust, and odors.

E. Low-Odor/Low-VOC Materials. Use low-odor / low-volatile organic compound (VOC) materials, including adhesives, sealants, and cleaners. During the submittal process, notify the COR when low-odor / low-VOC alternatives are not available for any required products or uses.

Odors that enter the facility and interfere with facility operations are not allowed.

F. Salvage Items. Any existing component or device that is to be removed and not incorporated back into the work is to be protected and turned over to the COR.

1.3 SUBMITTALS

A. Prevention of Transference of Construction Noise, Dust, and Odors Plan.

B. Safety Data Sheets (SDSs).

C. Hot work permits, requests as needed.

PART 2 - PRODUCTS (Not Used)

ANCHROAGE, ALASKA

SUBSTITUTION PROCEDURES 01 25 00 - 1

SECTION 01 25 00 – SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes descriptions of the Contractor's options in the selection of products, and procedures for requesting substitution of products.

1.2 OPTIONS

A. Products Specified by Reference Standards or by Description Only. Any product meeting those standards, as approved by the COR.

B. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions.

Provide submittal for substitute material as outlined in this section. Also see Specification 01 33 00 Submittal Procedures.

PART 2 - PRODUCTS

2.1 PRODUCTS

A. In general, manufacturer’s names, brand names, or model numbers may be specified for items as a basis of design, a schedule, detail, or in a list of approved products. This is not meant to be proprietary and the words "or equal" are implied if not expressly stated after every manufacturer's name, brand name, or model number stated in the specifications. Where manufacturer's names, brand names, or model numbers are specified for items, they set a standard for quality, function, and performance. Note that certain manufacturer warranties may also require other related products be produced by the same manufacturer, or by a manufacturer approved by the manufacturer. Products of other manufacturers are not automatically precluded provided they are the following.

1. Equal or superior in construction, efficiency, utility, or function to the product(s) specified.

2. Of a similar profile, shape, size, style, and configuration and can be incorporated into the work in the space allocated in a reasonable manner reflective of good design and engineering practices.

3. Accepted by the Architect/Engineer of Record and Contracting Officer (CO), in writing, as meeting the specified criteria and fit (both physical and functional) within the project.

4. Submitted for approval as a substitution.

B. The Contractor's submittal for approval of material or products of higher quality than that specified will not obligate the Government to pay any additional costs that may be associated with furnishing and installing the substitute material. The Contractor must, in such transmittals, state that there will be no additional costs borne by the Government as a result of the substitution.

ANCHROAGE, ALASKA

SUBSTITUTION PROCEDURES 01 25 00 - 2

C. The Contractor, when submitting materials for approval, which are other than that cited in the Contract Documents, must submit the necessary scale drawings, product data, and performance and test data of both the materials specified and the proposed substitution materials, so that a proper evaluation of the substitution request may be made. The request shall illustrate how the proposed substitution fits within the allocated space in a reasonable manner reflective of good design and engineering practices.

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1

SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes administrative provisions for coordinating construction operations on the project, including, but not limited to, the following.

1. General project coordination procedures.

2. Schedule of Values.

3. Coordination drawings.

4. Administrative and supervisory personnel.

5. Correspondence.

6. Project meetings.

1.2 COORDINATION

A. Coordination. Coordinate construction operations to ensure efficient and orderly installation of each part of the work.

1. Coordinate construction activities to ensure that operations are carried out with consideration given to conserving energy, water, and materials.

2. Coordinate construction operations that depend on each other for proper installation, connection, and operation.

3. Schedule construction operations in the sequence required to obtain the best results where installation of one part of the work depends on installation of other components, before or after its own installation.

4. Coordinate installation of different components to ensure maximum accessibility for required maintenance, service, and repair.

5. Make adequate provisions to accommodate items scheduled for later installation.

B. Memoranda. If necessary, prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. Prepare similar memoranda for COR and separate contractors if coordination of their work is required.

C. Administrative Procedures. Coordinate scheduling and timing of required administrative procedures with construction activities and other activities in the work area to avoid conflicts and ensure the orderly progress of the work. Such administrative activities include, but are not limited to, the following.

1. Preparation of the Schedule of Values.

2. Preparation of Contractor’s Construction Schedule.

3. Delivery and processing of submittals.

4. Pre-installation conferences.

5. Installation and removal of temporary facilities and controls.

6. Progress meetings.

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2

7. Project closeout activities.

1.3 SUBMITTALS

A. Schedule of Values (SOV). The Contractor must submit a draft Schedule of Values (SOV) within two weeks after the Contract award and, upon receipt of comments, shall make revisions and submit a final SOV prior to the Pre-Construction Meeting. The purpose of the SOV is to subdivide the Contract amount into line items that can be readily estimated and tracked for monthly progress payments. The SOV must be linked to the Contractor’s Construction Schedule and be separated into hierarchical groupings using the divisions and sections listed in the specifications.

1. The SOV must have a summary showing the whole project totals, each separate division’s total, and the subtotal of each section within each division. The SOV summary must have columns listing the estimated work completed to date, the amount of payments received, the current payment requested, and the amount remaining on the Contract for each line item.

2. Sections with large dollar amounts must be further subdivided into activities within the section, as determined by the Contractor. Line items should be of roughly similar value to the extent possible.

3. The SOV must be updated and re-submitted with each pay request and when changes are proposed and have been made to the Contract price. Progress SOVs must be agreed to by the COR in advance of pay requests.

B. Coordination Drawings. Prepare and submit for review and approval by the COR coordination drawings to illustrate maximum utilization of space for efficient installation of different components, or where coordination is required for installation of products and materials fabricated by separate entities.

1. Indicate the relationships of components shown on separate shop drawings.

2. Indicate the required installation sequences.

3. Refer to other specification sections for specific coordination and/or shop drawing requirements.

C. Serial Letter Log, with monthly updates.

D. Request for Information (RFI) Log, with monthly updates.

E. Key Project Personnel. With the start of construction operations, submit and post lists of key project personnel, including the superintendent or foreman, Site Safety and Health Officer (SSHO), Quality Control (QC) Officer, 24-hour emergency contact, alternates, subcontractor foremen, and others. Identify the positions, individuals, company names, and telephone numbers. Post copies of list in the work area, temporary field office, and project meeting rooms.

F. Utility Service Interruptions. The project is located at an FAA facility with 24 hours a day, 7 days a week operation where any unplanned, unapproved interruption of electrical, natural gas, water, or other services is prohibited. For minor interruptions in these services, provide a utility service interruption plan, subject to FAA approval, no later than three weeks before the first

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3

planned interruption, followed by confirmed and approved scheduled shut-down notices at least two weeks prior to each interruption. Also see Specification 01 14 00-1.1.M.

1.4 ADMINISTRATIVE AND SUPERVISORY PERSONNEL

A. General. In addition to the superintendent or foreman, provide other supervisory and administrative personnel as required for the proper performance of the work.

1.5 ON-SITE PERSONNEL

A. General. Whenever work is performed on site, the Contractor must have a company-designated superintendent or foreman, SSHO, QC Officer, at least one worker with current CPR and First Aid certifications, and at least one Contractor telephone for emergency use. For this job, the SSHO and QC Officer positions could be held by one or more qualified workers, as designated by the Contractor’s management. Each position should have a designated alternate in case the primary person is not available.

B. Qualifications. The superintendent or foreman, SSHO, and QC Officer must have at least three years of experience in the type of work being performed and each must be designated by the Contractor’s management as being a qualified, competent person in their assignment. The SSHO must also meet the qualifications required in Specification 01 35 29 Health, Safety, and Emergency Response Procedures.

C. Safety Plan. All workers, including subcontractors, except for brief occasional visitors, such as delivery drivers who shall be escorted by the Contractor, must read, understand, and sign-off on the Contractor’s Safety Plan before working on site. See Specification 01 35 29 Health, Safety, and Emergency Response Procedures.

1.6 CORRESPONDENCE

A. Serial Letters. All formal correspondence must be addressed and delivered electronically to the Contacting Officer (CO) and the COR in the format of a serial letter. The serial letters must be numbered sequentially commencing with number one (1), with no numbers missing or duplicated. All electronic files and documents must be legible. Enclosures attached or transmitted with the correspondence must also be furnished electronically. Each serial letter must include the Contract number, project name, and must have only one subject. The Contractor must create and maintain a serial letter log that shows the serial letter number, date, topic, and disposition. The Contractor must submit monthly serial letter log updates.

B. Requests for Information (RFIs). For questions about the Specifications, Drawings, or other aspects of the project, the Contractor shall submit questions electronically to the COR on a suitable RFI form of its choosing. The RFIs must be numbered sequentially commencing with number one (1), with no numbers missing or duplicated. All electronic files and documents must be legible. Enclosures attached or transmitted with the RFI must also be furnished electronically. Each RFI must include the Contract number, project name, and must have only

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4

one subject. The Contractor must create and maintain an RFI log that shows the RFI number, date, topic, and disposition. The Contractor must submit monthly RFI log updates.

1.7 PROJECT MEETINGS

A. General. Schedule and conduct meetings and conferences at the project site. Provide accommodations to attend remotely for FAA personnel working off site.

1. Attendees. Inform the COR, participants, individuals whose presence is required, and others involved about the date and time of each meeting.

2. Agenda. Prepare the meeting agenda and distribute it to all invited attendees.

3. Meeting Notes. Record attendees, noteworthy events, significant discussions, agreements achieved, and other items as appropriate. Distribute the meeting notes to everyone concerned, including COR even if he/she did not attend the meeting, within three days after the meeting.

B. Pre-Construction Meeting. Attend a pre-construction meeting before starting construction, at a time convenient to the Contracting Officer (CO) and the Contractor but no later than ten days prior to the start of construction. The conference will be held on site. The CO will conduct the meeting to review the project and other items listed below.

1. Attendees. FAA representatives, the Contractor, its superintendent or foreman, SSHO, and QC Officer shall attend the conference. The Contractor will submit their list of attendees to the COR five days before the meeting in accordance with Specification 01 35 53 Security Procedures. All participants at the conference shall be familiar with the project and be authorized to conclude matters relating to the work.

2. Agenda. The CO will distribute the agenda and discuss items of significance that could affect the work, including, but not limited to, the following.

a. Schedule

b. Changes

c. Correspondence

d. Payments

e. Submittals

f. Inspections

g. Coordination of trades

h. Labor

i. Safety

j. Notice to proceed

k. Other items

C. Pre-Installation Meetings. Conduct pre-installation meetings at the project site before each construction activity that requires coordination with other construction.

1. Attendees. The COR, the Contractor, and others involved in, or affected by, the installation and its coordination, or integration with, other materials and installations that have preceded, or will follow, shall attend the meeting.

2. Agenda. Review the progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following.

a. Contract Documents.

b. Related change orders.

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 5

c. Options.

d. Purchases.

e. Deliveries.

f. Submittals.

g. Review of mockups.

h. Compatibility.

i. Schedules.

j. Weather limitations.

k. Manufacturer's written recommendations.

l. Warranty requirements.

m. Space and access limitations.

n. Acceptability of substrates.

o. Temporary facilities and controls.

p. Regulations of authorities having jurisdiction.

q. Testing and inspecting requirements.

r. Required performance results.

s. Protection of construction and personnel.

3. Meeting Notes. Record significant meeting events, discussions, agreements, and disagreements.

4. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate actions necessary to resolve impediments to the performance of the work and reconvene the conference at earliest feasible date.

D. Weekly Progress and Coordination Meetings. Schedule, conduct, and document weekly progress and coordination meetings on site with the FAA during construction. The Contractor’s superintendent or foreman typically lead the meetings. The weekly progress and coordination meetings are in addition to specific meetings held for other purposes, such as pre-installation meetings.

1. Attendees. The COR, representatives of the FAA, and the Contractor shall attend the weekly progress and coordination meetings. The Contractor may also invite subcontractors, suppliers, and other entities who are involved in the planning, coordination, or performance of the work. All participants at the conference shall be familiar with the project and authorized to conclude matters relating to the work.

2. Agenda. Review, correct, and approve notes from the previous progress meeting. Review pending actions and other items of significance. Include topics for discussion as appropriate to plan and coordinate the work.

a. Contractor's Construction and Three-Week Look-Ahead Schedules. Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule.

Determine how construction behind schedule will be expedited and secure commitments from parties involved to do so. Discuss if schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract time.

b. Review present and future needs of each entity present, including the following.

1) Quality and work standards.

2) Change orders.

3) Interface requirements.

4) Sequence of operations.

ANCHROAGE, ALASKA

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 6

5) Status of submittals.

6) Off-site fabrication.

7) Deliveries.

8) Access.

9) Site utilization.

10) Temporary facilities and controls.

11) Work hours.

12) Activity hazards analyses.

13) Installation.

14) Inspection and testing.

15) Operation, maintenance, and cleaning.

3. Reporting. Distribute meeting notes within two days after the meeting to the COR, each party present, and other interested parties as determined by the Contractor. Include a brief summary, in narrative form, of progress since the previous meeting and report, a three-week look-ahead schedule, a brief summary of items discussed, and a list of pending action items.

a. Schedule Update. Revise the Contractor's Construction Schedule after each progress meeting when revisions to the schedule have been made or recognized.

Issue the revised schedule concurrently with the report from the meeting.

E. Safety Meetings. Conduct initial, daily, and weekly safety meetings in accordance with Specification 01 35 29 Health, Safety, and Emergency Response Procedures.

PART 2 - PRODUCTS (Not Used)

ANCHROAGE, ALASKA

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1

SECTION 01 32 00 – CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes administrative and procedural requirements for documenting the progress of construction during performance of the Contract, including the following.

1. Contractor's Construction Schedule

2. Daily construction reports

3. Differing field conditions reports

4. Special or unusual event reports

B. See Specification 01 33 00 Submittal Procedures for scheduling and tracking submittals using the Submittal Register.

1.2 DEFINITIONS

A.…