Attachment 1 Specialized Laboratory Testing SOW (8 Feb 24).pdf

PDF 294 KB Posted

Attached to
Specialized Lab Testing Federal contract opportunity
Solicitation number
SP0600-24-R-0500
Issued by
Defense Logistics Agency Energy

About this file

This statement of work outlines requirements for specialized laboratory testing services under a blanket purchase agreement. The Defense Logistics Agency Energy will issue task orders for aviation fuel testing at contractor laboratories located within four hours of specified cities. Testing must be completed within six hours of sample receipt and include analyses listed in the attached testing table with defined minimum and maximum limits. Contractors must hold ISO 9001 or ISO/IEC 17025 certification and provide annual equipment status updates. Test reports are due within two hours and must include specified data elements. The contractor shall retain samples for 15 days and provide shipping containers as needed.

View the file

Other files for this federal contract opportunity

Other files attached to Specialized Lab Testing, newest first.
File Type Posted
Amd 5.pdf PDF
Atth 3 Spec Lab Price Sheet r2.xlsx XLSX spreadsheet
Amd 4.pdf PDF
Atth 3 Specialized Lab Testing Price Sheet r1.xlsx XLSX spreadsheet
Amendment 0003- Specialized Laboratory Testing.pdf PDF
BPA_Questions.pdf PDF
RFP SP0600-24-R-0500 r2.pdf PDF
Amd 2.pdf PDF
Amd 1.pdf PDF
Attachment 3 Specialized Lab Testing Price Sheet.xlsx XLSX spreadsheet
RFP SP0600-24-R-0500 2024 02 15 Final.pdf PDF
Attachment 2 Specialized Laboratory Testing QASP (31 Jan 24).pdf PDF
Attachment 5- PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
Attachment 6 DOL WAGE DETERMINATION.pdf PDF
Attachment 4- PAST PERFORMANCE REFERRAL LIST.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work for

DV Laboratory Testing 8 February 2024

Contents

C-1.0 General Description:

C-1.01 Service Locations:

C-1.1 Logistics:

C-2.0 Scheduling of Services:

C-3.0 Turn-around Times:

C-4.0 Certification Compliance Plan:

C-4.1 Laboratory Equipment Plan:

C-5.0 Laboratory Test Report:

C-5.1 Laboratory Test Report Additional Email Addresses: W C-6.0 Staffing:

C-7.0 Access:

C-8.0 Sample Cans:

C-9.0 Retain samples:

TABLE 2: Testing Table and Limits

2 | P a g e

C-1.0 General Description: This Statement of Work (SOW) provides the requirements for specialized laboratory testing services under the DLA Energy Specialized Laboratory Testing Blanket Purchase Agreement (BPA). Upon receipt of a DLA Energy issued Task Order or Contracting Officer’s verbal authorization to proceed under the BPA, the Contractor will be responsible for the laboratory testing of aviation fuel defined in Table 2 at one of the locations identified in Table 1. A Quality Assurance Representative (QAR) will transport the fuel sample to the nominated laboratory and witness in-person all testing.

C-1.01 Service Locations: The laboratory testing facility shall be located within a four hour driving distance of one of the cities listed Table 1 below and shall meet the required turn-around times in section C-3.0. The Contractor shall provide the location(s) of the facility where the product shall be tested, facility testing capabilities, and contact information.

TABLE 1 SERVICE LOCATIONS:

City State City State City State

Montgomery Alabama

Boston Massachusetts

Oklahoma City Oklahoma

Phoenix Arizona Lansing Michigan Salem Oregon Little Rock Arkansas St. Paul Minnesota Providence Rhode Island

Monterey California Jackson Mississippi Pierre South Dakota

Denver Colorado Jefferson City Missouri Nashville Tennessee

Hartford Connecticut Helena Montana Austin Texas

Tampa Florida Lincoln Nebraska Salt Lake City Utah

Boise Idaho Carson City Nevada Montpelier Vermont

Indianapolis Indiana Santa Fe New Mexico Charleston West Virginia

Des Moines Iowa Albany New York Madison Wisconsin

Topeka Kansas Raleigh North Carolina Cheyenne Wyoming

Frankfort Kentucky Bismarck North Dakota Augusta Maine Columbus Ohio

C-1.1 Logistics: In the event that the Contractor’s available testing location(s) and capabilities create a logistical concern that would unduly delay testing and adversely impact mission requirements, DLA Energy reserves the right to use a third-party service provider.

C-2.0 Scheduling of Services: After the Contracting Officer (CO) authorizes a task order, the QAR will contact the laboratory to schedule the testing. The Contractor shall not perform services under this SOW without an order or direct authorization from a CO. Prior to commencing testing, the Contractor shall contact the CO if an order or verbal authorization to proceed has not been received. Only a CO can formally, either in writing or verbally, authorize testing and create an obligation.

C-3.0 Turn-around Times: Testing turn-around (TAT) shall be completed in 6 hours. Start time begins when Contractor receives a sample at its laboratory and TAT ends when written testing results are delivered to DLA Energy. The Contractor shall be given at least 12 hours advance notice of the requirement.

3 | P a g e

C-4.0 Certification Compliance Plan: The Contractor and any sub-contractor utilized for laboratory testing, shall be ISO 9001 or ISO/IEC 17025 certified and provide proof of certification when requested to the CO or QAR.

C-4.1 Laboratory Equipment Plan: The Contractor shall furnish a Laboratory Equipment Plan to the CO at the onset of the Blanket Purchase Agreement and provide an annual update on the status of all equipment used in laboratory testing by name, model, and serviceability. Equipment that malfunctions or becomes non-serviceable shall be reported to the CO and Contracting Officer Representative (COR) within 48-hours and a testing capability mitigation plan provided.

C-5.0 Laboratory Test Report: The Contractor shall maintain records evidencing all analysis performed under this Blanket Purchase Agreement. All samples tested shall be documented with a detailed report. Reports shall be complete and legible containing information pertaining but not limited to: Lab Name, Date of test, Grade of Fuel, Test Method, Test Name, Test Results, Test Units, and signature certifying results.

Thermal Stability test reports shall include the following additional data:

1. Type of tester used.

2. Tube manufacturer and serial number.

3. Rating method: Visual Tube Rater (VTR), Interferometric Tube Rater (ITR), or Ellipsometric Tube Rater

(ETR).

The Contractor shall correct and resubmit any reports not containing the appropriate information.

C-5.1 Laboratory Test Report Additional Email Addresses: Within 2 hours of testing completion, the Contractor shall email all test results to the COR, QAR, and to the organizational email address of:

dlaenergylaboratoryreports@dla.mil,. The Contractor will provide the test results to the CO when requested.

C-6.0 Staffing: The Contractor shall provide sufficient staff to accomplish all functions and tasks, to include simultaneous operations performing multiple tests at a time. Fuel Laboratory testing services may be required outside regular business hours, on weekends, and on holidays. The Contractor shall provide the contact information for a laboratory manager and assistant laboratory manager if the laboratory is not manned 24 hours, seven days a week.

C-7.0 Access: The Contractor shall allow DLA Energy representatives to witness testing or sampling. The Contractor shall provide the applicable information for access and provide follow-up to obtain access (for personnel and vehicles) to all facilities where product is tested or sampled. For areas that require special admission, the Contractor will assist DLA Energy representatives in gaining access.

C-8.0 Sample Cans: Contractor shall maintain a supply of ten unused epoxy lined fuel sample shipping containers to be provided to DLA Energy personnel per request for all locations nominated. Sample containers shall be stored to ensure they are clean and free from all substances that might contaminate the product being sampled. Containers must meet the following specifications: Complies with ASTM D-4306, height not to exceed 9 inches, diameter not to exceed 7 inches, capacity 1 USG, Bung Plug ¾” with lock-wire hole, carrying handle able to be shipped as hazardous material.

C-9.0 Retain samples: Samples shall be retained, after analysis, for a minimum of 15 days. In the event of a suspected quality issue or dispute a longer sample retention period may be requested by DLA Energy. The Contractor shall be responsible for disposal of excess fuel samples and sample containers.

mailto:dlaenergylaboratoryreports@dla.mil

4 | P a g e

TABLE 2: Testing Table and Limits

JP-5 Jet A Jet A-1 7 JP-8 F-24 Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.

Appearance C&B C&B C&B C&B C&B C&B C&B C&B C&B C&B

Gravity, API @ 60 °F D1298/D4052 36.0 48.0 37.0 51.0 37.0 51.0 37.0 51.0 37.0 51.0

Density at 15°C (kg/m3) 788 845 775 840 775 840 775 840 775 840 Weight: lb/USG Calculated 6.6 7.0 6.5 7.0 6.5 7.0 6.5 7.0 6.5 7.0 Distillation (°C) D86

10% Recovered 205 205 205 205 205 20% Recovered Report Report 50% Recovered Report Report Report Report Report 90% Recovered Report Report Report Report Report

Final Boiling Point 300 300 300 300 300 Freezing point, °C D5972/D2386

-46

-40

-47

-47

-40

Flash point, °C D93/D56 60 38 38 38 38

Particulate Matter (mg/L)

D2276, D5452, MIL- DTL- 83133

1.0

Conductivity (pS/m) D2624 700 700 50 700 50 700 Copper strip corrosion D130 No.1 No.1 No.1 No.1 No.1 Existent gum (mg/100 mL) D381 7 7 7 7 7 Fuel System Icing Inhibitor, (vol %) D5006 0.07 0.20 0.04 0.15 0.04 0.15 Thermal Stability D3241

Change in pressure drop, mm Hg 25 25 25 25 25 One of the tube deposit rating methods shall be run:

(1) Ellipsometer (ETR) (nm) or

Interferometer (ITR) (nm)

(2) Heater tube deposit, Visual Tube Rating

< 3

< 3 < 3 < 3 < 3

Fatty Acid Methyl Ester (FAME)

TABLE 2: Testing Table and Limits

File details come from the government source that posted it. Updated .