This document is a Statement of Work (SOW) for door and hardware replacements at the Federal Aviation Administration's Indianapolis Air Route Traffic Control Center (ARTCC). The project involves replacing doors and hardware at seven locations, including control room north and south entrances, front entrance, and various interior and exterior doors. Key requirements include installing 1-3/4-inch hollow metal fire-rated doors with narrow lites, continuous hinges, exit devices, push buttons, kick plates, and automatic door operators from manufacturers like LCN, Von Duprin, and Stanley. The work also involves modifying the front entrance sliding door, removing and reinstalling a concrete pedestal, and laying new flooring. Contractors must submit detailed documentation, coordinate with the FAA's access control contractor, and work during specified hours with FAA personnel escort, with control room doors requiring special attention to maintain one side's operational status.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work ARTCC Door and Hardware
Replacements
Federal Aviation Administration
Indianapolis Air Route Traffic Control Center 1850 S. Sigsbee Street Indianapolis, IN 46241
July 24, 2025
SOW, Seven Doors, ZID ARTCC, IN
The scope of work for this project is to replace and/or install doors and/or hardware, with associated accessibility and security features, at seven (7) openings and ensure proper function once installation is complete.
1) Per provided drawings and door schedule, Contractor must:
a. Remove and replace existing doors at the control room north and south entrances identified at 1A and 1B.
• Contractor will ensure no damage is caused to surrounding finishes and will be responsible for repair and replacement of any collateral damage caused.
• Contractor will properly recycle or dispose of old materials.
• Inspect the existing door frame or opening for structural integrity.
• Ensure the opening is square, plumb, and level.
• Install new doors according to manufacturer specifications.
b. Attach hardware per door schedule and specification requirements for: 1A, 1B, 2A, 2B, 2C, 2D, 3A
• Contractor will verify existing hardware size, type, finish and location to ensure new purchased materials are compatible (ie: continuous hinge, butt hinge, exit devices, closure devices, automatic openers, etc.)
c. Ensure proper alignment and smooth operation of the door.
d. Apply weatherstripping, soundproofing, or seals for energy efficiency and weather resistance, per hardware schedule
e. Paint or finish the doors and frames according to the door schedule.
f. Clean the installation area and perform a final inspection.
g. Test the doors for proper operation (swing, latch, locking mechanisms) and connection to security and accessible systems.
h. Provide a warranty or guarantee for the workmanship and materials for a period of one year from date of final payment.
2) In addition to sections previously stated, the Contractor will modify the front entrance, door 2A, per the following:
a. Replace interior sliding door motor.
b. Remove the accessible push button pedestal, reroute wire under the new concrete, and reinstall existing pedestal.
• Contractor will remove section of concrete, SOW, Seven Doors, ZID ARTCC, IN approximately 4’x12’ immediately exterior to door.
• Contractor will prep subbase and pour new slab on grade to match existing. Ensure proper placement to slope away from building entrance.
• Contractor will route push button in concrete pour and remount pedestal in new concrete. Install wire in ¾” PVC conduit.
• Contractor will NOT reinstall the handrail.
c. Remove VCT tile in vestibule, prep floor accordingly, and lay new flooring per finish schedule.(FAA provided flooring)
3) NTP will not be issued till all submittals have been approved. Contractor must submit, and receive approval, to all relevant submittals per attached sections: 08 11 13, 08 71 00, 08411, and 08422 as well as submittals indicated below:
a. Any sub-contractors: Company name, contact information, and primary point of contact for work to be performed.
b. Project timeline and schedule of values
4) All new door hardware should be remove and replace. No new programming of any of these components is expected. However; in the event to access control system does not work upon replacement of the new hardware, the contractor shall contact the agency’s access control contractor: MC Dean at 800-762-3326 to resolve any installation issues.
Current security regulations require that contractor personnel be escorted by FAA personnel at all times, unless the contractor has a current FAA badge. The FAA must provide escorts to all contractor personnel as well as inspection and quality control oversight of all work. All work must be scheduled and coordinated with technical operations engineer in advance. Work hours are Monday – Friday, 7:00am-5:00pm.
*Control room doors 1B (must always have one side operational) FAA can accommodate after-hours work, if the contractor chooses, for this set of doors only. Hours can be worked out locally with the FAA Resident Engineers. All personnel receiving access to FAA site must have a Real ID.
Indianapolis ARTCC (ZID) Indianapolis, Indiana
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 1
SECTION 08 11 13 - HOLLOW METAL DOORS AND FRAMES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
B. In addition to the standards specified within this section, the materials and assemblies specified herein must comply with specification section 01 46 00 "Blast Resistance".
1.2 SUMMARY
A. Section includes:
1. Interior standard steel doors and frames.
2. Exterior standard steel doors and frames.
3. Glazed openings in doors
B. Related Requirements:
1. Section 08 71 00 "Door Hardware" for door hardware for hollow-metal doors.
1.3 DEFINITIONS
A. Minimum Thickness: Minimum thickness of base metal without coatings according to NAAMM-HMMA 803 or ANSI/SDI A250.8.
1.4 COORDINATION
A. Coordinate anchorage installation for hollow-metal frames. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors. Deliver such items to Project site in time for installation.
B. Coordinate requirements for installation of door hardware, electrified door hardware, and access control and security systems.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, core descriptions, fire-resistance ratings, and finishes.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 2
B. Shop Drawings: Include the following:
1. Elevations of each door type.
2. Details of doors, including vertical- and horizontal-edge details and metal thicknesses.
3. Frame details for each frame type, including dimensioned profiles and metal thicknesses.
4. Locations of reinforcement and preparations for hardware.
5. Details of each different wall opening condition.
6. Details of electrical raceway and preparation for electrified hardware, access control systems, and security systems.
7. Details of anchorages, joints, field splices, and connections.
8. Details of accessories.
9. Details of moldings, removable stops, and glazing.
10. Blast performance criteria: Include design analysis with signed and sealed calculations & design requirements, air blast load testing, and installation detail drawings. Reference 01 46 00 "Blast Resistance" for additional information.
C. Product Schedule: For hollow-metal doors and frames, prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings. Coordinate with final door hardware schedule.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For door inspector.
1. Fire-Rated Door Inspector: Submit documentation of compliance with NFPA 80, Section 5.2.3.1.
B. Product Test Reports: For each type of fire-rated hollow-metal door and frame assembly for tests performed by a qualified testing agency indicating compliance with performance requirements.
C. Field quality control reports.
1.7 CLOSEOUT SUBMITTALS
A. Record Documents: For fire-rated doors, list of door numbers and applicable room name and number to which door accesses.
1.8 QUALITY ASSURANCE
A. Fire-Rated Door Inspector Qualifications: Inspector for field quality control inspections of fire-rated door assemblies shall meet the qualifications set forth in NFPA 80, section
5.2.3.1 and the following:
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 3
1. Door and Hardware Institute Fire and Egress Door Assembly Inspector (FDAI) certification.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Deliver hollow-metal doors and frames palletized, packaged, or crated to provide protection during transit and Project-site storage. Do not use nonvented plastic.
B. Deliver welded frames with two removable spreader bars across bottom of frames, tack welded to jambs and mullions.
C. Store hollow-metal doors and frames vertically under cover at Project site with head up.
Place on minimum 4-inch- high wood blocking. Provide minimum 1/4-inch space between each stacked door to permit air circulation.
1.10 WARRANTY
A. Provide manufacturer's standard warranty for hollow metal doors and frames.
1. Minimum Warranty Period: 2 years.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Curries Company; ASSA ABLOY.
2. Republic Doors and Frames.
3. Steelcraft; an Allegion brand.
2.2 PERFORMANCE REQUIREMENTS
A. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings indicated on Drawings, based on testing at positive pressure according to NFPA 252 or UL 10C.
1. Smoke- and Draft-Control Door Assemblies: Listed and labeled for smoke and draft control by a qualified testing agency acceptable to authorities having jurisdiction, based on testing according to UL 1784 and installed in compliance with NFPA 105.
http://www.specagent.com/LookUp/?ulid=5745&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457134180&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457134214&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457134203&mf=04&src=wd
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 4
2. Fire-Rated Assemblies with Fire Exit Hardware: Fire-rated doors to receive fire exit hardware shall bear a label stating "Fire Door to be Equipped with Fire Exit Hardware" according to NFPA 80.
B. Fire-Rated, Borrowed-Lite Assemblies: Assemblies complying with NFPA 80 and listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction, for fire-protection ratings indicated, based on testing according to NFPA 257 or UL 9.
C. Thermally Rated Door Assemblies: Provide door assemblies with U-factor of not more than 0.40 deg Btu/F x h x sq. ft. when tested according to ASTM C518.
D. Blast loading and performance requirements.
1. Reference specification 01 46 00 "Blast Resistance" for blast loading and performance requirements.
2.3 INTERIOR STANDARD STEEL DOORS AND FRAMES
A. Construct hollow-metal doors and frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.
B. Heavy-Duty Doors and Frames: ANSI/SDI A250.8, Level 2; ANSI/SDI A250.4, Level B. At locations indicated in the Door and Frame Schedule..
1. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches.
c. Face: Uncoated steel sheet, minimum thickness of 0.042 inch.
d. Edge Construction: Model 2, Seamless.
e. Edge Bevel: Bevel lock and hinge edges 1/8 inch in 2 inches.
f. Core: Manufacturer's standard.
g. Fire-Rated Core: Manufacturer's standard core for fire-rated doors.
2. Frames:
a. Materials: Uncoated steel sheet, minimum thickness of 0.053 inch.
b. Construction: Full profile welded.
3. Exposed Finish: Prime.
2.4 EXTERIOR STANDARD STEEL DOORS AND FRAMES
A. Construct hollow-metal doors and frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 5
B. Maximum-Duty Doors and Frames: ANSI/SDI A250.8, Level 4; ANSI/SDI A250.4, Level A. At locations indicated in the Door and Frame Schedule.
1. Doors:
a. Type: As indicated in the Door and Frame Schedule.
b. Thickness: 1-3/4 inches.
c. Face: Metallic-coated steel sheet, minimum thickness of 0.0747 inch, with minimum A40 coating.
d. Edge Construction: Model 2, Seamless.
e. Edge Bevel: Bevel lock and hinge edges 1/8 inch in 2 inches.
f. Top Edge Closures: Close top edges of doors with flush closures of same material as face sheets. Seal joints against water penetration.
g. Bottom Edges: Close bottom edges of doors where required for attachment of weather stripping with end closures or channels of same material as face sheets. Provide weep-hole openings in bottoms of exterior doors to permit moisture to escape.
h. Core: Polystyrene or Polyurethane.
2. Frames:
a. Materials: Metallic-coated steel sheet, minimum thickness of 0.0747 inch, with minimum A40 coating.
b. Construction: Full profile welded.
3. Exposed Finish: Prime.
2.5 FRAME ANCHORS
A. Jamb Anchors:
1. Type: Anchors of minimum size and type required by applicable door and frame standard, and suitable for performance level indicated.
a. Welded to back of frames and designed to engage jamb construction.
b. Masonry Type: Locate anchors not more than 16 inches from top and bottom of frame. Space anchors not more than 32 inches on center, to match coursing, and as follows:
1) Two anchors per jamb up to 60 inches high.
2) Three anchors per jamb from 60 to 90 inches high.
3) Four anchors per jamb from 90 to 120 inches high.
4) Four anchors per jamb plus one additional anchor per jamb for each
24 inches or fraction thereof above 120 inches high.
2. Quantity: Minimum of three anchors per jamb, with one additional anchor for frames with no floor anchor. Provide one additional anchor for each 24 inches of frame height above 7 feet.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 6
B. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor.
1. Monolithic Concrete Slabs: clip type anchors, with two holes to receive fasteners.
C. Material: ASTM A879/A879M, Commercial Steel (CS), 04Z coating designation; mill phosphatized.
1. For anchors built into exterior walls, steel sheet complying with ASTM A1008/A1008M or ASTM A1011/A1011M; hot-dip galvanized according to ASTM A153/A153M, Class B.
2.6 MATERIALS
A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.
B. Cold-Rolled Steel Sheet: ASTM A1008/A1008M, Commercial Steel (CS), Type B;
suitable for exposed applications.
C. Hot-Rolled Steel Sheet: ASTM A1011/A1011M, Commercial Steel (CS), Type B; free of scale, pitting, or surface defects; pickled and oiled.
D. Metallic-Coated Steel Sheet: ASTM A653/A653M, Commercial Steel (CS), Type B.
E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A153/A153M.
F. Power-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hollow-metal frames of type indicated.
G. Mineral-Fiber Insulation: ASTM C665, Type I (blankets without membrane facing);
consisting of fibers manufactured from slag or rock wool; with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively; passing ASTM E136 for combustion characteristics.
H. Safety Glazing: Where safety glazing is indicated, provide glazing that complies with 16 CFR 1201, Category II.
1. Safety Glazing Labeling: Where safety glazing is indicated, permanently mark glazing with certification label of the SGCC or another certification agency acceptable to authorities having jurisdiction. Label shall indicate manufacturer's name, type of glass, thickness, and safety glazing standard with which glass complies.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 7
2.7 FABRICATION
A. Door Astragals: Provide overlapping astragal on one leaf of pairs of doors where required by NFPA 80 for fire-performance rating or where indicated. Extend minimum 3/4 inch beyond edge of door on which astragal is mounted or as required to comply with published listing of qualified testing agency.
B. Hollow-Metal Frames: Fabricate in one piece except where handling and shipping limitations require multiple sections. Frame corners should be mitered, welded, and ground smooth prior to preparations for priming. Where frames are fabricated in sections, provide alignment plates or angles at each joint, fabricated of metal of same or greater thickness as frames.
1. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed fasteners unless otherwise indicated.
2. Door Silencers: Except on weather-stripped frames, drill stops to receive door silencers as follows. Keep holes clear during construction.
a. Single-Door Frames: Drill stop in strike jamb to receive three door silencers.
b. Double-Door Frames: Drill stop in head jamb to receive two door silencers.
C. Hardware Preparation: Factory prepare hollow-metal doors and frames to receive templated mortised hardware, and electrical wiring; include cutouts, reinforcement, mortising, drilling, and tapping according to ANSI/SDI A250.6, the Door Hardware Schedule, and templates.
1. Reinforce doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.
2. Comply with BHMA A156.115 for preparing hollow-metal doors and frames for hardware.
D. Glazed Lites: Provide stops and moldings around glazed lites where indicated. Form corners of stops and moldings with butted or mitered hairline joints.
1. Provisions for Glazing: Doors and frames with openings to be glazed shall be prepared to receive the glass. Glazing stops on the outside of interior openings shall be non-removable. Glazing beads on the inside of openings shall be removable screw-on or snap-on type. Provide fire-rated glass for fire rated doors and clear tempered glass for non-rated doors.
2. Provide stops and moldings flush with face of door, and with square stops unless otherwise indicated.
3. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that each glazed lite is capable of being removed independently.
4. Provide fixed frame moldings welded on outside of exterior and on secure side of interior doors and frames. Provide loose stops and moldings on inside of hollow-metal doors and frames.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 8
5. Coordinate rabbet width between fixed and removable stops with glazing and installation types indicated.
6. Provide stops for installation with countersunk flat- or oval-head machine screws spaced uniformly not more than 9 inches o.c. and not more than 2 inches o.c. from each corner.
2.8 GLAZING
A. Non-Fire-Protection Rated Glazing: Fully Tempered Float Glass: ASTM C 1048, Kind FT (fully tempered), Condition A (uncoated) unless otherwise indicated, Type I, Class 1 (clear), Quality-Q3.
B. Fire-Protection-Rated Glazing: Listed and labeled by a testing agency acceptable to authorities having jurisdiction, for fire-protection ratings indicated based on testing according to NFPA 252 for door assemblies.
1. Monolithic Ceramic Glazing: Clear, ceramic flat glass; 3/16 inch nominal thickness; polished on both sides. Impact Safety Rating: CPSC 16 CFR 1201 Category I and II.
2. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
a. Nippon Glass Co. (distributed by Technical Glass Products).
b. Safti First, Schott North America, Inc.
c. Vetrotech Saint-Gobain.
C. Laminated Glass: ASTM C1172
1. Reference 08 80 00 "Glazing" for additional information.
2. Glazing within blast resistant doors must be laminated and meet the performance requirements of 01 46 00 "Blast Resistance".
2.9 STEEL FINISHES
A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.
1. Shop Primer: Manufacturer's standard, fast-curing, lead- and chromate-free primer complying with ANSI/SDI A250.10; recommended by primer manufacturer for substrate; compatible with substrate and field-applied coatings despite prolonged exposure.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 9
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verification of Conditions: Examine areas and conditions under which the work is to be installed, and notify the Contractor in writing, with a copy to the COR, of any conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected.
1. Examine roughing-in for embedded and built-in anchors to verify actual locations before frame installation.
2. Beginning of the work shall indicate acceptance of the areas and conditions as satisfactory by the Installer.
3.2 PREPARATION
A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish by grinding, filling, and dressing, as required to make repaired area smooth, flush, and invisible on exposed faces. Touch up factory-applied finishes where spreaders are removed.
B. Drill and tap doors and frames to receive nontemplated, mortised, and surface-mounted door hardware.
3.3 INSTALLATION
A. Install hollow-metal doors and frames plumb, rigid, properly aligned, and securely fastened in place. Comply with approved Shop Drawings and with manufacturer's written instructions.
B. Hollow-Metal Frames: Comply with ANSI/SDI A250.11.
1. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces without damage to completed Work.
a. Where frames are fabricated in sections, field splice at approved locations by welding face joint continuously; grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces. Touch-up finishes.
b. Install frames with removable stops located on secure side of opening.
2. Fire-Rated Openings: Install frames according to NFPA 80.
3. Floor Anchors: Secure with postinstalled expansion anchors.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 10
a. Floor anchors may be set with power-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings.
4. Solidly pack mineral-fiber insulation inside frames.
5. In-Place Concrete or Masonry Construction: Secure frames in place with postinstalled expansion anchors. Countersink anchors, and fill and make smooth, flush, and invisible on exposed faces.
6. Installation Tolerances: Adjust hollow-metal frames to the following tolerances:
a. Squareness: Plus or minus 1/16 inch, measured at door rabbet on a line 90 degrees from jamb perpendicular to frame head.
b. Alignment: Plus or minus 1/16 inch, measured at jambs on a horizontal line parallel to plane of wall.
c. Twist: Plus or minus 1/16 inch, measured at opposite face corners of jambs on parallel lines, and perpendicular to plane of wall.
d. Plumbness: Plus or minus 1/16 inch, measured at jambs at floor.
C. Hollow-Metal Doors: Fit and adjust hollow-metal doors accurately in frames, within clearances specified below.
1. Non-Fire-Rated Steel Doors: Comply with ANSI/SDI A250.8.
2. Fire-Rated Doors: Install doors with clearances according to NFPA 80.
3. Smoke-Control Doors: Install doors according to NFPA 105.
D. Glazing: Comply with installation requirements in Section 08 80 00 "Glazing" and with hollow-metal manufacturer's written instructions.
1. Secure stops with countersunk flat- or oval-head machine screws spaced uniformly not more than 9 inches (230 mm) o.c. and not more than 2 inches (51 mm) o.c.
from each corner.
3.4 FIELD QUALITY CONTROL
A. Inspection Agency: Engage a qualified inspector to perform inspections and to furnish reports to COR.
B. Inspections:
1. Fire-Rated Door Inspections: Inspect each fire-rated door according to NFPA 80, Section 5.2.
C. Repair or remove and replace installations where inspections indicate that they do not comply with specified requirements.
D. Reinspect repaired or replaced installations to determine if replaced or repaired door assembly installations comply with specified requirements.
E. Prepare and submit separate inspection report for each fire-rated door assembly indicating compliance with each item listed in NFPA 80.
HOLLOW METAL DOORS AND FRAMES 08 11 13 - 11
3.5 REPAIR
A. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.
B. Touchup Painting: Cleaning and touchup painting of abraded areas of paint are specified in painting Sections.
END OF SECTION 08 11 13
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411-1
SECTION 08411 -ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
1.1 SUMMARY
A. This Section includes the following:
1. Exterior aluminum-framed storefronts.
a. Glazing is retained mechanically with gaskets on four sides.
2. Manual-swing aluminum doors.
1.2 PERFORMANCE REQUIREMENTS
A. General: Provide glazed aluminum curtain wall system that has the following capabilities based on preconstruction testing:
1. Withstands loads and thermal and structural movement requirements indicated without failure. Failure includes the following:
a. Air infiltration and water penetration exceeding specified limits.
b. Framing members transferring stresses, including those caused by thermal and structural movement, to glazing units.
B. Glazing is physically and thermally isolated from framing members.
C. System is pressure equalized at its interior face.
D. System is reglazable from the exterior.
E. Wind Loads: Provide glazed aluminum curtain wall system, including anchorage, capable of withstanding wind-load design pressures of 30 psf minimum and as calculated according to requirements of IBC 2006 and the American Society of Civil Engineers' ASCE 7, "Minimum Design Loads for Buildings and Other Structures," 6.4.2, "Analytical Procedure," whichever are more stringent.
1. Sidesway (Story Drift): Accommodate building story drift when wind loads effect maximum overturning moment. Calculate story drift according to requirements of authorities having jurisdiction.
2. Deflection of framing members in a direction normal to wall plane is limited to 1/175 of clear span or 1/2 inches, whichever is smaller, unless otherwise indicated.
3. Deflection of framing members overhanging an anchor point is limited to 2 times the length of the cantilevered member, divided by 175.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 2
4. Test Performance: Provide glazed aluminum entrance and storefront system that does not evidence material failures, structural distress, or permanent deformation of main framing members exceeding 0.2 percent of clear span when tested according to ASTM E 330.
a. Test Pressure: 150 percent of inward and outward wind-load design pressures.
b. Duration: As required by design wind velocity; fastest I mile of wind for relevant exposure category.
F. Seismic Loads: Provide glazed aluminum entrance and storefront system, including anchorage, capable of withstanding the effects of earthquake motions calculated according to requirements of IBC 2006 and ASCE 7, "Minimum Design Loads for Buildings and Other Structures," Section 9, "Earthquake Loads," whichever are more stringent.
G. Dead Loads: Provide glazed aluminum entrance and storefront system members that do not deflect an amount which will reduce glazing bite below 75 percent of design dimension when carrying full dead load. Provide a minimum 1/8-inch clearance between members and top of fixed panels, glazing, or other fixed part immediately below. Provide a minimum 1/16-inch clearance between members and operable windows and doors.
H. Live Loads: Provide glazed aluminum entrance and storefront system, including anchorage, that accommodates supporting structure's deflection from uniformly distributed and concentrated live loads indicated without failure of materials or permanent deformation.
I. Air Infiltration: Provide glazed aluminum entrance and storefront system with permanent resistance to air leakage through system of not more than 0.06 cfm/sq. ft. of fixed wall area when tested according to ASTM E 283 at a static-air-pressure difference of 6.24 lbf/sq. ft.
J. Water Penetration: Provide glazed aluminum entrance and storefront system that does not evidence water leakage when tested according to ASTM E 331 at minimum differential pressure of 20 percent of inward acting wind-load design pressure as defined by ASCE 7, "Minimum Design Loads for Buildings and Other Structures," but not less than 10 lbf/sq. ft.
K. Water Penetration: Provide glazed aluminum entrance and storefront system that does not evidence water leakage when tested according to AAMA 501.1 under dynamic pressure equal to 20 percent of inward acting wind-load design pressure as defined by ASCE 7, "Minimum Design Loads for Buildings and Other Structures," but not less than 10 lbf/sq. ft. Water leakage is defined as follows:
1. Uncontrolled water infiltrating system or appearing on systems normally exposed interior surfaces from sources other than condensation. Water controlled by flashing and gutters that is drained back to the exterior and cannot damage adjacent materials or finishes is not water leakage.
L. Thermal Movements: Provide glazed aluminum entrance and storefront system, including anchorage, that accommodates thermal movements of system and supporting elements resulting from the following maximum change (range) in ambient and surface temperatures without buckling, damaging stresses on glazing, failure of joint sealants, damaging loads on fasteners, noise or vibration, and other detrimental effects.
1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 3
M. Structural Support Movement: Provide glazed aluminum entrance and storefront system that accommodates structural movements including, but not limited to, sway, twist, column shortening, long-term creep, and deflection.
N. Condensation Resistance: Provide glazed aluminum entrance and storefront system with condensation-resistance factor (CRF) of not less than 55 when tested according to AAMA 1503.1.
0. Average Thermal Conductance: Provide glazed aluminum entrance and storefront system with an average U-value of not more than 0.50 Btu/sq. ft. x h x deg F when tested according to AAMA 1503.1.
P. Sound Transmission: Provide glazed aluminum entrance and storefront system with average sound transmission attenuation through system of not less than 30 decibels (dB) when tested according to ASTM E 90.
Q. Dimensional Tolerances: Provide glazed aluminum entrance and storefront system, including anchorage that accommodates dimensional tolerances of existing curtain wall framing members and other adjacent construction.
R. For installed products indicated to comply with certain design loadings, include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
1.3 SUBMITTALS
A. Product Data: Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of product indicated.
B. Shop Drawings: For aluminum-framed systems. Include plans, elevations, sections, details, and attachments to other work.
1. Include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
2. Include details of provisions for system expansion and contraction and for draining moisture occurring within the system to the exterior.
3. For entrances, include hardware schedule and indicate operating hardware types, functions, quantities, and locations.
C. Samples for Verification: For each type of exposed finish required, in manufacturer's standard sizes.
D. Fabrication Sample: Of each vertical-to-horizontal intersection of systems, made from 12-inch lengths of full-size components and showing details of the following:
1. Joinery.
2. Anchorage.
3. Expansion provisions.
4. Glazing.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 4
5. Flashing and drainage.
E. Welding certificates.
F. Qualification Data: For Installer.
G. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified testing agency, for aluminum-framed systems.
H. Field quality-control test and inspection reports.
I. Maintenance Data: For aluminum-framed systems to include in maintenance manuals.
J. Warranties: Special warranties specified in this Section.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: Capable of assuming engineering responsibility and performing work of this Section and who is acceptable to manufacturer.
1. Engineering Responsibility: Preparation of data for aluminum-framed systems including Shop Drawings based on testing and engineering analysis of manufacturer's standard units in assemblies similar to those indicated for this Project and submission of reports of tests performed on manufacturer's standard assemblies.
B. Testing Agency Qualifications: An independent agency qualified according to ASTM E 699 for testing indicated.
C. Product Options: Information on Drawings and in Specifications establishes requirements for systems' aesthetic effects and performance characteristics. Aesthetic effects are indicated by dimensions, arrangements, alignment, and profiles of components and assemblies as they relate to sightlines, to one another, and to adjoining construction. Performance characteristics are indicated by criteria subject to verification by one or more methods including preconstruction testing, field testing, and in-service performance.
1. Do not modify intended aesthetic effects except with COTR approval. If modifications are proposed, submit comprehensive explanatory data to COTR for review.
D. Accessible Entrances: Comply with the U.S. Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA)
E. Welding: Qualify procedures and personnel according to AWS Dl.2, "Structural Welding Code--Aluminum."
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 5
1.5 PROJECT CONDITIONS
A. Field Measurements: Verify actual locations of structural supports for aluminum-framed systems by field measurements before fabrication and indicate measurements on Shop Drawings.
1. Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating aluminum-framed systems without field measurements. Coordinate construction to ensure that actual dimensions correspond to established dimensions.
1.6 WARRANTY
A. Special Assembly Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of aluminum-framed systems that do not comply with requirements or that deteriorate as defined in this Section within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including, but not limited to, excessive deflection.
b. Noise or vibration caused by thermal movements.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering.
d. Adhesive or cohesive sealant failures.
e. Water leakage through fixed glazing and framing areas.
f. Failure of operating components to function properly.
2. Warranty Period: Two years from date of Substantial Completion.
B. Special Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering.
1. Warranty Period: 15 years from date of Substantial Completion.
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Kawneer.
2. EFCO Corporation.
3. Vistawall Architectural Products.
4. Alumicor Inc.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 6
2.2 MATERIALS
A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish indicated.
1. Sheet and Plate: ASTM B 209.
2. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221.
3. Extruded Structural Pipe and Tubes: ASTM B 429.
4. Structural Profiles: ASTM B 308/B 308M.
5. Welding Rods and Bare Electrodes: AWS AS.10/AS.1OM.
B. Steel Reinforcement: With manufacturer's standard corrosion-resistant primer complying with SSPC-PS Guide No. 12.00 applied immediately after surface preparation and pretreatment. Select surface preparation methods according to recommendations in SSPC-SP COM and prepare surfaces according to applicable SSPC standard.
1. Structural Shapes, Plates, and Bars: ASTM A 36/A 36M.
2. Cold-Rolled Sheet and Strip: ASTM A 1008/A 1008M.
3. Hot-Rolled Sheet and Strip: ASTM A 1011/A 101 lM.
2.3 FRAMING SYSTEMS
A. Framing Members: Manufacturer's standard extruded-aluminum framing members of thickness required and reinforced as required to support imposed loads.
1. Construction: Framing members are composite assemblies of two separate extruded-aluminum components permanently bonded by an elastomeric material of low thermal conductance.
B. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum with nonstaining, nonferrous shims for aligning system components.
C. Fasteners and Accessories: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding fasteners and accessories compatible with adjacent materials.
1. Where fasteners are subject to loosening or turning out from thermal and structural movements, wind loads, or vibration, use self-locking devices.
2. Reinforce members as required to receive fastener threads.
D. Concrete and Masonry Inserts: Hot-dip galvanized cast-iron, malleable-iron, or steel inserts complying with ASTM A 123/A 123M or ASTM A 153/A 153M requirements.
E. Flashing: Manufacturer's standard corrosion-resistant, nonstaining, nonbleeding flashing compatible with adjacent materials. Form exposed flashing from sheet aluminum finished to match framing and of sufficient thickness to maintain a flat appearance without visible deflection.
F. Framing System Gaskets and Sealants: Manufacturer's standard recommended by manufacturer for joint type.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 7
2.4 GLAZING SYSTEMS
A. Glazing: As specified in Section 08 80 00 "Glazing."
B. Glazing Gaskets: Manufacturer's standard compression types, replaceable, molded or extruded, that maintain uniform pressure and watertight seal.
C. Spacers and Setting Blocks: Manufacturer's standard elastomeric types.
D. Glazing Sealants: For structural-sealant-glazed systems, as recommended by manufacturer for joint type and as follows:
1. Weatherseal Sealant: ASTM C 920 for Type S, Grade NS, Class 25, Uses NT, G, A, and
O; neutral-curing silicone formulation compatible with structural sealant and other system components with which it comes in contact; and recommended by structural- and weatherseal-sealant and aluminum-framed system manufacturers for this use.
a. Color: Matching structural sealant.
2.5 DOORS
A. Doors: Manufacturer's standard glazed doors, for manual swing operation.
1. Door Construction: 1-3/4-inch overall thickness, with minimum 0.125-inch thick, extruded-aluminum tubular rail and stile members. Mechanically fasten comers with reinforcing brackets that are deep penetration and fillet welded or that incorporate concealed tie rods.
a. Thermal Construction: High-performance plastic connectors separate aluminum members exposed to the exterior from members exposed to the interior.
2. Door Design: Wide stile; 5-inch nominal width.
a. Accessible Doors: Smooth surfaced for width of door in area within 10 inches above floor or ground plane.
3. Glazing Stops and Gaskets: Beveled, snap-on, extruded-aluminum stops and preformed gaskets.
2.6 DOOR HARDWARE
A. General: Provide heavy-duty units in sizes and types recommended by entrance system and hardware manufacturers for entrances and uses indicated.
1. Opening-Force Requirements:
a. Egress Doors: Not more than 30 lbf required to set door in motion and not more than 15 lbfrequired to open door to minimum required width.
B. Pivot Hinges:
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 8
l. Standard: BHMAA156.4,Grade 1.
2. Offset-Pivot Hinges: Provide top, bottom, and intermediate offset pivots at each door leaf.
C. Locking Devices, General: Do not require use of key, tool, or special knowledge for operation.
1. Opening-Force Requirements:
a. Latches and Exit Devices: Not more than 15 lbf required to release latch.
D. Manual Flush Bolts: BHMA A156.16, Grade 1.
E. Panic Exit Devices: Listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for panic protection, based on testing according to UL 305.
1. Standard: BHMA A156.3, Grade 1.
F. Cylinders: BHMA A156.5, Grade 1.
1. Keying: Refer to Section 08 71 00 "Door Hardware."
G. Strikes: Provide strike with black-plastic dust box for each latch or lock bolt; fabricated for aluminum framing.
H. Operating Trim: BHMA A156.6.
I. Closers: With accessories required for a complete installation, sized as required by door size, exposure to weather, and anticipated frequency of use, and adjustable to meet field conditions and requirements for opening force.
1. Standard: BHMA Al56.4, Grade 1.
J. Door Stops: BHMA A156.16, Grade 1, floor or wall mounted, as appropriate for door location indicated, with integral rubber bumper.
K. Weather Stripping: Manufacturer's standard replaceable components.
1. Compression Type: Made of ASTM D 2000, molded neoprene, or ASTM D 2287, molded PVC.
2. Sliding Type: AAMA 701, made of wool, polypropylene, or nylon woven pile with nylon-fabric or aluminum-strip backing.
L. Weather Sweeps: Manufacturer's standard exterior-door bottom sweep with concealed fasteners on mounting strip.
M. Thresholds: Raised thresholds beveled with a slope of not more than 1:2, with maximum height of 1/2 inch.
1. Standard: BHMA A156.21.
N. Finger Guards: Manufacturer's standard collapsible neoprene or PVC gasket anchored to frame hinge-jamb at center-pivoted doors.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 9
2.7 ACCESSORY MATERIALS
A. Joint Sealants: For installation at perimeter of aluminum-framed systems, as specified m Section 07 92 00 "Joint Sealants."
B. Bituminous Paint: Cold-applied asphalt-mastic paint complying with SSPC-Paint 12 requirements except containing no asbestos, formulated for 30-mil thickness per coat.
2.8 FABRICATION
A. Form aluminum shapes before finishing.
B. Weld in concealed locations to greatest extent possible to minimize distortion or discoloration of finish. Remove weld spatter and welding oxides from exposed surfaces by descaling or grinding.
C. Framing Members, General: Fabricate components that, when assembled, have the following characteristics:
1. Profiles that are sharp, straight, and free of defects or deformations.
2. Accurately fitted joints with ends coped or mitered.
3. Means to drain water passing joints, condensation occurring within framing members, and moisture migrating within the system to exterior.
4. Physical and thermal isolation of glazing from framing members.
5. Accommodations for thermal and mechanical movements of glazing and framing to maintain required glazing edge clearances.
6. Provisions for field replacement of glazing from interior for vision glass and exterior for spandrel glazing or panels.
7. Fasteners, anchors, and connection devices that are concealed from view to greatest extent possible.
D. Mechanically Glazed Framing Members: Fabricate for flush glazing (without projecting stops).
E. Storefront Framing: Fabricate components for assembly using shear-block system.
F. Door Frames: Reinforce as required to support loads imposed by door operation and for installing hardware.
1. At exterior doors, provide compression weather stripping at fixed stops.
G. Doors: Reinforce doors as required for installing hardware.
1. At pairs of exterior doors, provide sliding weather stripping retained in adjustable strip mortised into door edge.
2. At exterior doors, provide weather sweeps applied to door bottoms.
H. Hardware Installation: Factory install hardware to the greatest extent possible. Cut, drill, and tap for factory-installed hardware before applying finishes.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 10
I. After fabrication, clearly mark components to identify their locations in Project according to Shop Drawings.
2.9 ALUMINUM FINISHES
A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes.
C. High-Performance Organic Finish (2-Coat Fluoropolymer): AA-Cl2C40Rlx Chemical Finish:
conversion coating; Organic Coating: manufacturer's standard 2-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with AAMA 2605 and with coating and resin manufacturers' written instructions.
1. Color and Gloss: Refer to Drawings.
PART 3 -EXECUTION
A. Examine areas, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of work.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. General:
1. Comply with manufacturer's written instructions.
2. Do not install damaged components.
3. Fit joints to produce hairline joints free of burrs and distortion.
4. Rigidly secure nonmovement joints.
5. Install anchors with separators and isolators to prevent metal corrosion and electrolytic deterioration.
6. . Seal joints watertight, unless otherwise indicated.
B. Metal Protection:
1. Where aluminum will contact dissimilar metals, protect against galvanic action by painting contact surfaces with primer or by applying sealant or tape or installing nonconductive spacers as recommended by manufacturer for this purpose.
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 11
2. Where aluminum will contact concrete or masonry, protect against corrosion by painting contact surfaces with bituminous paint.
C. Install components to drain water passing joints, condensation occurrmg within framing members, and moisture migrating within the system to exterior.
D. Set continuous sill members and flashing in full sealant bed as specified in Section 07 92 00 "Joint Sealants" and to produce weathertight installation.
E. Install components plumb and true in alignment with established lines and grades, without warp or rack.
F. Install glazing as specified in Section 08 80 00 "Glazing."
G. Entrances: Install to produce smooth operation and tight fit at contact points.
1. Exterior Entrances: Install to produce tight fit at weather stripping and weathertight closure.
H. Install insulation materials as specified in Section 07 21 00 "Thermal Insulation."
I. Install perimeter joint sealants as specified in Section 07 92 00 "Joint Sealants" and to produce weathertight installation.
J. Erection Tolerances: Install aluminum-framed systems to comply with the following maximum tolerances:
1. Location and Plane: Limit variation from true location and plane to 1/8 inch in 12 feet;
1/4 inch over total length.
2. Alignment:
a. Where surfaces abut in line, limit offset from true alignment to 1/16 inch.
b. Where surfaces meet at corners, limit offset from true,alignment to 1/32 inch.
3. Diagonal Measurements: Limit difference between diagonal measurement to 1/8 inch.
3.3 FIELD QUALITY CONTROL
A. Testing Agency: Contractor shall engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Testing Services: Testing and inspecting of representative areas to determine compliance of installed systems with specified requirements shall take place as follows and in successive stages as indicated on Drawings. Do not proceed with installation of the next area until test results for previously completed areas show compliance with requirements.
1. Air Infiltration: Areas shall be tested for air leakage of 1.5 times the rate specified for laboratory testing under Part 1 "Performance Requirements" Article, but not more than
0.09 cfm/sq. ft of fixed wall area when tested according to ASTM E 783 at a minimum static-air-pressure difference of 6.24 lbf/sq. ft.
2. Water Penetration: Areas shall be tested according to ASTM E 1105 at a mm1mum uniform static-air-pressure difference of 10 PSF and shall not evidence water
ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 08411 - 12
penetration.
3. Water Spray Test: Before installation of interior finishes has begun, a minimum area of 75 feet by 1 story of aluminum-framed systems designated by COTR shall be tested according to AAMA 501.2 and shall not evidence water penetration.
C. Repair or remove work where test results and inspections indicate that it does not comply with specified requirements.
D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
3.4 ADJUSTING
A. Entrances: Adjust operating hardware for smooth operation according to hardware manufacturers' written instructions.
1. For doors accessible to people with disabilities, adjust closers to provide a 3-second closer sweep period for doors to move from a 70-degree open position to 3 inches from the latch measured to the leading door edge.
END OF SECTION 08 41 13
THIS PAGE INTENTIONALLY LEFT BLANK.
AUTOMATIC ENTRANCES 08422 - 1
SECTION 08422 -AUTOMATIC ENTRANCES
PART I -GENERAL
I.I SUMMARY
A. Section Includes:
1. Interior, sliding, power-operated automatic entrances.
1.2
A.
B.
C.
D.
E.
1.3
A.
DEFINITIONS
AAADM: American Association of Automatic Door Manufacturers.
Activation Device: Device that, when actuated, sends an electrical signal to the door operator to open the door.
IBC: International Building Code.
Safety Device: Device that, to avoid injury, prevents a door from opening or closing.
For automatic door terminology, refer to BHMA A156.10 for definitions of terms.
PERFORMANCE REQUIREMENTS
Delegated Design: Design automatic entrances, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Structural Performance: Automatic entrances shall withstand the effects of gravity loads and the following loads and stresses within…