Attachment 1 - SOW (NAVSEA Cableway).docx
DOCX document 43 KB Posted
- Attached to
- --Cableway Training and Certification
- Solicitation number
- 70Z02325Q93220003
About this file
This Statement of Work (SOW) details a NAVSEA Certified Cableway Training requirement for the U.S. Coast Guard Offshore Patrol Cutter Project Resident Office (OPC PRO) in Panama City, FL. The training aims to certify up to 20 personnel in cable installation, termination, and testing according to NAVSEA guidelines, with three potential 5-day course dates in August and September 2025: August 4-8, August 25-29, and September 8-12. The comprehensive training will cover technical topics including cable installation procedures, tool usage, tube packing, connector installation, cable removal, and fire safety measures, with a final exam requiring a 70% score for NAVSEA Cableway Certification.
The contract is a firm fixed-price order with specific requirements for instructor qualifications, including a NAVSEA Cableway Certification Card and minimum 3 years of teaching experience. The contractor must provide all training materials, tools, and equipment, and will operate at the USCG OPC PRO facility from 0700-1700 daily. Deliverables include student course critique evaluations (within 14 days of training) and individual course completion certificates (within 30 days). Key points of contact include Contracting Officer Carl Spence, Contract Specialist Isaac Hernandez, and Contracting Officer Representative Lora Farley, with the solicitation number 70Z02325Q93220003 under the Department of Homeland Security U.S. Coast Guard.
Attachment 1 - SOW (NAVSEA Cableway)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z02325Q93220003_0_US.pdf | ||
| Attachment 3 - Instructions to Offerors.docx | DOCX document | |
| Attachment 2 - Special Contracting Requirements.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
NAVSEA Certified Cableway Training
1.0 GENERAL
1.1 BACKGROUND
The Offshore Patrol Cutter Project Resident office has a requirement to train personnel in proper cable installation and connectorization per NAVSEA guidelines, leading to NAVSEA Cableway Certification.
1.2 SCOPE
To provide 5-day NAVSEA Certified Cableway Training on location at OPC PRO in Panama City, FL for up to 20 participants who regularly inspect new construction Offshore Patrol Cutters in Cable installation, termination and testing. Training should lead to NAVSEA Cableway Certification.
1.3 OBJECTIVE
The Goal of this requirement is to train 20 USCG OPC PRO/RIO personnel in proper NAVSEA certified Cableway installs resulting in members becoming NAVSEA Cableway certified.
The cableway program provides NAVSEA Cableway Training and Certification to students. This training and certification provide the students with the safety and knowledge to inspect the ship's cableways and identify and correct all Category 1 and 2 discrepancies, to include the removal of dead-end cables, repair of wire way discrepancies and correction of all Fire Zone and watertight discrepancies.
The program is conducted in compliance with DOD STD 2003-Electrical Plant Installation Standard Methods 9EPISM and NAVSEAINST 9304.1D-Shipboard Electrical Cable and Cableway Inspection and Reporting Procedures- Reference NAVSEA letter, Serial #07Q/182 dated 19 March 1996, pertains to program authorization.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
a) Electric Plant Installation Standard Methods DOD-STD-2003 (NAVY) EPISM
b) Cable Inspection Criteria NAVSEA INST.9404.1D
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 NAVSEA Certified Cableway Training
70098PR250007150 STATEMENT OF WORK
LAST UPDATED: 03/28/2025
PAGE 1/6
2.1.1 Contractor must provide instructor and all necessary materials to include any necessary books, tools and equipment to teach the 5-day NAVSEA certified Cableway Training for up to 20 attendees.
Potential Course Dates:
· August 4th – August 8th, 2025
· August 25th- 29th 2025
· September 8th – 12th 2025
2.1.2 USCG OPC PRO will provide the facility between the hours of 0700-1700 on the above dates. Training to include 1 hour for lunch and regular 10-minute breaks to occur at a minimum of once an hour.
2.1.3 To provide cable inspectors training in proper cable removal and installation procedures Per:
a) Electric Plant Installation Standard Methods DOD-STD-2003 (NAVY) EPISM
b) Cable Inspection Criteria NAVSEA INST.9404.1D
2.1.4 Course Must Address the following Topics Per referenced standards:
· Use of & Proper Tools
· Tube Packing; Hard & Soft Packing & Neoprene Packing
· Stuffing Tube Blanking
· Installation of BX Conn including determining proper clearance hole size
· Installation of Metal Terminal Tube including determining proper clearance hole size
· Packing Nylon Tubes
· Blanking Nylon Tubes
· Blanking Unused Penetrations in Equipment
· Drip Proofing Non-watertight connectors/equipment
· Reinstall Cables Pulled out of connectors
· MCP Assembly and Disassembly
· MCP Blanking
· MCP Assy for Nonidentifiable Cables
· Installation of Straps, Hangers and Collars
· Understanding of Bend Radius and Layout
· Mounting Equipment
· Banding With/without Channel Rubber/COAX Cable
· Installation of Anti-Chafing Devices
· Installation of Fire Stop Material
· End Sealing Cables
· Splicing Shielded/UnShielded/Armored/Unarmored Cable
· Cable Installation
· Cable Removal
· Minor Hook Up Lights/Power/Comms
2.1.5 Comprehensive Exam to be conducted on the last day with those obtaining a score 70% or higher on the comprehensive exam is required for successful completion. Upon successful completion attendees will receive NAVSEA Cableway Certification card.
2.1.6 The contractor shall provide the Contracting Officer Representative (COR) a copy of their proposed course critique evaluation and training syllabus at least 15 days prior to the beginning of the first session. The government shall approve the proposed course critique evaluation and training syllabus within 5 working days of receipt.
3.0 CONTRACTOR PERSONNEL
3.1 QUALIFIED PERSONNEL
The Contractor must provide qualified personnel to perform all requirements specified in this SOW. Contractor or Instructor must possess a NAVSEA Cableway Certification Card with at least 3 years’ experience teaching the course.
3.2 CONTINUITY OF SUPPORT
The Contractor must ensure that the contractually required level of support for this requirement is always maintained. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e- mail notification to the COR prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.
3.4 EMPLOYEE IDENTIFICATION
3.4.1 Contractor employees visiting Government facilities must wear a visitor identification badge. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and always display all identification and visitor badges in plain view above the waist.
3.4.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government always issued badge in plain view above the waist.
3.6 EMPLOYEE CONDUCT
Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees always present a professional appearance and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The
Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract.
The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.1 SECURITY
Contractor access to classified information is not currently required under this SOW. Contractor Personnel shall comply with all applicable government regulations, policies and procedures when visiting or working at Government facilities to include any base access requirements per the Local USCG Command Security Officer. Under this SOW, Contractor may be exposed to Sensitive but Unclassified information. All Contractor employees with access to sensitive information shall execute DHS Form 11000-6, Department of Homeland Security Non-Disclosure Agreement (NDA), as a condition of access to such information.
4.1.1 On-site contractor personnel requiring access to government installation shall be properly vetted for badging credential. A Base Access Form will need to be filled out and submitted no later than 10 days before the course start. See attachment 3: Vendor Access Request Form.
The following conditions may apply:
4.1.1.1 Contractor personnel working under this SOW, at a minimum, must have a favorable fingerprint check and have the minimum Tier 1 investigation initiated and completed to obtain a DoD Common Access Card (CAC) via Trusted Associate Sponsorship System (TASS).
4.1.1.2 If a CAC is not required, then the provisions of COMDTINST 5532.1, Physical Access Control will be adhered to including a NCIC-III criminal history inquiry, favorable unescorted access determination and locally produced access credential issuance (i.e., visitor’s pass, temporary badge, etc.) must be followed.
PROTECTION OF INFORMATION
Contractor access to information protected under the Privacy Act is required under this Contract. Contractor employees must safeguard this information against unauthorized disclosure or dissemination in accordance with the law and Government policy and regulation.
4.2 PERIOD OF PERFORMANCE
Three potential Course Dates. Please note the Government only requires 1-Each 5 Day Training Course Required:
· August 4th – August 8th, 2025
· August 25th- 29th 2025
· September 8th – 12th 2025
4.3 PLACE OF PERFORMANCE
The primary place of performance will be at:
USCG OPC PRO Panama City 2504 Cherry Street Panama City, FL 32401 OPC Conference Room
4.4 HOURS OF OPERATION
Contractor will conduct training between the hours of 0800 and 1700 EST, Monday through Friday. Training to include 1 hour for lunch and regular 10-minute breaks to occur at a minimum of once an hour.
4.5 TRAVEL
This will be a Firm Fixed Price order. Travel will not be reimbursed. Any travel related costs must be included in the total cost of the project
4.7 GENERAL REPORT REQUIREMENTS
The Contractor must provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Microsoft Office Applications).
4.8 SECTION 508 COMPLIANCE
4.9 Section 508 does not apply to your deliverables.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide the workspace necessary to perform the on-site portion of Contractor services required in this contract.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor must furnish all necessary training materials to include manuals, workbooks and any tools and equipment for hands on activities.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
8.0 DELIVERABLES
8.1 Within 14 calendar days after the last training session, the contractor shall provide the government copies of all course critique evaluations completed by students.
8.2 Each student shall receive a certificate of course completion. The certificates shall be delivered to the COR within 30 days of the completion of the course.
9.0 U.S. COAST GUARD POINTS OF CONTACT:
9.1 USCG Contracting Officer
Carl Spence USCG OPC PRO Panama City E: carl.b.spence@uscg.mil
9.2 USCG Contract Specialist:
Isaac Hernandez
CG-9125
E: isaac.j.hernandez@uscg.mil
9.2 USCG Contracting Officer Representative (COR): Lora Farley
USCG OPC PRO
2504 Cherry Street, Panama City, FL 32401 Phone: 850-252-4356 Email: lora.a.farley@uscg.mil
File details come from the government source that posted it. Updated .