This Statement of Work (SOW) details a cubicle relocation project for the 362 TRS/TRR at Sheppard AFB, TX, scheduled for August 2025. The project requires moving 7 existing cubicles, which includes disconnecting and reconnecting electrical hard lines, transporting cubicle components down two flights of stairs without elevator access, and reassembling the cubicles in new designated locations. The contractor will provide all necessary tools and equipment, with work confined to normal business hours (7:00 a.m. to 4:00 p.m., Monday through Friday), though weekend or after-hours installation may be permitted with mutual agreement and at no additional cost to the government. The contractor is responsible for unboxing or disposing of refuse material and must coordinate with the customer to schedule delivery and installation at least 48 hours in advance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Cubicle Part List.pdf | ||
| Attachment 3 - Cubicle Relocation Q and A.pdf | ||
| Attachment 5 - Room Layout Photos.pdf | ||
| 362 TRS-TRR Office Cubicle Relocation - Combo.pdf | ||
| Attachment 2 - Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR
362 TRS/TRR
Cubicle
Relocation
August 2025
PREPARED BY
TSgt Shawn Worob
362 TRS/TRR
Sheppard AFB, TX
STATEMENT OF WORK
1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS:
A. Project Description: The work to be performed under this contract and in accordance with these contract documents consists of moving a total of 7 existing cubicles, which include cubicle walls, cabinets, and desks, disconnecting hard line electrical from wall boxes, transporting cubicles down two flights of stairs without the availability of elevators, reassembling 7 cubicles in the new designated location, and reconnecting the electrical hard lines to new wall boxes.
1. The Contractor will provide all tools and equipment needed to relocate the cubicles.
2. No delivery is required. All existing cubicles are at the location.
3. Installation/Setup is requested. Removal of existing furniture is not requested. Contractor is responsible for unboxing or disposing of refuse material.
B. Work hours and special conditions:
1.Delivery and installation shall be confined to normal work hours- 7:00 a.m. to 4:00 p.m., Monday through Friday, excluding Federal holidays. If both the government and contractor agree, installation may be permitted on weekends or after 4:30 p.m. at no additional cost to the government.
The contractor shall coordinate with the customer to schedule delivery and installation. Contractor shall contact customer to schedule delivery date and time at least 48 hours in advance.
1048808685C Highlight
29' 7 1/4"
' 5
/8
2' 6 3/8"
4'
/1
6"
9'
4'
9'
' 9
Room 225-A TDEGRoom E241Room E240 CDM Office
L H
B
IF
M L
/3
M
L
/3
M L
/4
M L
82/42 M
L 82/36
M L
82/36
ML82/24
ML50/30 ML50/30
ML82/24
LH BIF RH BIF
LH BIF
3W
HLS08 3W
H L
C
H L
C
2W
2W
2W
2W
2W
2W
2W
HLC24
2W
2W
2W
82HLC24
E C
HLS24
2W
H L
S
2W
HLC08
E C
HLS24
2W
H L
S
2W
58 HLC08
E C
E C
2W
2W
2W
E C
E
C
HLC24
H L
C
M L
/3
M
L
/3
ML58/24 ML58/48 ML50/30
ML34/30
M L
34/36 M
L 34/36
M L
/2
M L
34/36 M
L 34/36
ML34/30
M L
/3
M
L
/3
M L
/2
H L
S
HLC16
2W
EC34
M L
/4
M
L
/3
ML34/36 ML34/36
M L
34/30
M L
/2
ML82/36ML82/36 ML82/24
L H
B
IF
HLS08
H L
C
2W
2W
E C
HLC24 ML58/24 ML58/48 ML50/30
M L
34/36 M
L 34/36
ML34/30
M L
/3
M
L
/3
M L
/2
M L
/4
M L
58/48 M
L 34/30
M L
/3
ML34/36ML34/36ML34/36ML34/36ML58/24 ML58/24
LH BIF 2W
2W
2W 82 H
L C
H
L S
HLC16
2W
EC34
M L
58/48 M
L 50/30
ML34/36ML34/36
M L
/3
M L
58/24
ML82/36 ML82/36ML82/24
1L
W 1L 24W
1L 36W
1L 36 W
1L 36W
ML82/24
E C
ML82/24
E C
ML82/24
E C
M L
82/24
EC82
M L
/2
EC82
E-HDP6B
E -H
X J6
B K
3L 36W
3L 36 W
3L 36 W
3L 36 W
3L 36 W
3L 48W
3L
W 3L
W
1L 36W
3L 36W
3L 36W
3L 48 W
E -H
D P
6B
E-HDP6B
E -H
D P
6B
E-HDP6B
E -H
D P
6B
E-HDP6B
3L 36 W
3L 36 W
3L
W
3L 36W
3L 36W
3L
W
E-HDP6B
E -H
D P
6B
E-HDP6B
E -H
D P
6B
3L
W 3L
W
3L 36W
3L 36W
3L 36 W
3L 36 W
3L
W3L
W
3L 48W
3L 36W
3L 36W
HAT-30/72
24/48
24/72
PT-82/24
C-OMXC163614LC-OMXC163614L
A-LEDTL-24A-LEDTL-24
BBF/24/L
H A
T -30/72
24/48
/7
PT
-8
2/
C -O
M X
C
L C
-O M
X C
L
A -L
E D
T L
-24 A
-L E
D T
L -24
B B
F /2
4/ L
HAT-30/72
24/48
/9
PT
-8
2/
C -O
M X
C
L C
-O M
X C
L
A -L
E D
T L
-24 A
-L E
D T
L -24
B B
F /2
4/ L
H A
T -30/72
24/48
/7
PT
-8
2/
C -O
M X
C
L C
-O M
X C
L
A -L
E D
T L
-24 A
-L E
D T
L -24
B B
F /2
4/ L
HAT-30/72
/4
24/90
PT
-82/24
C -O
M X
C 163614L
C -O
M X
C 163614L
A -L
E D
T L
-2
A -L
E D
T L
-2
B B
F /24/L
H A
T -30/72
24/48
/7
PT
-8
2/
C -O
M X
C
L C
-O M
X C
L
A -L
E D
T L
-24 A
-L E
D T
L -24
B B
F /2
4/ L
HAT-30/72
/4
24/72
PT-82/24
C-OMXC163614L C-OMXC163614L
A-LEDTL-24 A-LEDTL-24
BBF/24/L
R H
-C T
L -2
RH-CTL-24
LH-CTL-24
L H
-C T
L -2
S H
-C T
L -2
SH-CTL-24
LH-CTL-24
L H
-C T
L -24
R H
-C T
L -24
RH-CTL-24
RH-CTL-24
R H
-C T
L -24
LH-CTL-24
L H
-C T
L -24
S H
-C T
L -24
SH-CTL-24
P P
T P
P T
PPT
PPT
P P
T P
P T
P P
T P
P T
P P
T P
P T
P P
T P
P T
PPT PPT
DFS DFS
D F
S D
F S
D F
S D
F S
D F
S D
F S
D F
S D
F S
DFSDFS
D F
S D
F S
PPT
DFS
9' 10"
240 Top Right
240 Top Left
240 Double Left Side
240 Double Left Side
241 Left Center
240 Bottom Center
| 362 TRS Cubicle Relocation SOW.pdf |
| Furniture to move (003).pdf |
File details come from the government source that posted it. Updated .