This document is a Performance Work Statement for a federal contract opportunity related to the removal of salt cedar within the FOAL Solar Well Project Area in Bighorn County, Wyoming.

The contractor is required to provide all personnel, equipment, tools, materials, and other services necessary to lop and scatter 100% of salt cedar within an 8-acre unit, as well as spray the salt cedar stumps with herbicide. The work must be completed using only hand equipment, such as chainsaws, with no heavy equipment permitted. Communication with the government's Contracting Officer Representative or Project Inspector must occur at a minimum of every three days. The contract work must be performed between October 1, 2024 and November 15, 2024. The technical proposal requirements include submitting resumes of key personnel, a list of past similar projects and references, and a work schedule.

View the file

Other files

File Type Posted
Facing_North_0004.jpg JPG image
McCullough_Peaks_Salt_Cedar_Map_0004.pdf PDF
Facing_Southwest_0004.jpg JPG image
Sol_140L6224R0002_Amd_0004.pdf PDF
Attachment_8-_Updated_Question_and_Answer_0004.docx DOCX document
Attachment_7-Site_Inspection_Record_071824_0004.pdf PDF
Facing_South_0004.jpg JPG image
Facing_Northwest_0004.jpg JPG image
Facing_North_2_0004.jpg JPG image
Stipulations_for_Contractors_to_use_horse_0004.docx DOCX document
Attachment_6-_Statement_of_Work-Updated_7-22-24_0004.pdf PDF
Facing_West_0004.jpg JPG image
Sol_140L6224R0002_Amd_0003.pdf PDF
Attachment_5-_Question_and_Answer_0002.docx DOCX document
Attachment_4-Pictures_0002.pdf PDF
Sol_140L6224R0002_Amd_0002.pdf PDF
Sol_140L6224R0002_Amd_0001.pdf PDF
Attachement_2_WD.pdf PDF
Attachment_3_Maps.pdf PDF
Sol_140L6224R0002.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

SECTION C:

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF WORK

The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and incidental services necessary, except for those designated as Government-Furnished Property, to perform a lop and scatter of salt cedar and herbicide treatment of salt cedar stumps after cutting as described in this Performance Work Statement (PWS).

These services are to be performed in the FOAL Solar Well Project Area located in Bighorn County, Wyoming; 108.514448W 44.471951N T52N R97W SEC. 15, 16 and 21 Turn off for road access to this project is located past mile marker 80 on US HWY 14 east if Cody, WY.

C.2 DEFINITIONS

C.2.1 General Definitions

ACCEPTABLE QUALITY LEVEL (AQL). Maximum deviation from the performance standard.

PERFORMANCE BASED ACQUISITION. A contracting method intended to ensure that required performance quality levels are achieved and that the Contractor’s total payment is related to the degree services meet contract performance standards.

PERFORMANCE REQUIREMENTS SUMMARY (PRS). An abridged version (summary) of the Performance Work Statement showing contract requirements, tasks/subtasks, standards, and acceptable quality levels. The PRS may also contain an abridged version of Quality Assurance Surveillance Plan showing the Government’s method of surveillance, incentives, and fee reductions for not meeting standards.

PERFORMANCE STANDARD. Standard of performance required by the Government.

PERFORMANCE WORK STATEMENT (PWS). Specific requirements the Contractor must meet in performance of the contract. The PWS contains required services (tasks/critical subtasks), performance standards, acceptable quality levels, and incentives/disincentives.

QUALITY ASSURANCE. Actions taken by the Government to assure services meet contract requirements.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) OR QUALITY ASSURANCE

PLAN (QAP). A written document showing Government surveillance method and scheduling to be used to assess the Contractor’s performance against the performance standard.

QUALITY CONTROL. Those actions taken by a Contractor to control the performance of services to ensure services meet the requirements of the PWS.

C.2.2 Technical Definitions None

C.3 GOVERNMENT-FURNISHED PROPERTY

C.3.1 None

C.4 CONTRACTOR FURNISHED ITEMS

The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and incidental services necessary.

C.4.1 Quality Control Plan

The Contractor shall establish and maintain a Quality Control Program to ensure the requirements of the contract are achieved. One copy of the Contractor’s Quality Control Plan shall:

Be provided to the Contracting Officer prior to the start of contract work.

C.5 TASKS/CRITICAL SUBSTASKS AND STANDARDS

C.5.1 Task 1: Lop and scatter 100% of Salt Cedar within the designated 8 acre unit.

Standard/AQL: Cut and scatter 100% of Salt Cedar within 8 acres of the FOAL Solar Well Project Area. Salt Cedar would be cut to 3-5 inches above ground level. Cut juniper skeletons may be left where they are cut. No cut material will be scattered/ piled in roadways. Work quality inspection will focus on the removal of Salt Cedar cut to 3-5 inches above ground. Pictures of project area are attached to show the project area.

Unless presenting a safety hazard to workers No aspen, or any native live trees will be cut.

C.5.1 Task 2: Spray salt cedar stumps with Element within the designated 8 acre unit.

Standard/AQL: After salt cedars have been cut, the salt cedar stumps will be sprayed with Element 4 and Basal Bark Oil within the designated 8 acre unit. Work quality inspection will focus on the herbicide spraying of all Salt Cedar stumps.

C.5.2 Task 3: Communication will be in English both written and verbal.

Standard/AQL: While production work is being completed verbal communications will be completed at a minimum every third day to the Contracting Officer Representative (COR) or Project Inspector (PI)

C.6 SPECIFICATIONS

All unit boundaries are marked with either flagging or tree marking paint.

Work to be completed using hand equipment (chainsaw). Support from small equipment such as a 4- wheeler or side by side UTV to facilitate equipment (chainsaw) or fuel movement as well as medical incidents is also allowed but travel is restricted to existing roads and trails. No heavy equipment use will be permitted.

Work shall be started no earlier than October 1, 2024, and shall be completed no later than November 15, 2024, to complete Task 1 and 2 of the cutting of salt cedar and spraying salt cedar stumps with herbicide within the project area.

Work to be completed using hand equipment (chainsaw). No heavy equipment use will be permitted.

All Machinery/saws shall be equipped with approved spark arrestors.

Work shall be stopped if road conditions become poor due to excessive moisture (mud/rain/snow). The government will monitor road conditions and keep the contractor informed.

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 TECHNICAL PROPOSAL CONTENTS

QUALIFICATIONS AND EXPERIENCE OF KEY PERSONNEL: Offerors shall submit a one-page resume of all key personnel proposed for this contract.

PAST PERFORMANCE: Offerors shall submit a list of clients for past and present similar projects covering the past three (3) years. Provide: contact name, address, phone number, fax number, e-mail address. The Government will survey these clients to obtain past performance information (quality, timeliness, cost control, business relationships) related to Offeror’s current and past work.

TIMELINESS: Offeror’s shall submit their work schedule for this project.