Attachment_8-_Updated_Question_and_Answer_0004.docx
DOCX document 19 KB Posted
- Attached to
- MCCULLOUGH PEAKS SALT CEDAR REMOVAL 2024
- Solicitation number
- 140L6224R0002
About this file
This document contains a Question and Answer (Q&A) attachment related to Solicitation 140L6224R0002 for the MCCULLOUGH PEAKS SALT CEDAR REMOVAL 2024 project.
The Q&A addresses several questions from potential contractors, including: whether a Wyoming commercial applicator's license is required for herbicide treatment, if proof of a passed test can substitute for the license, the project location coordinates, whether the site visit is mandatory, and clarification on requirements for cutting, piling, and spraying the salt cedar. The response notes that large salt cedar infestations can be piled, but retreatment of stumps will be conducted by the BLM. Other details include: using hand equipment only, no heavy machinery allowed, and the project timeline of starting on October 1, 2024 and completing by November 15, 2024. The solicitation also requires contractors to submit qualifications, past performance, and a work schedule as part of their technical proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Facing_North_0004.jpg | JPG image | |
| McCullough_Peaks_Salt_Cedar_Map_0004.pdf | ||
| Facing_Southwest_0004.jpg | JPG image | |
| Sol_140L6224R0002_Amd_0004.pdf | ||
| Attachment_7-Site_Inspection_Record_071824_0004.pdf | ||
| Facing_South_0004.jpg | JPG image | |
| Facing_Northwest_0004.jpg | JPG image | |
| Facing_North_2_0004.jpg | JPG image | |
| Stipulations_for_Contractors_to_use_horse_0004.docx | DOCX document | |
| Attachment_6-_Statement_of_Work-Updated_7-22-24_0004.pdf | ||
| Facing_West_0004.jpg | JPG image | |
| Sol_140L6224R0002_Amd_0003.pdf | ||
| Attachment_5-_Question_and_Answer_0002.docx | DOCX document | |
| Attachment_4-Pictures_0002.pdf | ||
| Sol_140L6224R0002_Amd_0002.pdf | ||
| Sol_140L6224R0002_Amd_0001.pdf | ||
| Attachement_2_WD.pdf | ||
| Attachment_3_Maps.pdf | ||
| Sol_140L6224R0002.pdf | ||
| Attachment_1_SOW.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt Cedar Removal Question and Answer
Question: Will a Wyoming commercial applicators license be required for the treatment of the stumps with the Element 4 and Basal Bark Oil chemicals?
Answer: I found out from my district weeds specialist that the contractor would need a Wyoming commercial applicators license.
Question: One question on the amendment: It says a WY state applicator license is required to be submitted with the proposal. We have started the process of getting testing scheduled. We anticipate that we can get in and complete the tests next week. We will know if it was passed on the testing date and can provide proof of test results. However, I have been informed that it can take up to 3 weeks to get the licenses through the state paperwork system. Would a copy of a passed test meet the requirements to submit a proposal? With the intention of an amendment to our proposal once we have received the actual applicator license.
Answer: I would be okay with proof of test results that show they passed and provide the certificate as soon as possible. Work can't start in the fall so by then, they should have their WY state applicator license certificate Question: Can you provide coordinates for the location for cedar removal concerning solicitation 140L6224R0002? I would like to look at the area before I place a bid.
Answer: The center of the project is -108.5137883 44.4727864.
Question: Is the site visit for Solicitation 140L6224R0002 mandatory? And is the site accessible outside of the site visit time?
Answer: The site visit is not mandatory and the site is accessible outside of the site visit time. Also here are some photos of the site I took today. We have a couple of bunches of salt cedar but as you get closer to the bunches there are little ones here and there.
New questions from 7/22/24 (asked during site visit):
Question: What are the specifications for spreading salt cedar cuttings?
Answer: Spread salt cedar cuttings flat on the ground.
Question: How much herbicide is to be sprayed?
Answer: Douse the stumps.
Question: Is there access for 4-wheelers/ATVs to drive off road?
Answer: There is no public access to go off road within the project area.
Question: Can contractors use horses to carry equipment?
Answer: Yes, stipulations for using domestic horses within the McCullough Peaks HMA are attached.
Question: Is there access via private land?
Answer: Yes, contractor must get permission from private landowner to access the site from the south.
Question: Can large infestations of salt cedar be put in piles?
Answer: Yes, an updated map and Task 1 show locations of the highest infestation of salt cedar, and may be piled. Task 1 will be updated to reflect salt cedar infestations can be piled instead of scattered. . Cut material will be piled in designated areas that will be delineated by flagging within the project area.
Question: Will the contractor be required to return to the site if the salt cedar stumps show regrowth?
Answer: No, retreatment of salt cedar stumps will be conducted by BLM. Prior to ending project work, BLM will Quality Inspect the site to ensure all salt cedar stumps are treated.
Question: Can the Russian Olives be cut down?
Answer: No, do not cut Russian Olives.