This Statement of Work (SOW) details painting requirements for the Bureau of Indian Affairs' Chief Ignacio Justice Center located in Towaoc, Colorado. The project involves comprehensive surface preparation, painting of jail cells, doors, and metal handrails using high-quality, anti-graffiti, low-VOC paint with one primer coat and two finish coats. Work will be performed Monday through Friday between 8:00am and 4:30pm, with strict adherence to security protocols and OSHA regulations. The contractor must provide all personnel, equipment, materials, and supervision, and will be responsible for daily cleanup and final site restoration. Upon completion, the contractor must submit a written project confirmation, final inspection documentation, and retain leftover paint for future touch-ups. The primary point of contact for the project is Waylon Blackie, Maintenance Worker, and the solicitation is tracked under Solicitation Number 140A0725Q0025 through the Department of the Interior's Bureau of Indian Affairs Northwest Region.

View the file

Other files

File Type Posted
Attachment_1_SOW_V2_0001.docx DOCX document
Sol_140A0725Q0025_Amd_0001.pdf PDF
Attachment_2_IA_-_IEE_Representation_Form.pdf PDF
Atachment_3_Wage_Determination.pdf PDF
Sol_140A0725Q0025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Painting of the BIA Chief Ignacio Justice Center 107 Spruce St, Towaoc, CO 81334

PROJECT OVERVIEW

This Statement of Work (SOW) outlines the requirements for prepping and painting jail cells, doors, and metal handrails at the Chief Ignacio Justice Center located at 107 Spruce St., Towaoc, CO 81334. The project's goal is to refresh and protect these surfaces, ensuring a durable, clean, and professional finish that complies with all safety and security standards.

SCOPE OF WORK

The contractor shall provide all personnel, equipment, tools, materials and supervision necessary to perform required services under this contract.. The scope includes:

* Surface Preparation: All surfaces will be thoroughly cleaned, degreased, and sanded to ensure proper paint adhesion. This includes removing existing flaking or peeling paint, rust, and other contaminants. Any cracks or holes will be filled and repaired with an appropriate patching compound.

* Painting: The contractor will apply one coat of primer and two coats of high-quality, durable, anti-graffiti paint to all surfaces. This paint will be resistant to chipping, scratching, and harsh cleaning chemicals.

* Cleanup: The contractor will be responsible for daily cleanup of the work area and a final, thorough cleanup upon completion of the project, leaving the site in a safe and clean condition.

Exclusions The following items are not included in this SOW:

* Painting of floors, ceilings, or exterior walls.

* Repair or replacement of structural components, such as doors or handrails.

* Removal or replacement of plumbing fixtures, electrical outlets, or light fixtures.

Materials All materials, including primers, paints, and cleaners, will be provided by the contractor and must be approved before use. The paints used will be low odor, low-VOC (Volatile Organic Compounds) to minimize disruption and potential health risks to facility occupants. A product data sheet for all materials will be submitted for approval.

Schedule and Milestones The work will be performed during the work hours of 8:00am to 4:30pm Monday through Friday. No work shall be performed outside these times or on federal holidays.

Deliverables Upon completion of the project, the contractor shall provide the following:

* A fully painted and finished jail cell, door, and handrail surfaces that meet the quality standards outlined in this SOW.

* A written confirmation of project completion, including a final inspection by the facility staff representative.

* Any leftover paint for future touch-ups.

Security and Safety The contractor and all personnel must adhere to strict security protocols while on the premises. All tools and equipment will be checked in and out daily. The contractor will follow all Occupational Safety and Health Administration (OSHA) regulations and use personal protective equipment (PPE) at all times.

Project Management All project communications will be directed through the primary point of contact below: