Attachment 1- SOS RELIANCE (WMEC 210A) UPDD FJL 23ER0_BLANK.xls

XLS spreadsheet 44 KB Posted

Attached to
Unplanned Drydock (UPDD): USCGC RELIANCE UPDD FY23
Solicitation number
70Z08023QMECP0007
Issued by

About this file

This document contains a pricing schedule for the unplanned drydock availability of the USCGC RELIANCE from January 24-31, 2023. The schedule lists various work items needed for the drydocking such as inspecting and repairing the controllable pitch propeller hub, removing and reinstalling the propeller shaft and rudder assembly, and providing temporary services and support for sea trials. Labor rates by location are also provided along with a composite labor rate of $55 per hour and assumed overhead and profit factors. The related federal contract opportunity is a solicitation from the U.S. Coast Guard for the USCGC RELIANCE unplanned drydock from January 24-31, 2023.

View the file

Other files

File Type Posted
0003 page 2 RELIANCE UPDD FY23.pdf PDF
A0003.pdf PDF
A0002.pdf PDF
0002 page 2 RELIANCE UPDD FY23.pdf PDF
A0001.pdf PDF
0001 page 2 RELIANCE UPDD FY23.pdf PDF
RFQ SHIP REPAIR COMBINED SYNOPSIS_RELIANCE DD.pdf PDF
Attachment 2-SOW RELIANCE (WMEC 210A) UPDD FJL 23R0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC RELIANCE (WMEC-210A) UNPLANNED DRYDOCK AVAILABILITY FY2023
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001DrydockJOB1$0.00
D-002Temporary Services, Provide - CutterJOB1$0.00
D-003Sea Trial Performance, Support, ProvideJOB1$0.00
D-004Controllable Pitch Propeller (CPP) Hub, Inspect and RepairJOB1$0.00
D-005Propeller Shaft, Remove and ReinstallJOB1$0.00
D-006Rudder Assembly, Remove and ReinstallJOB1$0.00
O-00AComposite Labor RateHour0
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(1/5/2023) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .