Attachment 1 SOO NUEX 2019-00004 Luke Premise Wiring Bldg S11 SOO 20Aug2021.pdf
PDF 488 KB Posted
- Attached to
- Luke Premise Wiring Bldg S11
- Solicitation number
- FA488721Q0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S11 site walkthrough questions.docx | DOCX document | |
| S11 site walkthrough questions part 2.docx | DOCX document | |
| Attachment 2 WD 2015-5469 Rev14 4.6.2021.txt | TXT text file | |
| Combined_Synopsis_Solicitation- Bldg S-11 FOC FA488721Q0064.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES – SOO
FOR
PREMISE WIRING
WITHIN BS11
AT
Luke AFB AZ
Prepared By
38ES/ENPW
4064 Hilltop Road
Tinker AFB OK 73145-2713
Page Intentionally Left Blank
1.0 INTRODUCTION. This Statement of Objectives (SOO) defines the requirements for the Contractor to engineer, furnish, install and test (EFI&T) premise wiring within building S11 at Luke AFB AZ.
Newly installed premise wiring will support Non-classified Internet Protocol Router Network (NIPRNet).
2.0 REQUIREMENTS.
2.1 General Requirements. The Contractor shall provide all materials, transportation, labor, management, tools, and other incidentals necessary to meet the requirements as stated in this SOO. All materials provided shall be new and not refurbished.
2.2 Base Support Requirements. The Contractor must identify any base support requirements (for example, laydown and storage areas) necessary to complete this project. The Contractor shall coordinate with 56CS/SCXP for storage space and staging area requirements.
2.3 Restoration. The Contractor shall restore all disturbed grounds/base property to the “as found” condition or better after installation. Base grounds/property restoration requirements shall be complied with.
2.4 Project Residue. All residues from this project shall be disposed off base and IAW Federal, State, local, and base environmental laws and regulations. The Contractor is wholly responsible for project waste removal. Removed premise wiring shall be transported to DRMO on base; premise wiring will be processed for disposition. Contractor may use base Recycling Center to dispose of other project waste materials. Contractor shall verify which waste materials the Recycling Center will accept. Contractor will not use base, facility, or building waste dumpster(s) to dispose of project waste material(s). If Contractor chooses to lease dumpsters for project waste, Contractor shall coordinate with 56CS/SCX for dumpster placement.
3.0 COMMODITY REQUIREMENTS. The Contractor shall engineer, furnish, and install the infrastructure as defined herein.
3.1 Converged Communications Requirements: “RESERVED”
3.2 Networking Requirements: The Contractor shall complete the following requirements.
3.2.1 Route new CAT 6 cabling to a new full size cabinet in the media room, as shown in sketch 1. Existing cabling installed under the Command Post renovation project shall stay in the existing communications rooms/closets. New cable installations will terminate where the existing LAN cabling is terminated, refer to sketch 1. All non-Command Post NIPRNet drops shall be terminated in new patch panels located in the media room and to be labeled “Comm Rack”.
3.2.2 User drop locations indicated on sketch are approximate. The Contractor shall verify all locations.
3.2.3 Areas indicated in the sketches are composed of various types of work spaces, the Contractor shall verify appropriate hardware required for cable routing, installation, and termination.
3.2.4 Existing cable routes within walls may be reused if within general location of User drop indicated on sketches.
3.2.5 New Data Drop installation(s) shall be at a height above the finish floor for easy access for patch cord connections.
3.2.6 Install cable support hardware for the entire cable run per Industry and Installation standards. Table of standards located in section 8.1
3.2.7 Contractor shall make use of pre-installed 1-1/2” metal conduit with pull string and quad-gang CAT 6 telecommunications outlet 6-8” from every electrical outlet. Outlets are located 18” above the floor and the conduit extends 2” above the drop ceiling.
3.2.8 All cables shall be routed with a structured and orderly manner. Secure cable(s) within support hardware i.e. J-hooks or Cable tray.
3.2.9 The Contractor shall fire stop all cable entrances cut, drilled, or cored drilled into walls, per Industry and Safety codes. Table of standards located in section 8.1
3.2.10 Installation/Construction of new Communications Rooms/Areas is anticipated; therefore a new rack/cabinet space will have to be used for the installation of new patch panels at the communications room/closet side of the new premise wiring. The Contractor shall provide the necessary power, grounding and bonding requirements to meet code and TIA/EIA standard and coordinate with the 56CS/SCXP for exact location.
3.2.11 Install plenum rated cables where required by Industry and applicable standards. Table of standards located in section 8.1
3.2.12 Install CAT 6 cables at the locations indicated in sketches. Note: Building Floor plans are not to scale.
3.2.13 All CAT 6 cables shall be “Home Runs” from user drop (face plate) to patch panel(s).
Cable runs shall not exceed 270 feet in length.
3.2.14 All workstations and printers shall have two (2) or 4 (four) CAT 6 cables installed for NIPRNet. Wherever feasible, Contractor shall make use of Quad drops at the user location such as multiple side by side workstations. Refer to Sketch 1 for Building Layout
3.2.15 All new CAT 6 cabling shall have a “Blue” colored sheath for identification.
3.2.16 All termination hardware, cable components, and cables shall be CAT 6 compliant.
Termination hardware to include but not limited to termination modules, patch panels, etc. All jacks shall include Retention Force Technology™ (or similar) which promotes consistent performance over the life of the system. The jack should also include separation towers allowing for quicker and easier terminations. All cabling and terminations hardware shall be new and not refurbished.
3.2.17 Label all new premise wiring installations with Luke AFB label scheme. Faceplate and patch panels shall both be labeled. Labeling will be completed via permanent method.
Hand written labeling is not authorized. Labeling scheme provided in Attachment #2.
3.2.18 Test and certify all new cable installations to the Category 6 specifications. Document test results for review and reference.
3.2.19 All working area(s) shall be restored to original condition IAW Luke AFB policy.
3.2.20 The Contractor shall provide CAT 6 UTP RJ45 Patch Cords. Patch cords shall be of a variety of cable lengths for cable routing from patch panels and network switches. Also, provide patch cords from User(s) drop face plate to User network device i.e.
laptop/desktop. The Contractor shall verify patch cord cable length required for User drop connections with 56 CS/SCXP.
3.2.21 The Contractor shall provide 12-strand single-mode fiber optic cable between 8 and 10um between the existing communication room rack mounted patch panel and the newly proposed cabinet/communications room terminated on contractor provided new FOC patch panel. FO cabling is required to be terminated onto the aforementioned patch panels using LC type connectors.
3.3. Cable Removal. NEC 800.25 and 770.25 require that the accessible portion (see definition) of abandoned optical fiber and communications cables shall be removed from pathways. Cables that are not terminated at both ends at a connector or other equipment and are not identified for future use with a tag (label) of sufficient durability are considered to be abandoned communications cables.
4.0 MANAGEMENT.
4.1 Schedule. The Contractor shall provide a complete milestone schedule that denotes major activities to include time-phased start and completion dates for this project and sub-projects associated with the installation of the components and systems.
4.2 Project Manager on Site. The Contractor shall provide a full time, on-site Project Manager (PM) to oversee all facets of the project.
4.3 Quality Assurance. The Contractor shall provide quality assurance support for the entire life of the project. This support shall assist the government representative in performing random spot checks and in performing the system acceptance tests. Contractor QA and Government Repesentative shall be responsible for identifying system and outside plant deficiencies and/or discrepancies throughout the life of the project. A weekly report (soft copy) will be submitted indicating project progress/statuses and listings any deficiencies/discrepancies found and actions to correct them.
4.4 Compliance. The Contractor shall remain in compliance with all Federal, State, county, and base security and safety laws, regulations, policies, and requirements.
4.5 Clean up. At day’s end, the Contractor shall remove all debris and surplus materials from the work place. Equipment and materials required to complete the work effort may remain on site as long as they are organized/stored in a manner that does not cause a safety hazard.
4.6 Environmental Management. The Contractor shall comply with the most stringent environmental federal, state, and local laws and regulations; and Air Force policies, instructions, and plans. The federal Government is not exempt from compliance with environmental regulations. The installer shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on Luke AFB AZ. The Prime Contractor shall ensure their sub contractors (if any) comply with these specifications. Asbestos may be present at all buildings within the scope of this project. But the presence of asbestos along, adjacent, or within existing cable runs is not anticipated. If asbestos is discovered during the installation phase of this project, the Contractor shall stop work and contact 56CS/SCXP for disposition.
4.7 Integrated Product Team (IPT). The Contractor shall chair a weekly IPT meeting consisting of Contractor representatives, the Contracting Officer, Program Manager, Engineer, and representatives of the 56 Communications Squadron. The purpose of this meeting is to discuss project progress, problems being encountered, and other discussions necessary/beneficial to ensure success and timely completion of the SOO.
4.8 Walk-Through. The Contractor shall schedule a final project walk-through of all work completed prior to close out with the government Project Manager. This should be scheduled at least 72 hours prior to the event.
5.0 DELIVERABLES.
5.1 List of Deliverables. All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements set forth in this Task Order. All deliverables shall be produced using recommended software tools/versions as accepted by the Government. The Contractor shall submit the following deliverables:
Data Item Title
As Built Work Schedule Status Report Meeting Minutes Test Report Test Plan
5.2 Cutover Plan: Reserved.
5.3 Acceptance Test Plan: The Contractor shall provide a detailed acceptance test plan of the installation covering all aspects of the installation and demonstrate the acceptability of the work on meeting the government requirement. The Contractor shall perform all tests and document results of tests with government witnesses overseeing the Acceptance testing.
5.4 As-Built Drawings: The Contractor shall provide as-built drawings for the installed equipment to include where and how they connect/interface with each other and existing base. As-built red line drawings (either in CAD or MS VISIO with a courtesy copy in PDF format) shall depict new cables, panels terminated and test results. Drawings shall contain floorplans, comm closet locations, rack elevations, grounding and locations of installed cable routes/trays, etc.
5.5 Training: Reserved.
5.6 Testing Requirements: The Contractor shall perform testing and inspections of all systems solutions to ensure the technical adequacy and accuracy of all work, including reports and other documents required in support of that work. The Contractor shall conduct on-site testing in accordance with the Original Equipment Manufacturer’s installation manuals, practices and the appropriate vendor’s test procedures. The Contractor shall provide a detailed test plan.
6.0 WARRANTY
The vendor shall provide a one year warranty or manufacturer’s standard commercial warranty, whichever is longer. The vendor shall also provide a one year workmanship warranty. The warranty period shall start from the date of system and or project acceptance.
7.0 PERFORMANCE.
7.1 Period of Performance. The period of performance for the project shall not exceed three months after the start of the project.
7.2 Place of Performance. The place of performance is Luke AFB AZ.
7.3 Hours of Work. The Contractor shall routinely work during normal operating hours of the site.
Monday through Friday, excluding federal holidays. Any site work requested by the Contractor to be performed outside of normal duty hours shall be coordinated with the Base POC at least two working days in advance. The Contracting Officer must be notified in advance if there is any cost impact for this work.
8.0 GOVERNMENT FURNISHED INFORMATION/ACCESS/STANDARDS.
8.1 The Contractor shall comply with all base installation standards. Installation technicians shall be familiar with appropriate Commercial/Military/Local Installation Standards. Installation tasks shall be performed in accordance with the appropriate installation standards and practices. Installation Contractor shall comply with all commercial codes and standards to include but not limited to the following:
NUMBER TITLE WEBSITE OR LOCATION
BICSI Building Industry Consulting Service
International, Inc (BICSI) http://www.bicsi.org/
NFPA 70 (2020) National Fire Protection Association (NFPA), National Electric Code (NEC) http://www.nfpa.org/
ANSI American National Standards Institute (ANSI) and Internet Standards Resources http://www.ansi.org/
TIA Telecommunications Industry Association Engineering: TIA Standards See Commodity Specific Appendices and Individual Task Orders http://www.tiaonline.org/
ANSI/TIA-568-0.E
(2020)
Generic Telecommunications Cabling for Customer Premises https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-568-1.E
(2020)
Commercial Building Telecommunications Cabling Standard https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-568-2.D
(2018)
Balanced Twisted-Pair Telecommunications Cabling and Components Standard https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-568-3.D
(2016)
Optical Fiber Cabling Components https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-569-E
(2019)
Commercial Building Standards for Telecommunications Pathways and Spaces https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-606-C
(2017)
Administration Standard for Commercial Telecommunications Infrastructure https://www.ansi.org/ http://www.tiaonline.org/
ANSI/TIA-607-D
(2019)
Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises https://www.ansi.org/ http://www.tiaonline.org/
EIA/ECA-310-E
(Dec 2005)
Cabinets, Racks, Panels and Associated Equipment https://www.ansi.org/ http://www.tiaonline.org/
ISO/IEC 111801
(2017)
Generic Cabling for Customer Premises https://www.iso.org/home.html https://www.iec.ch/
IEEE 802 Standards -IEEE 802.3af Power over Ethernet (PoE) Standard -IEEE 802.3at Power over Ethernet+ (Plus) Standard -IEEE 802.3an Physical Layer and Management Parameters for 10 Gbps Operation Type 10GBASE-T -IEEE 802.3ba Media Access Control Parameters, Physical Layers and Management Parameters for 40 Gbps and 100 Gbps Operation -IEEE 802.11 Wireless Standard https://www.ieee.org/ http://www.bicsi.org/ http://www.nfpa.org/ http://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.ansi.org/ http://www.tiaonline.org/ https://www.iso.org/home.html https://www.iec.ch/ https://www.ieee.org/
ICEA S-80-576
(2002)
Telecommunications Wire and Cable for Wiring of Premises
Insulated Cable Engineer Association, Inc., P.O.
Box P, South Yarmouth MA 02664; Telephone
(508) 394-4424
NEMA TC 2
(2013)
Electrical Polyvinyl Chloride (PVC) Tubing and Conduit http://www.nema.org/index_nema.cfm/1260/
UFC 3-580-01
(2016)
Whole Building Design Guide Telecommunications Interior Infrastructure Planning and Design https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-580-01
I3A (2016) Technical Criteria for Installation Information Infrastructure Architecture https://www.lrl.usace.army.mil/Portals/64/docs/ Engineering/Design_Army_Res/i3a.pdf
The Contractor shall obtain and comply with any other applicable manuals not identified above that would be required to meet industry standards.
9.0 SECURITY
9.1 Stated work and associated products shall be performed at the UNCLASSIFIED level. However, when access to classified areas may be required, selected personnel who install network equipment, test network equipment and cutover network equipment may be required to obtain a minimum of DoD Secret Security Clearance. Escorts may be required, as some work will be performed in secure facilities. It is the Government’s responsibility to provide escorts.
9.2 The Contractor shall process a Site Visit Request Letter (Refer below 9.3). This letter shall identify the names, social security numbers, driver’s license numbers and state of issue, and birth date of the personnel who will performing on this SOO. This information is required to grant access to the base.
If required by the base, the Contractor shall provide identification badges for their employees. All Contractor personnel shall wear these badges while on duty on the Government site. The badges shall identify the individual, company name, and be clearly and distinctly marked as Contractor and be in accordance with base regulations.
9.3 Complete Installation Access Application form (Refer above 9.2). Access requests should be made thru 56CS/SCXP. Access requests shall be submitted at least one (1) week prior to scheduled arrival.
http://www.nema.org/index_nema.cfm/1260/ https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-580-01 https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-3-580-01 https://www.lrl.usace.army.mil/Portals/64/docs/Engineering/Design_Army_Res/i3a.pdf https://www.lrl.usace.army.mil/Portals/64/docs/Engineering/Design_Army_Res/i3a.pdf
Attachment #1
Sketch 1: Proposed Bldg S11 Duplex and Quad drop locations
Sketch 2: Proposed Bldg S11 Duplex and Quad drop locations (Secured Location)
Attachment #2
Luke AFB LAN Faceplate and Patch Panel Labeling Standard
1.1 Two Position UTP Wall Plate
ROOM Actual room number from the facility drawings at time of design.
Telecom Room Actual TR or Equipment Room where the end of the wall plate cables terminate. In existing facilities with no Telecom Room (TR) numbers the TR room identifier shall be floor number, room number where room number starts with the letter A with additional TR labeled B, C etc.
RACK # Actual Rack number that contains the patch panel where the cable terminates.
PATCH PANEL # Actual patch panel number.
PORT #’s Actual port numbers in the patch panel
The bottom position of the UTP wall plate shall be marked with the Room Number that the wall plate is installed. This information is reflected in the site cable plan.
Top Position Example:
110-1-1-1, 2
TR 110
Rack # 1 Patch Panel # 1 Port #’s 1,2 (On the patch panel)
Bottom Position Example:
32 = Room Number (Actual room # from the cable plan and facility drawings at time of design)
Top Position Example: (no comm. room identifier) 1A-1-1-1, 2 = TR 1A, Rack # 1, Patch Panel # 1, Port #’s 1,2 (On the patch panel)
110-1-1-1,2
A B
TR 110
RACK 1
PATCH PANEL 1
PORT #s 1,2
DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)
A - Outlet - White B - Outlet - Blue
ROOM NUMBER (Actual room number from site cable plan and facility drawings at time of network infrastructure site cable plan development.)
Example of a Single Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 1 of the patch panel.
110-1-1-3,4
A B
TR 110
RACK 1
PATCH PANEL 1
STARTING PORT # 3,4
DATA OUTLETS (Color Coded. Site Specific Colors may be used in lieu of standard colors)
A - Outlet - White B - Outlet - Blue
ROOM NUMBER (Actual room number from site cable plan and facility drawings at time of network infrastructure site cable plan development.)
Example of a Second Dual Data Outlet Located in room 32 and terminating in TR 110, Rack # 1, Patch Panel # 1 and starting in port # 3 of the patch panel.
Figure 1: Two-Position Wall Plate Numbering Scheme
1.2 Four Position UTP Wall Plate
ROOM Actual room number from the facility drawings at time of design
TR Actual TR or Equipment Room where the end of the wall plate cables terminate. In existing facilities with no Telecom Room (TR) numbers the TR room identifier shall be floor number, room number where room number starts with the letter A with additional TR labeled B,C etc.
RACK # Actual Rack number that contains the patch panel where the cable terminates.
PATCH PANEL # Actual patch panel number.
PORT #’s Actual port numbers in the patch panel
The bottom position of the UTP wall plate shall be marked with the Room Number that the wall plate is installed. This information is reflected in the site cable plan.
Top Position Example:
110-1-1-1, 2, 3, 4
TR 110
Rack # 1 Patch Panel # 1 Port #’s 1,2,3,4 (On the patch panel)
Bottom Position Example:
32 = Room Number (Actual room # from the cable plan and facility drawings at time of design)
Top Position Example: (no comm. room identifier) 1A-1-1-1, 2, 3, 4 = TR 1A, Rack # 1, Patch Panel # 1, Port #’s 1,2,3,4 (On the patch panel)
Figure 2: Four-Position Wall Plate Numbering Scheme
1.3 Patch Panel Labeling
Patch panel shall be labeled using the following format. Room number (actual room where user wall plate is located), face plate number, jack designator, 110-1 A B C D.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
110-1 A B C D
| 1.1 Two Position UTP Wall Plate |
| 1.2 Four Position UTP Wall Plate |
| 1.3 Patch Panel Labeling |
File details come from the government source that posted it. Updated .