Attachment_1_-_SEED_FOPR_001.pdf
PDF 764 KB Posted
- Attached to
- MTE Pump Generating Manufacturing and Rehab IDIQ
- Solicitation number
- 140R6024R0006
About this file
This document provides details on a federal solicitation for an indefinite delivery indefinite quantity contract to support the Mt Elbert Pump Generating Plant. The solicitation number is 140R6024R0006 and is being issued by the Department of the Interior Bureau of Reclamation to acquire contractor performance for the supply and construction of the Mt Elbert Pump Generating Plant. Under this multiple award IDIQ contract, contractors will support activities such as manufacturing, rehabilitating, and maintaining pumps and related equipment at the plant. The objective is for the Bureau of Reclamation to have pre-competed contractors available to issue delivery or task orders for various pump-related projects and needs at the facility on an as-needed basis.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAIR OPPORTUNITY PROPOSAL REQUEST
(FOPR)
Mount Elbert U1 Rotor Repair
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
MISSOURI BASIN REGION
BILLINGS, MT
UPPER COLORADO BASIN REGION
SALT LAKE CITY, UT
Solicitation Document No.
FOPR 0001
Document Title
MTE SEED FOPR
Contents
SECTION B – SUPPLIES OR SERVICES AND PRICES TURBINE AND GENERATOR HYDROELECTRIC
SECTION C – Statement / Description / Specification of Work SECTION D – Packaging and Marking SECTION E – Inspection and Acceptance
E.1 Please refer to the C-MAC IDIQ contract for requirements related to this section SECTION F -- Deliveries or Performance 11
F.1 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984
F.2 refer to the C-MAC IDIQ contract for all additional requirements related to this section
SECTION G - Contract Administration Data 12 Contract Administration Information – Government Provided Information
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM
(IPP) APRIL 2013
G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION JULY 1993
G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND LIMITATIONS BUREAU OF
RECLAMATION MAY 2018
SECTION H -- Special Contract Requirements 16 H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DECEMBER 2015
SECTION I - Contract Clauses 17 I.1 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU OF RECLAMATION ALT I
MARCH 2022
SECTION J – List of Attachments and Exhibits SECTION K – Representations, Certifications and Other Statements of OFFERORS SECTION L – Instructions, Conditions and Notices to Bidders 21
L.4 52.216-1 – TYPE OF CONTRACT APRIL 1984
L.7 52.236-27 SITE VISIT CONSTRUCTION ALT I FEBRUARY 1995
L.11 WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021
SECTION M -- Evaluation Factors for Award 23 M.1 WBR 1452.215-84 EVALUATION FACTORS FOR AWARD—QUALITY AND COST/PRICE APPROXIMATELY EQUAL –
BUREAU OF RECLAMATION MARCH 2021
Document Title
MTE SEED FOPR
Fair Opportunity Proposal Request Number: 0001
Description of Work Includes:
1. Crack Repair Design.
2. Crack Repair Construction:
a. Construction Mobilization and Preparation.
b. Construct Crack Repair.
c. Inspect Rotor Assembly.
d. Commissioning.
Location of Work: Work is located at Mt. Elbert Pumped Storage Powerplant approximately 20 miles south-southwest of Leadville, CO via US Highway 24 (US 24) and Colorado Highway 82 (CO 82), 24 miles north-northwest of Buena Vista, CO via US 24 and CO 82, and 144 miles from Denver International Airport via Interstate Highway 70 (I-70), US 24, and CO 82.
Site Visit: March 25 - 29, 2024
Must request a 2 day site visit to Monte Baird email: mbaird@usbr.gov and cardon copy(cc) Jessica Busman email jbusman@usbr.gov
Questions Due: April 11, 2024 1pm MDT
Closing Date/Time: May 2, 2024, 1pm MDT
This is a Fair Opportunity Proposal Request (FOPR) for construction to be provided under the HYDRO Multiple Award Task Order Contracts (MATOCs). A review of the FOPR requirements has been conducted, and it has been determined that the preponderance of the work falls within the scope of the contract.
1. Funding: An award will be made under this solicitation, as funds are presently available. The Government reserves the right to cancel this solicitation / Task Order Request for Proposal (FOPR) before the closing date .
2. Contract Clauses: All contract clauses contained in the base Multiple Award Contracts IDIQ are hereby incorporated into this solicitation. The clauses contained in this FOPR will supplement the clauses in the base IDIQ contract.
3. Proposal Acceptance Period/Date: The proposal acceptance period shall extend ninety (60) days past the TORFP closing date.
Document Title
MTE SEED FOPR
Continuation of Section B –
SECTION B – SUPPLIES OR SERVICES AND PRICE TURBINE AND GENERATOR
HYDROELECTRIC
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of a Price Schedule.
(1) Offerors shall complete Price Schedules 1 and 2. Failure to complete Price Schedules 1 and 2 will result in an incomplete offer, which will not be considered.
(2) Price Schedule 3 is an elective Price Schedule.
(3) Price Schedules 1, 2, and 3 are alternative Price Schedules; award will be made on only one of these Price Schedules on the basis of best value to Government and availability of funds.
(b) Optional Price Schedules:
(1) Offerors shall complete Optional Price Schedules 1A and 2A. Failure to complete Optional Price Schedules 1A and 2A will result in an incomplete offer, which will not be considered.
(2) Optional Price Schedule 3A is an elective Optional Price Schedule.
(3) Option for Increased Quantity – Separately Priced Line Item for Optional CLIN provisions.
(c) Offers are subject to the terms and conditions of this solicitation.
(d) Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in the contract clause, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at, Variation in Estimated Quantity, does not apply to lump-sum items.
(e) See the contract clause at, Payment for Mobilization and Preparatory Work, for CLIN 1-1, 1-4, 2-1, 2-4, 3-1, and 3-4.
(f) Definitions:
(1) CLIN: Contract Line Item Number.
Document Title
MTE SEED FOPR
Price Schedule 1 – Rotor Spider Replacement (BASE PROPOSAL)
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1-1 01 81 05 Design Rotor Spider Replacement
For the lump sum of $
1-2 01 81 05 Furnish Rotor Spider Replacement
For the lump sum of $
1-3 WBR
1452.232-81
Construction Mobilization and Preparation
For the lump sum of $
1-4 01 81 05 Construct and Install Rotor Spider Replacement
For the lump sum of $
1-5 01 81 05 Inspect Rotor Assembly For the lump sum of $
1-6 01 81 05 Commissioning For the lump sum of $
TOTAL BASE PROPOSAL AMOUNT
OPTIONAL Price Schedule 1A - Rotor Spider Replacement Extended Warranty
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1A-1 01 81 05 Extended Warranty – 1 year For the lump sum of $
Document Title
MTE SEED FOPR
Price Schedule 2 – Rotor Assembly Replacement (ALTERNATE PROPOSAL)
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
2-1 01 81 05 Design Rotor Assembly Replacement
For the lump sum of $
2-2 01 81 05 Furnish Rotor Assembly Replacement
For the lump sum of $
2-3 WBR
1452.232-81
Construction Mobilization and Preparation
For the lump sum of $
2-4 01 81 05 Construct and Install Rotor Assembly Replacement
For the lump sum of $
2-5 01 81 05 Inspect Rotor Assembly For the lump sum of $
2-6 01 81 05 Commissioning For the lump sum of $
TOTAL ALTERNATE PROPOSAL AMOUNT $
OPTIONAL Price Schedule 2A - Rotor Assembly Replacement Extended Warranty
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
2A-1 01 81 05 Extended Warranty – 1 year For the lump sum of $
Document Title
MTE SEED FOPR
Price Schedule 3 – Rotor Spider Repair (ELECTIVE ALTERNATE PROPOSAL)
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
3-1 01 81 05 Design Rotor Spider Repair For the lump sum of $
3-2 01 81 05 Furnish Rotor Spider Repair For the lump sum of
3-3 WBR
1452.232-81
Construction Mobilization and Preparation
For the lump sum of $
3-4 01 81 05 Construct and Install Rotor Spider Repair
For the lump sum of $
3-5 01 81 05 Inspect Rotor Assembly For the lump sum of $
3-6 01 81 05 Over and Above Rotor Defect Repair
300 in3 $ $
3-7 01 81 05 Commissioning For the lump sum of $
TOTAL ALTERNATE PROPOSAL AMOUNT $
OPTIONAL Price Schedule 3A (Elective) - Rotor Crack Repair Extended Warranty
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
3A-1 01 81 05 Extended Warranty – 1 year For the lump sum of $
3A-2 01 81 05 Extended Warranty – 5 years For the lump sum of $
END OF SUPPLIES OR SERVICES AND PRICES/COSTS
Document Title
MTE SEED FOPR
SECTION C – Statement / Description / Specification of Work
C.1. Disclosure of the magnitude of construction projects. In accordance with FAR 36.204, the estimated price range of this project is:
Between $4,000,000 and $8,000,000.
Please See Section J Attachment(s) for specifications, drawings, and supporting data.
Document Title
MTE SEED FOPR
SECTION D – Packaging and Marking
Please refer to the C-MAC IDIQ contract for requirements related to this section.
Document Title
MTE SEED FOPR
SECTION E – Inspection and Acceptance
E.1 Please refer to the C-MAC IDIQ contract for requirements related to this section.
Document Title
MTE SEED FOPR
SECTION F -- Deliveries or Performance
F.1 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the calendar days stated in the proposal after notice to proceed. * The time stated for completion shall include final cleanup of the premises.
(End of clause)
F.2 refer to the C-MAC IDIQ contract for all additional requirements related to this section.
Document Title
MTE SEED FOPR
SECTION G - Contract Administration Data
Contract Administration Information – Government Provided Information
Contracting Officer Contract Specialists Contracting Officer Representative
Ms. Jessica Busman 125 S. State St., Room 1800 Salt Lake City, UT 84138 772-359-9749 jbusman@usbr.gov
Mr. Monte Baird 125 S. State St., Room 1800 Salt Lake City, UT 84138 406-247-7615 mbaird@usbr.gov
Mr. Thomas Moritz 11056 West County Road 18E Loveland, CO 80537 970-646-2492 tmoritz@usbr.gov
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers having been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers exceeding the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
Document Title
MTE SEED FOPR
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR via electronic transmission. This can be through email, mail, or fax. If by fax please request the appropriate fax number. Email is the preferred method of delivery.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of Clause)
G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE
PROCESSING PLATFORM (IPP) APRIL 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice, failure to provide the items will result in invoice rejection:
Reference FAR 52.232-5 – payments under Firm Fixed Price Construction Contracts
Once the invoice has been submitted into the IPP system, the Contractor shall also submit an electronic copy of the invoice to the following:
Contract Officer: (Jessica Busman – jbusman@usbr.gov) Contracting Specialist: (Monte Baird – mbaird@usbr.gov) Procurement Technician: (Scott Becker – tbecker@usbr.gov)
Failure to transmit invoices via electronic transmission may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Clause)
G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION MARCH 2022
(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held virtual using Microsoft Teams.
https://www.ipp.gov/ mailto:jbusman@usbr.gov mailto:ippgroup@bos.frb.org
Document Title
MTE SEED FOPR
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference in its offer.
(End of Clause)
G.4 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES AND
LIMITATIONS BUREAU OF RECLAMATION MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
Document Title
MTE SEED FOPR
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
Document Title
MTE SEED FOPR
SECTION H -- Special Contract Requirements
H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM
DECEMBER 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at: https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6)The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
https://www.cpars.gov/
Document Title
MTE SEED FOPR
(End of Clause) Please refer to the C-MAC IDIQ contract for requirements related to this section.
SECTION I - Contract Clauses In addition to the clauses in the Multiple Award IDIQ , the following apply to this TO:
☐ FAR 52.216-29 Time and Materials/Labor Hour Proposal Requirements ☒ FAR 52.216-32 Task-Order and Delivery-Order Ombudsman ☐ FAR 52.232-18 Availability of Funds ☐ FAR 52.232-22 Limitation of Funds ☐ FAR 52.232-28 Invitation to Propose Performance Based Payments ☐ FAR 52.232-32 Performance-Based Payments ☐ WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (MAR 2022)
I.1 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU
OF RECLAMATION ALT I MARCH 2022
(a) General. Payment for the Mobilization and Preparatory Work line item of the schedule will be made as reflected herein. To the extent that this line item exceeds the percentage of total contract pricing as estimated by the Contracting Officer in WBR 1452.236-85, Instruction for Mobilization and Preparatory Work Schedule Line Item, payment will be made as reflected in Section (d)(5) below.
Reclamation will make payment to the Contractor in accordance with this clause for operations including, but not limited to, those necessary for --
(1) Movement of personnel, equipment, supplies, and incidentals to the project site;
(2) The establishment of offices, buildings, plants and other facilities, at the site (excludes temporary buildings (e.g. storage sheds, shops, offices) and utilities listed in the Operations and Storage Areas clause of this contract;
(3) Payment of premiums for project bonds and insurance; and
(4) Other work and operations which must be performed or costs incurred incident to the initiation of meaningful work at the site and for which the contract does not otherwise provide for payment.
(5) Approved detailed logic diagram(s) and the baseline schedule.
(d)..(4) When progress payments totaling ten percent of the total original contract amount have been made by the Government for all other work accomplished under the contract and upon approval of the detailed logic diagram(s) and baseline schedule, the balance of the amount for the mobilization and preparatory work contract line item or five percent of the total original contract amount (whichever is the lower) shall be paid to the contractor.
(End of Clause)
Document Title
MTE SEED FOPR
I.2. 52.217-9 OPTION TO EXTEND THE WARRANTY TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of the warranty by written notice to the Contractor within _365 after commissioning; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least _60_ days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended warranty shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed __based on awarded price schedule.
Document Title
MTE SEED FOPR
SECTION J – List of Attachments and Exhibits
Attachment Number Description Number of Pages Attachment #3 Specifications 165 Attachment #4 Drawings 17 Attachment #5 SEED Wage Determination 11
Document Title
MTE SEED FOPR
SECTION K – Representations, Certifications and Other Statements of OFFERORS
Please refer to the C-MAC IDIQ contract for all additional requirements related to this section
Document Title
MTE SEED FOPR
SECTION L – Instructions, Conditions and Notices to Bidders
L.4 52.216-1 – TYPE OF CONTRACT APRIL 1984
The Government contemplates award of a Firm Fixed Price Contract resulting from this solicitation.
(End of Provision)
L.7 52.236-27 SITE VISIT CONSTRUCTION ALT I FEBRUARY 1995
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for – March 25-29, 2024
Must request a 1-2-day site visit to Monte Baird email: mbaird@usbr.gov and cardon copy(cc) Jessica Busman email jbusman@usbr.gov
(c) Participants will meet at - 5583 Hwy 82 Twin Lakes CO 81251
(End of Provision)
L.3. 52.252-4 ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
52.217-9 OPTION TO EXTEND THE WARRANTY TERM OF THE CONTRACT (MAR 2000)
L.11 WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021
This procurement will be conducted in accordance with FAR Part 16.
In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation (see FAR 52.215- 1), each offeror shall submit a proposal in accordance with the instructions contained in this IDIQ provision.
(a) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of Proposal Information – Department of the Interior provision of this solicitation (see DIAR 1452.215-71), offerors shall mark trade-secret, or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary Information."
Proposal Volumes.
(b)Offerors shall submit separate Volumes with the required number of copies as follows:
(l) SEED Technical Proposal included in Volume II - Page limitation of 75 pages includes SEED Technical Proposal (2)SEED Price Proposal in Volume III - Page limitation of 6 pages(Page limit for pricing does not include the Schedule B pages.)
(c)General Contents. Each separate proposal Volume shall follow the requirements in solicitation document 140R6024R0006
Document Title
MTE SEED FOPR
(1) SEED Technical Proposal. The technical proposal should convincingly describe the capability of the offeror's organization to participate in this project and effectively demonstrate a thorough understanding of the work statement contained in Section C of this solicitation. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the technical proposal:
(a) Table of Contents. The Table of Contents shall list all sections of the technical proposal. Any future amendments, additions and/or revisions to the proposal shall be included in an updated Table of Contents;
(b) Index. The Index section shall cross reference the statement of work, specifications, or performance work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Section M;
(c) Enclosures. The Enclosures Section shall include a list of any tables, drawings, charts, and any other enclosures which summarize data or information;
(d) Executive Summary. The Executive Summary shall include a brief discussion of how the required work will be performed and important highlights of the proposal.
(e) General. Volume II, Technical Proposal, shall be an orderly, specific, and complete document in every detail. It shall be presented in a manner which allows it to “stand alone” without the need to reference other documents. It shall convincingly describe the capability of the Offeror’s organization to participate in this project and effectively state a thorough understanding of the specifications and design contained in Section C of this solicitation. The proposal shall be organized and written so that it can be easily read and meaningfully evaluated by Reclamation personnel from a variety of different functional and technical disciplines. It shall be a coherent document free of internal inconsistencies as well as inconsistencies with other volumes of the proposal.
(f) Use and Disclosure of Proposal Information. In accordance with DIAR 1452.215-71 Use and Disclosure of Proposal Information.
Department of the Interior provision of this solicitation, offerors shall mark trade secret, or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The Offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-4) contained in the proposal with the restrictive legend “Proprietary Information.”
(g) Pricing. For the Technical Proposal to be evaluated strictly on the merit of the material submitted, pricing shall be in Volumes I & III. No pricing information shall be provided in Volume II (Technical Proposal).
(h) Short Concise Writing Preference. There is no need to max out the page count if there is no internal need decided to do so.
Verbose statements and essays are not desired or required in response to this notice. As an overview, Reclamation will evaluate two main factors; 1) The Offeror and its capabilities/competency to meet the technical evaluation factor items/specifications, and 2) the work each offeror is promising if award is received. The purpose of this RFP is to evaluate the capability of the Offeror, not its writing skills. Terms can be laymen’s terms for simplicity if appropriate for the subject matter.
Illustrate in simple terms the technical approach and capability your firm will apply, and possesses, if award is received, to satisfy the purpose and scope of this project according to the specifications and this RFP document.
Factor 1 SEED Evaluation: Technical Approach, Constructability and Schedule
Provide detailed narrative work plans for each price schedule B. The work plans shall identify potential subcontractors and significant anticipated material suppliers. The work plans shall correlate with the offeror’s proposed construction schedule and explain in detail the offeror’s, or subcontractor’s, approach to accomplish the following specific construction tasks:
Subfactor 1: Technical Approach and Constructability:
Narrative description of the offeror’s rotor repair design. Provide sufficient details to convey proposer’s understanding of the contract requirements and desired project outcome. Conceptual drawings in AutoCAD of the rotor repair indicating modifications to existing equipment, material selections, weights and constructability.
Document Title
MTE SEED FOPR
Narrative descriptions explaining how the offeror’s rotor repair will be installed and commissioned. Provide sufficient details to convey proposer’s understanding of the contract requirements and desired project outcome.
Detailed explanation of the quality control procedures utilized at each stage of the manufacturing, installation, and commissioning work; to include fabrication, machining, welding, assembly, testing and inspections.
Description of the repair or replacement logistics starting with approved design (Point A) and ending at installation (Point ‘X’).
Specifically, describe how the offeror plans to execute the rotor repair to meet project milestones. Provide enough details to demonstrate the offer understands the logistics of the repair or replacement.
Subfactor 2: Schedule:
The schedule must be supported with a narrative describing how the offeror plans to complete the entire project and the time allowed for performance, including major milestones.
For each price schedule submitted, provide a complete project schedule (design through commissioning), applying Critical Path Method (CPM) techniques, of the workflow consistent with good project management practices. Provide a narrative description of items and/or workforce that could be implemented to restore a delayed schedule. The schedule shall include a logic diagram, reports, and bar chart showing the major items of work contained in the proposal, their durations, anticipated start and finish dates, float, material procurement, major submittals required, and the logical relations or interface between activities.
The schedule shall show detailed sequencing of the following:
Rotor repair design phases and Government review.
Material procurement, manufacturing, fabrication, inspections and ready for shipment (RFS). Rotor disassembly and reassembly, including rim shrink.
Rotor repair and inspection activities at site; including hazardous material abatement. Government rotor installation. Assume four (4) months for Government Installation.
Unit commissioning activities.
Volume III, Pricing Proposal Evaluation Factor 5: SEED Cost / Price To permit objective evaluation of the technical proposal, no cost or price information shall be included in the technical proposal (Volume II). Offerors shall provide a complete schedule and price proposal (Volume III) for the SEED FOPR(see section J).
The primary purpose of the Pricing Proposal Volume is to provide the CO and the team of evaluators an understanding of how the price proposal was developed. The price evaluation criteria of completeness, reasonableness, and Total Evaluated Price (TEP) as defined in Section M of the RFP will be assessed from the Offeror’s information provided in this volume. Cost-Realism may also be applied as stated in Section M of the RFP.
Submission: The electronic copies shall be clearly identified. PDF files are highly preferred for the Pricing Proposal Volume, Schedule B from the SF 1442 and shall be filled out and submitted with Volume III (Pricing Proposal). In addition, the Offeror can, as an option, submit the pricing proposal (Contract Estimate Worksheet, Pricing Assumptions, Estimating Techniques, etc.) in Microsoft Word and Microsoft Excel as appropriate with the electronic submittal if needed to show any formulas or calculations that would be helpful for price evaluation. Word Documents and Excel spreadsheets must be editable and not password protected.
Total Evaluated Price (TEP) for the SEED Task Order: For pricing, the Government will evaluate the pricing provided by each Offeror for the project based on a TEP. Offerors shall input prices for all identified work in the Schedule B, as well as any meaningful rationale needed to understand the provided pricing. The TEP is Fixed-Price, contractually binding, and shall include all costs associated with completing the solicited project.
Cost or Pricing Information Requirements: In accordance with FAR 15.402, 15.403-1(b), and 15.403-3(a), “information other than cost or pricing data” may be required to support price reasonableness. If, after receipt of proposals, the CO determines that there is insufficient information available to determine the reasonableness of the proposed pricing the Offeror shall be required to submit additional
Solicitation Document No. Document Title
MTE SEED FOPR
Price Information: Information beyond that required by this instruction shall not be submitted unless the Offeror considers it essential to document or support its price position. All information relating to the proposed prices/rates, including all required supporting documentation, must be included in the section of the proposal designated as the Pricing Volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal, with the exception of Schedule B pricing if separate.
Rounding: All total dollar amounts provided shall be rounded to the nearest cent.
Pricing Proposal at a minimum shall include:
1) Filled out/Completed SEED Price Schedule B with all Unit Prices;
2) Pricing Assumptions;
3) Estimating Techniques Methodology;
4) The following listed items will be retained and applied to modification actions if applicable. This method allows using the initial award competition as the justification of reasonable rates throughout the performance of the contract which makes handling modifications easier throughout the life of the contract. The following items will be applied for the length of the contract including all modification actions after time of award:
a. Home Office Overhead Rate.
b. Field Overhead Rate.
c. Profit Rate.
d. General and Administrative (G&A) Rate if applied/applicable.
e. Pass-Through overhead and profit rates for subcontractors.
f. Equipment Rates – per piece of equipment.
g. Labor Rates – if over Davis-Bacon-Act (DBA) or non-applicable to DBA wage determination (e.g., key personnel, professional categories).
h. Labor Burden – include the labor burden for all employees.
i. Escalation Rates – if applicable per 12-month period from time of basic award.
5) Total Price Clearly Marked and Labeled
Additional Items:
(a) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of Proposal Information --
Department of the Interior provision of this solicitation, offerors shall mark trade secret, or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary
Information."
(b) Cost Information in Other Volumes. No cost information shall be included in any other volume of a proposal unless required by paragraph (d) of the Technical Proposal Instructions -- Bureau of Reclamation provision of this solicitation.
(c) Page Numbering. All pages in the cost proposal shall be consecutively numbered (including pages with tables and exhibits).
The offeror shall clearly identify all exhibits and supporting information.
(End of Provision)
Please refer to the C-MAC IDIQ contract for additional requirements related to this section.
Document Title
MTE SEED FOPR
M.1 WBR 1452.215-84 EVALUATION FACTORS FOR AWARD—QUALITY AND COST/PRICE
APPROXIMATELY EQUAL – BUREAU OF RECLAMATION MARCH 2021
(a) Award will be made to the responsible offeror submitting a proposal which conforms to the solicitation and is most advantageous to the Government considering the factors and any significant subfactors listed in this provision.
(b) In the evaluation of proposals, all evaluation factors (listed in this provision) other than cost or price, when combined, are considered to be approximately equal to cost or price. The relative importance to be placed on the factors in relation to each other is contained in paragraph (e) of this provision. However, the degree of importance of cost or price may increase with the degree of non-cost or non-price equality between the proposals. If a proposal is determined by the contracting officer to be "technically unacceptable" as a result of evaluating all factors other than cost or price, the proposal may be rejected from further consideration. The contracting officer reserves the right to make award to other than the technically acceptable offeror with the lowest cost or price proposal if it is determined that the technical benefits of another offeror's proposal justify its higher cost or price. The contracting officer also reserves the right to make award to a lower-priced, lower-scored offeror if it is determined that the cost or price premium involved in awarding to a higher-rated, higher-priced offeror is not justified.
Since technical proposals are being solicited to obtain information to be used in the evaluation, the Government reserves the right to use information outside of the proposal to evaluate the capability of offerors and the value of offers.
(c) Pursuant to FAR 15.305(a)(1), a cost or price analysis will be performed to determine price reasonableness and any instances of unbalanced pricing, using one or more of the techniques at FAR 15.404-1.
(d) The following factors and significant subfactors (if listed), will be considered in evaluating proposals and making the source selection:
1. Evaluation Factor 1 – SEED Technical Approach and Schedule
2. Evaluation Factor 2 - SEED Cost/Price
Evaluation Methodology:
All proposed prices will be reviewed for price reasonableness and any instances of unbalanced pricing. The price component to be used in any tradeoffs with technical factors will be comprised of the Total Evaluated Price.
Next, a technical will be performed on proposals received from all Offerors as required in Section L. Evaluations will cease when all proposals are fully evaluated as to provide each offeror with substantive feedback if debriefs are requested. Only those Offerors determined to meet the proposal requirements (in accordance with Sections L&M) with an acceptable past performance rating, either initially or as a result of discussions, will be considered for award.
Award will be made to the proposal determined to be the “Best Value” to the government. All non-price evaluation factors, when combined, are approximately equal in importance to price.
Solicitation Requirements, Terms and Conditions:
Offerors are required to meet all solicitation requirements, such as terms and conditions, reps and certs, and technical requirements as detailed in the specifications, in addition to those listed as evaluation factors or elements. Failure to meet a requirement may result in an offer being ineligible for award.
SEED FOPR VOLUME II – TECHNICAL PROPOSAL EVALUATION FACTORS
Evaluation Factor 1: Technical Approach and Schedule
SECTION M -- Evaluation Factors for Award
Document Title
MTE SEED FOPR
Factor 1 SEED Evaluation – Technical Approach, Constructability and Schedule:
The Offerors will be evaluated on the understanding and knowledge of the project through the required task work plans identified under Evaluation Factor: Technical Approach, constructability and Schedule in Section L.
Subfactor 1:
Each alternative Price Schedule will be evaluated independently. The offeror will be evaluated on their design approach, proposed rotor repair/ replacement design, understanding of contract requirements and desired project outcome, and constructability. Providing a comprehensive and detailed preliminary analysis, calculations, drawings, company past successful experience, evidence of adequate facilities and equipment, and a detailed and comprehensive description of the planning, execution and interrelationships demonstrating complexity awareness are more favorable and will receive a higher technical rating.
Subfactor 2:
Proposed Construction Schedule – The offeror will be evaluated based on their project team’s ability to effectively schedule the project to ensure on-time delivery. The evaluation will be based on the offeror’s detailed construction schedule, calendars used, and information provided on total float, key submittals, and critical path. The higher level of detail in the provided schedule demonstrates the offeror’s understanding of the construction sequencing for the project and will be evaluated more favorably. The schedule will be evaluated on how the offeror plans to complete the entire project within the time allowed for performance, including major milestones. The narrative will be evaluated on assumptions for typical weather impacts (reasonable and expected based on historical weather information for the area) and how cold weather is accounted for in the construction schedule.
VOLUME III – PRICING PROPOSAL EVALUATION
Evaluation Factor 2 –SEED Cost / Price:
All proposals will be evaluated to determine the best value to the government as described below:
a. The pricing criteria used for evaluation are (1) Completeness, (2) Price Reasonableness, and (3) Total Evaluated Price (TEP).
b. Completeness: The Government will review the SEED pricing submission(see section J) for completeness and compliance with
Section L of the RFP. Incomplete price submissions may NOT be evaluated, and the proposal may be eliminated from the competition.
c. Price Reasonableness: The Offeror’s price proposal will be evaluated using one or more of the techniques defined in FAR 15.404-1
(Proposal Analysis Techniques). Price reasonableness is most easily defined as “what another reasonable businessperson would pay for the good or service under the same circumstances.”
d. SEED Total Evaluated Price (TEP): Price Analysis will be performed to determine the reasonableness of the Offeror’s pricing proposal. The TEP will be calculated as the sum of all proposed prices contained in the Schedule B pricing. The TEP is a fixed and contractually binding amount, all applicable prices must be completed. An omitted item may result in proposal elimination.
f. All proposed prices will be reviewed for price reasonableness and any instances of unbalanced pricing.
(End of Provision)
M.2 52.217-5 EVALUATION OF OPTIONS (JULY 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of provision)
Please refer to the C-MAC IDIQ contract for requirements related to this section
END OF TASK ORDER REQUEST FOR PROPOSAL
| SECTION B – SUPPLIES OR SERVICES AND PRICES TURBINE AND GENERATOR HYDROELECTRIC |
| SECTION C – Statement / Description / Specification of Work |
| SECTION D – Packaging and Marking |
| SECTION E – Inspection and Acceptance |
| E.1 Please refer to the C-MAC IDIQ contract for requirements related to this section. |
| SECTION F -- Deliveries or Performance |
| F.1 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984 |
| F.2 refer to the C-MAC IDIQ contract for all additional requirements related to this section. |
| SECTION G - Contract Administration Data |
| Contract Administration Information – Government Provided Information |
| G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011 |
| G.2 DOI-AAAP 0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP) APRIL 2013 |
| G.3 WBR 1452.242-80 POST AWARD CONFERENCE BUREAU OF RECLAMATION JULY 1993 |
| SECTION H -- Special Contract Requirements |
| H.1 DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DECEMBER 2015 |
| SECTION I - Contract Clauses |
| I.2144 WBR 1452.232-81 – PAYMENT FOR MOBILIZATION AND PREPARATORY WORK – BUREAU OF RECLAMATION ALT I MARCH 2022 |
| SECTION J – List of Attachments and Exhibits |
| SECTION K – Representations, Certifications and Other Statements of OFFERORS |
| SECTION L – Instructions, Conditions and Notices to Bidders |
| L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE FEBRUARY 1998 |
| This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned tha... |
| FAR provisions https://www.acquisition.gov/far/ |
This is the start of the file's text. The full file is on GovTribe.