Attachment 1- Section L.pdf

PDF 347 KB Posted

Attached to
Contractor Operated Civil Engineer Supply Store (COCESS)
Solicitation number
FA441725R0015
Issued by

About this file

This document is Section L - Instructions, Conditions, and Notices to Offerors for a Contractor Operated Civil Engineer Supply Store (COCESS) solicitation. The Request for Proposal (RFP) requires offerors to submit a three-volume proposal: Volume I (Price Proposal), Volume II (Technical), and Volume III (Past Performance). Proposals must be submitted through SAM.gov or the Solicitation Module in PIEE by the specified due date, with specific formatting requirements including 8.5" x 11" pages, font size 12 pitch, and page limits for each volume.

The technical proposal must include a Store Management Plan and Transition Plan, each limited to 10 pages, detailing how the contractor will manage the store and transition operations within 30 days of contract award. Past performance documentation should include up to five references from contracts completed within the last three years, with past performance questionnaires to be submitted electronically by project owners. The contract is for a five-year ordering period, with pricing to be determined through specified databases and a Pricing Discount Coefficient. Proposals will be evaluated on technical capabilities, past performance, and pricing, with the government reserving the right to award based on initial proposals without further discussion.

View the file

Other files

File Type Posted
Attachment 8 - Common COCESS Items Price List Updated 6.16.25.xlsx XLSX spreadsheet
Solicitation Amendment FA441725R00150005 SF 30.pdf PDF
Attachment 1 - Section L- Instructions Conditions and Notices to Offerors 6.17.25.pdf PDF
Attachment 9 - Pricing Discount Coefficient Table_Revised 6.16.2025.xlsx XLSX spreadsheet
Attachment 2 - Section M - Evaluation Factors for Award 6.17.25.pdf PDF
Solicitation Amendment FA441725R00150004.pdf PDF
COCESS Questions 6 June 2025.pdf PDF
Solicitation Amendment FA441725R00150003 SF 30.pdf PDF
Attachment 19a - Store Stock Items 2025 Revised 20250605 .xlsx XLSX spreadsheet
Attachment 8 - Common COCESS Items Price List Updated 6.2.25.xlsx XLSX spreadsheet
Attachment 1 - Section L- Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 2 - Section M - Evaluation Factors for Award.pdf PDF
Attachment 3 - PWS COCESS Final 4 June 25.pdf PDF
COCESS Questions 4 June 2025.pdf PDF
Solicitation Amendment FA441725R00150002 SF 30.pdf PDF
COCESS Questions 2 June 2025.pdf PDF
COCESS Salient Characteristics 01.jpg JPG image
Attachment 3 - PWS COCESS Final 5.15.25-FTEVL-DD768T3.pdf PDF
Attachment 8 - Common COCESS Items Price List Updated 6.2.25.xlsx XLSX spreadsheet
Attachment 19 -CDRL A0010 Supplemental Priced Item List (SPI).pdf PDF
COCESS Question Number 37 Q_A - 5 Year Inventory list.xlsx XLSX spreadsheet
COCESS Salient Characteristics 03.jpg JPG image
Attachment 4 - WD 2015-4531 Rev. 30.pdf PDF
Solicitation Amendment FA441725R00150001 SF 30.pdf PDF
Attachment 1 - Section L- Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 19a - Store Stock Items 2025.xlsx XLSX spreadsheet
COCESS Salient Characteristics 04.jpg JPG image
Attachment 2 - Section M- Evaluation Factors for Award.pdf PDF
Attachment 9 - Pricing Discount Coefficient Table Final Version.xlsx XLSX spreadsheet
Attachment 3 - PWS COCESS Final.pdf PDF
Attachment 2- Section M.pdf PDF
Attachment 7 - Additional Clause Ordering.pdf PDF
Attachment 8 - Common COCESS Items Price List.xlsx XLSX spreadsheet
Attachment 9 - Pricing Discount Coefficient Table.xlsx XLSX spreadsheet
Attachment 15 - CDRL A0006 Final Report.pdf PDF
Attachment 18 - CDRL A0009 Phase-Out Plan.pdf PDF
Attachment 10 - CDRL A0001 COCESS Store Items List.pdf PDF
Attachment 11 - CDRL A0002 Employee Listing.pdf PDF
Attachment 13 - CDRL A0004 On-Site Store Manager.pdf PDF
Solicitation - FA441725R0015.pdf PDF
Attachment 3 - PWS COCESS Final.pdf PDF
Attachment 4 - WD 2015-4531 Rev. 29.pdf PDF
Attachment 5 - Past Performance Questionnaire.pdf PDF
Attachment 6 - Financial Reference Sheet - FA441725R0015.pdf PDF
Attachment 12 - CDRL A0003 Emergency Support.pdf PDF
Attachment 17 - CDRL A0008 Contractor Transition.pdf PDF
Attachment 14 - CDRL A0005 TRIRIGA Access.pdf PDF
Attachment 16 - CDRL A0007 Contractor Environmental Awareness Training.pdf PDF
Attachment 19 - CDRL A0010 Supplemental Priced Item List (SPI).pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

Section L - Instructions, Conditions, and Notices to Offerors

THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE

PHYSCIALLY REMOVED FROM ANY RESULTANT AWARD.

1. Overview

To ensure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. This section L of the Request of Proposal (RFP) provides general guidance for preparing proposals as well as specific instruction on the format and content of the proposal. The offeror’s proposal must include all data and information requested in Section L and must be submitted in accordance with these instructions. Non-conformance with the instructions provided in this Section L and/or failure to meet a requirement may result in an offer being ineligible for award.

1.1. General Instructions

The offeror’s proposal must include all data and information requested within this section. Proposals may be submitted by ALL interested parties in https://sam.gov and within the Solicitation Module in PIEE (https://piee.eb.mil). Potential offerors are encouraged to subscribe for real-time email notifications when information has been posted to the website for this solicitation.

Offerors shall meet all solicitation requirements, including terms and conditions, representations and certifications. Failure to meet a requirement may result in an offer being ineligible for award.

Each proposal shall consist of three (3) separate volumes:

Volume I – Price Proposal Volume II – Technical

Volume III – Past Performance

1.1.1. The proposal shall be clear, concise, and shall include sufficient detail for an effective evaluation and provide complete accompanying rationale. The proposal should not rephrase or restate the Government’s requirement but shall provide conclusive rationale to address how the offeror intends to meet the requirements. All offerors will provide detailed capabilities and experience and will base its evaluation on the information presented in the offeror’s proposal, past performance and any questionnaires returned to the source selection team.

The contracting officer listed below is the Government’s sole point of contact for this acquisition. Written requests for clarification must be sent to the POCs at the following email addresses:

Christina Smith, christina.smith.44@us.af.mil Ashley Williams, ashley.williams.85@us.af.mil SrA Melissa Perez-Hughes, melissa.perez-hughes@us.af.mil

1.1.2. If an offeror believes that the requirements in these instructions contain an error, omission or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale and remedies the offeror is asking the Contracting Officer to consider. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion. This reservation includes matters of additional or substitute pages of the initial proposal.

**Late offers will be processed in accordance with FAR 52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers.”**

2.0. Specific Instructions

2.1. Offerors are responsible for submitting proposals (including any revisions, and amendments) to reach the Government office designated in this solicitation by the time specified in the solicitation. Paper (hard copy) proposals shall NOT be provided and will not be evaluated. EMAIL SUBMISSION OF PROPOSALS WILL NOT BE ACCEPTED. Proposals may be submitted in one of the following three ways:

2.1.1. Offerors may deliver proposal through the Solicitation Module in Procurement Integrated Environment (PIEE). Offerors are responsible for ensuring PIEE registration and any training needed is completed prior to anticipated solicitation closing date. See links below:

Solicitation Module Training: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

2.1.2. Proposals may be hand carried by submission of disks (CDs or DVDs) containing electronic files.

Title of the documents should include the offerors CAGE code (e.g. “Vol 1 Tech Proposal CAGE#”).

The physical address for hand carried deliveries is 350 Tully Street, Building 90339, Hurlburt Field, Florida 32544. Contractors should request base access for hand carried proposal delivery NLT 72 hours prior to the proposal due date/time by sending an email request identifying the company name and list of individuals requesting access to the POCs identified in paragraph 1.1.1. in the previous section.

2.1.3. Proposals may also be submitted by mail to the 1st Special Operations Contracting Squadron at Hurlburt Field, Florida. Mailed proposals must be on disk (CD or DVD) and all files must be in .pdf format. Title of the documents should include the offerors CAGE code (e.g. “Vol 1 Tech Proposal CAGE#”). DO NOT use U.S. Postal Service (USPS) mail service. Mail only using commercial carriers, UPS or FedEx. It is the responsibility of the proposing company to ensure the package is delivered on time. The address for proposal submission is:

2.1.4. Questions must be submitted via email to the personnel noted above in 1.1.1. All questions are due no later than 9:00 AM CST, by 22 May 2025. All questions and answers will be posted to the PIEE Solicitation Module as well as the SAM.gov website. It is the responsibility of the contractor to continuously monitor the site for updates. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, all questions must be submitted electronically to the individual(s) listed below. Any questions submitted after this period may not be answered.

Christina Smith, christina.smith.44@us.af.mil AND Ashley Williams, ashley.williams.85@us.af.mil AND SrA Melissa Perez-Hughes, melissa.perez-hughes@us.af.mil

2.1.5. The offer due date is specified in Block 8 of the SF 1449 for this solicitation. By signing block 30a of the SF 1449, the offeror certifies that the proposal is valid for 6 months from the due date and time.

2.1.6. Each offeror’s proposal must be saved in .pdf format and shall follow the instructions in FAR 52.212-1.

Offers shall be on 8.5” X 11” page, with specific limits for each volume listed below. The offeror shall not submit elaborate brochures or documentation, detailed artwork and other embellishments.

2.1.7. All proposals shall be complete and clearly presented, to include sufficient detail for effective evaluation as detailed in Section M of this solicitation. Proposals shall be assembled in an orderly manner.

3.0. General Information – Volume I, II, and III

3.1. A complete proposal shall consist of three (3) volumes: Volume I, Price Proposal, Volume II, Technical and Volume III, Past Performance. Specific guidance regarding the content is provided below.

Page limitations shall be treated as maximums and if exceeded, the excess pages will not be read or considered in the evaluation of the proposal.

3.1.1. An electronic page is defined as each face of an 8.5”x11” electronic sheet of paper containing information. For formatting purposes, the font size shall not be less than 12 pitch. Pages shall be numbered sequentially by volume.

Volume Volume Title Copies (Electronic)

Page Limit

I Price Proposal:

Pricing Discount Coefficient Supplemental Priced Items (SPI) List Common COCESS Items Price List Teaming Arrangement Documentation

1 No Limit

II Technical Store Management Plan Transition Plan

1 No more than 10 pages

III Past Performance Past Performance Information Sheets Past Performance Questionnaires Consent Form, if applicable

1 10 pages for past performance information. *this limit does NOT include past performance questionnaires and consent forms*

NOTE 1: Past performance information must contain no more than five (5) references of relevant and related contracts performed within the last three (3) years. If the offeror is a Joint Venture, in addition to the five (5) references for the prime, the offeror may provide up to five (5) additional references for the Joint Venture. It is the sole responsibility of the offeror to track the submission of Past Performance Questionnaires and ensure that the Government receives them NOT LATER THAN THE DUE DATE AND TIME ESTABLISHED IN THIS RFP FOR OFFER SUBMISSION. The evaluator shall email questionnaires to:

Christina Smith, christina.smith.44@us.af.mil AND Ashley Williams, ashley.williams.85@us.af.mil AND

SrA Melissa Perez-Hughes, melissa.perez-hughes@us.af.mil

NOTE 2: Provide the form, Consent Form. Concerns submitting offers on a particular acquisition as joint ventures are considered as affiliated and controlling or having the power to control each other regarding performance of the contract. i.e. joint profit, for which purpose they combine their efforts, property, money, skill, or knowledge, but not on a continuing or permanent basis for conducting business generally.

Joint Ventures are characterized as two or more business entities that have been merged to create one business entity with equal responsibility during the contract and will have a single Cage Code joining the two companies.

Volume 1- Price Proposal, General Instructions

3.2.1. The offeror’s price proposal shall fully and clearly demonstrate reasonableness as well as document the Total Evaluated Price (TEP). The contract will have a five-year ordering period. The offered prices for each category in, Attachment 8 - Common COCESS Items Price List, will be added together to determine the total price. That total will then be combined with the total for the Attachment 19 - SPI List to become the TEP.

3.2.2. Data outside of what is required by this instruction shall not be submitted, unless the offeror considers it essential to document or support their price position. All data relating to the proposed price must be included in the section of the proposal, Price Volume. Adequate price competition is expected for this solicitation, thus if only one offer is received the offeror may be required to provide data other than certified cost or pricing data in accordance with FAR 15.403-3, Requiring Data Other Than Certified Cost or Pricing Data.

3.2.3. Attachment 9 - Pricing Discount Coefficient shall be submitted in accordance with these instructions. Offerors shall select pricing databases from the list within the Performance Work Statement section. Each category identified, the offeror must propose one (1) primary and one (1) alternate database.

The offeror shall also propose a discount percentage for each corresponding database category. The proposed discount percentage will automatically calculate a coefficient factor percentage for each category. By proposing a discount percentage against an identified database for each category, the offeror is proposing to sell items found in the database category at the advertised price multiplies by the corresponding category coefficient factor. Only two (2) databases, one primary and one alternate, are permitted for each of the identified categories listed in the PWS.

3.2.4. Attachment 8 - Common COCESS Items Price List pricing for common items by trade categories shall be completed by the offeror. If there are items found in the primary and alternate database, the offeror must complete the Common COCESS Items Price List utilizing the primary database. If items are not available in the primary database, the offeror must complete the Common COCESS Items Price List utilizing the alternate database.

3.2.5. Each category will have a total at the bottom and each category total will populate to the first sheet.

The totals from each category will then be added together to determine a total for the entire list of categories and this will be the Total Evaluated Price.

3.2.6. Items included in the Attachment 19 - CDRL A0010 Supplemental Priced Item List (SPI) list are items that cannot be found in the category databases. The SPI list will be added to the contract. The submission of like-items shall be evaluated by the Government to ensure it is acceptable during the price evaluation process. All like-item submission must contain the part number or serial number and the manufacturer. The SPI list shall be updated as changes occur through contract modifications.

3.2.7. Offeror’s shall fill-in the cells with pricing information, which must be rounded to two decimal points to reflect cents. If any pricing proposal does not include this format, the Government will apply the specified format to determine the extended pricing and TEP.

Volume II Technical

3.3.1. All offerors must submit one (1) original and one (1) sanitized copy with CAGE code only in place of Company Name. Sanitized copy shall be provided as a separate file name (i.e., “Sanitized Tech Proposal CAGE #”). Sanitized copy shall include all subfactors. Technical Volume with their proposal.

Responses will be evaluated against the Technical Factors identified in Addendum 52.212-2. Proposals shall provide convincing information to address the technical portion of the offer. The Government will base its evaluation on the information presented in the offer. Any paraphrasing of the Statement of Work or phrases such as, standard procedures will be employed or well-known techniques will be used, will be considered unacceptable and negatively impact the offeror’s rating. The use of visual aids or artwork are not necessary or desired.

3.3.2. The Technical volume shall be comprised of two parts and limited to no more than ten (10) pages each.

SUBFACTOR 1: Store Management Plan SUBFACTOR 2: Transition Plan

3.3.3. Store Management Plan (Attachment 11, 12 &13 - CDRL A0002, A0003 & A0004)

3.3.3.1. The contractor shall submit a Store Management Plan with their proposal. The plan shall identify the management and staffing requirements the contractor plans to use to ensure compliance with the Performance Work Statement (PWS).

3.3.4. Transition Plan (Attachment 17 - CDRL A0008)

3.3.4.1. Offerors shall provide a Transition Plan that contains key milestones that illustrate when the offeror intends to manage, staff, set-up, and complete all required tasks within 30 days after contract award and be able to perform in accordance with the Performance Work Statement of the first day of the performance period without degradation of support from the previous contract.

3.3.5. Additional Information

The Government reserves the right to amend the PWS or solicitation prior to the response due date and time. All amendments will be communicated via PIEE module and SAM.gov, to include questions/answers, new attachments, and new response due dates and times.

Volume III, Past Performance Information

3.4.1. All offerors shall provide recent and relevant past performance information. Information provided may be letters, customer surveys, independent surveys, etc. to validate customer satisfaction, quality of completed projects (that are similar) and overall job performance within the last three years. If there are any corrective actions, an explanation must be included to include any remedies. If the contractor does not have recent and relevant past performance, the offeror shall state this in their proposal.

Past Performance Information that is not recent or relevant will not be evaluated.

Recent past performance – defined as ongoing contracts with a performance history, and contracts completed within three (3) years from the issue date of this solicitation.

Relevant contracts – defined as contracts that meet the definition listed in Section M.

3.4.2. Past performance references for the same or similar type of contracts will be evaluated. Evaluation of the quality and extent of the offeror’s performance deemed recent and relevant to this solicitation will be performed by the Government. Past performance sources from either other Government sources or commercial sources will also be used. Relevant information may also be obtained from the Contractor Performance Assessment Reporting System (CPARS) or any other means the Government deems necessary.

3.4.3. If the offeror intends to submit past performance information of a teaming arrangement member or a joint venture partner, then the offeror shall provide sufficient information to clearly convey the roles and responsibilities that each member or partner performed. Past Performance information of team members or joint venture partners shall be consistent with the proposed roles and responsibilities that each member or partner will perform for this requirement. Identify each member's share of the prospective contract, 50/50, 51/49, etc. Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.). Provide for protection of competition-sensitive proprietary information (subcontractor past performance cannot be disclosed to the prime offeror without the subcontractor's consent). Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation. Include a Statement of Assurance that the team member will not be replaced for the duration of the contract, and any exceptions should be identified. Also, include a Statement of Assurance that the team members are not teaming with another firm for this requirement. Include a Statement of acknowledgement that the Prime Contractor is responsible for adhering to contract terms and conditions and daily management. The Prime Contractor is obligated to negotiate in good faith and is responsible for conveying mandatory government terms and conditions to subcontractors. The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors.

Past Performance Questionnaires (Attachment 5)

3.4.4. The submission of past performance questionnaires does not count towards the page limit for the offeror’s Past Performance Volume. The Government requires the offeror to send out the questionnaire to each of the relevant and recent Past Performance POCs. Altered or substituted questionnaires will not be evaluated. All past performance questionnaires will only be accepted electronically from the Project Owner or authorized representative. Questionnaires will not be accepted from prime contractors, subcontractors, or manufactures. Offerors are responsible for ensuring their questionnaires are sent to their references and the questionnaires are returned fully completed directly via email to:

Christina Smith, christina.smith.44@us.af.mil AND

Ashley Williams, ashley.williams.85@us.af.mil AND SrA Melissa Perez-Hughes, melissa.perez-hughes@us.af.mil

File details come from the government source that posted it. Updated .