Attachment 1 - Section B Schedule of Supplies and Services.xls
XLS spreadsheet 38 KB Posted
- Attached to
- USCGC BUCKTHORN (WLI 642) DD FY20
- Solicitation number
- 70Z085-20-Q-P4577900
About this file
This document contains a federal contract solicitation and associated pricing schedule for ship repair services. The solicitation requests quotes to perform various dry dock repairs to the USCGC Buckthorn, a 100-foot Inland Buoy Tender, at the contractor's facilities between July 14, 2020 and September 8, 2020. Services include ship repair and associated support work as detailed in the attached specification. Pricing is requested for over 50 line items in the schedule of supplies and services spreadsheet. Quotes are due by a small business and must include documentation of past performance, certifications, insurance, subcontractors, and representations. Award will be a firm-fixed-price contract to the responsible quoter providing the best value to the government.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BUCKTHORN (WLI-100) DRYDOCK AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | $ - 0 | |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $ - 0 | |
| O-003 | U/W Body, Preserve (100%) | JOB | 1 | $ - 0 | |
| O-004 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | $ - 0 | |
| O-005 | U/W Body, Preserve (Partial - Condition B) | JOB | 1 | $ - 0 | |
| O-006 | Hull Plating Freeboard, Preserve – Partial | JOB | 1 | $ - 0 | |
| O-007 | Hull and Structural Plating (General) -10.2-Pound Steel, Renew | JOB | 1 | $ - 0 | |
| O-008 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-009 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-010 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-011 | Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-012 | Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| D-013 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | JOB | 1 | $ - 0 | |
| D-014 | Hull And Structural Plating (General) - Degraded Weld (Steel), Repair | JOB | 1 | $ - 0 | |
| D-015 | Appendages (U/W), Leak Test | JOB | 1 | $ - 0 | |
| O-016 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $ - 0 | |
| D-017 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-018 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| O-019 | Propulsion Shafting, Straighten | JOB | 1 | $ - 0 | |
| O-020 | Propeller Shaft Sleeve(s), Renew | JOB | 1 | $ - 0 | |
| D-021 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $ - 0 | |
| O-022 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $ - 0 | |
| D-023 | Propeller , Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| D-024 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $ - 0 | |
| D-025 | Fathometer Transducer, General Maintenance | JOB | 1 | $ - 0 | |
| D-026 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $ - 0 | |
| D-027 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $ - 0 | |
| D-028 | Rudder Assembly; Remove, Inspect and Reinstall | JOB | 1 | $ - 0 | |
| D-029 | Rudder(s), Preserve (“100%”) | JOB | 1 | $ - 0 | |
| O-030 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $ - 0 | |
| O-031 | Tanks (Potable Water), Preserve “Partial” | JOB | 1 | $ - 0 | |
| D-032 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $ - 0 | |
| D-033 | Drydock | JOB | 1 | $ - 0 | |
| D-034 | Temporary Services, Provide - Tender | DAY | 1 | $ - 0 | |
| D-035 | Sea Trial Performance, Support, Provide | JOB | 1 | $ - 0 | |
| D-036 | Crews Head Deck and Shell, Repair | JOB | 1 | $ - 0 | |
| D-037 | Mechanical Chain Stopper, Realignment, Inspect and Service | JOB | 1 | $ - 0 | |
| D-038 | ATON Shop Deck, Repair | JOB | 1 | $ - 0 | |
| D-039 | Hull and Structural Plating - 7.65- Pound Steel Plate, Crop and Renew | JOB | 1 | $ - 0 | |
| D-040 | Weathertight Doors, Renew | JOB | 1 | $ - 0 | |
| D-041 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $ - 0 | |
| D-042 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $ - 0 | |
| D-043 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $ - 0 | |
| D-044 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $ - 0 | |
| D-045 | Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul And Renew | JOB | 1 | $ - 0 | |
| D-046 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $ - 0 | |
| D-047 | Sewage Piping, Clean And Flush | JOB | 1 | $ - 0 | |
| D-048 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $ - 0 | |
| O-049 | Spud Wells, Preserve | JOB | 1 | $ - 0 | |
| D-050 | Spud Wells, Inspect | JOB | 1 | $ - 0 | |
| D-051 | Grey Water Piping, Renew | JOB | 1 | $ - 0 | |
| D-052 | Aluminum Plating (Eroded Weld), Repair | JOB | 1 | $ - 0 | |
| D-053 | Galley Griddle / Range, Replace | JOB | 1 | $ - 0 | |
| D-054 | Asbestos-Containing Material, 100% Abatement, Perform | JOB | 1 | $ - 0 | |
| O-00A | Composite Labor Rate | Hour | 430 | $ - 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 |
&C(1/17/2020) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .