Attachment 1 - Section B Schedule of Supplies and Services Rev1.xls
XLS spreadsheet 39 KB Posted
- Attached to
- USCGC BUCKTHORN (WLI 642) DD FY20
- Solicitation number
- 70Z085-20-Q-P4577900
About this file
This solicitation requests quotes for ship repair services for the USCGC Buckthorn. The Coast Guard seeks a contractor to perform drydock repairs from July 14 to September 8, 2020 at a location within 400 nautical miles of the cutter's homeport in Sault Ste. Marie, Michigan. The solicitation includes a schedule of supplies and services with line items for work on hull plating, appendages, tanks, propulsion components, decking, and other areas. Quoters must submit pricing for all line items, past performance documentation, certifications, and insurance information. The solicitation will result in a firm fixed-price contract awarded to a small business, with a NAICS code of 336611 for ship repair.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BUCKTHORN (WLI-100) DRYDOCK AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | $ - 0 | |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $ - 0 | |
| O-003 | U/W Body, Preserve (100%) | JOB | 1 | $ - 0 | |
| O-004 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | $ - 0 | |
| O-005 | U/W Body, Preserve (Partial - Condition B) | JOB | 1 | $ - 0 | |
| O-006 | Hull Plating Freeboard, Preserve – Partial | JOB | 1 | $ - 0 | |
| O-007 | Hull and Structural Plating (General) -10.2-Pound Steel, Renew | JOB | 1 | $ - 0 | |
| O-008 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-009 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-010 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-011 | Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew | JOB | 1 | $ - 0 | |
| O-012 | Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew | JOB | 1 | $ - 0 | |
| D-013 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | JOB | 1 | $ - 0 | |
| D-014 | Hull And Structural Plating (General) - Degraded Weld (Steel), Repair | JOB | 1 | $ - 0 | |
| D-015 | Appendages (U/W), Leak Test | JOB | 1 | $ - 0 | |
| O-016 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $ - 0 | |
| D-017 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-018 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| O-019 | Propulsion Shafting, Straighten | JOB | 1 | $ - 0 | |
| O-020 | Propeller Shaft Sleeve(s), Renew | JOB | 1 | $ - 0 | |
| D-021 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $ - 0 | |
| O-022 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $ - 0 | |
| D-023 | Propeller , Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| D-024 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $ - 0 | |
| D-025 | Fathometer Transducer, General Maintenance | JOB | 1 | $ - 0 | |
| D-026 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $ - 0 | |
| D-027 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $ - 0 | |
| D-028 | Rudder Assembly; Remove, Inspect and Reinstall | JOB | 1 | $ - 0 | |
| D-029 | Rudder(s), Preserve (“100%”) | JOB | 1 | $ - 0 | |
| O-030 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $ - 0 | |
| O-031 | Tanks (Potable Water), Preserve “Partial” | JOB | 1 | $ - 0 | |
| D-032 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $ - 0 | |
| D-033 | Drydock | JOB | 1 | $ - 0 | |
| D-034 | Temporary Services, Provide - Tender | JOB | 1 | $ - 0 | |
| D-035 | Sea Trial Performance, Support, Provide | JOB | 1 | $ - 0 | |
| D-036 | Crews Head Deck and Shell, Repair | JOB | 1 | $ - 0 | |
| D-037 | Mechanical Chain Stopper, Realignment, Inspect and Service | JOB | 1 | $ - 0 | |
| D-038 | ATON Shop Deck, Repair | JOB | 1 | $ - 0 | |
| D-039 | Hull and Structural Plating - 7.65- Pound Steel Plate, Crop and Renew | JOB | 1 | $ - 0 | |
| D-040 | Weathertight Doors, Renew | JOB | 1 | $ - 0 | |
| D-041 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $ - 0 | |
| D-042 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $ - 0 | |
| D-043 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $ - 0 | |
| D-044 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $ - 0 | |
| D-045 | Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul And Renew | JOB | 1 | $ - 0 | |
| D-046 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $ - 0 | |
| D-047 | Sewage Piping, Clean And Flush | JOB | 1 | $ - 0 | |
| D-048 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $ - 0 | |
| O-049 | Spud Wells, Preserve | JOB | 1 | $ - 0 | |
| D-050 | Spud Wells, Inspect | JOB | 1 | $ - 0 | |
| D-051 | Grey Water Piping, Renew | JOB | 1 | $ - 0 | |
| D-052 | Aluminum Plating (Eroded Weld), Repair | JOB | 1 | $ - 0 | |
| D-053 | Galley Griddle / Range, Replace | JOB | 1 | $ - 0 | |
| D-054 | Asbestos-Containing Material, 100% Abatement, Perform | JOB | 1 | $ - 0 | |
| D-055 | COVID-19 Prevention and Response Planning and Precautions, Perform | JOB | 1 | $ - 0 | |
| O-00A | Composite Labor Rate | Hour | 430 | $ - 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 |
&C(1/17/2020) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .