Attachment_1_-_Schedule_of_Unit_Pricing.xlsx
XLSX spreadsheet 209 KB Posted
- Solicitation number
- ITB-26-16-CW
- Issued by
- Volusia County, Florida
About this file
This is a Schedule of Unit Pricing attachment for Invitation to Bid ITB-26-16-CW issued by the Port Orange Water Treatment Plant in Florida. The project involves the rehabilitation of three Transfer Pump Stations serving the North, Central, and South treatment trains. The scope of work includes replacement of six existing vertical transfer pumps (two per station) with upgraded associated piping, pipe supports, electrical systems, and concrete pump pads, along with site restoration including sod, concrete, soil, and gravel replacement in kind at all disturbed areas. The pricing schedule contains 22 line items encompassing mobilization and general conditions, insurance and bonding, demolition, pump installation, materials including DIP piping in 10-inch and 12-inch diameters, valves, electrical work, and project closeout with as-built drawings.
Bidders are required to submit unit prices for each line item, with costs listed as either lump sum (LS), each (EA), cubic yard (CY), linear foot (LF), or square foot (SF). The schedule specifies quantities for each item, including six transfer pump installations, 100 square feet of aluminum grating, 50 linear feet each of 10-inch and 12-inch DIP piping, and associated fittings and valves. Bidders must complete the vendor name and date fields and are cautioned that modifications to Attachment 1 may render their bid non-responsive. The document does not specify pricing amounts, response deadlines, or award dates, as this is the pricing template provided to prospective contractors for completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| ATTACHMENT 1 SCHEDULE OF UNIT PRICING | |
| ERROR:#VALUE! | |
| TITLE: ITB-26-16-CW _ WATER TREATMENT PLANT TRANSFER PUMP STATION MODIFICATIONS | |
| VENDOR NAME:_________________________________________________________________ | |
| DATE:______________________ |
| Modification to "Attachment 1" may cause your bid to be non-responsive | |||||
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | Mobilization/General Conditions | 1 | LS | ||
| 2 | Insurance, Performance and Payment Bond | 1 | LS | ||
| 3 | Project Closeout/As-built Drawings | 1 | LS | ||
| 4 | Preconstruction video | 1 | LS | ||
| 5 | Construction Testing (All) | 1 | LS | ||
| 6 | General Site Restoration | 1 | LS | ||
| 7 | Pump Station Demolition (All) | 1 | LS | ||
| 8 | Transfer Pump Install (Including frame,coupling,motor,freight,startup and operator training | 6 | EA | ||
| 9 | Pump Leveling Pads | 6 | EA | ||
| 10 | Concrete Fill | 4 | CY | ||
| 11 | Bend Base Leveling Pads | 4 | EA | ||
| 12 | Aluminum Grating | 100 | SF | ||
| 13 | 10" DIP Piping (Including fittings, reducers, flanges, spool pieces, etc.) | 50 | LF | ||
| 14 | 12" DIP Piping (Including fittings, reducers, flanges, spool pieces, etc.) | 50 | LF | ||
| 15 | Concrete Pipe Supports (varying sizes) | 1 | LS | ||
| 16 | Stanchion Saddle Adjustable Metal Pipe Supports | 6 | EA | ||
| 17 | 10" DI Check Valve | 4 | EA | ||
| 18 | 12" DI Check Valve | 2 | EA | ||
| 19 | 10" DI Gate Valve | 4 | EA | ||
| 20 | 12" DI Gate Valve | 2 | EA | ||
| 21 | Electrical (Complete) | 1 | LS | ||
| 22 | Permitting Allowance | 1 | LS |
Total
File details come from the government source that posted it. Updated .