Attachment 1 Schedule of Services Blank Price Schedule.xls
XLS spreadsheet 52 KB Posted
- Attached to
- DRYDOCK: USCGC ACTIVE DDS FY26
- Solicitation number
- 70Z08025QMECP0029
About this file
This document is a detailed pricing schedule for the drydock availability of USCGC ACTIVE (WMEC-210A) planned for fiscal year 2026. The comprehensive schedule lists 44 line items covering various marine maintenance and repair services, including hull plating preservation, underwater body inspections, propulsion system work, equipment renewals, and tank preservation. Services are categorized as definitive items (marked with "D-" prefix) and optional items (marked with "O-" prefix), with each service priced as a job and quantified at either 1 or 2 units.
The contract opportunity is issued by the US Coast Guard, with a performance period from January 13, 2026 to March 23, 2026. The total scope requires the contractor to provide all labor, materials, equipment, and services necessary for comprehensive drydock repairs on the CGC ACTIVE. The pricing schedule includes provisions for potential over and above/growth work, with labor rates and material markup fees to be applied if additional scope is introduced. The contract specialist is Petal Donald, who can be contacted at Petal.C.Donald@uscg.mil for further information about the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ACTIVE (WMEC-210A) DRYDOCK AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Ultrasonic Testing | JOB | 1 | ||
| D-002 | U/W Body, Preserve, 100 percent | JOB | 1 | ||
| D-003 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | 1 | ||
| D-004 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-005 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | ||
| D-006 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-007 | Mast, Preserve, 100 Percent | JOB | 1 | ||
| D-008 | Propulsion Shafting, Strain Gauge Alignment, Drydock, Check | JOB | 1 | ||
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-010 | Propulsion Shaft Coating, Renew (Optional) | JOB | 1 | ||
| D-011 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| D-012 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | ||
| O-013 | Stern Tube Interior Surfaces, Preserve, 100 Percent (Optional) | JOB | 1 | ||
| D-014 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-015 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | ||
| O-016 | Controllable Pitch Propeller (CPP) Hubs, Renew (Optional) | JOB | 2 | ||
| O-017 | Controllable Pitch Propeller (CPP) Hubs, Inspect (Optional) | JOB | 2 | ||
| D-018 | Emergency Diesel Generator, Exhaust Piping, Clean and Inspect | JOB | 1 | ||
| D-019 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-020 | Doppler Speed Log Transducer, Clean and Inspect | JOB | 1 | ||
| D-021 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-022 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | 1 | ||
| D-023 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | ||
| D-024 | Tanks, Potable Water Preserve, 100 Percent | JOB | 1 | ||
| D-025 | Superstructure, Preserve, 100 Percent | JOB | 1 | ||
| D-026 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | ||
| D-027 | Drydock | JOB | 1 | ||
| D-028 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| O-029 | Temporary Services, Heating and Cooling (Optional) | JOB | 1 | ||
| D-030 | Reduction Gear Lube Oil Strainer Assembly, Replace | JOB | 1 | ||
| D-031 | Oily Water Separator, Replace | JOB | 1 | ||
| D-032 | Potable Water Tanks, Repair | JOB | 1 | ||
| D-033 | Oily Water Holding Tank, Repair | JOB | 1 | ||
| D-034 | Chain Lockers, Repair and Preserve | JOB | 1 | ||
| D-035 | Tanks and Voids, Partial Preservation | JOB | 1 | ||
| D-036 | Sewage System, Repair and Preserve | JOB | 1 | ||
| D-037 | Hull Plating, Repair | JOB | 1 | ||
| D-038 | Inflatable Shaft Seal Assemblies, Piping and Valves, Renew | JOB | 1 | ||
| D-039 | Fuel Valves and Piping, Renew | JOB | 1 | ||
| O-040 | Propulsion Shafting, Straighten (Optional) | JOB | 2 | ||
| D-041 | Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-042 | Propulsion Shafting, Optical or Laser Alignment Check (Optional) | JOB | 1 | ||
| O-043 | Propeller Shaft Sleeves, Renew (Optional) | JOB | 2 | ||
| O-044 | Stern Tube, Renew (Optional) | JOB | 2 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 4702 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $181,365.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(7/11/2025) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .