Attachment 1 Schedule of Services Blank Price Schedule Rev1.xls
XLS spreadsheet 52 KB Posted
- Attached to
- DRYDOCK: USCGC ACTIVE DDS FY26
- Solicitation number
- 70Z08025QMECP0029
About this file
This document is a detailed Pricing Schedule for the U.S. Coast Guard Cutter ACTIVE Drydock Availability in Fiscal Year 2026. The comprehensive schedule outlines 44 line items for drydock services, including both definite and optional tasks such as hull plating preservation, underwater body testing, propulsion shaft inspections, equipment renewals, and various repair and maintenance activities. The contract covers a performance period from 13 January 2026 to 23 March 2026, with the U.S. Coast Guard as the contracting agency.
The pricing schedule includes specific job descriptions with unit quantities, allowing for both mandatory (designated with "D-" prefix) and optional (designated with "O-" prefix) services. Additional provisions are made for potential over and above/growth work, with space for contractors to input labor rates and material markup fees. The document provides a comprehensive framework for pricing drydock repairs, with options for supplemental services and potential contract modifications. The total pricing will be evaluated based on the definite and optional items, with a flexibility for additional work beyond the initial scope.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ACTIVE (WMEC-210A) DRYDOCK AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Ultrasonic Testing | JOB | 1 | ||
| D-002 | U/W Body, Preserve, 100 percent | JOB | 1 | ||
| D-003 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | 1 | ||
| D-004 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-005 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | ||
| D-006 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-007 | Mast, Preserve, 100 Percent | JOB | 1 | ||
| D-008 | Propulsion Shafting, Strain Gauge Alignment, Drydock, Check | JOB | 1 | ||
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-010 | Propulsion Shaft Coating, Renew (Optional) | JOB | 1 | ||
| D-011 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| D-012 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | ||
| O-013 | Stern Tube Interior Surfaces, Preserve, 100 Percent (Optional) | JOB | 1 | ||
| D-014 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-015 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | ||
| O-016 | Controllable Pitch Propeller (CPP) Hubs, Renew (Optional) | JOB | 2 | ||
| O-017 | Controllable Pitch Propeller (CPP) Hubs, Inspect (Optional) | JOB | 2 | ||
| D-018 | Emergency Diesel Generator, Exhaust Piping, Clean and Inspect | JOB | 1 | ||
| D-019 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-020 | Doppler Speed Log Transducer, Clean and Inspect | JOB | 1 | ||
| D-021 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-022 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | 1 | ||
| D-023 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | ||
| D-024 | Tanks, Potable Water Preserve, 100 Percent | JOB | 1 | ||
| D-025 | Superstructure, Preserve, 100 Percent | JOB | 1 | ||
| D-026 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | ||
| D-027 | Drydock | JOB | 1 | ||
| D-028 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| O-029 | Temporary Services, Heating and Cooling (Optional) | JOB | 1 | ||
| D-030 | Reduction Gear Lube Oil Strainer Assembly, Replace | JOB | 1 | ||
| D-031 | Oily Water Separator, Replace | JOB | 1 | ||
| D-032 | Potable Water Tanks, Repair | JOB | 1 | ||
| D-033 | Oily Water Holding Tank, Repair | JOB | 1 | ||
| D-034 | Chain Lockers, Repair and Preserve | JOB | 1 | ||
| D-035 | Tanks and Voids, Partial Preservation | JOB | 1 | ||
| D-036 | Sewage System, Repair and Preserve | JOB | 1 | ||
| D-037 | Hull Plating, Repair | JOB | 1 | ||
| D-038 | Inflatable Shaft Seal Assemblies, Piping and Valves, Renew | JOB | 1 | ||
| D-039 | Fuel Valves and Piping, Renew | JOB | 1 | ||
| O-040 | Propulsion Shafting, Straighten (Optional) | JOB | 2 | ||
| D-041 | Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-042 | Propulsion Shafting, Optical or Laser Alignment Check (Optional) | JOB | 1 | ||
| O-043 | Propeller Shaft Sleeves, Renew (Optional) | JOB | 2 | ||
| O-044 | Stern Tube, Renew (Optional) | JOB | 2 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 4702 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $181,365.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |