Attachment 1 Schedule of Services Blank Price Schedule Rev1.xls

XLS spreadsheet 52 KB Posted

Attached to
DRYDOCK: USCGC ACTIVE DDS FY26
Solicitation number
70Z08025QMECP0029
Issued by

About this file

This document is a detailed Pricing Schedule for the U.S. Coast Guard Cutter ACTIVE Drydock Availability in Fiscal Year 2026. The comprehensive schedule outlines 44 line items for drydock services, including both definite and optional tasks such as hull plating preservation, underwater body testing, propulsion shaft inspections, equipment renewals, and various repair and maintenance activities. The contract covers a performance period from 13 January 2026 to 23 March 2026, with the U.S. Coast Guard as the contracting agency.

The pricing schedule includes specific job descriptions with unit quantities, allowing for both mandatory (designated with "D-" prefix) and optional (designated with "O-" prefix) services. Additional provisions are made for potential over and above/growth work, with space for contractors to input labor rates and material markup fees. The document provides a comprehensive framework for pricing drydock repairs, with options for supplemental services and potential contract modifications. The total pricing will be evaluated based on the definite and optional items, with a flexibility for additional work beyond the initial scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ACTIVE (WMEC-210A) DRYDOCK AVAILABILITY FY2026
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating, U/W Body, Ultrasonic TestingJOB1
D-002U/W Body, Preserve, 100 percentJOB1
D-003Hull Plating Freeboard, Preserve, 100 PercentJOB1
D-004Appendages (U/W), Preserve (Internal) and Leak TestJOB1
D-005Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1
D-006Voids (Non-Accessible), Preserve (Internal) and Leak TestJOB1
D-007Mast, Preserve, 100 PercentJOB1
D-008Propulsion Shafting, Strain Gauge Alignment, Drydock, CheckJOB1
D-009Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
O-010Propulsion Shaft Coating, Renew (Optional)JOB1
D-011Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or RenewJOB1
D-012Propulsion Shaft Bearings, External, RenewJOB1
O-013Stern Tube Interior Surfaces, Preserve, 100 Percent (Optional)JOB1
D-014Controllable Pitch Propellers, Clean and InspectJOB1
D-015Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1
O-016Controllable Pitch Propeller (CPP) Hubs, Renew (Optional)JOB2
O-017Controllable Pitch Propeller (CPP) Hubs, Inspect (Optional)JOB2
D-018Emergency Diesel Generator, Exhaust Piping, Clean and InspectJOB1
D-019Fathometer Transducer, RenewJOB1
D-020Doppler Speed Log Transducer, Clean and InspectJOB1
D-021Sea Valves and Waster Pieces, Overhaul Or RenewJOB1
D-022Sea Strainers, Duplex, All Sizes, OverhaulJOB1
D-023Rudder Assembly, Remove, Inspect And ReinstallJOB1
D-024Tanks, Potable Water Preserve, 100 PercentJOB1
D-025Superstructure, Preserve, 100 PercentJOB1
D-026Cathodic Protection, Zinc Anodes, Renew,JOB1
D-027DrydockJOB1
D-028Temporary Services, Provide - CutterJOB1
O-029Temporary Services, Heating and Cooling (Optional)JOB1
D-030Reduction Gear Lube Oil Strainer Assembly, ReplaceJOB1
D-031Oily Water Separator, ReplaceJOB1
D-032Potable Water Tanks, RepairJOB1
D-033Oily Water Holding Tank, RepairJOB1
D-034Chain Lockers, Repair and PreserveJOB1
D-035Tanks and Voids, Partial PreservationJOB1
D-036Sewage System, Repair and PreserveJOB1
D-037Hull Plating, RepairJOB1
D-038Inflatable Shaft Seal Assemblies, Piping and Valves, RenewJOB1
D-039Fuel Valves and Piping, RenewJOB1
O-040Propulsion Shafting, Straighten (Optional)JOB2
D-041Propulsion Intermediate Shafts; Remove, Inspect, and ReinstallJOB1
O-042Propulsion Shafting, Optical or Laser Alignment Check (Optional)JOB1
O-043Propeller Shaft Sleeves, Renew (Optional)JOB2
O-044Stern Tube, Renew (Optional)JOB2
O-00AComposite Labor RateHour0
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour4702$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$181,365.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00