Attachment 1 - Schedule 70Z03825RB0000003.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
Repair of the Main Rotor Blades and Tip Caps on the MH-65 Aircraft
Solicitation number
70Z03825RB0000003
Issued by

About this file

This is a Schedule of Supplies/Services for an Indefinite Delivery Requirements contract for the repair of Main Rotor Blades (MRB) and Tip Caps for MH-65 Aircraft. The United States Coast Guard (USCG) Aviation Logistics Center is sole-sourcing the contract to Airbus Helicopters, Inc. of Grand Prairie, TX, with a base period from 03/01/2026 to 02/28/2027 and four potential one-year option periods through 02/28/2031. The contract covers multiple line items (CLINs) for repairing main rotor blades, tip caps, and associated tasks such as whirl tower testing, structural skin repair, blade exchanges, and hourly labor rates for hidden damages, unusual damages, and engineering changes.

The solicitation (70Z03825RB0000003) is being issued as a Request for Proposal with a closing date of July 18th, 2025, at 2:30 pm EDT. Electronic proposals are required to be emailed to Charles.B.Colson2@uscg.mil. The contract is classified under NAICS code 488190 with a small business size standard of $40 million. While the estimated contract value is not specified, the schedule indicates 110 main rotor blade repairs and 100 tip cap repairs per period, with additional task order modifications possible. Airbus Helicopters France is recognized as the original equipment manufacturer (OEM) for these parts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

CLINITEM DESCRIPTIONEST QTYUNIT OF ISSUEUNIT PRICEEST AMOUNT
0001Repair Main Rotor Blades (MRB)110EA$0.00$ - 0
IAW SOW Section 5.0
NSN:1615-01-HS2-0025
P/N: 366A11-0010-07
OR
NSN:1615-14-472-7358
P/N: 366A11-0010-06
OR
NSN: 1615-01-HR2-3169
P/N: 366A11-0010-05
OR
NSN: 1615-01-HS1-6050
P/N: 366A11-0010-04
OR
NSN: 1615-01-HR2-3319
P/N: 366A11-0010-03
BER/Scrap Fee associated in AHI Texas1EA$0.00$ - 0
with CLIN 0001 IAW S0W Section 6.0
BER/Scrap Fee associated in AH France1EA$0.00$ - 0
with CLIN 0001 IAW S0W Section 6.0
0002Repair of MRB Tip Caps100EA$0.00$ - 0
IAW SOW Section 5.0
NSN: 1560-01-HS2-2339
P/N: 366A11-5030-03
BER/Scrap Fee associated1EA$0.00$ - 0
with CLIN 0002 IAW S0W Section 6.0
0003Tasks under CLIN 0003 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.2
1. Whirl Tower Testing1EA$ - 0$ - 0
2. Metallic Tip Block1EA$ - 0$ - 0
3. Root End Bushings Replacement1EA$ - 0$ - 0
4. Bushing Re-Bonding and Touch-up1EA$ - 0$ - 0
5.No fault/Refinish with Whirl Tower and High-1EA$ - 0$ - 0
Visibility Paint
0004Tasks under CLIN 0004 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work.
Structural Skin Repair Tasks IAW SOW Section 5.2
1. Up to 6CM2 Surface Damage Size1EA$ - 0$ - 0
2. 6CM2 - 100CM21EA$ - 0$ - 0
3. 101CM2 - 400CM21EA$ - 0$ - 0
4. 401CM2 - 700CM21EA$ - 0$ - 0
5. 701CM2 - 100CM21EA$ - 0$ - 0
0005Tasks under CLIN 0005 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.3 and 5.4
1. Main Rotor Blade Exchange1EA$ - 0$ - 0
2. Repair of Blade Container1EA$ - 0$ - 0
3. Replacement of an Unrepairable Blade Container1EA$ - 0$ - 0
0006Hidden Damages Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
0007Unusual Damage Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
0008Product/Engineering Change Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.4on individual
Hourly Rate $________________task order
0009Service Bulletins Hourly Labor RateTBDHRNot separately priced
IAW SOW Section 6.5
Hourly Rate $________________

ESTIMATED BASE PERIOD TOTAL $ - 0

As per FAR Part 16.503 (c), the Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the Contractor to any equitable adjustment in price under the Government Property clause of the contract.

&"Arial,Bold"Base Year Period of Performance: 03/01/2026 - 02/28/2027 &"Arial,Regular" &"Arial,Bold"Schedule of Supplies/Sevices Solicitation Number 70Z03825RB0000003

ATTACHMENT 1

Option 1

CLINITEM DESCRIPTIONEST QTYUNIT OF ISSUEUNIT PRICEEST AMOUNT
1001Repair Main Rotor Blades (MRB)110EA$0.00$ - 0
IAW SOW Section 5.0
NSN:1615-01-HS2-0025
P/N: 366A11-0010-07
OR
NSN:1615-14-472-7358
P/N: 366A11-0010-06
OR
NSN: 1615-01-HR2-3169
P/N: 366A11-0010-05
OR
NSN: 1615-01-HS1-6050
P/N: 366A11-0010-04
OR
NSN: 1615-01-HR2-3319
P/N: 366A11-0010-03
BER/Scrap Fee associated in AHI Texas1EA$0.00$ - 0
with CLIN 1001 IAW S0W Section 6.0
BER/Scrap Fee associated in AH France1EA$0.00$ - 0
with CLIN 1001 IAW S0W Section 6.0
1002Repair of MRB Tip Caps100EA$0.00$ - 0
IAW SOW Section 5.0
NSN: 1560-01-HS2-2339
P/N: 366A11-5030-03
BER/Scrap Fee associated1EA$0.00$ - 0
with CLIN 1002 IAW S0W Section 6.0
1003Tasks under CLIN 1003 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.2
1. Whirl Tower Testing1EA$ - 0$ - 0
2. Metallic Tip Block1EA$ - 0$ - 0
3. Root End Bushings Replacement1EA$ - 0$ - 0
4. Bushing Re-Bonding and Touch-up1EA$ - 0$ - 0
5.No fault/Refinish with Whirl Tower and High-1EA$ - 0$ - 0
Visibility Paint
1004Tasks under CLIN 1004 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work.
Structural Skin Repair Tasks IAW SOW 5.2
1. Up to 6CM2 Surface Damage Size1EA$ - 0$ - 0
2. 6CM2 - 100CM21EA$ - 0$ - 0
3. 101CM2 - 400CM21EA$ - 0$ - 0
4. 401CM2 - 700CM21EA$ - 0$ - 0
5. 701CM2 - 100CM21EA$ - 0$ - 0
1005Tasks under CLIN 1005 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.3 and 5.4
1. Main Rotor Blade Exchange1EA$ - 0$ - 0
2. Repair of Blade Container1EA$ - 0$ - 0
3. Replacement of an Unrepairable Blade Container1EA$ - 0$ - 0
1006Hidden Damages Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
1007Unusual Damage Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
1008Product/Engineering Change Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.4on individual
Hourly Rate $________________task order
1009Service Bulletins Hourly Labor RateTBDHRNot separately priced
IAW SOW Section 6.5
Hourly Rate $________________

ESTIMATED OPTION PERIOD ONE TOTAL $ - 0

As per FAR Part 16.503 (c), the Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the Contractor to any equitable adjustment in price under the Government Property clause of the contract.

&"-,Bold"&12Option Year One Period of Performance: 03/01/2027 - 02/29/2028 &"-,Bold"&12Schedule of Supplies/Services Solicitation Number 70Z03825RB0000003

ATTACHMENT 1

Option 2

CLINITEM DESCRIPTIONEST QTYUNIT OF ISSUEUNIT PRICEEST AMOUNT
2001Repair Main Rotor Blades (MRB)110EA$0.00$ - 0
IAW SOW Section 5.0
NSN:1615-01-HS2-0025
P/N: 366A11-0010-07
OR
NSN:1615-14-472-7358
P/N: 366A11-0010-06
OR
NSN: 1615-01-HR2-3169
P/N: 366A11-0010-05
OR
NSN: 1615-01-HS1-6050
P/N: 366A11-0010-04
OR
NSN: 1615-01-HR2-3319
P/N: 366A11-0010-03
BER/Scrap Fee associated in AHI Texas1EA$0.00$ - 0
with CLIN 2001 IAW S0W Section 6.0
BER/Scrap Fee associated in AH France1EA$0.00$ - 0
with CLIN 2001 IAW S0W Section 6.0
2002Repair of MRB Tip Caps100EA$0.00$ - 0
IAW SOW Section 5.0
NSN: 1560-01-HS2-2339
P/N: 366A11-5030-03
BER/Scrap Fee associated1EA$0.00$ - 0
with CLIN 2002 IAW S0W Section 6.0
2003Tasks under CLIN 2003 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.2
1. Whirl Tower Testing1EA$ - 0$ - 0
2. Metallic Tip Block1EA$ - 0$ - 0
3. Root End Bushings Replacement1EA$ - 0$ - 0
4. Bushing Re-Bonding and Touch-up1EA$ - 0$ - 0
5.No fault/Refinish with Whirl Tower and High-1EA$ - 0$ - 0
Visibility Paint
2004Tasks under CLIN 2004 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work.
Structural Skin Repair Tasks IAW SOW 5.2
1. Up to 6CM2 Surface Damage Size1EA$ - 0$ - 0
2. 6CM2 - 100CM21EA$ - 0$ - 0
3. 101CM2 - 400CM21EA$ - 0$ - 0
4. 401CM2 - 700CM21EA$ - 0$ - 0
5. 701CM2 - 100CM21EA$ - 0$ - 0
2005Tasks under CLIN 2005 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.3 and 5.4
1. Main Rotor Blade Exchange1EA$ - 0$ - 0
2. Repair of Blade Container1EA$ - 0$ - 0
3. Replacement of an Unrepairable Blade Container1EA$ - 0$ - 0
2006Hidden Damages Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
2007Unusual Damage Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
2008Product/Engineering Change Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.4on individual
Hourly Rate $________________task order
2009Service Bulletins Hourly Labor RateTBDHRNot separately priced
IAW SOW Section 6.5
Hourly Rate $________________

ESTIMATED OPTION PERIOD ONE TOTAL $ - 0

As per FAR Part 16.503 (c), the Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the Contractor to any equitable adjustment in price under the Government Property clause of the contract.

&"-,Bold"&12Option Year Two Period of Performance: 03/01/2028 - 02/28/2029 &"-,Bold"&12Schedule of Supplies/Services Solicitation Number 70Z03825RB0000003

ATTACHMENT 1

Option 3

CLINITEM DESCRIPTIONEST QTYUNIT OF ISSUEUNIT PRICEEST AMOUNT
3001Repair Main Rotor Blades (MRB)110EA$0.00$ - 0
IAW SOW Section 5.0
NSN:1615-01-HS2-0025
P/N: 366A11-0010-07
OR
NSN:1615-14-472-7358
P/N: 366A11-0010-06
OR
NSN: 1615-01-HR2-3169
P/N: 366A11-0010-05
OR
NSN: 1615-01-HS1-6050
P/N: 366A11-0010-04
OR
NSN: 1615-01-HR2-3319
P/N: 366A11-0010-03
BER/Scrap Fee associated in Texas1EA$0.00$ - 0
with CLIN 3001 IAW S0W Section 6.0
BER/Scrap Fee associated in AH France1EA$0.00$ - 0
with CLIN 3001 IAW S0W Section 6.0
3002Repair of MRB Tip Caps100EA$0.00$ - 0
IAW SOW Section 5.0
NSN: 1560-01-HS2-2339
P/N: 366A11-5030-03
BER/Scrap Fee associated1EA$0.00$ - 0
with CLIN 3002 IAW S0W Section 6.0
3003Tasks under CLIN 3003 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.2
1. Whirl Tower Testing1EA$ - 0$ - 0
2. Metallic Tip Block1EA$ - 0$ - 0
3. Root End Bushings Replacement1EA$ - 0$ - 0
4. Bushing Re-Bonding and Touch-up1EA$ - 0$ - 0
5.No fault/Refinish with Whirl Tower and High-1EA$ - 0$ - 0
Visibility Paint
3004Tasks under CLIN 3004 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work.
Structural Skin Repair Tasks IAW SOW 5.2
1. Up to 6CM2 Surface Damage Size1EA$ - 0$ - 0
2. 6CM2 - 100CM21EA$ - 0$ - 0
3. 101CM2 - 400CM21EA$ - 0$ - 0
4. 401CM2 - 700CM21EA$ - 0$ - 0
5. 701CM2 - 100CM21EA$ - 0$ - 0
3005Tasks under CLIN 3005 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.3 and 5.4
1. Main Rotor Blade Exchange1EA$ - 0$ - 0
2. Repair of Blade Container1EA$ - 0$ - 0
3. Replacement of an Unrepairable Blade Container1EA$ - 0$ - 0
3006Hidden Damages Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
3007Unusual Damage Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
3008Product/Engineering Change Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.4on individual
Hourly Rate $________________task order
3009Service Bulletins Hourly Labor RateTBDHRNot separately priced
IAW SOW Section 6.5
Hourly Rate $________________

ESTIMATED OPTION PERIOD THREE TOTAL $ - 0

As per FAR Part 16.503 (c), the Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the Contractor to any equitable adjustment in price under the Government Property clause of the contract.

&"-,Bold"&12Option Year Three Period of Performance: 03/01/2029 - 02/28/2030 &"-,Bold"&12Schedule of Supplies/Services Solicitation Number 70Z03825RB0000003

ATTACHMENT 1

Option 4

CLINITEM DESCRIPTIONEST QTYUNIT OF ISSUEUNIT PRICEEST AMOUNT
4001Repair Main Rotor Blades (MRB)110EA$0.00$ - 0
IAW SOW Section 5.0
NSN:1615-01-HS2-0025
P/N: 366A11-0010-07
OR
NSN:1615-14-472-7358
P/N: 366A11-0010-06
OR
NSN: 1615-01-HR2-3169
P/N: 366A11-0010-05
OR
NSN: 1615-01-HS1-6050
P/N: 366A11-0010-04
OR
NSN: 1615-01-HR2-3319
P/N: 366A11-0010-03
BER/Scrap Fee associated in AHI Texas1EA$0.00$ - 0
with CLIN 4001 IAW S0W Section 6.0
BER/Scrap Fee associated in AH France1EA$0.00$ - 0
with CLIN 4001 IAW S0W Section 6.0
4002Repair of MRB Tip Caps100EA$0.00$ - 0
IAW SOW Section 5.0
NSN: 1560-01-HS2-2339
P/N: 366A11-5030-03
BER/Scrap Fee associated1EA$0.00$ - 0
with CLIN 4002 IAW S0W Section 6.0
4003Tasks under CLIN 4003 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.2
1. Whirl Tower Testing1EA$ - 0$ - 0
2. Metallic Tip Block1EA$ - 0$ - 0
3. Root End Bushings Replacement1EA$ - 0$ - 0
4. Bushing Re-Bonding and Touch-up1EA$ - 0$ - 0
5.No fault/Refinish with Whirl Tower and High-1EA$ - 0$ - 0
Visibility Paint
4004Tasks under CLIN 4004 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work.
Structural Skin Repair Tasks IAW SOW 5.2
1. Up to 6CM2 Surface Damage Size1EA$ - 0$ - 0
2. 6CM2 - 100CM21EA$ - 0$ - 0
3. 101CM2 - 400CM21EA$ - 0$ - 0
4. 401CM2 - 700CM21EA$ - 0$ - 0
5. 701CM2 - 100CM21EA$ - 0$ - 0
4005Tasks under CLIN 4005 below will be used for Task Order Modifications on a case-by case and
are considered "over and above" normal repair work IAW SOW 5.3 and 5.4
1. Main Rotor Blade Exchange1EA$ - 0$ - 0
2. Repair of Blade Container1EA$ - 0$ - 0
3. Replacement of an Unrepairable Blade Container1EA$ - 0$ - 0
4006Hidden Damages Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
4007Unusual Damage Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.3on individual
Hourly Rate $________________task order
4008Product/Engineering Change Hourly Labor Rate1HRTo be determined
IAW SOW Section 6.4on individual
Hourly Rate $________________task order
4009Service Bulletins Hourly Labor RateTBDHRNot separately priced
IAW SOW Section 6.5
Hourly Rate $________________
ESTIMATED OPTION PERIOD FOUR TOTAL$ - 0
ESTIMATED GRAND TOTAL$ - 0

As per FAR Part 16.503 (c), the Government Property furnished for repair. Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as "estimated" or "maximum" will not entitle the Contractor to any equitable adjustment in price under the Government Property clause of the contract.

&"-,Bold"&12Option Year Four Period of Performance: 03/01/2030 - 02/28/2031 &"-,Bold"&12Schedule of Supplies/Services Solicitation Number 70Z03825RB0000003

ATTACHMENT 1

File details come from the government source that posted it. Updated .