Attachment 1 - Salient Characteristics List.pdf

PDF 263 KB Posted

Attached to
Combined Synopsis/ Solicitation - Disintegrators Federal contract opportunity
Solicitation number
FA469025Q0033
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 1 - Salient Characteristics List is a detailed technical specification document for two complete disintegrator systems to be delivered to Ellsworth Air Force Base in South Dakota. The document outlines requirements for two separate facilities (LO and MPF), each requiring a disintegrator system with specific technical specifications including NSA/CSS security compliance, destruction capabilities for paper and electronic media, motor requirements (15 HP for LO facility, 30 HP for MPF facility), and integrated waste collection and dust filtration systems.

Key specifications include DIN Security Level 66399, ability to destroy classified and sensitive media, NSA rating of minimum 500 lbs. per hour destruction capacity, and specific installation constraints (LO facility requires components to pass through 7'x7' door, MPF facility requires components to pass through 4'x7' door and fit in a 14'x22' room). The contract includes a five-year warranty, continued maintenance support, blade resharpening capabilities, and initial training. Delivery is specified for no earlier than September 1st, 2025, with the contractor responsible for shipping and complete system installation at Ellsworth AFB.

View the file

Other files for this federal contract opportunity

Other files attached to Combined Synopsis/ Solicitation - Disintegrators, newest first.
File Type Posted
Amendment 01 Questions and Answers.pdf PDF
Attachment 3 - Provisions and clauses.pdf PDF
Attachment 2 - Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Salient Characteristics List

Salient Characteristics:

BACKGROUND: The MPF and LO Facilities require a total of two complete disintegrator systems. The contractor will procure shipping to Ellsworth AFB. The contractor will also provide an installation team to install both complete systems.

OBJECTIVES: Attain two (2) complete disintegrator systems which include: one (1) Disintegrator, one (1) Filtration/collection system with bagged dust collection.

Installation: The MPF and LO facilities each require installation by the contractor. The contractor will make all electrical connections to the system.

Delivery: No earlier than September 1st 2025. The contractor will procure shipping of two (2) complete systems to Ellsworth AFB South Dakota.

Disintegrator Technical Specifications for LO Facility:

• Listed on NSA/CSS EPL for Paper Disintegrators, CDs, and Key Tape

• DIN Security Level: 66399 T-6, E-5, O-5, P-7

• Security Compliance: Classified, CUI/PII, NIST 800-88, DoD Emergency Destruction

Guidelines, all commercial destruction regulations

• Media accepted: Paper, optical disks, small e-media

• NSA rated at a minimum 500 lbs. per hour

• Max partical size 3/32 inch

• Motor: minimum 15 HP 460V/3-Phase/60Hz

• Soundproofed base and feed hopper

• Minimum 10” by 16” cutting chamber

• Solid steel (NO hollow spaces) rotor

• Blades seated direct to rotor

• Disintegrator integrated into complete system

• Included maintenance kit with spare set blades, tool kit, v-belts, waste collection bags

Disintegrator Technical Specifications for MPF Facility:

• Listed on NSA/CSS EPL for Paper Disintegrators, CDs, and Key Tape

• DIN Security Level: 66399 T-6, E-5, O-5, P-7

• Security Compliance: Classified, CUI/PII, NIST 800-88, DoD Emergency Destruction

Guidelines, all commercial destruction regulations

• Media accepted: Paper, optical disks, small e-media

• NSA rated at a minimum 500 lbs. per hour

• Max partical size 3/32 inch

• Motor: minimum 30 HP 460V/3-Phase/60Hz

• Soundproofed base and feed hopper

• Minimum 10” by 16” cutting chamber

• Solid steel (NO hollow spaces) rotor

• Blades seated direct to rotor

• Disintegrator integrated into complete system

• Included maintenance kit with spare set blades, tool kit, v-belts, waste collection bags

Waste Collection and Dust Filtration System for LO and MPF facilities:

• Dual bag waste collection system with separate bottomless filter for bagged dust collection

• 1.5 HP 460V/3-Phase/60Hz

• Waste and dust collection system integrated into complete system

Complete System sound Enclosuer For LO and MPF facilities:

• Not Required

Warranty For LO and MPF facilities:

• Five-year warranty on complete system

Support For LO and MPF facilities:

• Continued support for routine maintenance

• Blade Resharpening Capabilities

• Initial training for operation, collection bag change, routine maintenance requierments

System LO facility Room Instalation Specifications

• All components must pass through a 7 foot wide 7 foot tall door for installation

System MPF Room Instalation Specifications:

• All components must pass through a 4 foot wide 7 foot tall door for installation

• Complete system must fit in a 14 foot x 22 foot room

File details come from the government source that posted it. Updated .