Attachment 1 - Salient Characteristics List.pdf
PDF 263 KB Posted
- Attached to
- Combined Synopsis/ Solicitation - Disintegrators Federal contract opportunity
- Solicitation number
- FA469025Q0033
About this file
Attachment 1 - Salient Characteristics List is a detailed technical specification document for two complete disintegrator systems to be delivered to Ellsworth Air Force Base in South Dakota. The document outlines requirements for two separate facilities (LO and MPF), each requiring a disintegrator system with specific technical specifications including NSA/CSS security compliance, destruction capabilities for paper and electronic media, motor requirements (15 HP for LO facility, 30 HP for MPF facility), and integrated waste collection and dust filtration systems.
Key specifications include DIN Security Level 66399, ability to destroy classified and sensitive media, NSA rating of minimum 500 lbs. per hour destruction capacity, and specific installation constraints (LO facility requires components to pass through 7'x7' door, MPF facility requires components to pass through 4'x7' door and fit in a 14'x22' room). The contract includes a five-year warranty, continued maintenance support, blade resharpening capabilities, and initial training. Delivery is specified for no earlier than September 1st, 2025, with the contractor responsible for shipping and complete system installation at Ellsworth AFB.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 01 Questions and Answers.pdf | ||
| Attachment 3 - Provisions and clauses.pdf | ||
| Attachment 2 - Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – Salient Characteristics List
Salient Characteristics:
BACKGROUND: The MPF and LO Facilities require a total of two complete disintegrator systems. The contractor will procure shipping to Ellsworth AFB. The contractor will also provide an installation team to install both complete systems.
OBJECTIVES: Attain two (2) complete disintegrator systems which include: one (1) Disintegrator, one (1) Filtration/collection system with bagged dust collection.
Installation: The MPF and LO facilities each require installation by the contractor. The contractor will make all electrical connections to the system.
Delivery: No earlier than September 1st 2025. The contractor will procure shipping of two (2) complete systems to Ellsworth AFB South Dakota.
Disintegrator Technical Specifications for LO Facility:
• Listed on NSA/CSS EPL for Paper Disintegrators, CDs, and Key Tape
• DIN Security Level: 66399 T-6, E-5, O-5, P-7
• Security Compliance: Classified, CUI/PII, NIST 800-88, DoD Emergency Destruction
Guidelines, all commercial destruction regulations
• Media accepted: Paper, optical disks, small e-media
• NSA rated at a minimum 500 lbs. per hour
• Max partical size 3/32 inch
• Motor: minimum 15 HP 460V/3-Phase/60Hz
• Soundproofed base and feed hopper
• Minimum 10” by 16” cutting chamber
• Solid steel (NO hollow spaces) rotor
• Blades seated direct to rotor
• Disintegrator integrated into complete system
• Included maintenance kit with spare set blades, tool kit, v-belts, waste collection bags
Disintegrator Technical Specifications for MPF Facility:
• Listed on NSA/CSS EPL for Paper Disintegrators, CDs, and Key Tape
• DIN Security Level: 66399 T-6, E-5, O-5, P-7
• Security Compliance: Classified, CUI/PII, NIST 800-88, DoD Emergency Destruction
Guidelines, all commercial destruction regulations
• Media accepted: Paper, optical disks, small e-media
• NSA rated at a minimum 500 lbs. per hour
• Max partical size 3/32 inch
• Motor: minimum 30 HP 460V/3-Phase/60Hz
• Soundproofed base and feed hopper
• Minimum 10” by 16” cutting chamber
• Solid steel (NO hollow spaces) rotor
• Blades seated direct to rotor
• Disintegrator integrated into complete system
• Included maintenance kit with spare set blades, tool kit, v-belts, waste collection bags
Waste Collection and Dust Filtration System for LO and MPF facilities:
• Dual bag waste collection system with separate bottomless filter for bagged dust collection
• 1.5 HP 460V/3-Phase/60Hz
• Waste and dust collection system integrated into complete system
Complete System sound Enclosuer For LO and MPF facilities:
• Not Required
Warranty For LO and MPF facilities:
• Five-year warranty on complete system
Support For LO and MPF facilities:
• Continued support for routine maintenance
• Blade Resharpening Capabilities
• Initial training for operation, collection bag change, routine maintenance requierments
System LO facility Room Instalation Specifications
• All components must pass through a 7 foot wide 7 foot tall door for installation
System MPF Room Instalation Specifications:
• All components must pass through a 4 foot wide 7 foot tall door for installation
• Complete system must fit in a 14 foot x 22 foot room