This is a Statement of Work for RFQ 19SN1025Q0013 detailing refurbishment work required at the Deputy Chief of Mission Residence located at No. 17 Swettenham Road in Singapore. The project involves comprehensive cleaning, repainting, and restoration work for the main house, staff quarters, guard house, and compound areas including gates, driveways, sidewalks, and other exterior elements.

The scope includes extensive exterior and interior painting work using specified ICI Dulux products, repair of damaged surfaces, treatment of mold/mildew, restoration of terrazzo floors, concrete roof maintenance, and refurbishment of multiple living spaces across two floors. The contractor must provide all materials, equipment, and English-speaking supervision, while complying with Singapore Urban Redevelopment Authority conservation guidelines. Work hours are 0800-1630 Monday through Friday, excluding holidays. The contractor must submit detailed work schedules, cost proposals, and weekly progress reports. Safety requirements include compliance with U.S. OSHA guidelines and development of a Site Safety and Health Plan. The solicitation response deadline is March 21, 2025 at 1630 hours Singapore time.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 19SN1025Q0013 Attachment 1 - SOW

PROJECT: Deputy Chief of Mission Residence Make Ready LOCATION: No. 17 Swettenham Road, Singapore 248105

STATEMENT OF WORK

I. BACKGROUND

The U.S. Embassy in Singapore intends to award a contract for the Refurbishment of the Deputy Chief of Mission Residence. The aim of this statement of work (SOW) is to refresh and restore the residence main house and staff quarters to provide a better living experience to its future residents.

II. GENERAL REQUIREMENTS

The Contractor shall provide professional construction services and furnish all required personnel, tools of trade, equipment, materials, transportation, insurance, delivery and a competent English-speaking Supervisor who will stay at the job site every workday throughout the execution of the project. The Contractor shall ensure that the project is executed in compliance of the OBO guidelines, drawings, attachments, and technical provisions stated herein, while following all security and safety protocols directed by the Embassy. This property is a conserved house under the jurisdiction of the Singapore Urban Redevelopment Authority (URA). All work such as repair, renovation, replacement, and maintenance work must comply with the guidelines and protocols set forth by URA.

III. SCOPE OF WORK

The Contractor shall perform work consisting of but not limited to the items listed below. This Scope of Work shall be used in conjunction with the accompanying drawings, photos, and other documents and data to complete the project. The Contractor shall work with the Contracting Officer (CO) or Contracting Officer Representative (COR) until the completion and final turn over of the project.

The general scope of the project is cleaning, repainting, and restoration work of the whole residence including, but not limited to, the following:

•DCR Main house (Exterior, Interior, Roof)

•Staff quarters (Exterior, Interior, Roof)

•Guard House (Exterior, Interior, Roof)

•DCR Compound (gates, driveways, sidewalks, patios, curbs, planters, courts, etc.) and elements within the premises.

The Contractor may propose alternative procedures for all the work, subject to the approval of OBO, US Embassy COR, Singapore Urban Redevelopment Authority (URA), and other relevant bodies.

A. DCR MAIN HOUSE

1.Exterior Work

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Prepare all surfaces for cleaning. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove loose and peeled paint. Exercise care when removing or scraping loose paint, exterior surfaces have rough plasterwork finish that must be maintained.

d. Seal off gaps and openings properly (doors, windows, wall openings and penetrations, etc.) to prevent water and moisture penetration into the interiors while performing the repainting work.

e. Pressure-wash all exterior concrete patio or pavers surfaces to remove all deposits, stains, and dirt build-up. Use appropriate pressure setting. If the patio, pavers, or any surface have cracked or open joints, contractors are to adapt an alternative strategy such as pressure washing from a distance of 2 meters from the surface being cleaned to avoid further damage or contractor can opt to hand clean such areas. Allow enough time to dry completely.

f. Provide proper cover to items and areas where pressure-washing is not applicable (exposed conduits and PVC pipes & joints, air conditioning units and brackets, wall lights, railings, canopy framing, delicate façade elements, etc.). These items shall be cleaned manually by hand.

g. Prepare all surfaces for repainting per paint manufacturer’s guidelines. Repair any cracks, dents, holes, and other damage with appropriate fillers. Finished surface must match the original look.

h. Apply appropriate primers and base coats on all bare substrates.

i. Apply at least two coats of emulsion paint (ICI Dulux Weather Shield Emulsion Paint, White WS 25155 or approved equivalent). Ensure even coverage and coloration of paint.

j. Repair any damage to front porch and guest suite porch ceiling. Prepare surface for repainting.

k. Repaint front porch and guest suite porch ceiling with color matching to existing.

Note: Do not paint over all exposed fair-faced brickwork on the façade unless such surfaces are already painted in the existing. All restoration work and repainting work must match the original look of the DCR.

2.Roofing and Canopies

a. Pressure-wash clay roof tile to remove deposits, stains, and dirt build-up. Manual cleaning must be done to remove hardened build-up or any kind of dirt that cannot be removed by pressure-washing.

b. Damaged portions of these areas must be repaired and restored using matching material and the same installation or construction methodology.

c. Remove leaves and clean other debris on the wire netting surrounding the eaves of the house.

d. Prepare the surfaces of all exposed roof and canopy framing structures for repainting.

e. Apply appropriate primer and repaint the exposed roof and canopy framing with black color to match the existing.

3. Concrete Roof above Patio

a. Clear entire concrete roof from debris.

b. Check concrete roof for any cracks, gaps, or damage that may cause leak below prior to washing.

Pressure-wash entire concrete roof to remove all algae, oil, dirt, and other buildup.

c. Repair all cracks, dents, holes, or any kind of damage with appropriate fillers or sealing compound and apply as per manufacturer’s recommendations.

4. Concrete Roof above Dining Room

a. Clear entire concrete roof from debris.

b. Check concrete roof for any cracks, gaps, or damage that may cause leak below prior to washing.

Pressure-wash entire concrete roof to remove all algae, oil, dirt, and other buildup.

c. Repair all cracks, dents, holes, or any kind of damage with appropriate fillers or sealing compound and apply as per manufacturer’s recommendations.

5. Bedroom Balconies (On level 2 - Master Bedroom and Bedroom 2)

a. Pressure-wash all balconies, treat mold and mildew growth.

b. Patch-up cracks, holes, dents with appropriate fillers and apply as per manufacturer’s recommendations.

c. Rectify any uneven surface and ensure proper slope to drains.

d. Clean all balcony railings with appropriate solvent. Sand or buff if necessary to remove visible blemishes, scratches, and other surface imperfections. Repair if necessary.

6. Terrazzo Floors

a. Clean all terrazzo finished floors, walkways, stairs, and sidewalk around the house to remove all dirt, stains, and grime buildup.

• Patio and stairs near the dining room (approx. 102 sqm.)

• Sidewalk at the back of the of the dining room (approx. 19 sqm.)

b. Apply a seal stripper to remove old dressing and sealer. Wash and clean terrazzo surfaces again to remove all residue.

c. Machine polish with #80 and #120 grit diamond or abrasive stone bits to smoothen floor surface.

d. Apply water-based penetrating sealer and buff to shine.

7. Interior Work

Scope of work under this section covers the following areas in the DCR:

1st Floor

• Representational Living Area

• Dining Room

• Kitchen

• Wine Storage Area

• Laundry Area

• Pantry

• Ironing & Storage Area

• Guest Suite (bedroom with bathroom, living room, and changing room)

2nd Floor

• Family Living Area

• Master Bedroom with balcony

• Master T&B

• Bedroom 2 with balcony

• Bedroom 3 with changing room / walk-in closet

• Common Bathroom

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Clean all interior walls, ceiling, and other surfaces to remove all existing paint, dirt, deposits, and stains. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove all hooks, picture hangers, and nails (unless specified otherwise) and remove all existing paint.

• Note: Do not remove the mirror mounts in the dining room. The mirrors will be reinstalled at the same location after completion of work.

d. Repair all damage, dents, cracks, and holes caused by removal of the hooks, hangers, and nails with appropriate fillers. Allow to dry before sanding to achieve a smooth even surface. Prepare surface for repainting.

e. Apply appropriate sealers, primers, and base coats.

f. Apply one coat of ICI Dulux Pentalite “Debutant PL 2207” or approved equivalent. Apply additional coats on some areas to ensure adequate and even paint coverage on all surfaces.

8. Restoration Work

a. The Contractor shall restore all affected and damaged areas of the building and property impacted by the work done for this project at no cost to the Embassy.

b. Construction work done to be inspected and evaluated by COR.

9. Dining room ceiling

The Contractor shall perform work consisting of but not limited to the items listed below. This Scope of Work shall be used in conjunction with the accompanying drawings, photos, and other documents and data to complete the project. The Contractor shall work with the Contracting Officer (CO) or Contracting Officer Representative (COR) until the completion and final turn over of the project.

The scope of work includes all ceiling false beams located inside the main representational dining room. Note that these beams/frames or not load bearing and only for decorative purposes.

a) Verify all conditions and measurements of the dining room ceiling.

b) Remove affected utilities and lighting fixtures (chandelier, track light, etc.), coordinate with

COR to identify a location where to store and safe keep items.

c) Remove all existing wood false beams and dispose offsite.

d) Restore existing ceiling finishes. Clean all affected ceiling surface, patch with ceiling putty to cover any holes, cracks or uneven portions. Dry and smoothen ceiling by sanding.

e) Clean entire ceiling and prepare surface to be ready to receive paint. Ensure that entire ceiling surface is smooth and even.

f) Supply and install new Chengal (or approved equivalent) timber/wood ceiling false beam.

Match to existing design, finishes and measurements.

g) Apply anti-termite preservative Solignum Colourless AZ or approved equivalent. Follow application procedures as specified with by the manufacturer.

h) Provide painting works as necessary to match color and texture to existing, use Singapore Standard SS34 for undercoat and SS7 for enamel paints. Comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S.

Government Properties.”

i) The Contractor to clean-up and dispose of all debris and waste material daily after work hours and upon completion of work. Do not store items and materials for disposal on site overnight.

j) Reinstall affected utilities and lighting fixtures to the original ceiling location.

B. STAFF HOUSE

1. Exterior Work

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Prepare all surfaces for cleaning and pressure washing. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove loose and peeled paint. Exercise care when removing or scraping loose paint, exterior surfaces have rough plasterwork finish that must be maintained.

d. Seal off gaps and openings properly (doors, windows, wall openings and penetrations, etc.) to prevent water and moisture penetration into the interiors while performing the repainting work.

e. Pressure-wash all exterior patio or paver surfaces to remove all deposits, stains, and dirt build-up.

Use appropriate pressure setting. If the patio, pavers, or any surface have cracked or open joints, contractors are to adapt an alternative strategy such as pressure washing from a distance of 2 meters from the surface being cleaned to avoid further damage or contractor can opt to hand clean such areas. Allow enough time to dry completely.

f. Provide proper cover to items and areas where pressure-washing is not applicable (exposed conduits and PVC pipes & joints, air conditioning units and brackets, delicate façade elements, etc.).

These items shall be cleaned manually by hand.

g. Prepare all surfaces for repainting as per paint manufacturer’s guidelines. Repair any cracks, dents, holes, and other damage with appropriate fillers. Apply plaster finish matching the original look.

h. Apply appropriate primers and base coats on all bare substrates.

i. Apply at least two coats of emulsion paint (ICI Dulux Weather Shield Emulsion Paint, White WS 25155 or approved equivalent). Ensure even coverage and coloration of paint.

2. Interior Work

Scope of work under this section covers the following areas in the DCR:

• Two bedrooms and one toilet at first storey.

• Three bedrooms and two bathrooms at second storey.

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Clean all interior walls, ceiling, and other surfaces to remove all existing paint, dirt, deposits, and stains. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove all hooks, picture hangers, and nails (unless specified otherwise) and remove all existing paint.

• Note: Do not remove the mirror mounts in the dining room. The mirrors will be reinstalled at the same location after completion of work.

d. Repair all damage, dents, cracks, and holes caused by removal of the hooks, hangers, and nails with appropriate fillers. Allow to dry before sanding to achieve a smooth even surface. Prepare surface for repainting.

e. Apply appropriate sealers, primers, and base coats.

f. Apply one coat of ICI Dulux Pentalite “Debutant PL 2207” or approved equivalent. Apply additional

g. Repair wardrobe doors of the second bedroom and repaint with color matching to existing.

3. Restoration Work

C. GUARD HOUSE

1. Exterior Work

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Prepare all surfaces for cleaning and pressure washing. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove loose and peeled paint. Exercise care when removing or scraping loose paint, exterior surfaces have rough plasterwork finish that must be maintained.

d. Seal off gaps and openings properly (doors, windows, wall openings and penetrations, etc.) to prevent water and moisture penetration into the interiors while performing the repainting work.

e. Pressure-wash all exterior patio or paver surfaces to remove all deposits, stains, and dirt build-up.

Use appropriate pressure setting. If the patio, pavers, or any surface have cracked or open joints, contractors are to adapt an alternative strategy such as pressure washing from a distance of 2 meters from the surface being cleaned to avoid further damage or contractor can opt to hand clean such areas. Allow enough time to dry completely.

f. Provide proper cover to items and areas where pressure-washing is not applicable (exposed conduits and PVC pipes & joints, air conditioning units and brackets, delicate façade elements, etc.).

These items shall be cleaned manually by hand.

g. Prepare all surfaces for repainting as per paint manufacturer’s guidelines. Repair any cracks, dents, holes, and other damage with appropriate fillers. Apply plaster finish matching the original look.

h. Apply appropriate primers and base coats on all bare substrates.

i. Apply at least two coats of emulsion paint (ICI Dulux Weather Shield Emulsion Paint, White WS 25155 or approved equivalent). Ensure even coverage and coloration of paint.

2. Interior Repainting

a. Review and comply with all the relevant precautions and procedure in the attached “Standard Painting Procedure for U.S. Government Properties.”

b. Clean all interior walls, ceiling, and other surfaces to remove all existing paint, dirt, deposits, and stains. Remove mold and mildew and treat affected surfaces with anti-mildew solution to avoid recurrence.

c. Remove all hooks, picture hangers, and nails (unless specified otherwise) and remove all existing paint.

d. Repair all damage, dents, cracks, and holes caused by removal of the hooks, hangers, and nails with appropriate fillers. Allow to dry before sanding to achieve a smooth even surface. Prepare surface for repainting.

e. Apply appropriate sealers, primers, and base coats.

f. Apply one coat of ICI Dulux Pentalite “Debutant PL 2207” or approved equivalent. Apply additional

3. Restoration Work

D. DCR COMPOUND

1. For all painting works under this section, comply with all the relevant precautions and procedures in the attached “Standard Painting Procedure for U.S. Government Properties.”

1. Repaint 10 units of 1-meter-high lamp posts with matte black paint. Submit paint swatch and sample to COR for approval.

2. Repaint 12 units of drain cover gratings (610mm x 345mm) at the front porch with ICI Gloss Enamel Black GL122 or approved equivalent.

3. Repaint all manhole covers. Match color to existing, submit swatches for COR approval.

4. Prepare surface of motorized gate as per paint manufacturer’s guidelines and repaint with color matching the existing. Ensure even and smooth coverage. Match color to existing, submit swatches for COR approval.

5. Repaint all road markings, curbs, parking lines, and other markings within the premises. Make sure lines are straight or aligned the same as the existing.

6. Repaint the crown of garden/planter wall at the patio outside the dining room, (28.37-meter length,

0.53 meter width, 0.10 meter height). Color must match the brick red color of the floor.

7. Repaint all walls and fences within the yard with ICI Dulux Weathershield Paint (White) or approved equivalent.

8. Pressure-wash all sidewalks and curbs around the main house and within the compound.

9. Repaint gas cylinder storage cage with ICI Dulux Enamel Matt Black or approved equivalent.

10. The Contractor shall restore all affected and damaged areas of the building and property impacted by the work done for this project at no cost to the Embassy.

11. Construction work done to be inspected and evaluated by COR.

IV. CONTRACT ADMINISTRATION

a. OBO does not make representations or warranties of whatsoever kind or nature, either expressed or implied, as to the quality, level of completion, accuracy, extent of compliance with the standards, codes, and requirements described or referred to in this SOW, or the extent of coordination between or among the documents provided to the contractor.

b. Neither the Embassy’s nor OBO’s review, approval, or acceptance of, nor payment for the services required under this contract, shall be considered to operate as a waiver of any rights under this contract or any cause of action against the Contractor arising out of the performance of this contract.

c. OBO has the right to inspect and test all services called for by the contract, to the extent practicable, at all times and places during the term of the contract. OBO may perform quality assurance inspections (QAI) to confirm the work is being performed according to the Statement of Work.

d. The Embassy has the right to terminate this contract of convenience at any time in whole, or from time to time, if the Contracting Officer determines it is in the interest of the Embassy.

e. The Contracting Officer (CO) shall provide a written Notice to Proceed [NTP] to the Contractor. No work shall be initiated until the NTP is issued by the CO.

V. RESPONSIBILITY OF THE CONTRACTOR

a. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services.

b. The Contractor shall identify a Project Manager who shall be responsible for the overall management of this Contract. The Project Manager must speak English and be approved by the Embassy.

c. The Contractor shall provide professional competent English-speaking Supervisor who will stay at the job site every workday throughout the execution of the project. The Contractor shall ensure that the project is executed in compliance of the OBO guidelines, drawings, attachments, and technical provisions stated herein, while following all security and safety protocols directed by the Embassy.

d. The Contractor shall assume full responsibility for any damages, injuries, or environmental damage whether intentional or accidental, to any area involving contract personnel or equipment.

The contractor is responsible to restore the damage to its original condition and/or personnel injuries at Contractor’s expense.

e. The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters. The Contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the Contracting Officer’s Representative (COR).

f. The Contractor shall always keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the owner.

Unsightly materials and debris including excess soil, garbage, leftover material and equipment should be removed as required.

VI. CONSTRUCTION REQUIREMENTS

a. The Contractor shall be responsible for all required materials (unless stated otherwise), equipment, and personnel to manage, administer, and supervise this project. All workmanship shall be of good quality and performed in a skillful manner as determined of OBO.

b. The Contractor shall have limited access to or be admitted into any building on the compound outside the areas designated for the project except with permission by the Embassy.

c. The Contractor will be permitted to use the area within the compound for operation of his construction equipment and temporary facilities. Verify with the COR the location of the temporary staging area for the project. The Contractor is responsible for obtaining any additional off compound storage areas required.

d. Working hours will be from 0800 – 16:30 Monday – Friday, excluding local holidays. Weekend or afterhours work must be approved by the CO or COR and will not be justification for additional cost.

VII. SAFETY REQUIREMENTS

a. The Contractor shall comply with U.S. OSHA (Occupational Safety and Health Administration) guidelines and local safety and health requirements and shall assume full responsibility and liability for compliance with all other applicable standards and regulations pertaining to accident prevention, life, health, and safety of personnel; as well as preventing damage to materials, supplies, properties, and equipment.

b. Prior to commencing the project, the contractor is required to review the work site and identify hazards that may occur while performing work.

c. Prior to starting a project, the contractor shall contact COR, to ensure they have received pertinent information for the project including requirements for permits, floor plans, utility information, asbestos, lead based paint, and other hazardous materials.

d. The contractor is expected to provide a “competent person” to implement Site Health and Life Safety plan and to oversee its compliance. A competent person is an individual who, by way of training and/or experience, is knowledgeable of applicable standards, can identify workplace hazards relating to the specific operation, is designated by the employer, and has authority to take appropriate actions.

e. The Contractor is required to provide the proof of payment of local insurances of all employees that will be involved in the project. Likewise, the contractor is required to provide monthly payment documents of local insurance for the length of work.

f. The Contractor shall conduct a safety briefing before starting daily work.

g. Contractor personnel who have signs of drunkenness or who are under the influence of stimulants or hallucinogens will be denied entry to the work area.

h. The contractor shall ensure individuals working at the site are trained and aware of potential hazards. The contractor shall ensure that these individuals are provided with proper safety equipment to prevent accidental injury in accordance with the requirements of the contract.

i. All workers will remove all chains, rings, watches and/or bracelets during the execution of work.

j. Smoking is prohibited at the work site and will use only designated area for smokers.

k. The contractor is required to report immediately all mishaps to the COR and the contracting officer.

A “mishap” is any event causing injury, disease or illness, death, material loss or property damage, or incident causing environmental contamination. The mishap reporting requirement shall include fires, explosions, hazardous materials contamination, and other similar incidents that may threaten people, property, and equipment.

l. The Contractor shall be responsible for the removal and/or disposal of hazardous waste generated from the project. Hazardous waste generated from the project must be removed and disposed of in accordance with the Department’s Hazardous Waste Management Policy as well as local rules and regulations.

m. The contractor shall ensure proper safety, health and environmental requirements of EM 385-1-1 applicable to their project are followed.

n. The contractor shall ensure individuals working at the site are trained and are aware of potential hazards. Contractors shall ensure that these individuals are provided with proper safety equipment to prevent accidental injury in accordance with the requirements of the contract.

o. The Contractor will hold the Government and its agents harmless for any action, errors, or omission on his part, his employees, workers, or his subcontractors that result in illness, injury, or death.

p. The Contractor shall be responsible for all injuries to his employees/workers.

q. The Contractor must place provisional barricades and warning signs to maintain a safe and accessible path-of-travel for all pedestrians, including those with disabilities, to avoid accidents to third parties. These barricades, signs, fencing, traffic cones, caution tape, and other temporary safety items shall be erected and maintained for the duration of the Contract and must comply with international and local codes and regulations.

r. The Contractor and all their personnel are required to use personal protective equipment (PPE).

The Contractor is required to inspect and maintain spare PPE in case of damage, deterioration, or loss of the equipment. The PPE must meet the technical specifications required by international and local standards and regulations.

s. All tools, equipment, and machinery that will be used in the execution of the project must be inspected by a competent person before starting the project. COR and Safety representatives of the US Embassy may inspect equipment, tools, and machinery of the contractor at any time and may request to change it if deemed necessary.

t. In addition to the safety/accident prevention requirements of FAR 52.236-13, Accident Prevention Alternate I, the contractor shall comply with the following additional safety measures.

u. High Risk Activities. If the project contains any of the following high-risk activities, the contractor shall follow the section in the latest edition, as of the date of the solicitation, of the U.S. Army Corps of Engineers Safety and Health manual, EM 385-1-1 that corresponds to the high-risk activity. Before work may proceed, the contractor must obtain approval from the COR of the written safety plan required by FAR 52.236-13, Accident Prevention Alternate I, containing specific hazard mitigation and control techniques.

• Scaffolding.

• Work at heights above 1.8 meters.

• Trenching or other excavation greater than one (1) meter in depth.

• Earth-moving equipment and other large vehicles.

• Cranes and rigging.

• Welding or cutting and other hot work.

• Partial or total demolition of a structure.

• Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits; other electrical hazards may also require the use of a GFCI.

• Work in confined spaces (limited exits, potential for oxygen less than 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.).

• Hazardous materials – a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations, which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.

• Hazardous noise levels as required in EM 385-1 Section 5B or local standards if more restrictive.

v. Safety and Health Requirements. The contractor and all subcontractors shall comply with the latest edition of the U.S. Army Corps of Engineers Safety and Health manual EM 385-1-1, or OSHA 29

CFR parts 1910 or 1926 if no EM 385-1-1 requirements are applicable, and the accepted contractor’s written safety program.

• https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health- Requirements-Manual/

w. Records. The contractor shall maintain an accurate record on all mishaps incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the contracting officer.

x. Subcontracts. The contractor shall insert this clause, including this paragraph I, with appropriate changes in the designation of the parties, in subcontracts.

y. Written program. The plan required under the clause entitled “Accident Prevention Alternate I” shall be known as the Site Safety and Health Plan (SSHP) and shall address any activities listed in paragraph (a) of this clause, or as otherwise required by the contracting officer/COR.

• The SSHP shall be submitted at least 10 working days prior to commencing any activity at the site.

• The plan must address developing activity hazard analyses (AHAs) for specific tasks. The AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. Work shall not begin until the AHA for the work activity has been accepted by the COR and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives.

• The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by EM 385 1 1) shall be identified and included in the AHA. Proof of their competency/qualification shall be submitted to the contracting officer or COR for acceptance prior to the start of that work activity. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).

VIII. CONTRACTOR DELIVERABLES

a. Drawings and Specifications. The Contractor is required to provide the plans, shop drawings, and relevant documents required for the performance of the work, and submit tabulated listing of all materials, finishes, and specifications used for each window for future reference and maintenance purposes.

b. Cost. The Contractor shall submit cost proposal showing a breakdown of the services to be provided. The cost proposal shall include all work, personnel, material, equipment, mobilization, logistics, insurances, overhead cost, profit, and other items necessary to execute the project up to its completion.

c. Work Schedule. The Contractor shall submit a work schedule, setting forth date, time, contents of work, personnel, and timeline to completion for approval by the COR.

d. Permits. The Contractor shall also be responsible for obtaining the local permits required to execute the project. This includes the preparation of the documents that need to be submitted to obtain such permits (ex. Conservation Permission from URA).

e. Professional Construction Services. The Contractor shall commence work promptly, execute the work diligently and professionally, and achieve final completion and acceptance of the construction work stipulated herein this SOW.

f. Documentation. Weekly reports with photos and details pertaining to the progress of the project shall be submitted by the contractor to the COR.

IX. SECURITY

a. Contractor’s personnel must stay within the working site and not wander around the adjacent offices or areas not covered under this Scope of Work.

b. Contractor’s personnel are prohibited to roam around the premises during work hours or stay inside the Compound after each day of work.

c. The work to be performed under this SOW requires that the Contractor, its employees, and sub-contractors submit corporate, financial, and personnel information for review by the Embassy.

Information submitted by the Contractor will not be disclosed beyond the Embassy.

X. ATTACHMENTS

Attachment 01

Standard Painting Procedure for U.S.- Government Properties.

(2008)

a) The successful contractor must comply with the brand and type of paint specified for the project. If the specified paints are unavailable, their equivalent may be used subject to the approval of the Facilities Maintenance Manager or his assignee. Where brand and type of paint and material are not specified, bidders must specify and use brand and type of paint and material of high quality with anti-fungus / mold / algae properties. Failure to do so will render their bids null and void. Colors of the paint used are to be the same as the existing colors unless specified otherwise.

b) Concrete floor, when specified to be painted, are to be coated with a minimum of 2 coats of “I.C.I. Floor Paint” or its equivalent if approved by the Facilities Maintenance Manager.

c) Where applicable, the contractor shall ease all doors and windows that are to be re-painted;

i.e. plane down leading surfaces of doors and windows so that they will not bind when the new paint work is completed. Only electric or hand plane may be used for this kind of work on timber surfaces.

After this phase has been completed, the timber surfaces should be sanded with fine sandpaper to smooth edges and remove all splinters.

d) Blowlamps should only be used to burn off old coats of paint on metal surfaces. During such operation, fire extinguishers must be handily available to the operators. Where possible, it is preferable to use chemical paint removers.

e) For proper adhesion, all woodwork and metalwork must be properly sanded, cleaned, and rendered dust, oil and mildew free prior to repainting. All surfaces with mildew growth must be treated with an anti-mildew solution to eliminate recurring mildew growth. All rusted metalwork must be properly sanded or chemically cleaned to remove flaked paint and rust. Unless otherwise specified, all woodwork and metalwork must be finished with 2 coats of ICI outdoor enamel paint.

f) The appropriate sealers, primers and base coats must be applied on all bare substrate prior to the application of the finish coats. For compatibility, such preparatory coatings must be the manufacturer-specified constituents of a complete paint system of the final finish.

g) Arrangement must be made with the Facilities Maintenance Manager or his assignee to inspect all prepared surfaces prior to each subsequent application of sealer, primer, and finish coats.

The contractor can only apply the relevant subsequent coat after each inspection and approval by the Facilities Maintenance Manager or his assignee. Such period of inspection must not exceed the frequency of twice a day.

h) The contractor must ensure adequate paint coverage on all painted surfaces to obtain a good and even color throughout.

i) All recommendations on the procedure and usage by the manufacturer of the paint and other material used in this project must be strictly adhered to.

j) Unless specified otherwise, the contractor shall provide labor and equipment to remove furniture and roll up carpets, if so required, in order to facilitate his painting operation. Such furniture and carpet must be relocated to their original position after the completion of the painting work, unless instructed otherwise.

k) Prior to any painting work, all fittings such as power points, switches, door handles, lamp fittings, faucets, etc. must be properly masked to prevent paint marring their surfaces. Masking shall be carried out with covers, masking tape, paper, or masking cream as appropriate. The contractor must also provide for the removal of stains, if any, caused by the masking material.

l) Masking material used on sprinkler heads, public address system, smoke and heat detectors, and all other safety devices must be removed immediately after each painting session. If such safety devices were removed to facilitate painting work, they must be re-installed and checked for effectiveness and proper working order immediately after reinstallation. This is to ensure that the devices are in position and in good working order when the area is unattended.

m) Proper covering materials must also be provided when painting operation is in progress. Paint drips on floor and furniture, etc. must be removed and cleaned by the contractor at his expense.

Failure to use such drop sheets may result in the cancellation of contract.

n) All paint stains and drips on floor, glass panels, electrical and sanitary fittings, and door and window hardware in the repainting area will be the responsibility of the contractor to remove. No excuse will be accepted for paint on any surface for which it was not intended. The status of the stain or drip being new or old from a past painting project does not absolve the contractor from this responsibility.

o) The contractor must provide all tools, material, and equipment to complete the work specified in the scope of work. This includes all necessary safety equipment to comply with the regulations of the local authorities.

- END OF STATEMENT OF WORK -