attachment_1_RFP DES 2025-02.pdf
PDF 135 KB Posted
- Solicitation number
- RFP DES 2025-02
- Issued by
- Coos County, New Hampshire
About this file
This document is a supplemental attachment for the Little Bog Pond Dam and Lower Trio Pond Dam Reconstruction Project Bid Package. The attachment includes contract drawings for the project, which is being administered by the state government. The project involves the reconstruction of two dams, and interested bidders can access the contract drawings through the provided Dropbox links. No additional details are provided regarding the scope of work, item quantities, response deadlines, site visits, or contract term. Pricing terms, set asides, incumbents, funding sources, and other salient information are also not included in this attachment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Little Bog Pond Dam and Lower Trio Pond Dam Reconstruction Project – Bid Package Supplemental Attachments
Please find the supplemental attachments for the Little Bog Pond Dam and Lower Trio Pond Dam Reconstruction Project – Bid Package at the link below.
Attachment 1: Contract Drawings https://www.dropbox.com/scl/fo/cb712xcvrh7car2p4z7hf/AAV6D4HNpzVQ2CSCLtuNy0g?
rlkey=pq4yafrlq0qs27d3e2y1cprwa&st=m8u96959&dl=0 https://www.dropbox.com/scl/fo/cb712xcvrh7car2p4z7hf/AAV6D4HNpzVQ2CSCLtuNy0g?rlkey=pq4yafrlq0qs27d3e2y1cprwa&st=m8u96959&dl=0
File details come from the government source that posted it. Updated .