About this file

The document is a Request for Bid (RFB) issued by the New Hampshire Fish and Game Department for the Newfound Lake Public Boat Access Facility, specifically focusing on the installation and extraction of seasonal extension piles during autumn 2025 and spring 2026. The project involves the strategic placement and removal of dock segments, gangways, and extension piles at a public boat access site, with multiple images documenting various stages of the dock construction, including dock segments, gangway installation, excavator lifts, and views of the completed facility from different angles.

The images provide a comprehensive visual documentation of the project, showing technical details such as dock segment transportation, lifting and positioning techniques, pile slot mechanisms, and the final configuration of the boat access facility. The site appears to be located at Newfound Lake, with a concrete boat ramp, floating dock, gangway, and an overhead light for improved accessibility and safety. The RFB includes multiple photographs demonstrating the construction process, equipment used (such as excavators), and the precise technical implementation of the dock and its components.

View the file

Other files

File Type Posted
RFB F&G 2025-03.pdf PDF
rfb-f-g-2025-03-award.pdf PDF
rfb-f-g-2025-03.pdf PDF
attachment-1-rfb-f-g-2025-03.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New Hampshire Fish and Game Department April 1, 2025

Request for Bid – Newfound Lake Public Boat Access Facility- Installation and Extraction of Seasonal Extension Piles (autumn 2025 and spring 2026)

Img18- Extension piles on truck

Img21- Dock Finished (1) SE view

Img22- Dock Finished (2) NE view

Img22a- View from ramp of overhead light

Img328- Dock segments and gangway

Img340- View west from ramp- edge of water

Img370- Dock segment and excavator lift

Img380- Dock and open pile slot

Img401- Gangway and excavator lift

Img403- Gangway at abutment

Img408 Bolting dock segments together

Img208- Pile Chain at end of Dock

Img410- Dock and closed pile slot

Img209- View of double ramp from dock

File details come from the government source that posted it. Updated .