attachment-1-rfb-f-g-2026-05.pdf
PDF 733 KB Posted
- Solicitation number
- RFB F&G 2026-05
- Issued by
- Grafton County, New Hampshire
About this file
This is a Request for Bid (RFB) issued by the New Hampshire Fish and Game Department for the installation and extraction of seasonal extension piles at the Newfound Lake Public Boat Access Facility, with work scheduled for autumn 2026 and spring 2027. The project involves the seasonal placement and removal of extension piles that support dock infrastructure at the public boat access facility. The RFB was issued on June 12, 2026, and includes detailed photographic documentation of the existing dock systems, gangways, ramps, pile configurations, and bolting mechanisms to provide bidders with comprehensive site conditions and specifications for the work.
The document provides visual references for the dock segments, pile slots, excavator operations, overhead lighting, and related infrastructure necessary for understanding the scope of work, though specific pricing terms, contract duration, response deadlines, and award information are not detailed in this attachment. Additional contract documents would be required to establish bid submission dates, evaluation criteria, funding sources, and final award decisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| rfb-f-g-2026-05.pdf | ||
| rfb-f-g-2026-05-award.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Hampshire Fish and Game Department
June 12, 2026
Request for Bid – Newfound Lake Public Boat Access Facility-
Installation and Extraction of Seasonal Extension Piles (autumn 2026 and spring 2027)
Img18- Extension piles on truck
Img21- Dock Finished (1) SE view
Img22- Dock Finished (2) NE view
Img22a- View from ramp of overhead light
Img328- Dock segments and gangway
Img340- View west from ramp- edge of water
Img370- Dock segment and excavator lift
Img380- Dock and open pile slot
Img401- Gangway and excavator lift
Img403- Gangway at abutment
Img408 Bolting dock segments together
Img208- Pile Chain at end of Dock
Img410- Dock and closed pile slot
Img209- View of double ramp from dock
File details come from the government source that posted it. Updated .