Attachment 1_Repair Electrical and Bathroom Building 137 SOW_Clean.pdf
PDF 255 KB Posted
- Solicitation number
- FA445225R0042
About this file
This Statement of Work (SOW) details a construction project for repairing electrical systems and bathrooms in Building 137 at Fort Bragg, North Carolina. The project (P2-00022-25) requires the contractor to furnish labor, materials, and equipment to complete comprehensive renovations, including replacing drywall, ceiling tiles, toilets, shower heads, electrical outlets, light switches, exhaust fans, and performing necessary electrical and plumbing work. The project must be completed within 60 days, with work to be performed between 7:30 AM - 4:00 PM, Monday through Friday.
Key requirements include compliance with multiple federal and military standards, submission of an Accident Prevention Plan within 10 calendar days of award, completion of iWatch training for all employees, and adherence to strict safety and environmental protocols. The contractor must provide a minimum one-year warranty on all materials and workmanship, submit waste disposal documentation, and coordinate closely with the Contracting Officer's Representative (COR). Utility services (power and water) will be available on-site, and the contractor must follow specific guidelines for personnel, site access, and photography restrictions at Fort Bragg.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Project Location: Ft. Bragg, North Carolina
Purchase request Type: Construction
Project Description: Repair Electrical and Bathroom, Building 137
Project Number: P2-00022-25
Document Status: 12 AUG 2025
Prepared By: 43d AMOG, Business Office
Repair Electrical and Bathrooms, P2-00022-25
STATEMENT OF WORK
12 AUG 2025
NOTE: ONLY CHECKED BOXES APPLY
Request for Construction Services: P2-00022-25, Repair Electrical and Bathrooms
1. Description of Work: The Contractor shall furnish all labor, material, equipment, incidentals, supervision, and transportation for work necessary to repair electrical and bathrooms in building 137 at Fort Bragg, NC. All work shall be performed in accordance with the purchase order specifications, manufacturer’s recommendations, and Unified Facilities Criteria (UFC) 1-200-01 and UFC 1-200-02, Whole Building Design Guide (WBDG). Work performed under this task order shall comply with the latest edition of all required publications, Federal, Department of the Army, State of North Carolina, and Fort Bragg construction safety and environmental protection laws, regulations, rules, and codes (i.e. American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), ASTM International (ASTM), U.S. Department of Defense (DOD), U.S.
Environmental Protection Agency (EPA), etc.) and the Fort Bragg Installation Design Guide (IDG), dated at the time of the purchase order award. When a required publication is not specifically referenced in the purchase order, the Contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
2. AT/OPSEC Requirements: See AT/OPSEC Cover sheet.
Access, General Protection, and Security Policy and Procedures.
Contractor and all associated subcontractor employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal, Director of Emergency Services, or Security Office. The contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this purchase order, should the Force Protection Condition (FPCON) at any installation or individual facility change, the Government may require changes in Contractor security matters or processes.
iWatch Training.
The Contractor and all associated sub-purchase contractors shall brief all employees on the local iWatch program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch and instruct employees to report suspicious activity to the Contracting Officer’s Representative (COR). This training shall be completed within 5 calendar days of purchase order award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 15 calendar days after purchase order award. This information is available at the following website: https://www.youtube.com/watch?v=vlzYhQp7fPw https://www.youtube.com/watch?v=vlzYhQp7fPw
3. Monthly Anticipated Adverse Weather Delay: Workdays Based on 5-Day Work Week.
These days are included in the POP.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
10 9 6 4 4 6 8 7 4 4 5 9
4. Interface with Government Personnel: Access to and from the site shall be coordinated through 43d AMOG Facility Manager and COR. Additionally, the Contractor shall coordinate work schedule with designated COR.
5. Contractor Requirements:
A. Project Involves Handling of Asbestos or Lead Base Paint.
Records of the Survey are provided.
Record of Survey has not been completed.
REC provided: See Appendix L
B. Occupancy During Construction
C. Quality Control System (QCS) Required
D. Submittals are required in the following materials.
All Materials (FIO Approval)
E. After purchase order award:
APP – Accident Prevention Plan (GA Approval)
Contractors shall submit all required submittals, including the APP within 10 calendar days of issuance of the purchase order AWARD.
6. Government Furnished Items/Work: The Government will remove all wall mounted objects, furnishings, and equipment. The Government put all removed items back in place after completion of work.
7. Scope of Work: For this job, the contractor shall provide all required labor, materials and equipment for full performance of the work specified in this document. Unless specified otherwise, all materials, material colors, types, sizes, and other material specifications, processes, and procedures shall comply with the Fort Bragg Installation Design Guide (IDG) and manufacturer specifications. The scope of work under this purchase order includes the following specific items of work:
A. Architectural:
1. Replace drywall and tile above the shower insert in women restroom with water resistant drywall or cement backer board. Replaced drywall finish shall be like the men’s bathroom shower. Reference Appendix A – Site Map for location of restrooms.
2. Replace all plastic filmed ceiling tiles in bathrooms with like ceiling tiles.
3. Prepare the surfaces for painting and paint all paintable surfaces in the bathrooms.
Contractors shall paint using the manufacturer’s specifications for lighting while applying coating to ensure no defects, holidays, or uneven tones.
4. Repair door closure on the first stall in men’s bathroom to make the door swing out and close the door properly.
B. Plumbing:
1. Replace existing toilets in men’s and women’s bathrooms (3 in total). The Contractor shall ensure there is always one working toilet in the facility.
2. Demolish and replace shower heads to match existing chrome in the men’s and women’s showers (2 in total) with WaterSense labeled shower heads to match existing.
3. Replace the core of shower mixing valves (2 in total) in both bathrooms. Ensure new core is available before removal of existing core.
D. Electrical:
1. Install four (4) twist locks and 120-volt outlets on the back of the electrical racks, including all conduit and wiring required, to provide dedicated power as indicated on the site map.
2. Replace all light switches, outlets, and vent fan controls in both bathrooms including new faceplates to match existing.
E. Mechanical
1. Replace exhaust fans in both bathrooms. New exhaust fans shall be rated at 120 cubic feet per minute or greater, and less than or equal to 1.5 sones.
2. Replace damaged vent fan duct work that can be seen in both bathrooms.
F. General Work Notes
1. The contractor shall be responsible for the coordination of all parts of the work so that no work shall be left in an unfinished or incomplete condition as indicated by UFC and governing code(s).
2. The Contractor shall protect existing, in-place, and new work. When working in and around the existing building, extreme care shall be exercised regarding protection of the existing structure and mechanical and electrical services which will remain. The contractor shall repair, replace, or restore all existing conditions damaged in the performance of demolition and/or new work as outlined in this SOW.
3. Contractor shall coordinate and pay for the collection, separation, recycle, removal, and legal disposal of materials and rubbish, debris, excess, and unwanted or needed materials.
4. Contractor shall plan work to always provide adequate protection for persons and property and execute the work in such a manner to avoid any hazard to persons and property as necessary.
5. Contractor shall continuously coordinate phasing and construction with the COR.
G. Contractor is responsible to verify all measurements and conditions pre-bid. The Government intends to only hold one official site visit. Requests for additional site access must go through the 763 ESS/OL-Pope Contracting Squadron (763 ESS) point of contact (POC) listed in the Request for Proposal. Any additional site access will be made available to all Contractors solicited for this project. Acceptance of the purchase order shall constitute acceptance of the existing conditions. The contractor shall: protect existing, in-place, and new work, always provide adequate protection for persons and property, and execute the work in such a manner to avoid any hazard to persons and property as necessary.
H. The government referenced details indicate the general extent of the work. The references are not intended to indicate or describe all work required for the full performance and completion of the requirements of the job.
I. Kick-off Meeting: Contractor shall schedule a kick-off meeting to occur within one week of purchase order award. Representatives in attendance shall at a minimum include contractor project manager, contractor engineer or technical representative, COR and customer facility manager.
J. Contractor shall provide timeline to completion during the RFQ phase. The contractor shall adhere to the schedule given, not to exceed 60 days from start to completion, and shall meet or coordinate with the COR bi-weekly.
K. All materials shall be on hand before any work commences.
8. ADDITIONAL ENCLOSURES: It is the responsibility of the Contractor to ensure they are in receipt of and have reviewed all appendices prior to award.
A. Appendix A – Site Map
9. DISPOSAL OF WASTE: Loose debris on trucks leaving the site shall be loaded in a manner that shall prevent losing or dropping of materials on streets and conform to local ordinances/ laws. Fasten suitable cover, such as a tarpaulin, over the load before entering surrounding streets. The Contractor shall be responsible for cleaning up any materials that fall from trucks and held liable for any resulting damages. The Contractor is solely responsible for spillage from its vehicles, and such spillage shall be cleaned up immediately. The Contractor shall report all spills to the Fort Bragg Fire Department 910.432.0911 or 911. For the duration of this purchase order and daily, the Contractor shall remove from all roads and / or streets asphalt, mud, soil, rocks, trash, and debris that result from its operations. All roads and / or streets affected shall be cleaned before the close of business on the day affected. Contractor is also responsible for restoring the site/grounds back to its original condition. Grass/soil shall be restored to its original condition.
A. The contractor shall submit all trip tickets from the off-post landfill facility to the
COR/ACOR within three working days to show all debris is being land-filled in accordance with all Federal requirements and in an approved location.
B. The Contracting Officer (CO) in coordination with the COR will determine if materials removed from and not reused in the project are salvageable or unsalvageable.
Salvageable materials shall be disposed of as directed by the CO. When material is designated as unsalvageable, the material from that point shall become the property of the purchase contractor.
C. The Fort Bragg Lamont Construction and Demolition (C&D) Landfill is closed and does not accept any C&D Waste or Asbestos Waste. The Municipal Solid Waste (MSW) Transfer Station at the Lamont Landfill Facility is closed and is not accepting MSW at the facility.
D. All contractors shall use a State Certified C&D Landfill or Subtitle “D” Landfill outside
Department of Defense land for the disposal of C&D waste, asbestos waste, and MSW.
The Contractor shall maintain data of all waste disposed (C&D and MSW) and all materials recycled in execution of a purchase order. The Department of the Army (DA) and the North Carolina Department of Environmental Quality (NCDEQ) require monthly and annual reporting of all materials (waste and recyclables) managed by Fort Bragg. The Fort Bragg Environmental Compliance Branch, Solid Waste/Recycling Office is responsible for compiling data into monthly Directorate Reports to be consolidated into reports for DA and NCDEQ. A form from the Solid Waste/Recycling Office or a Contractor form shall be completed by the Contractor with the type of waste or recycled material, the weight of the waste/material (tons or pounds), and the certified facility accepting the waste/material. This information shall be submitted to Fort Bragg Solid Waste/Recycling Office no later than the second Friday of each month. Information can be submitted in person or by fax (910.396.4188). The phone number for the Solid Waste/Recycling office is 910-396-3372.
E. All recyclable materials generated during execution are Government property unless the purchase order specifies that the Contractor can obtain the materials. State Law and Fort Bragg regulations require covering of loads of waste or recyclables to prevent litter. All waste and recyclable material loads are subject to be inspected of their contents while on Department of Defense land. The Lamont Landfill Facility Recycling Area will accept specific recyclable items as indicated below.
F. Concrete, Brick, Block and Asphalt: tested and free of asbestos and lead based paint to be recycled; no larger than 2 feet by 2 feet pieces or equivalent; minimal amount of dirt in load; no rebar protruding out of the concrete.
G. Trees, Limbs, and Stumps: 6 feet or less in length for diameter < 3 feet; 3 feet or less in length for diameter => 3 feet; minimal amount of dirt in load and in stump roots; ground wood chips accepted; no trash in load.
H. Pallets: serviceable and non-serviceable.
I. Steel and Aluminum: no items requiring demilitarization; no items containing or coated with liquid.
J. Cardboard: clean of trash, plastic, Styrofoam, wood, metal, etc.; 40 cubic yard dumpsters available for material; alternate acceptance location at Fort Bragg Recycling Center (Building 3-1240, DPW Compound at Butner Road / Reilly Road intersection).
10. AVAILABILITY AND USE OF UTILITY SERVICES: Utility services are available on site (power and water only) for the completion of the work required.
The Government will make no connections or alterations to the existing utility systems for the contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge. The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the purchase order, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise notified by the COR.
Prior to installing any utility connections at an office/storage site, the plan will be approved by the COR. When utility meters are installed, the Contractor shall notify the COR for the initial meter reading. Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter.
11. CONTRACTOR STORAGE AND TRAILERS: The Contractor shall place or paint a sign on all storage trailer(s) and building(s) used on this purchase order. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the Contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the purchase order and prior to submitting the final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.
12. SAFETY: Safety will follow the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes.
Contractor is responsible for daily clean up and complete restoration of the area once the Purchase request is complete. Additional safety references to be followed include:
a. 29 CFR 1910, OSHA General Industry Standard
b. 29 CFR 1926, OSHA Interim Construction Standard
c. DA Pamphlet 385-10, The Army Safety Program
d. Fort Bragg Regulation 385-10, Fort Bragg Safety Program
13. CONTRACTOR’S PERSONNEL
A. Contractor personnel performing work under this purchase order shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed, and approval has been granted by the Government for the non-U.S. citizen to perform the required support.
B. Contractor personnel performing work under this purchase order shall be able to read, write, speak, and understand the English language to effectively carry out all Purchase request requirements. They shall have a command of both the written and spoken English language to communicate in person properly, clearly, and effectively or via electronic devices (telephone or Email) with co-workers, Government employees, and the public.
C. Contractor personnel shall act as guests on the installation, which they are. Employees are expected to be always on the job site. In the event a contractor employee’s conduct is unsatisfactory, the foreman/supervisor is expected to handle the situation accordingly and in a timely manner.
14. HOURS OF WORK: Work shall be accomplished between the hours of 7:30 AM - 4:00 PM, Monday through Friday. No work shall be done on weekends or on federal holidays without prior approval from the CO. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday.
Work schedule and facility security shall be coordinated with the Contracting Officer Representative (COR) or Quality Assurance (QA) personnel for facility access and security maintenance during duration of work. Contractors shall not work outside of the stated hours of work, without first obtaining approval from the COR or QA personnel.
15. WARRANTY: The Contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.
16. PHOTOGRAPHY: Photography on Fort Bragg is regulated/restricted. All contractors needing to photograph as part of their work shall gain approval from Shane Woodmancy at shane.r.woodmancy.civ@army.mil (910) 908-1086 or Don Mollett at donald.l.mollett.civ@army.mil (910) 907-5293 for Ft. Bragg, Simmons Army Airfield and Pope Army Field, prior to taking photographs. Tag geolocation data and other metadata shall be turned off.
END OF STATEMENT OF WORK