Attachment 1 QASP.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26326Q007
About this file
This Quality Assurance Surveillance Plan (QASP) provides a systematic method for the government to evaluate contractor performance, specifically for CT technologist services at the Iowa City VA Medical Center. The document outlines key performance standards and surveillance methods, including periodic inspections of qualification documents, time and attendance sheets, patient safety reporting, and training documentation. Critical performance requirements include: 100% ARRT(CT) certification for technologists, 95% on-time availability for services, immediate reporting of patient safety incidents, maintaining current registrations and certifications, completing mandatory training, and strict compliance with HIPAA and privacy regulations.
The QASP establishes a comprehensive monitoring approach with defined performance ratings ranging from Exceptional to Unsatisfactory. The Contracting Officer (Matthew Rose from NCO 23) and Contracting Officer's Representative (Britney Roman from Iowa City VAMC) will oversee surveillance activities. If performance does not meet acceptable quality levels, the government will document issues through a Contract Report (CR) and may require the contractor to develop a corrective action plan. The document emphasizes the contractor's responsibility for quality control and management to meet contract terms, with the government maintaining an objective and fair evaluation process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
The contractor will be evaluated in accordance with the following:
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored?
How will monitoring will take place?
Who will conduct the monitoring?
How will monitoring efforts and results be documented?
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Matthew Rose Organization or Agency: NCO 23
b. Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Britney Roman Organization or Agency: Iowa City VAMC
*Note: Assigned CO, COR, and Contractor Representatives may be changed at any time by written notice to all parties. A contract modification will not be required.
Attachment 1: QASP
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary Program Manager:
Alternate Program Manager:
4. PERFORMANCE STANDARDS
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION.
b. PERIODIC INSPECTION. Inspections scheduled and reported quarterly per COR delegation or as needed – Qualification documents, time and attendance sheets, VA Patient Safety Reporting System, training documentation (e.g., TMS certificates for HIPAA course)
c. VALIDATED USER/CUSTOMER COMPLAINTS.
d. VERIFICATION AND/OR DOCUMENTATION PROVIDED BY CONTRACTOR.
6. SAMPLE QASP PERFORMANCE REPORT DATE: __________________
Measures PWS
Reference
Performance
Requirement
Standard Acceptable Quality Level
Surveillance
Method
Met AQL/DID NOT MEET
AQL-
CPARS RATING/ADD
COMMENTS
Qualifications of Key Personnel
4.6.4.1 All contractor’s
CT
technologist(s) shall be
ARRT(CT)-
certified.
All (100%) contract CT technologist(s) are ARRT(CT)-certified.
100% Periodic Inspection of qualification documents
Patient Access 4.6.4.2 The Contractor shall provide contractor’s CT technologist(s) in accordance with the operating hours and VA clinical schedule outlined in this
PWS.
All (100%) contractor’s CT technologist(s) are on time and available to perform services.
Contractor’s CT technologist(s) on-time and available to perform services 95% of the time
Periodic Inspection of Time and Attendance Sheets
Patient Safety 4.6.4.3 Patient safety incidents shall to be reported using Patient Safety Report. All incidents reported immediately (within 24 hours.)
All (100%) of patient safety incidents are reported using Patient Safety Report within 24 hours of incident.
100% of patient safety incidents are reported using Patient Safety Report within 24 hours of incident.
Periodic Inspection
Maintains registration, and certification
4.6.4.4 Updated
registration and certification shall be provided as they are renewed.
Registration information kept current.
All (100%) registration(s) and certification(s) for Contractor’s CT technologist(s) shall be provided as they are renewed.
Registration information kept current.
100% registration(s) and certification(s) for contractor’s CT technologist(s) shall be provided as they are renewed.
Registration information kept current. No acceptable deviation.
Periodic Inspection
Mandatory Training 4.6.4.5 Contractor shall complete all required training on time per facility policy
All (100%) of required training is complete on time by contract
CT
technologist(s).
100% completions Periodic Inspection
Privacy, Confidentiality and
HIPAA
4.6.4.6 Contractor is
aware of all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA and complies with all standards Zero breaches of privacy or confidentiality
All (100%) contractor CT technologist(s) comply with all laws, regulations, policies and procedures relating to Privacy, Confidentiality and HIPAA
100% compliance; Periodic Inspection;
Contractor shall provide evidence of annual training required by the facility, reports violations per VA Handbook 6500.6.
7. CPARS RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level. The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/documents/CPARS- Guidance.pdf:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract.
Also there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g.
Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTO
RY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g. Management, Quality, Safety or Environmental Deficiency Reports, or letters).
8. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (CPARS).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Report (CR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
The contractor shall acknowledge receipt of the CR in writing. The CR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO. See Sample CR below.
9. COR AND CONTRACTOR ACKNOWLEDGEMENT OF QASP
SIGNED:
COR NAME/TITLE DATE
SIGNED:
CONTRACTOR NAME/TITLE DATE
CONTRACT REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CR PREPARED b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. Issue Identified (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9a. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures. Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION.
13. GOVERNMENT ACTIONS
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR
NOTIFIED
COR
CONTRACTING
OFFICER
| Primary Program Manager: |
| Alternate Program Manager: |
File details come from the government source that posted it. Updated .