Attachment 1 PWS YLTA Final (FED 2020).docx
DOCX document 55 KB Posted
- Attached to
- Hazardous Material Monitoring Services
- Solicitation number
- W912PQ-20-Q-0049
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-20-Q-0049.pdf | ||
| Attachment 1 A YLTA Demo SOW Final (FED 2020).pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Demolition and Related Hazardous Materials Abatement Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control (and 3rd party monitoring and testing as required by NYS and Federal Codes, Rules and Regulations as applicable to the work of this Contract), except as specified in Paragraph 3.0 as Government Furnished, to perform Demolition and Related Hazardous Materials Abatement Services, as defined in this PWS.
1.2 Background: The 860 acre Youngstown Local Training Area (YLTA) located at 1525 Balmer Rd., Youngstown, NY 14131, is federally owned property is licensed to the New York Army National Guard. The Service Contract Act (SCA) prevailing wage applies work conducted at this location. Wage Decision is attached.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and one (1) 12-month option period.
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).
1.4.1.1 A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Independence Day: July 4th
1.4.3.6 Labor Day
1.4.3.7 Columbus Day
1.4.3.8 Veteran’s Day: November 11th
1.4.3.9 Thanksgiving Day
1.4.3.10 Christmas Day: December 25th
1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 0600-1500 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Youngstown Local Training Area, 1525 Balmer Rd., Youngstown, NY 14131. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.4.1 Telework: Not Applicable
1.4.4.2 Unscheduled gate closures by employees of the NYS Division of Military Naval Affairs and/or the New York Army National Guard may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to the COR. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .
1.4.5.2 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after completion of training.
1.4.5.3 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at http://cdsetrain.dtic.mil/opsec/.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. The contractor shall include procedures covering key control in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.
1.4.6.1.1 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.
1.4.6.1.2 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.
1.4.6.2 Lock Combinations: (Reserved)
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government. These meeting may be conducted in person or via teleconference as required.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: (Reserved)
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel: N/A there is no contractor travel authorized.
1.4.13 Data Rights: (Reserved)
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods: (Reserved)
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AEI | Army Enterprise Infostructure |
| AR | Army Regulation |
| AT/OPSEC | Antiterrorism/Operational Security |
| BI | Background Investigation |
| CM | Contract Manager |
| CMRA | Contractor Manpower Reporting Application |
| COR | Contracting Officer Representative |
| DA | Department of the Army |
| DD254 | Department of Defense Contract Security Classification Specification |
| DFARS | Defense Federal Acquisition Regulation Supplement |
| DMNA | Division of Military and Naval Affairs |
| DoD | Department of Defense |
| FAR | Federal Acquisition Regulation |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services |
| HQDA | Headquarters, Department of the Army |
| HSPD | Homeland Security Presidential Directive |
| IA | Information Assurance |
| IS | Information System(s) |
| KO | Contracting Officer |
| LF | Linear Feet |
| NGB | National Guard Bureau |
| OCI | Organizational Conflict of Interest |
| PII | Personally Identifiable Information |
| PIPO | Phase In/Phase Out |
| POC | Point of Contact |
| PRS | Performance Requirements Summary |
| PWS | Performance Work Statement |
| QA | Quality Assurance |
| QASP | Quality Assurance Surveillance Plan |
| QC | Quality Control |
| QCP | Quality Control Program |
| SSN | Social Security Number |
| TE | Technical Exhibit |
| USD(I) | Under Secretary of Defense for Intelligence |
| YLTA | Youngstown Local Training Area |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): NONE
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
5.0 Requirements: The contractor shall:
5.1 Abate and dispose of hazardous materials.
5.1.1 Provide 3rd party testing and monitoring for demolition sites.
5.1.2 Handle and dispose of hazardous materials in accordance with New York State Codes, Rules and Regulations.
5.2 Demolish all structures defined in the “Demolish Structures, Utility Systems and Rail Track” attachment
5.2.1 Demolish entire rail track
5.2.2 Demolish structures, electrical stations, mechanical equipment and elevated concrete at 16 locations listed in the SOW attachment.
5.2.2.1 The 75 foot radius shall be cleaned up of the surrounding area. All visible items shall be identified, demolished and removed from site. Examples include lose and embedded metal, elevated concrete, abandoned equipment, poles and electrical/mechanical systems in and around the specified demo sites.
5.3 Demolish and remove an additional 10 fire hydrants, 7500 linear feet of rail track, 3000 linear feet of elevated wire troughs, 44 utility poles, and 33 trees.
5.4 Stockpile demolished trees and vegetation at water tower on-site.
5.5 Demolish an additional 6 locations (partially demolished concrete bunkers) as part of the bid option, if awarded. See slides referencing “Bid Option” at the end of the SOW attachment.
5.6 Contractor Manpower Reporting Application (CMRA):
5.6.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USPFO-NY via a secure data collection site.
5.6.2 The contractor shall completely fill in all required data fields using the following web address: https.beta.sam.gov/. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2020. Contractors may direct questions to the help desk a thttps.beta.sam.gov/ .
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
| Federal Acquisition Regulation |
| 05/06/2020 |
| Mandatory |
| https://www.acquisition.gov/?q=browsefar or |
http://farsite.hill.af.mil/
| Defense Federal Acquisition Regulation Supplement |
| 08/17/1998 |
| Mandatory |
| http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or http://farsite.hill.af.mil/ |
DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
| 01/23/2014 |
| Advisory |
| http://www.esd.whs.mil/Directives/issuances/dodm/ |
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9)
| August 2013 |
| Advisory |
| http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf |
| DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
| Advisory |
| http://www.dtic.mil/whs/directives/corres/pub1.html |
Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors
| 03/07/2014 |
| Advisory |
| http://www.apd.army.mil/ProductMaps/PubForm/ArmyDir.aspx |
AR 190-13
The Army Physical Security Program
| 02/25/2011 |
| Advisory |
| http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx |
Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors
| 08/27/2004 |
| Advisory |
| https://www.dhs.gov/homeland-security-presidential-directive-12 |
DoDD 5400.11 Department of Defense Privacy Program
| 10/29/2014 |
| Advisory |
| http://www.dtic.mil/whs/directives/corres/dir.html# |
DoD 5400.11-R Department of Defense Privacy Program
| 05/14/2007 |
| Advisory |
| http://www.dtic.mil/whs/directives/corres/pub1.html |
DoDD 8140.01 Cyberspace Workforce Management
| 08/11/2015 |
| OK |
| http://www.dtic.mil/whs/directives/corres/dir.html |
DoD 8570.01-M Information Assurance Workforce Improvement Program
| 12/19/2005 (Change 4: 11/10/2015) |
| OK |
| http://www.dtic.mil/whs/directives/corres/pub1.html |
AR 25-2
Information Assurance
| 10/24/2007 |
| OK |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
AR 530-1
Operations Security
| 09/26/2014 |
| OK |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
DoD 5220.22-M National Industrial Security Program Operating Manual 02/28/2006 (Change 2: 05/18/2016)
| OK |
| http://www.dtic.mil/whs/directives/corres/pub1.html |
AR 381-12
Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b)
| 06/01/2016 |
| OK |
| http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx |
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
DD 1172-2
Application for Identification Card/DEERS Enrollment
| Mar 2017 |
| http://www.dtic.mil/whs/directives/forms/index.htm |
I-9 Employment Eligibility Verification
| 11/14/16 |
| https://www.uscis.gov/sites/default/files/files/form/i-9.pdf |
DD 441
Department of Defense Security Agreement
| Jan 2017 |
| http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm |
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| http://dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
5.1 Abate and dispose of Hazardous Materials
| The contractor shall Obtain/Provide 3rd party testing and monitoring for demolition sites. The contractor shall handle and dispose of hazardous materials in accordance with New York State Codes, Rules and Regulations. |
| Hazardous waste removal report is received monthly. |
Hazardous material monitoring logs are conducted daily, with weekly reporting Periodic Inspection / COR
5.2 Demolish all structures identified in the attachment
| The contractor shall demolish 16 sites and clean a 75 foot radius of the surrounding area. All visible items shall be identified, demolished and removed from site. Examples include lose and embedded metal, elevated concrete, abandoned equipment, poles and electrical/mechanical systems in and around the specified demo sites |
| Meets the standard 90% of the time. Alternate AQL: Demolition and cleaning does not meet performance standards at not more than 2 locations |
| Random inspection / COR |
5.3 Demolish additional items
| The contractor shall demolish and remove 7500 linear feet of rail track, 10 fire hydrants, 3000 linear feet of elevated wire troughs, 44 utility poles, and 33 trees. |
| Removals report is received weekly. Alternate AQL: Total count does not meet performance standards. |
| Random monitoring and inspection / COR |
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| 1.4.1 Quality Control Plan |
| A final QCP shall be submitted NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.1 AT Level 1 Awareness Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 1.4.5.2 iWatch Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.3 OPSEC
Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
Ver. May 2018
File details come from the government source that posted it. Updated .