This Performance Work Statement (PWS) details a stove replacement and installation project for the Department of the Air Force at Hurlburt Field, Florida. The contractor is required to remove 132 existing stoves from two dormitory buildings (Bldg. 91009 and Bldg. 90358) and replace them with 140 new GE Model JD630DTWW stoves, with 8 additional units to be stored in a warehouse. Key requirements include properly disconnecting and removing old stoves, installing new stoves with correct electrical connections, testing functionality, and disposing of old units in compliance with local environmental regulations.
The project scope includes pickup of new stoves from Building 91161, delivery to specified locations, complete installation within the same day, and daily cleanup of work areas. Work is to be performed between 7:00 AM and 4:00 PM, Monday through Friday, with an estimated completion time of 2-4 weeks after the purchase request. The contractor will coordinate work through Mr. Jeff Davis (1 SOCES) and must request a final inspection upon completion. The government will provide necessary utilities, and the contractor is responsible for supplying all materials and installation tools.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR STOVE REPLACEMENT
AND INSTALLATION
1.0 PROJECT DESCRIPTION:
1.1 The contractor shall provide all labor, equipment, materials, and transportation necessary to remove existing stoves, install new stoves, and properly dispose of old units in accordance with the requirements outlined below.
1.2 The stoves to be installed are GE Model JD630DTWW. Each unit includes an electrical whip, which must be properly connected to the pre-existing wiring within the wall at each installation location.
1.3 The contractor shall ensure that all electrical connections are properly secured, in compliance with local regulations.
2.0 WORK INCLUDED: The work to be performed includes, but is not limited to, the following:
2.1. Pickup and Delivery:
2.1.1. Pickup 140 new stoves from Bldg. 91161, 644 Independence Road, Hurlburt Field, FL 32544 and deliver them to designated installation locations:
To: Bldg. 91009 (Qty 72) – 125 Howie Walters, Hurlburt Field, FL 32544 (Dorm)
To: Bldg. 90358 (Qty 60) – 219 Simpson Ave, Hurlburt Field, FL 32544 (Dorm)
To: Bldg. 92276 (Qty 8) – 59 Mayo St, Hurlburt Field, FL 32544 (Storage Warehouse)
2.2. Installation:
2.2.1. Disconnect and remove old stoves from designated location (Bldg. 91009, Qty 72 & Bldg. 90358, Qty 60) and install new stoves in the same locations. Test installed new stoves for functionality, ensuring proper operation.
2.3. Disposal and Cleanup:
2.3.1 All old stoves shall be removed and disposed of in compliance with local environmental regulations. The contractor shall clean up the work area daily, ensuring no debris or hazards remain. All tools and equipment shall be secured in a designated area to prevent interference with military operations. Every location where a stove is removed shall have a new stove installed by the end of that workday.
3.0 HOURS OF WORK:
3.1. Normal hours of work shall be from 7:00 AM to 4:00 PM, Monday through Friday, except Federal Holidays. Work outside normal hours may be approved on a case-by-case basis with prior approval by the Contracting Officer.
4.0 ESTIMATED COMPLETION TIME:
4.1. Completion is estimated to be within 2-4 weeks after receipt of the purchase request.
5.0 COORDINATION OF WORK:
5.1. The contractor shall coordinate all work through the designated Government Point of Contact (POC):
Mr. Jeff Davis, 1 SOCES, Phone: 850-797-3913
6.0 UTILITIES:
6.1. The Government will provide access to necessary utilities required to complete the project, including electricity and water.
7.0 MATERIALS:
7.1. The contractor shall provide all necessary materials for the completion of this project, including installation tools.
8.0 FINAL ACCEPTANCE:
8.1. The contractor shall request a final inspection from the Government Point of Contact after all work has been completed.
8.2. The Government Point of Contact shall ensure that all areas are cleaned and restored to their original condition, all contractor equipment is removed from the installation, and all work meets the required specifications.
END OF PERFORMANCE WORK STATEMENT
DERRICK MONROE, DAF