This Performance Work Statement (PWS) details a tree thinning project for the Bureau of Land Management's Salmon Field Office in Idaho. The project involves reducing conifer tree cover in the Mill Creek area, a 392-acre historic sagebrush steppe habitat located approximately 11 miles northwest of Leadore, Idaho. Specific requirements include cutting Douglas-fir, lodgepole pine, and juniper trees less than or equal to 8 inches in diameter using hand tools, with trees to be cut, bucked, limbed, and scattered according to strict specifications.
The contract is set for performance between August 11 and September 26, 2025, with a total small business set-aside under NAICS code 115310. Contractors must provide all personnel, equipment, and labor necessary to complete the thinning, lopping, and scattering services. Key objectives include improving sagebrush steppe health and enhancing habitat for greater sage-grouse and other sagebrush-dependent species. The project requires detailed fire prevention measures, equipment cleaning protocols, and compliance with specific cutting and disposal guidelines, with an acceptable quality level of 95% for various performance tasks.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_3_-_WD___2015-5517_REV_25_20_MAY_25.pdf | ||
| Appendix_2-_FAR_52_212-3_(MAY_2024)(DEVIATION_FEB_2025).pdf | ||
| Sol_140L2625Q0059.pdf | ||
| Attachment_2_-_Mill_Creek_Contract_2025_map.pdf | ||
| Appendix_1_-_Pricing_Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF LAND MANAGEMENT – Salmon Field Office Performance Work Statement
Mill Creek Lop and Scatter F-1
1. General: This is a non-personal services contract to provide for tree thinning services. The Government shall not exercise any supervision or control over the providers performing these services. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The Salmon Field Office, Bureau of Land Management (BLM) is acquiring services for tree thinning. The Contractor shall furnish all personnel, tools, labor, supervision, equipment, materials, supplies, transportation, training, and incidentals necessary to perform tree thinning services in accordance with the specifications provided.
1.2. Background: The Mill Creek project area generally consists of Douglas-fir (Pseudotsuga menziesii), lodgepole pine (Pinus contorta), and Rocky Mountain juniper (Juniperus scopulorum) trees encroaching into sagebrush steppe. The methods that will be used to reduce Douglas-fir, lodgepole, and juniper tree cover in both project areas include utilizing hand crews to cut down the trees.
1.3. Objectives: The objective of the Mill Creek project is to reduce the cover of conifer trees, thus improving the health of the sagebrush steppe and enhancing habitat for the greater sage-grouse and other sagebrush obligate species.
1.4. Scope: The work under this contract is to reduce conifer tree cover by cutting conifer trees and scattering the slash per contract specifications.
1.5. Period of Performance: Treatment operations will begin on or after August 11, 2025. All operations shall be completed no later than September 26, 2025.
Estimated Start Date: August 11, 2025
Required End Date: September 26, 2025
1.6. General Information
1.6.1. Hours of Operation: Work hours under this contract shall be limited to the time between 6 a.m.
to 8 p.m. Work will not be permitted on Federal holidays, unless authorized by the COR.
1.6.2. Federal Observed Holidays: In addition to any holidays declared by Executive Orders, the following Federal Legal Holidays are observed: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.
1.6.3. Place of Performance: The project area is located approximately 11 miles northwest of Leadore, Idaho. All work will be performed on land administered by the BLM. The total acreage for the unit was calculated to be 392 acres. Acreage of the unit was determined by calculations based on a horizontal plane using GIS technology (see Area Maps).
The project unit is located within the following Township/Range/Sections:
Township 16 North, Range 24 East, Sections 10, 11, 14, and 15
1.6.4. Pre-work Conference: Prior to commencement of work, a meeting may be requested by the Contracting Officer to be attended by the Contractor, the Contracting Officer's Representative (COR), and the Project Inspector(s). The meeting will be held at the Salmon Field Office or at the Mill Creek unit at a time mutually agreeable to the Contractor and the Contracting Officer to discuss the work schedule and to familiarize both parties with the responsibilities of each under this contract. At this time the Contractor shall provide to the COR a written "work progress plan" that details dates, locations, equipment, and employees to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government.
At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.
1.6.5. Invoicing: Invoices shall be submitted through IPP for payment, after services have been performed with supporting invoice on company letterhead and referenced purchase order number.
Unit Costs offered must be “All-Inclusive” for materials, labor, transportation, surcharges, fees and services necessary and incidental to tree thinning services. Invoices shall reflect only those costs indicated in the Price Schedule. All expenses relating to maintenance and operation of equipment shall be considered in the all–inclusive pricing. The Contract will be considered completed and payment due when all areas furnished to the Contractor by the Government have been treated to the standards specified.
1.6.6. Project Boundary Marking: The location and access to the unit(s) are shown on the vicinity and unit map(s). The unit boundaries will not be identified by flagging, it will be up to the contractor to identify and verify boundaries in the field using maps and electronic devices to stay within the unit(s).
1.6.7. Access: Legal public access to the project areas will be identified on the maps prior to the contractor starting the implementation phase. Seasonal road closers may exist (contractor will be notified of closures upon award). Contractor will assume responsibility for any additional access if desired. If roads or any type of access become subject to damage, because of adverse weather conditions or other natural and or political reasons, the COR/PI will relay information to the contractor, and a Stop Work Order may be implemented by the Contacting Officer (CO) until other access can be decided.
1.6.8. Notification of Cessation or Restart of Work: The Contractor will have personnel on project site prior to commencing work, during work, and will notify COR or Project Inspector of changing weather conditions. The COR or Project Inspector will allow Contractor to continue or stop work if weather factors dictate.
1.6.9. Personnel Requirements: The Contractor must always maintain an adequate work force to ensure timely completion of the work and is responsible for the crew knowing the requirements of the contract. The crew is also responsible for maintaining a safe working environment following OSHA standards. The Contractor must attend the pre-work meeting and provide a written performance plan including crew size prior to beginning work.
1.6.9.1. Key Personnel: The following personnel are considered key personnel by the Government: Applicators must be designated by the Contractor. The contractor will furnish a legible list of all contract employees (last name, first name) to the assigned COR. If there are any changes to the list of contract employees during the life of the contract a new list will be provided to the COR.
1.6.9.1.1. Work Crew: Shall be furnished by the Contractor for performing thinning treatment. The Contractor shall furnish the necessary qualified mechanics for maintenance of equipment and shall furnish all fuel, oil, and service required for operation of equipment and vehicles.
1.6.9.1.2. Crew Foreman: A Contractor Representative must be on-site always directing work. This person must be fluent in English and will also serve as an on the ground contact person for the COR/PI. Failure to maintain a Contractor Representative will result in suspension of work until an acceptable on-the-ground Contractor Representative is provided. A maximum of five (5) days will be allowed to produce a qualified Contractor Representative. Failure to do so within five days may result in the Contracting Officer (CO) issuing a Suspend Work Order. CO and COR must be informed of any changes of Contractor Representative.
1.6.10. Camping: Camping on agency-administered lands will only be allowed on site(s) pre-approved by an authorized officer. Camping areas for crews will be identified and surveyed for cultural resources prior to use of that camp location. Some camp sites including designated camp sites have been identified and cleared for use, ask the COR for details. The Contractor shall maintain all camping areas in an orderly and sanitary manner. The ordering and maintenance of portable toilets and dumpsters is the responsibility of the contractor. All fire regulations and restrictions shall be followed. All garbage and refuse shall be removed from the camp site(s) by the Contractor and disposed of offsite before final payment is made.
1.6.11. Detailed Unit Information: The Mill Creek unit consists of scattered conifer trees growing in historic sagebrush steppe habitat. The total acreage for the Mill Creek unit is approximately 392 acres. Because of the scattered nature of the vegetation, not all acres within the established boundaries of the units will require the same amount of labor to achieve the specifications outlined below. It shall be the responsibility of the Contractor to determine the quantity of work needed to meet specifications identified in this SOW. The unit is accessible by gravel road or by walk-in of up to 0.75 miles. Legal public access to the project area will be identified on a map prior to the contractor starting the implementation phase. The Contractor will assume responsibility for any additional access if desired. If roads or any type of access become subject to damage, because of adverse weather conditions or other natural and or political reasons, the COR will relay information to the contractor, and a Stop Work Order may be implemented by the CO until other access can be decided.
1.6.12. Risk and Damages: The Contractor shall assume all risks in connection with performance of the contract and shall be liable for any damages to persons or property in connection with the prosecution of the work, including employees of the Contractor.
1.6.13. Protection of Improvements: The COR may order a cessation of work if vehicles are operated on roads within the work area when ground or weather conditions cause or lead to loss of traction.
Such conditions usually develop where frozen ground is thawing, when snow is melting, and during or immediately following rainstorms. Any soil and ground disturbance caused by equipment during and after operations will be rehabilitated.
1.6.14. Salvage Rights: No salvage will be allowed.
1.6.15. Designation of Contracting Officer’s Representative: The CO shall designate the COR and PI.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documentation executed by the CO prior to completion of the contract.
F-2
2. Definitions
2.1. Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.2. Contracting Officer (CO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.3. Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.4. Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.5. Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use.
Equipment does not include material, real property, special test equipment or special tooling.
2.6. Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.
2.7. Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.8. Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
F-3
3. Government Furnished Property and Services
3.1. The Government will provide various USGS 7.5-minute quadrangles (1:24,000 scales) or GIS equivalent with unit boundaries clearly identified.
3.1.1. Work sites will not be marked by the Government with flagging. The contractor may flag the boundaries of the unit at their discretion; however, the contractor will be responsible for removal of all flagging.
F-4
4. Contractor -Furnished Items and Services
4.1. Equipment Requirements:
4.1.1. Unless otherwise specified herein, the Contractor shall provide all labor, transportation, materials, and equipment necessary to perform the work as described herein.
4.1.2. Ensure that all equipment is cleaned off prior to operating on Government lands. Remove all dirt, grease, and plant parts that carry noxious weed seeds or vegetative parts. This may be accomplished with a pressure hose. In addition, if equipment is found operating in a noxious weed area, the equipment must be cleaned before leaving project or moving to another area.
4.1.3. GPS equipment must have an accuracy of +/- 10 meters and be capable of accepting/uploading shape files or track logs.
4.2. Service Requirements:
4.2.1. Thinning, lopping, and scattering
4.2.1.1. The material to be treated consists of live Douglas-fir, lodgepole pine, and juniper seedlings, saplings, and mature trees growing in historic sagebrush steppe habitat.
4.2.1.2. All live Douglas-fir, lodgepole pine, and juniper trees less than or equal to 8 inches DBH shall be cut.
4.2.1.3. The treatment will be completed using hand tools, including chainsaws, hand saws, loppers, etc.
4.2.1.4. No mountain mahogany (Cercocarpus ledifolius), limber pine (Pinus flexilis), or whitebark pine (Pinus albicaulis) shall be cut.
4.2.1.5. All cut trees greater than 2 inches DBH shall be bucked and limbed.
4.2.1.6. All branches shall be completely severed from the bole before scattering.
4.2.1.7. All stems and limbs will be completely cut and scattered away from the stump. Stump height shall not exceed 4 inches and will be cut flat. No live limbs will be left on the stumps of cut trees.
4.2.1.8. Slash will not exceed 4 feet in length and will be dispersed so not to exceed 12 inches in depth.
4.2.1.9. All cut/scattered vegetation will be scattered at least 10 feet away from existing roads, trails, fences, and irrigation ditches.
F-5
5. Specific Tasks
5.1. Thinning, Lopping, and Scattering: The Contractor shall furnish all personnel, tools, labor, supervision, equipment, materials, supplies, transportation, training, and incidentals necessary to perform the thinning, lopping, and scattering services in accordance with the specifications provided. Services shall be billed in accordance with pricing schedule (See PWS 4.2.1).
F-6
6. Applicable Technical Orders, Specifications, Regulations, Manuals
6.1. Fire Prevention: Primarily for purposes of fire prevention and control, the Contractor shall comply with the following provisions:
6.1.1. The Contractor shall comply with all the applicable Idaho State Fire Prevention Laws, Rules, Regulations, and Standards.
6.1.2. Prior to starting operations during a closed fire season or periods of high fire danger, the Contractor shall prepare a fire prevention and fire control plan to the satisfaction of the COR.
6.1.3. Provide and maintain in good repair on the contract area the following equipment for use during a closed fire season or periods of high fire danger:
6.1.3.1. Firefighting tools shall be kept at vehicle staging areas or at such other place(s) as the COR shall designate whenever employees of the Contractor are working on the contract area.
All firefighting tools shall be identified, organized, and easily accessible to all Contractor employees. The fire tools shall be in good condition, be tight on strong handles, and have sharp cutting edges. There shall be at least one (1) tool for each Contractor employee working on the contract area. Three-fourths (3/4) of all fire tools shall be shovels, hoes, or other scraping tools. The fire tools shall be used only for fighting fire.
6.1.3.2. A shovel in good condition with not less than a three (3) foot handle and a blade not less than seven and three-quarters (7 3/4) inches wide shall be within fifty (50) feet of any power saw when in operation.
6.1.3.3. Two (2) back-pack pumps at each vehicle staging area to be kept full of water and in good operating condition.
6.1.3.4. A serviceable chemical fire extinguisher of at least eight (8) ounces minimum capacity shall be carried during a closed fire season or period of high fire danger by each saw operator using a power saw on the contract area. Such fire extinguisher shall be filled and in operating condition and shall at all times be immediately available to the operator when the saw is being fueled or the motor of the saw is running. Any fueling of a power saw shall be done in an area which has first been cleared of all flammable material. Power saws shall be moved at least twenty (20) feet from the place of fueling before the engine is started. A shovel shall be available with each gas can when refueling. Each power saw shall be equipped with an exhaust system and a spark arresting device.
6.1.3.5. The CO may require additional fire tools and fire equipment as the fire danger may warrant.
Technical Exhibits:
Required services table with Accepted Quality Level:
Performance Task Performance Standard Acceptable Quality
Level Method(s) of Inspection
Thinning, Lopping, and Scattering (PWS 5.1)
Stump height < 4" 95% Random inspection Live limbs removed 95% Random inspection Trees felled that meet specifications
95% Random inspection
Scattered slash that meets the specifications
95% Random inspection
DELIVERABLE FREQUENCY REFERENCE MEDIUM/FORMAT SUBMIT
TO
Performance/Work Plan
Once 1.6.4 Pre-work conference
By email in PDF format or hard copy
COR
Crew Manifest Once, and as needed when crew manifest changes.
1.6.9 Personnel
Requirements
By email in PDF or scanned or hard copy
COR
| BUREAU OF LAND MANAGEMENT – Salmon Field Office |
| Performance Work Statement |
| Mill Creek Lop and Scatter |
| F-1 |
| 1. General: This is a non-personal services contract to provide for tree thinning services. The Government shall not exercise any supervision or control over the providers performing these services. Such contract service providers shall be accountable... |
| 1.1. Description of Services/Introduction: The Salmon Field Office, Bureau of Land Management (BLM) is acquiring services for tree thinning. The Contractor shall furnish all personnel, tools, labor, supervision, equipment, materials, supplies, transpo... |
| 1.2. Background: The Mill Creek project area generally consists of Douglas-fir (Pseudotsuga menziesii), lodgepole pine (Pinus contorta), and Rocky Mountain juniper (Juniperus scopulorum) trees encroaching into sagebrush steppe. The methods that will b... |