Attachment 1 PWS invasive plant species 2024.pdf
PDF 202 KB Posted
- Attached to
- HERBICIDE TREATMENT OF INVASIVE PLANT SPECIES
- Solicitation number
- FA6703-24-Q-0010
About this file
This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide herbicide treatment of invasive plant species on Dobbins Air Reserve Base (Dobbins ARB) in Georgia. The objective is to conduct foliar spray and cut stump/vine applications of herbicides to manage invasive plant species within specified forested areas on the installation. The contractor must provide all labor, materials, equipment, reporting, and other documentation required to perform this work. The contract is for a base year plus four one-year option periods. Key requirements include obtaining a 95% minimum kill within four weeks of each application, adhering to the Dobbins ARB Integrated Pest Management Plan, and following Georgia's Best Management Practices for Forestry. The contractor must possess valid state pesticide licenses and certifications. Delivery of daily herbicide usage records and a final report are required. The related federal contract opportunity is a small business set-aside solicitation for these herbicide treatment services at Dobbins ARB.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) For
HERBICIDE TREATMENT OF INVASIVE PLANT SPECIES
For
DOBBINS ARB, GEORGIA
1.0 PURPOSE
In recognition that military lands have significant natural resources, Congress enacted the Sikes Act in 1960 to address wildlife conservation and public access on military installations. The 1997 amendments to the Sikes Act require the DoD to develop and implement an Integrated Natural Resources Management Plan (INRMP) for each military installation with significant natural resources. INRMPs provide for the management of natural resources, including plants, fish, wildlife and their habitats. To the maximum extent practicable, they incorporate ecosystem management principles, and describe procedures and projects that manage and maintain the landscapes necessary to sustain military-controlled lands for mission purposes. Executive Order 13112 was enacted in 1999 in order to (i) prevent the introduction of invasive species; (ii) detect and respond rapidly to and control populations of such species in a cost-effective and environmentally sound manner; (iii) monitor invasive species populations accurately and reliably; (iv) provide for restoration of native species and habitat conditions in ecosystems that have been invaded; (v) conduct research on invasive species and develop technologies to prevent introduction and provide for environmentally sound control of invasive species;
and (vi) promote public education on invasive species and the means to address them.
The National Invasive Species Council Management Plan (2016-2018) identifies actions for the Federal government and its partners to take to prevent, eradicate, and control invasive species, as well as restore ecosystems and other assets adversely impacted by invasive species.
The objective of the work described in this statement is to provide herbicide treatment to invasive plant species located within specified areas of forested land on Dobbins ARB, including hand-cutting/treating trunks above 6 feet in height. Portions of the specified areas to be treated may be located in or near wetlands and/or on stream banks. Dobbins natural resources include about 480 acres of unimproved grounds (mostly forested), Big Lake (10 acres), Little Lake (2 acres), 23 acres of wetlands, and about 7 miles of streams and creeks as detailed in the Dobbins ARB INRMP. All herbicides used shall be limited to those approved for use on Air Force property as listed in the Dobbins ARB Integrated Pesticides Management Plan (IPMP).
2.0 DESCRIPTION OF WORK
2.1 Foliar Spray Application of Herbicide for Invasive Plant Species
Dobbins ARB approved herbicides to be applied as foliar spray for invasive plant species and shall be a finish spray solution. Only aquatic use solutions shall be used in aquatic areas. Solution shall be applied to all visible invasive plant species within forested areas. Application method will be by backpack sprayer or equipment capable and calibrated to low volume per acre broadcast application.
This application method shall be applied at least twice per year, between the dates of October 1st and September 30 (typically Spring and Fall). This is a 5-year (base + 4 option years) contract.
2.2 Cut Stump/Vine Application of herbicide for woody invasive plant species:
Woody plant species greater than 6 feet in height shall be severed by hand and the rooted stump shall be treated with herbicide. Stumps/woody vines shall be cut within specified areas, as low as possible and not to exceed 6 inches in height, treated with herbicide. Contractor shall apply herbicide to the cut stump within 5 minutes following severance. Contractor shall apply a marking dye to severed stumps. Hand-cutting tools may include machetes, axes, saws, chainsaws, and similar. No heavy equipment will be permitted. These areas shall also include foliar application of herbicides for smaller invasive plant species as specified in Section 2.1 of this PWS. This is a 5-year (base + 4 option years) contract.
2.3 Herbicide Effectiveness
Contractor is required to obtain a 95% minimum kill within 4 weeks of application of each treatment area. The Contractor will be solely responsible for herbicide effectiveness. The contracting officer representative (COR) will evaluate chemical effectiveness within 4 weeks following treatment to assess results. If vegetative kill is inadequate, the Contractor must re-apply within 1 month following treatment. Re-application shall be completed by 30 October each year.
2.4 Application Area
Area maps specifying the requested treatment areas (in acres) will be provided to the Contractor with the service request for treatment. The location maps provided with each service request will show the general locations of each area and approximate size in acres to be treated.
3.0 QUALIFICATIONS
Contractor shall provide a sufficient number of certified/licensed, trained and competent personnel to accomplish the work of this contract. All work shall be completed to standards specified below and/or as included in the latest publication of Georgia’s Best Management Practices (BMP) for Forestry (State BMP guidelines). The Contractor shall possess a valid State of Georgia Pesticide Contractor’s License and a State of Georgia Commercial Applicator License in the appropriate category. Each individual directly involved with the application and/or supervision of the application of specified chemicals shall possess in the appropriate category a valid State of Georgia Commercial Applicator
License and shall be certified in accordance with DOD Directive 4150.7, state requirements, and AFMAN 32-1053. Copies of individual licenses shall be furnished to the COR at least one week prior to the commencement of the work.
4.0 GOVERNMENT FURNISHED MATERIALS
Base personnel will provide installation access to Contractor personnel (presuming they meet security review requirements) and facilitate access to appropriate locations on the installation from which to conduct the survey. Dobbins ARB will also provide applicable common installation picture layers, drawings, and other pertinent existing data.
5.0 HERBICIDE, MATERIALS, LABOR, & EQUIPMENT
Contractor shall supply herbicides, mixing water, surfactants, mixing/storage tanks, vehicles, and all materials, parts, labor and equipment necessary to perform the work. All unused materials shall be removed by the Contractor. A water source may be provided for tank mixing on the military installation as designated by the COR, and back flow prevention is required. Tank mixing is subject to be spot-checked by the COR or his representative. All herbicides must be secured within vehicles at all times while on the installation. Vehicles shall not be left unattended unless properly locked and secured. All vehicles shall be maintained with a clean and orderly appearance, free from observable herbicide spills, residues, or build-up. Equipment, tanks, and transport vehicles shall have observable signage stating “Pesticide Storage” when in use with herbicide application. Overnight parking of equipment and vehicles shall be in a place designated by the COR. The contractor will be required to provide the categories of equipment and materials for approval prior to start of work. Contractor may be required to supply COR with appropriate proof of quality and quantity on all materials used. Contractor shall provide all necessary equipment, including personal protective equipment (PPE), for completing specified work and in accordance with product label. One (1) copy of the label and safety data sheet (SDS) shall be furnished to the COR for approval, and approved prior to work performance. The Contractor shall have a label and SDS on site at all times and readily available for inspection at any time during application.
Bidders shall submit with their bids a general description detailing his/hers methods of operation to accomplish each task. Include within this description the manpower, types/characteristic of equipment to be used and the method of operation to make foliar and cut stump/vine applications of herbicides, vegetation removal and a timeline for completion.
6.0 GENERAL
6.1 CLEAN WATER ACT: All work shall be accomplished in accordance with the provisions of the Clean Water Act. Use of temporary silt fencing or other filtering devices shall be required when working near running streams, open water and wetlands to deter herbicide activities from entering aquatic resources. The contractor is responsible for proper installation of temporary filtering devices prior to herbicide activity in these areas. Care shall be taken to prevent chemical from entering streams, wetlands and/or open water and all herbicide is to be applied in accordance with chemical labels and EPA guidelines.
6.2 WASTE: If any hazardous materials (gasoline, used motor oil, etc.) are released into the environment during operations, it must be accumulated, managed and manifested off the installation in accordance with the regulations of the Resource Conservation and Recovery Act (40 CFR 260 – 280) and State of Georgia hazardous waste regulations. All waste manifests shall be signed only by authorized Dobbins ARB Hazardous Waste personnel. The COR and Dobbins Environmental Office (CEV) shall be notified immediately of the occurrence of any such event. Contractor shall be responsible for reporting, cleanup, and proper disposal of any hazardous waste generated. No petroleum products, oils, or lubricants (POL) may be willfully discharged into the environment, including spills due to negligence. Care must be taken when maintaining equipment not to release POL’s onto the ground, and the contractor is responsible for immediate cleanup and reporting of any such accidental release as discussed in the pre-work conference. Contractor shall reseal and dispose of empty pesticide containers off the installation at an authorized disposal site. All containers shall be tripled rinsed and the rinsate shall go into tank sprayer and sprayed on target vegetation. The work area shall be cleared daily of cans, container, or lunch articles (general trash) deposited by the contractor.
6.3 ACCESS: Ingress/egress of all equipment deliveries shall be accomplished through use of the contractor’s gate. Contractors without common access cards (CACs) shall be required to register all vehicles, equipment, and personnel with Base Security Police prior to commencement of work. Contractor shall submit a completed Dobbins ARB visitor Form 4 (provided by CEV) to the natural resource program manager (NRPM) in CEV, at least 7 days in advance of arriving on base. The NRPM will submit the form to Security for processing and approval. This work requires access to parts of the Base with restricted access. Permission to work in these areas shall be coordinated by the COR with CEV. Herbicide treatment of the forest stands on the south side of the base encroaches on one explosive safety arc. Dobbins Safety office (94 AW/SE) requires an AF Form 4437 be completed by CEV, and the contractor will be notified when the Risk Assessment is completed.
6.4 MONITORING WELLS: Several active monitoring wells are located in the vicinity of the work. These wells appear as a section of pipe or a steel post approximately three feet (3’) in height from ground level, or a marked cement square. No work shall be allowed within forty feet (40’) of these wells. Manholes for underground utilities exist along some of the work area. All efforts shall be taken not to damage these wells, manholes, or any other fixed utility or structure occurring on the base.
6.5 SPECIAL CARE: While herbicide application is located in unpopulated areas, the herbicides shall be applied in such a manner as to prevent toxic exposure to personnel, pets, wildlife, ornamental plants, and any other non-target components of the environment. Applications shall not be made during or prior to imminent rainfall, immediately after heavy rains, rainfall of more than 1 inch in 24 hours, or while runoff is occurring, or following frost. Care shall be taken to prevent chemical drift. The Contractor shall perform in strict accordance with the provisions of the Clean Air Act as applicable to this contract, including, but not limited to, no open burning or fugitive emissions. Extra care shall be taken to prevent drift off installation property to include, but not limited to, proper consideration of wind direction and variability at time of application. Care must be taken when operating equipment through natural areas not to damage seedlings or mature trees. Herbicide treatments must be accomplished in such a manner as to limit the spray to the target plants and minimize drift onto non-target vegetation on the site. The contractor shall take all these variations into account when submitting a quote. No equipment shall be operated in, or herbicides applied within, the designated State-protected special plant (Pink Lady Slipper) areas within designated forested areas. Pink Lady Slipper areas will be identified by the COR prior to commencement of work.
6.6 DELIVERABLES: Accurate records/logs (Form DD 1532) of the amounts
(pounds) of herbicide used shall be maintained and presented to the COR and application quantities must be closely tracked daily and presented to the COR to ensure proper reporting of quantity of active ingredients applied. The Contractor shall provide a final report of active ingredient applied on DD Form 1532 in Excel format, which will be furnished by the COR, and provided electronically. Units of measure on the DD Form 1532 for area treated shall be in acres. Units of measure on the DD Form 1532 for product shall be in pounds when possible for each specified herbicide applied per site or group of sites. Herbicide usage records shall be completed daily within 24 hours of application using DD Form 1532. The final usage report shall be provided to the CEV NRPM via email.
Email addresses shall be provided to the Contractor by the COR at the pre-work conference. https://www.acq.osd.mil/eie/afpmb/docs/standardlists/dd1532-1.xlsm (link to DD Form 1532 spreadsheet).
https://www.acq.osd.mil/eie/afpmb/docs/standardlists/dd1532-1.xlsm
| HERBICIDE TREATMENT OF INVASIVE PLANT SPECIES |
| For |
| DOBBINS ARB, GEORGIA |
| 1.0 PURPOSE |
| In recognition that military lands have significant natural resources, Congress enacted the Sikes Act in 1960 to address wildlife conservation and public access on military installations. The 1997 amendments to the Sikes Act require the DoD to develop... |
| The objective of the work described in this statement is to provide herbicide treatment to invasive plant species located within specified areas of forested land on Dobbins ARB, including hand-cutting/treating trunks above 6 feet in height. Portions ... |
| 2.0 DESCRIPTION OF WORK |
File details come from the government source that posted it. Updated .