This is a project plans document for the Illinois Department of Natural Resources (IDNR) detailing the removal and installation of new floating boat docks at the Washington County State Recreation Area in Nashville, Illinois. The project encompasses seven dock locations across the recreation area, with locations 1, 2, and 3 (Main Boat Ramp, Concessions, and Cabins & Campground) included in the base bid, and locations 4, 5, 6, and 7 (Old Gibson Boat Ramp, Lonely Oaks, Little Bear, and Family Shelter) offered as individual additive alternate bids. The contractor is responsible for providing all labor, equipment, and materials necessary to remove existing floating boat docks, gangways, abutments, and spud poles, then install new galvanized steel frame docks with encapsulated floatation and composite decking, accompanied by concrete abutments, riprap protection, and steel spud pole anchorage at each location. A preconstruction meeting must be coordinated with the IDNR Project Manager and Site Superintendent prior to work initiation, with the contractor required to submit a proposed construction schedule and draft Contractor's Schedule of Values for approval.
The contractor must verify all site conditions and quantities prior to bidding and is responsible for ensuring positive site drainage, ADA grade compliance, proper utility coordination, and overall design intent at each completed site, with no additional compensation allowed for minor field adjustments. The project requires coordination with the site superintendent to minimize public impacts, as the recreation area will remain open during construction. All work areas must be secured with appropriate traffic control measures, including cones, barricades, and signage, while primary park roads remain open unless authorized for closure. The contractor must identify and locate existing utilities prior to commencing work, with damage to utilities repaired at the contractor's expense. All excess excavation and removed materials shall be hauled offsite and disposed of legally, and any damage to adjacent turf areas, trees, pavements, or utilities shall be repaired with like or newer materials at contractor expense.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE MAP
SHEET INDEX
G-01 COVERSHEET
C-01 DOCK LOCATIONS, NOTES & SCHEDULE
C-02 MAIN BOAT RAMP DOCK PLAN
C-03 CONCESSIONS BOAT DOCK DEMO PLAN
C-04 CONCESSIONS BOAT DOCK PROPOSED PLAN
C-05 CABINS AND CAMPGROUND DOCK PLAN
C-06 OLD GIBSON BOAT RAMP DOCK PLAN
C-07 LONELY OAKS DOCK PLAN
C-08 LITTLE BEAR & FAMILY SHELTER DOCK PLANS
C-09 TYPICAL DOCK AND ABUTMENT PROFILE VIEW
C-10 DETAILS
INSTALL NEW BOAT DOCKS
WASHINGTON COUNTY STATE RECREATION AREA
WASHINGTON COUNTY, IL
IDNR FILE NO. 4-26-027
JS
AREA LOCATION MAP
PROJECT
LOCATION
KS
PROJECT
LOCATION
© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox © 2026 TomTom © 2026 Zenrin
LOCATION 2
CONCESSIONS
LOCATION 7
FAMILY SHELTER
LOCATION 1
MAIN BOAT RAMP
LOCATION 4
OLD GIBSON BOAT RAMP
LOCATION 6
LITTLE BEAR
SITE ADMIN OFFICE
LOCATION 3
CABINS AND CAMPGROUND
LOCATION 5
LONELY OAKS
SITE BOUNDARY
WASHINGTON
COUNTY STATE
RECREATION AREA
GENERAL NOTES:
1. SCOPE OF WORK - THIS PROJECT WILL CONSIST OF THE CONTRACTOR PROVIDING ALL LABOR, EQUIPMENT AND MATERIALS REQUIRED TO PROPERLY CONSTRUCT AND INSTALL MULTIPLE REPLACEMENT FLOATING BOAT DOCKS AT VARIOUS LOCATIONS WITHIN THE WASHINGTON COUNTY STATE RECREATION AREA (SRA). A SUMMARY OF
THE PROPOSED PRIMARY WORK ITEMS INCLUDES BUT IS NOT LIMITED TO:
1.1. REMOVAL OF EXISTING FLOATING BOAT DOCKS, AND ALL ASSOCIATED ITEMS INCLUDING GANGWAY, ABUTMENT, AND SPUD POLES.
1.2. INSTALLATION OF NEW FLOATING BOAT DOCKS, GANGWAYS, SPUD POLES, AND CONCRETE ABUTMENTS.
1.3. ALL NEW DOCKS AND GANGWAYS ARE TO BE GALVANIZED STEEL FRAME CONSTRUCTION WITH ENCAPSULATED FLOATATION AND COMPOSITE DECKING.
1.4. ALL DOCKS WILL INCLUDE A NEW CONCRETE ABUTMENT/APPROACH PAD, RIPRAP PROTECTION, AND STEEL SPUD POLE ANCHORAGE.
1.5. DOCK LOCATIONS 1, 2 AND 3 ARE TO BE INCLUDED IN THE BASE BID.
1.6. DOCK LOCATIONS 4, 5, 6 AND 7 ARE TO BE INCLUDED AS INDIVIDUAL ADDITIVE ALTERNATE BIDS.
2. PROJECT AREA - THE OVERALL PROJECT CONSISTS OF MULTIPLE INDIVIDUAL SITES SPREAD ACROSS VARIOUS LOCATIONS OF THE WASHINGTON COUNTY SRA, WHICH WILL CONTINUE TO BE OPEN TO AND USED BY THE GENERAL PUBLIC THROUGHOUT CONSTRUCTION. ALL WORK SHALL BE COORDINATED WITH THE SITE SUPERINTENDENT AND CONDUCTED IN AN ORDERLY AND EFFECTIVE MANNER TO MINIMIZE IMPACTS TO THE OWNER AND GENERAL PUBLIC.
3. ORDER OF OPERATIONS - CONCURRENT WORK AT MULTIPLE SITES WILL BE LIMITED TO THOSE ONLY WITHIN CLOSE PROXIMITY OF EACH OTHER AND WITHIN THE CAPABILITIES OF THE CONTRACTOR TO MAKE CONTINUAL PROGRESS AT EACH LOCATION. PARTIAL ACCEPTANCE MAY BE REQUESTED OF SUBSTANTIALLY COMPLETED INDIVIDUAL SITES IN ORDER TO MAINTAIN A REASONABLE LEVEL OF SERVICE TO THE GENERAL PUBLIC UNTIL ALL CONSTRUCTION IS COMPLETED.
4. SAFETY - CONTRACTOR SHALL PROVIDE APPROPRIATE VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL VIA TRAFFIC CONES, BARRICADES, SIGNAGE, CAUTION TAPE, AND/OR PHASING AS NECESSARY AND AS REQUESTED BY THE SITE SUPERINTENDENT TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION. ALL PRIMARY PARK AND CAMPGROUND ROADS SHALL REMAIN OPEN UNLESS CLOSURE IS AUTHORIZED BY THE SITE SUPERINTENDENT. ALL ACTIVE WORK AREAS SHALL BE CLOSED OFF TO PUBLIC ACCESS, AND ANY OPEN EXCAVATIONS SHALL BE FENCED OFF OVERNIGHT. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR EQUIPMENT AND
MATERIALS.
5. PRECONSTRUCTION MEETING - PRIOR TO INITIATING ANY CONSTRUCTION THE CONTRACTOR SHALL COORDINATE A PRECONSTRUCTION MEETING WITH THE IDNR PROJECT MANAGER, SITE SUPERINTENDENT, AND OTHER STAKEHOLDERS AS APPROPRIATE. A PROPOSED CONSTRUCTION SCHEDULE AND DRAFT CONTRACTOR'S SCHEDULE OF
VALUES (CSV) SHALL BE SUBMITTED FOR IDNR REVIEW.
6. SITE LAYOUT
6.1. SOME ITEMS, DIMENSIONS, AND QUANTITIES DEPICTED ON THE PROPOSED SITE PLAN LAYOUTS MAY BE SHOWN SCHEMATICALLY OR PROVIDED FOR THE
CONTRACTOR'S GENERAL REFERENCE . THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SITE CONDITIONS AND QUANTITIES PRIOR TO BIDDING, AND ULTIMATELY ENSURING EACH COMPLETED SITE HAS POSITIVE SITE DRAINAGE, CLEANLY TIES IN TO EXISTING FEATURES, IS COORDINATED WITH EXISTING UTILITIES, IS IN COMPLIANCE WITH ADA GRADE REQUIREMENTS, AND MEETS THE OVERALL DESIGN INTENT. MINOR FIELD ADJUSTMENTS MAY BE REQUIRED TO ACHIEVE THESE CONDITIONS OR TO ACCOMMODATE VARIATIONS ACROSS DIFFERENT MANUFACTURERS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR SUCH MODIFICATIONS.
6.2. PRIOR TO CONSTRUCTION AND INSTALLATION, FINAL LOCATIONS AND ELEVATIONS OF DOCKS AND ABUTMENTS SHALL BE STAKED BY THE CONTRACTOR AND APPROVED
BY THE DNR REGIONAL ENGINEER.
7. PRIOR TO COMMENCING SITEWORK, CONTRACTOR SHALL IDENTIFY, INVESTIGATE, AND LOCATE ANY EXISTING UTILITIES THAT MAY BE IN CONFLICT WITH THE PROPOSED WORK. ANY POTENTIAL CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE IDNR PROJECT MANAGER TO DETERMINE IF FURTHER ACTION IS NEEDED. DAMAGE TO
ANY EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
8. THE CONTRACTOR SHALL TAKE CARE NOT TO CAUSE DAMAGE TO ANY TURF AREAS, TREES, PAVEMENTS, UTILITIES, OR OTHER FEATURES ADJACENT TO THE WORK AREA LIMITS SHOWN. ANY DAMAGE SHALL BE REPAIRED AT THEIR EXPENSE WITH LIKE OR NEWER MATERIALS. ALL DISTURBED TURF AREAS SHALL BE GRADED, SEEDED, FERTILIZED AND MULCHED.
9. ALL EXCESS EXCAVATION AND REMOVED MATERIALS, EXCEPT AS NOTED, SHALL BE HAULED OFFSITE AND DISPOSED OF IN A LEGAL MANNER.
Feet
200010000 500
JS
KS
32'
12'
6'
4'
Remove Ex.
Gangway, Dock, Spud Poles
Existing Dock Was Previously Removed, Remove Remaining Spud Poles
Remove Ex.
Conc. Abutment
Ex. Conc. Boat Ramp
Proposed Gangway 5'x32'
Hinged Connection ADA Compliant
Proposed Floating Dock 8'x28'
Pipe Guide (see detail)
10" Cleat (8 total, see detail)
Transfer Rail (see detail)
Install RR3 Riprap Min. 4'
Around Perimeter
Pour New Concrete Approach 6' Wide x 6' Long Plus Abutment
8'
28'
32'
6'
6'
Location #1 - Main Boat Ramp Dock
EXISTING / REMOVAL PLAN PROPOSED PLAN
Feet 20100
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND
INSTALLATION.
180'
27' 6'
30'
KAYAK LAUNCH
TO BE RELOCATED
ON NEW DOCK
CONCRETE APPROACH SLAB TO BE
REMOVED 6' x 11' x 4" THICK
REMOVE ALL EXISTING
DOCKS, GANGWAYS,
AND SPUD POLES
CONCRETE PANELS
TO BE REMOVED
6'
13'+/-
12'
Location #2 - Concessions Dock Demo Plan
Feet 1:1200
2401200 60
152'
6'
20'
8" Dock Cleats at 10'
Spacing
36'
6' Kayak launch proposed location
Proposed Conc. Landing 6' Wide x 5' Long Plus Abutment
Proposed Gangway 5' x 36'
Pipe Guide (see detail) manufacturer to determine spacing
Proposed Floating Dock (typ.)
8" Dock Cleats Install 6 per section
5'
Replace Concrete Panels.
Intersection Panel @ 2% Max Slope in Any Direction.
Install RR3 Riprap Min. 4' Around Perimeter
4' (Typ. 5)20' (Typ.) 6'
Existing Sidewalk
Shoreline
6'
~55'
Hinged Connection ADA Compliant
Location #2 - Concessions Dock Proposed Plan
Feet 20100
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND
INSTALLATION.
40'
40'
6'
6'
3'-11"
16'
3'
Remove last two wooden steps and stringers
Remove existing wood and concrete dock landing
Remove all existing Docks, Gangways, Spud Poles
12'
40'
6'
40'
Proposed 4' x 16' Gangways (2). Gangway ends to rest on dock surface similar to existing configuration, with 18" min. overlap. Provide metal skid plate on dock with side guards.
Increase dock flotation as needed to maintain required freeboard. Max slope requirements N/A at this location.
Pipe Guide (see detail)
8" Cleat - 10 Total (see detail)
Proposed Conc. Landing & Abutment With Hinged Gangway Connection
Reconstruct two lower wooden steps and handrail to tie into abutment and match existing steps
Proposed Floating Dock
6'
Proposed Conc. Landing & Abutment With Hinged
Gangway Connection. Set new edge 2-3' closer to embankment.
5'
Reconstruct two lower wooden steps and handrail.
Install RR3 Riprap Min.
4' Around Perimeter
Install RR3 Riprap Min. 4' Around Perimeter
16' 16'
8'
5'
6'
Location #3 - Cabins & Campground Dock
Feet 20100
EXISTING / REMOVAL PLAN PROPOSED PLAN
JS
KS
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
24'
20'
6'
3'
Remove Existing Dock, Gangway, and Spud Poles
Pipe Guide (see detail)
8" Cleat - 6 Total (see detail)
Proposed Floating Dock 6' x 20'
24'
20'
6'
5'
6'
8'
Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment
Proposed Gangway 5' x 24'
Existing Boat Ramp
Shoreline
Install RR3 Riprap Min. 4' Around Perimeter
Hinged Connection ADA Compliant
Location #4 - Old Gibson Boat Ramp Dock (Additive Alternate #1)
EXISTING / REMOVAL PLAN PROPOSED PLAN
Feet
20100
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND
INSTALLATION.
32'
40'
6'
4'
6'
Ex. dock and spud poles to be removed.
Previously removed dock section
Previously removed gangway
20'
28'
6'
Pipe Guide (see detail)
Hinged Connection ADA Compliant
Proposed Gangway 5'x20'
Proposed Floating Dock 6'x28'
8" Cleat (8 total, see detail)
Install RR3 Riprap Min. 4' Around Perimeter
Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment8'
Location #5 - Lonely Oaks (Add. Alt. #2)
EXISTING / REMOVAL PLAN PROPOSED PLAN
Feet 20100
JS
KS
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
30'
Remove existing dock, gangway, and spud poles
20'
28'
6'
Pipe Guide (see detail)
Hinged Connection ADA Compliant
Proposed Gangway 5'x20'
Proposed Floating Dock 6'x28'
8" Cleat (8 total, see detail)
Install RR3 Riprap Min. 4' Around Perimeter
Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment
8' 20'
12'
30'
Remove existing boardwalk, gangway, dock and spud poles
28'
6'
24'
Pipe Guide (see detail)
Hinged Connection ADA Compliant
Proposed Gangway 5'x24'
Proposed Floating Dock 6'x28'
8" Cleat (8 total, see detail)
Install RR3 Riprap Min.
4' Around Perimteter
Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment
8'
Location #6 - Little Bear (Add. Alt. #3) Location #7 - Family Shelter (Add. Alt. #4)
EXISTING / REMOVAL PLAN PROPOSED PLAN
Feet 20100
Feet 20100
EXISTING / REMOVAL PLAN PROPOSED PLAN
JS
KS
NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS
AND ABUTMENTS SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE DNR
Normal Pool +- 478.8'
Max. Pool +- 484.2' Emergency Spillway
Offset Notch in Abutment For Gangway Roller Pad - 18" Long, Height T.B.D. by gangway manufacturer. Roller to be set at max 4" from back of notch when gangway is level.
12" Overhang ADA Handrail
34"Conc. Approach 6' Wide x 6" Thick
2% Max Slope
#4 @ 12" O.C. (Each Way)
30" Min.
Gangway Max Slope 1:12 at Normal Pool
Hinged Connection ADA-compliant
2"x Wood Rubrail (Match Frame+Decking Height)
Furnish and install pile caps on all pipes, color black
8-12" Frame
Decking
Approximate Lake Bottom Varies Contractor to verify and design accordingly
4' min.
Pipe Anchorage - Manufacturer to specify number, size and location. Min. 4" Dia.
Polyethylene encased polystyrene floats bolted to frame. Size and number determined by manufacturer.
Notes: Gangway framing may vary by manufacturer and application. Must meet nominal dimension, loading, and ADA handrail and edge protection requirements.
Concrete abutment to be monolithic pour unless approved by DNR Engineer.
2'x5' Hinged Galv. Steel Transition Plate 1:12 Max Slope Top of Spud Elevation
Minimum 487.5' 3" Max.
Edge Protection Rail
16-18" Freeboard
Supplemental flotation for gangway as necessary Riprap Over Fabric RR3 or RR4 (as specified by location)
3:16" CA-6
18"
Chamfered Top Frame Corners
18"
MIN. 12" (RR3)
MIN. 16" (RR4)
12" Min.
8' or as Noted
6"
Add Base Aggregate or Mub Slab if Subgrade is
Unsuitable
4' Min. (Face and Sides)
Gangway and dock surfaces to be 1x6 or 2x6 composite or PVC decking
Compacted CA-6 backfill (if excavated)
Typical Dock & Abutment Profile View Not to Scale
1" Minimum Roller All Around
4" MIN. DIA. PIPE
10" x 10" Minimum Bracket
CR5 HEX HD. COATED BOLT,
FLAT WASHERS, LOCK WASHER
& NUT (2 PER CLEAT)
DECKING
METAL FRAMING
DECKING
METAL FRAMING
SIDE ELEVATION END ELEVATION
2'0"
2"
3.5"
#8x1-1/4" STAINLESS STEEL
WAFER HEAD SCREWS OR RING
SHANK NAILS. PLACE 6" ON
CENTERS ON TOP AND 10" ON SIDE
DECKING
METAL FRAMING
VINYL BUMPER
8" MIN THICKNESS
BLACK
METAL FRAMING
TOP OF DECK
RUB RAIL
PLAN VIEW
ELEVATIONSIDE ELEVATION END ELEVATION
CLEAT DETAIL
TRANSFER RAIL DETAIL BUMPER DETAIL
PIPE GUIDE DETAIL
WOOD RUBRAIL
NOTE: SIZES SHOWN ARE MINIMUMS.
ACTUAL PIPE AND BRACKET SIZES
T.B.D. BY CONTRACTOR BASED ON
APPLICABLE DOCK SIZE,
CONFIGURATION, AND LOADING
8" OR 10" GALV. STEEL CLEAT