Attachment 1 - Project Plans~12.pdf

PDF 3 MB Posted

Attached to
DNR Washington County SRA - Install New Floating Docks
Solicitation number
27-422DNR-REALT-B-54674
Issued by
Washington County, Niles Village, Illinois

About this file

This is a project plans document for the Illinois Department of Natural Resources (IDNR) detailing the removal and installation of new floating boat docks at the Washington County State Recreation Area in Nashville, Illinois. The project encompasses seven dock locations across the recreation area, with locations 1, 2, and 3 (Main Boat Ramp, Concessions, and Cabins & Campground) included in the base bid, and locations 4, 5, 6, and 7 (Old Gibson Boat Ramp, Lonely Oaks, Little Bear, and Family Shelter) offered as individual additive alternate bids. The contractor is responsible for providing all labor, equipment, and materials necessary to remove existing floating boat docks, gangways, abutments, and spud poles, then install new galvanized steel frame docks with encapsulated floatation and composite decking, accompanied by concrete abutments, riprap protection, and steel spud pole anchorage at each location. A preconstruction meeting must be coordinated with the IDNR Project Manager and Site Superintendent prior to work initiation, with the contractor required to submit a proposed construction schedule and draft Contractor's Schedule of Values for approval.

The contractor must verify all site conditions and quantities prior to bidding and is responsible for ensuring positive site drainage, ADA grade compliance, proper utility coordination, and overall design intent at each completed site, with no additional compensation allowed for minor field adjustments. The project requires coordination with the site superintendent to minimize public impacts, as the recreation area will remain open during construction. All work areas must be secured with appropriate traffic control measures, including cones, barricades, and signage, while primary park roads remain open unless authorized for closure. The contractor must identify and locate existing utilities prior to commencing work, with damage to utilities repaired at the contractor's expense. All excess excavation and removed materials shall be hauled offsite and disposed of legally, and any damage to adjacent turf areas, trees, pavements, or utilities shall be repaired with like or newer materials at contractor expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE MAP

SHEET INDEX

G-01 COVERSHEET

C-01 DOCK LOCATIONS, NOTES & SCHEDULE

C-02 MAIN BOAT RAMP DOCK PLAN

C-03 CONCESSIONS BOAT DOCK DEMO PLAN

C-04 CONCESSIONS BOAT DOCK PROPOSED PLAN

C-05 CABINS AND CAMPGROUND DOCK PLAN

C-06 OLD GIBSON BOAT RAMP DOCK PLAN

C-07 LONELY OAKS DOCK PLAN

C-08 LITTLE BEAR & FAMILY SHELTER DOCK PLANS

C-09 TYPICAL DOCK AND ABUTMENT PROFILE VIEW

C-10 DETAILS

INSTALL NEW BOAT DOCKS

WASHINGTON COUNTY STATE RECREATION AREA

WASHINGTON COUNTY, IL

IDNR FILE NO. 4-26-027

JS

AREA LOCATION MAP

PROJECT

LOCATION

KS

PROJECT

LOCATION

© 2026 Microsoft Corporation © Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO © Mapbox © 2026 TomTom © 2026 Zenrin

LOCATION 2

CONCESSIONS

LOCATION 7

FAMILY SHELTER

LOCATION 1

MAIN BOAT RAMP

LOCATION 4

OLD GIBSON BOAT RAMP

LOCATION 6

LITTLE BEAR

SITE ADMIN OFFICE

LOCATION 3

CABINS AND CAMPGROUND

LOCATION 5

LONELY OAKS

SITE BOUNDARY

WASHINGTON

COUNTY STATE

RECREATION AREA

GENERAL NOTES:

1. SCOPE OF WORK - THIS PROJECT WILL CONSIST OF THE CONTRACTOR PROVIDING ALL LABOR, EQUIPMENT AND MATERIALS REQUIRED TO PROPERLY CONSTRUCT AND INSTALL MULTIPLE REPLACEMENT FLOATING BOAT DOCKS AT VARIOUS LOCATIONS WITHIN THE WASHINGTON COUNTY STATE RECREATION AREA (SRA). A SUMMARY OF

THE PROPOSED PRIMARY WORK ITEMS INCLUDES BUT IS NOT LIMITED TO:

1.1. REMOVAL OF EXISTING FLOATING BOAT DOCKS, AND ALL ASSOCIATED ITEMS INCLUDING GANGWAY, ABUTMENT, AND SPUD POLES.

1.2. INSTALLATION OF NEW FLOATING BOAT DOCKS, GANGWAYS, SPUD POLES, AND CONCRETE ABUTMENTS.

1.3. ALL NEW DOCKS AND GANGWAYS ARE TO BE GALVANIZED STEEL FRAME CONSTRUCTION WITH ENCAPSULATED FLOATATION AND COMPOSITE DECKING.

1.4. ALL DOCKS WILL INCLUDE A NEW CONCRETE ABUTMENT/APPROACH PAD, RIPRAP PROTECTION, AND STEEL SPUD POLE ANCHORAGE.

1.5. DOCK LOCATIONS 1, 2 AND 3 ARE TO BE INCLUDED IN THE BASE BID.

1.6. DOCK LOCATIONS 4, 5, 6 AND 7 ARE TO BE INCLUDED AS INDIVIDUAL ADDITIVE ALTERNATE BIDS.

2. PROJECT AREA - THE OVERALL PROJECT CONSISTS OF MULTIPLE INDIVIDUAL SITES SPREAD ACROSS VARIOUS LOCATIONS OF THE WASHINGTON COUNTY SRA, WHICH WILL CONTINUE TO BE OPEN TO AND USED BY THE GENERAL PUBLIC THROUGHOUT CONSTRUCTION. ALL WORK SHALL BE COORDINATED WITH THE SITE SUPERINTENDENT AND CONDUCTED IN AN ORDERLY AND EFFECTIVE MANNER TO MINIMIZE IMPACTS TO THE OWNER AND GENERAL PUBLIC.

3. ORDER OF OPERATIONS - CONCURRENT WORK AT MULTIPLE SITES WILL BE LIMITED TO THOSE ONLY WITHIN CLOSE PROXIMITY OF EACH OTHER AND WITHIN THE CAPABILITIES OF THE CONTRACTOR TO MAKE CONTINUAL PROGRESS AT EACH LOCATION. PARTIAL ACCEPTANCE MAY BE REQUESTED OF SUBSTANTIALLY COMPLETED INDIVIDUAL SITES IN ORDER TO MAINTAIN A REASONABLE LEVEL OF SERVICE TO THE GENERAL PUBLIC UNTIL ALL CONSTRUCTION IS COMPLETED.

4. SAFETY - CONTRACTOR SHALL PROVIDE APPROPRIATE VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL VIA TRAFFIC CONES, BARRICADES, SIGNAGE, CAUTION TAPE, AND/OR PHASING AS NECESSARY AND AS REQUESTED BY THE SITE SUPERINTENDENT TO MAINTAIN PUBLIC SAFETY DURING CONSTRUCTION. ALL PRIMARY PARK AND CAMPGROUND ROADS SHALL REMAIN OPEN UNLESS CLOSURE IS AUTHORIZED BY THE SITE SUPERINTENDENT. ALL ACTIVE WORK AREAS SHALL BE CLOSED OFF TO PUBLIC ACCESS, AND ANY OPEN EXCAVATIONS SHALL BE FENCED OFF OVERNIGHT. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR EQUIPMENT AND

MATERIALS.

5. PRECONSTRUCTION MEETING - PRIOR TO INITIATING ANY CONSTRUCTION THE CONTRACTOR SHALL COORDINATE A PRECONSTRUCTION MEETING WITH THE IDNR PROJECT MANAGER, SITE SUPERINTENDENT, AND OTHER STAKEHOLDERS AS APPROPRIATE. A PROPOSED CONSTRUCTION SCHEDULE AND DRAFT CONTRACTOR'S SCHEDULE OF

VALUES (CSV) SHALL BE SUBMITTED FOR IDNR REVIEW.

6. SITE LAYOUT

6.1. SOME ITEMS, DIMENSIONS, AND QUANTITIES DEPICTED ON THE PROPOSED SITE PLAN LAYOUTS MAY BE SHOWN SCHEMATICALLY OR PROVIDED FOR THE

CONTRACTOR'S GENERAL REFERENCE . THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL SITE CONDITIONS AND QUANTITIES PRIOR TO BIDDING, AND ULTIMATELY ENSURING EACH COMPLETED SITE HAS POSITIVE SITE DRAINAGE, CLEANLY TIES IN TO EXISTING FEATURES, IS COORDINATED WITH EXISTING UTILITIES, IS IN COMPLIANCE WITH ADA GRADE REQUIREMENTS, AND MEETS THE OVERALL DESIGN INTENT. MINOR FIELD ADJUSTMENTS MAY BE REQUIRED TO ACHIEVE THESE CONDITIONS OR TO ACCOMMODATE VARIATIONS ACROSS DIFFERENT MANUFACTURERS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR SUCH MODIFICATIONS.

6.2. PRIOR TO CONSTRUCTION AND INSTALLATION, FINAL LOCATIONS AND ELEVATIONS OF DOCKS AND ABUTMENTS SHALL BE STAKED BY THE CONTRACTOR AND APPROVED

BY THE DNR REGIONAL ENGINEER.

7. PRIOR TO COMMENCING SITEWORK, CONTRACTOR SHALL IDENTIFY, INVESTIGATE, AND LOCATE ANY EXISTING UTILITIES THAT MAY BE IN CONFLICT WITH THE PROPOSED WORK. ANY POTENTIAL CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE IDNR PROJECT MANAGER TO DETERMINE IF FURTHER ACTION IS NEEDED. DAMAGE TO

ANY EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.

8. THE CONTRACTOR SHALL TAKE CARE NOT TO CAUSE DAMAGE TO ANY TURF AREAS, TREES, PAVEMENTS, UTILITIES, OR OTHER FEATURES ADJACENT TO THE WORK AREA LIMITS SHOWN. ANY DAMAGE SHALL BE REPAIRED AT THEIR EXPENSE WITH LIKE OR NEWER MATERIALS. ALL DISTURBED TURF AREAS SHALL BE GRADED, SEEDED, FERTILIZED AND MULCHED.

9. ALL EXCESS EXCAVATION AND REMOVED MATERIALS, EXCEPT AS NOTED, SHALL BE HAULED OFFSITE AND DISPOSED OF IN A LEGAL MANNER.

Feet

200010000 500

JS

KS

32'

12'

6'

4'

Remove Ex.

Gangway, Dock, Spud Poles

Existing Dock Was Previously Removed, Remove Remaining Spud Poles

Remove Ex.

Conc. Abutment

Ex. Conc. Boat Ramp

Proposed Gangway 5'x32'

Hinged Connection ADA Compliant

Proposed Floating Dock 8'x28'

Pipe Guide (see detail)

10" Cleat (8 total, see detail)

Transfer Rail (see detail)

Install RR3 Riprap Min. 4'

Around Perimeter

Pour New Concrete Approach 6' Wide x 6' Long Plus Abutment

8'

28'

32'

6'

6'

Location #1 - Main Boat Ramp Dock

EXISTING / REMOVAL PLAN PROPOSED PLAN

Feet 20100

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND

INSTALLATION.

180'

27' 6'

30'

KAYAK LAUNCH

TO BE RELOCATED

ON NEW DOCK

CONCRETE APPROACH SLAB TO BE

REMOVED 6' x 11' x 4" THICK

REMOVE ALL EXISTING

DOCKS, GANGWAYS,

AND SPUD POLES

CONCRETE PANELS

TO BE REMOVED

6'

13'+/-

12'

Location #2 - Concessions Dock Demo Plan

Feet 1:1200

2401200 60

152'

6'

20'

8" Dock Cleats at 10'

Spacing

36'

6' Kayak launch proposed location

Proposed Conc. Landing 6' Wide x 5' Long Plus Abutment

Proposed Gangway 5' x 36'

Pipe Guide (see detail) manufacturer to determine spacing

Proposed Floating Dock (typ.)

8" Dock Cleats Install 6 per section

5'

Replace Concrete Panels.

Intersection Panel @ 2% Max Slope in Any Direction.

Install RR3 Riprap Min. 4' Around Perimeter

4' (Typ. 5)20' (Typ.) 6'

Existing Sidewalk

Shoreline

6'

~55'

Hinged Connection ADA Compliant

Location #2 - Concessions Dock Proposed Plan

Feet 20100

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND

INSTALLATION.

40'

40'

6'

6'

3'-11"

16'

3'

Remove last two wooden steps and stringers

Remove existing wood and concrete dock landing

Remove all existing Docks, Gangways, Spud Poles

12'

40'

6'

40'

Proposed 4' x 16' Gangways (2). Gangway ends to rest on dock surface similar to existing configuration, with 18" min. overlap. Provide metal skid plate on dock with side guards.

Increase dock flotation as needed to maintain required freeboard. Max slope requirements N/A at this location.

Pipe Guide (see detail)

8" Cleat - 10 Total (see detail)

Proposed Conc. Landing & Abutment With Hinged Gangway Connection

Reconstruct two lower wooden steps and handrail to tie into abutment and match existing steps

Proposed Floating Dock

6'

Proposed Conc. Landing & Abutment With Hinged

Gangway Connection. Set new edge 2-3' closer to embankment.

5'

Reconstruct two lower wooden steps and handrail.

Install RR3 Riprap Min.

4' Around Perimeter

Install RR3 Riprap Min. 4' Around Perimeter

16' 16'

8'

5'

6'

Location #3 - Cabins & Campground Dock

Feet 20100

EXISTING / REMOVAL PLAN PROPOSED PLAN

JS

KS

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

24'

20'

6'

3'

Remove Existing Dock, Gangway, and Spud Poles

Pipe Guide (see detail)

8" Cleat - 6 Total (see detail)

Proposed Floating Dock 6' x 20'

24'

20'

6'

5'

6'

8'

Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment

Proposed Gangway 5' x 24'

Existing Boat Ramp

Shoreline

Install RR3 Riprap Min. 4' Around Perimeter

Hinged Connection ADA Compliant

Location #4 - Old Gibson Boat Ramp Dock (Additive Alternate #1)

EXISTING / REMOVAL PLAN PROPOSED PLAN

Feet

20100

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

REGIONAL ENGINEER PRIOR TO CONSTRUCTION AND

INSTALLATION.

32'

40'

6'

4'

6'

Ex. dock and spud poles to be removed.

Previously removed dock section

Previously removed gangway

20'

28'

6'

Pipe Guide (see detail)

Hinged Connection ADA Compliant

Proposed Gangway 5'x20'

Proposed Floating Dock 6'x28'

8" Cleat (8 total, see detail)

Install RR3 Riprap Min. 4' Around Perimeter

Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment8'

Location #5 - Lonely Oaks (Add. Alt. #2)

EXISTING / REMOVAL PLAN PROPOSED PLAN

Feet 20100

JS

KS

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

30'

Remove existing dock, gangway, and spud poles

20'

28'

6'

Pipe Guide (see detail)

Hinged Connection ADA Compliant

Proposed Gangway 5'x20'

Proposed Floating Dock 6'x28'

8" Cleat (8 total, see detail)

Install RR3 Riprap Min. 4' Around Perimeter

Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment

8' 20'

12'

30'

Remove existing boardwalk, gangway, dock and spud poles

28'

6'

24'

Pipe Guide (see detail)

Hinged Connection ADA Compliant

Proposed Gangway 5'x24'

Proposed Floating Dock 6'x28'

8" Cleat (8 total, see detail)

Install RR3 Riprap Min.

4' Around Perimteter

Pour New Concrete Approach 6' Wide x 8' Long Plus Abutment

8'

Location #6 - Little Bear (Add. Alt. #3) Location #7 - Family Shelter (Add. Alt. #4)

EXISTING / REMOVAL PLAN PROPOSED PLAN

Feet 20100

Feet 20100

EXISTING / REMOVAL PLAN PROPOSED PLAN

JS

KS

NOTE: FINAL LOCATIONS AND ELEVATIONS OF DOCKS

AND ABUTMENTS SHALL BE STAKED BY THE

CONTRACTOR AND APPROVED BY THE DNR

Normal Pool +- 478.8'

Max. Pool +- 484.2' Emergency Spillway

Offset Notch in Abutment For Gangway Roller Pad - 18" Long, Height T.B.D. by gangway manufacturer. Roller to be set at max 4" from back of notch when gangway is level.

12" Overhang ADA Handrail

34"Conc. Approach 6' Wide x 6" Thick

2% Max Slope

#4 @ 12" O.C. (Each Way)

30" Min.

Gangway Max Slope 1:12 at Normal Pool

Hinged Connection ADA-compliant

2"x Wood Rubrail (Match Frame+Decking Height)

Furnish and install pile caps on all pipes, color black

8-12" Frame

Decking

Approximate Lake Bottom Varies Contractor to verify and design accordingly

4' min.

Pipe Anchorage - Manufacturer to specify number, size and location. Min. 4" Dia.

Polyethylene encased polystyrene floats bolted to frame. Size and number determined by manufacturer.

Notes: Gangway framing may vary by manufacturer and application. Must meet nominal dimension, loading, and ADA handrail and edge protection requirements.

Concrete abutment to be monolithic pour unless approved by DNR Engineer.

2'x5' Hinged Galv. Steel Transition Plate 1:12 Max Slope Top of Spud Elevation

Minimum 487.5' 3" Max.

Edge Protection Rail

16-18" Freeboard

Supplemental flotation for gangway as necessary Riprap Over Fabric RR3 or RR4 (as specified by location)

3:16" CA-6

18"

Chamfered Top Frame Corners

18"

MIN. 12" (RR3)

MIN. 16" (RR4)

12" Min.

8' or as Noted

6"

Add Base Aggregate or Mub Slab if Subgrade is

Unsuitable

4' Min. (Face and Sides)

Gangway and dock surfaces to be 1x6 or 2x6 composite or PVC decking

Compacted CA-6 backfill (if excavated)

Typical Dock & Abutment Profile View Not to Scale

1" Minimum Roller All Around

4" MIN. DIA. PIPE

10" x 10" Minimum Bracket

CR5 HEX HD. COATED BOLT,

FLAT WASHERS, LOCK WASHER

& NUT (2 PER CLEAT)

DECKING

METAL FRAMING

DECKING

METAL FRAMING

SIDE ELEVATION END ELEVATION

2'0"

2"

3.5"

#8x1-1/4" STAINLESS STEEL

WAFER HEAD SCREWS OR RING

SHANK NAILS. PLACE 6" ON

CENTERS ON TOP AND 10" ON SIDE

DECKING

METAL FRAMING

VINYL BUMPER

8" MIN THICKNESS

BLACK

METAL FRAMING

TOP OF DECK

RUB RAIL

PLAN VIEW

ELEVATIONSIDE ELEVATION END ELEVATION

CLEAT DETAIL

TRANSFER RAIL DETAIL BUMPER DETAIL

PIPE GUIDE DETAIL

WOOD RUBRAIL

NOTE: SIZES SHOWN ARE MINIMUMS.

ACTUAL PIPE AND BRACKET SIZES

T.B.D. BY CONTRACTOR BASED ON

APPLICABLE DOCK SIZE,

CONFIGURATION, AND LOADING

8" OR 10" GALV. STEEL CLEAT