Attachment 1 - Project Plans~10.pdf
PDF 11 MB Posted
- Solicitation number
- 26-422DNR-REALT-B-52702
- Issued by
- Dekalb County, Illinois
About this file
This file consists of project plans and technical drawings for the Weldon Springs State Park Recreational Trail and Bridge Improvements project, prepared by the Illinois Department of Natural Resources (IDNR) in DeWitt County. The project involves removal and construction of trail improvements and bridge structures within the state park, specifically addressing two main structures: removal of an existing 59-foot by 6-foot washboard structure (Structure 2) with replacement of a new recreational trail stairway with handrails, and removal of an existing 68-foot timber bridge (Structure 3) with construction of a new timber bridge spanning approximately 60 feet. The project includes detailed quantity summaries specifying materials such as 9.9 cubic yards of concrete, 2,050 pounds of reinforcement bars, 67 treated timber board-feet, 88 feet of pipe handrail, 420 tons of stone dumped riprap, and various tree removal and erosion control measures. Construction staging areas, traffic control plans, and access routes are defined within the park's easement boundaries, with all disturbed areas to be seeded, mulched, and fertilized in accordance with Illinois Department of Transportation standards.
The project plans establish benchmark locations and control points using NAD 1983 (2011) coordinates with elevations referenced to NAVD 1988, enabling accurate construction staking and verification. Site superintendent contact information is provided for Charles Montgomery at 4734 Weldon Springs Road, Clinton, Illinois. The design includes detailed specifications for caisson concrete footings, treated timber stringers and joists, structural steel connections, and riprap erosion protection measures. All existing structures are subject to nominal construction variations, with contractor responsibility for verifying dimensions and protecting surrounding vegetation and property during construction. Work areas must remain contained within established easements and park boundaries, with temporary erosion control blankets and seeding required if disturbed areas are exposed for seven days or longer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ipg-active-registered-vendor-disclosure-formerly-forms-b-v-26-1-8-26-2025-1~45.docx | DOCX document | |
| B52702contract-template-v-25-4.docx | DOCX document | |
| vendor-disclosure-formerly-forms-a-v26-2-7-22-2025~22.docx | DOCX document | |
| Attachment 2 - Special Provisions~9.pdf | ||
| B52702invitation-for-bid-vendor-instructions-and-requirements-v26-1.docx | DOCX document | |
| B52702invitation-for-bid-offer-to-the-state-of-illinois.pdf | ||
| Attachment 3 - Bid Form~2.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 100.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
IDNR 3-23-001
O
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
W e ld o n
S
O Q
.d g n F
IL
E
N A
M E
4/9/2026
LTM
LEL
4/8/2026
DEWITTRECREATIONAL TRAIL AND BRIDGE IMPROVEMENTS PROJECT
WELDON SPRINGS STATE PARK
SUMMARY OF QUANTITIES AND GENERAL NOTES
JTC
M
D E
L
QUANTITY
SUMMARY OF QUANTITIES
PAY ITEM DESCRIPTIONCODE NO. UNIT
SPECIAL PROVISION ITEM
1REMOVAL OF EXISTING STRUCTURES NO. 2 EACH
1REMOVAL OF EXISTING STRUCTURES NO. 3 EACH
9.9CU YD
2050POUNDREINFORCEMENT BARS
67100100 MOBILIZATION L SUM 1
NR105001 CONSTRUCTION STAKING L SUM 1
50100400
50100500
50300225 CONCRETE STRUCTURES
50800105
420101100 TREE TRUNK PROTECTION EACH
CONDITIONS AS DIRECTED BY THE ENGINEER.
LAYOUT OF STONE DUMPED RIPRAP MAY BE VARIED IN THE FIELD TO SUIT GROUND 8.
QUANTITY ACTUALLY FURNISHED AT THE UNIT PRICE BID FOR THE WORK.
ADDITIONAL COMPENSATION. HOWEVER, THE CONTRACTOR WILL BE PAID FOR THE
OR ORDERING OF MATERIALS. SUCH VARIATIONS SHALL NOT BE CAUSE FOR
FIELD AND MAKE NECESSARY APPROVED ADJUSTMENTS PRIOR TO CONSTRUCTION
CONTRACTOR IS RESPONSIBLE TO VERIFY SUCH DIMENSIONS AND DETAILS IN THE
STRUCTURES ARE SUBJECT TO NOMINAL CONSTRUCTION VARIATIONS. THE
TAKEN FROM EXISTING PLANS AND/OR PAST SURVEYS AND REPORTS. THE EXISTING
PLAN DIMENSIONS AND DETAILS RELATIVE TO THE EXISTING STRUCTURES HAVE BEEN 7.
THE CONTRACT.
MATERIAL SHALL BE APPROVED BY THE ENGINEER. THE COST SHALL BE INCLUDED IN
CONSTRUCTION FENCE, OR IN THE CASE OF CAISSONS COVERED. THE FENCE
ALL OPEN EXCAVATIONS ARE TO BE SURROUNDED WITH A FOUR FOOT HIGH 6.
CORRECTED AT NO ADDITIONAL COST TO THE DEPARTMENT.
STRUCTURES. ANY DAMAGES CAUSED BY THE CONSTRUCTION ACTIVITY SHALL BE
THE CONTRACTOR SHALL TAKE DUE CARE WHILE EXCAVATING NEAR EXISTING 5.
OR WORK LIMITS INDICATED ON THE PLANS.
ALL CONSTRUCTION OPERATIONS SHALL BE CONTAINED WITHIN THE EASEMENT AREA 4.
DEPARTMENT.
DESTROYED DUE TO CONSTRUCTION OPERATIONS AT NO ADDITIONAL COST TO THE
INCLUDING ACCESS ROADS AND PARKING AREAS, WHICH MAY BE DAMAGED OR
107.20 OF THE STANDARD SPECIFICATIONS, ANY PRIVATE OR PUBLIC PROPERTY,
THE CONTRACTOR SHALL PROTECT AND RESTORE IN ACCORDANCE WITH ARTICLE 3.
ADDITIONAL COST TO THE DEPARTMENT.
OF ALL HAUL ROADS, TRAILS, ACCESS ROUTES AND PARKING AREAS SHALL BE AT NO
THE LOCATION, MAINTENANCE, REMOVAL AND RESTORATION TO ORIGINAL CONDITION 2.
COORDINATES ARE NAD 1983 (2011).
ALL ELEVATIONS REFER TO NAVD (NORTH AMERICAN VERTICAL DATUM) 1988. ALL 1.
GENERAL NOTES
NR509020 PIPE HANDRAIL, SPECIAL FOOT 88
50700105 TREATED TIMBER F.B.M. 3995
TREATMENT OF THE DISTURBED LAND SHALL BE MADE BY THE ENGINEER.
ACRES OR LESS OF LAND. FINAL DECISION ON WHAT IS DISTURBED AND PROPER
4. FOR THE PURPOSES OF BIDDING, THE DISTURBED AREA IS EXPECTED TO BE 0.25
MESH WILL BE ALLOWED.
WITH A 100% BIODEGRADABLE WOVEN NATURAL ORGANIC FIBER NET. NO PLASTIC
3. THE EROSION CONTROL BLANKET SHALL BE SUITABLE FOR SLOPE APPLICATION
FERTILIZED, AND COVERED WITH MULCH, METHOD 1.
2. ALL DISTURBED AREAS SHALL BE SEEDED WITH CLASS 4A SEED MIXTURE,
NUTRIENTS SHALL BE INCLUDED IN THE COST OF OTHER PAY ITEMS.
251.07 SHALL NOT APPLY. THE COSTS FOR SEED, MULCH, AND FERTILIZER
OF THE IDOT STANDARD SPECIFICATIONS. ARTICLES 250.09, 250.10, 251.06, AND
MULCHED, AND FERTILIZED IN ACCORDANCE WITH SECTION 250 AND SECTION 251
ALL DISTURBED AREAS CAPABLE OF GROWING GRASS SHALL BE SEEDED, 1.
PERMANENTLY SEEDED AREA NOTES:
OFFICE OF REALITY AND CAPITAL PLANNING
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
7020100210 TREE REMOVAL (OVER 15 UNITS DIAMETER) UNIT
2320100110 TREE REMOVAL (6 TO 15 UNITS DIAMETER) UNIT
85PERIMETER EROSION BARRIER FOOT28000400
56FILTER FABRIC SQ YD28200200
20STONE DUMPED RIPRAP, CLASS A3 TON28100805
770FURNISHING AND ERECTING STRUCTURAL STEEL POUND50500405
NR704001 TRAFFIC CONTROL AND PROTECTION, SPECIAL L SUM 1*
EMAIL: CHARLES.D.MONTGOMERY@ILLINOIS.GOV
PHONE: 217-935-2644 CELL: 217-799-2165
CLINTON, IL 61727
4734 WELDON SPRINGS ROAD
CHARLES MONTGOMERY
SITE SUPERINTENDENT CONTACT INFORMATION IS AS BELOW:
COORDINATION6.
MULCHED AND DEBRIS REMOVED.
WORK AREAS AND ALL AFFECTED AREAS SHALL BE FINISH GRADED, SEEDED,
CLEAN-UP5.
ENGINEER.
ACCORDING TO IDOT REGULATIONS OR OTHER MEANS AS APPROVED BY THE
IN WORK AREAS, INSTALL TREE TRUNK PROTECTION AROUND DESIGNATED TREES
COST TO THE DEPARTMENT.
ANY RUTTING OR OTHER DAMAGE MUST BE PROMPTLY REPAIRED AT NO ADDITIONAL
ESTABLISHED PATHS OR ACCESS PATHS APPROVED BY THE ENGINEER.
LIGHT-WEIGHT WIDE-TIRE VEHICLES SUCH AS ATV'S. VEHICLES MUST STAY ON
WITHIN THE PARK: TRANSPORT MATERIALS, EQUIPMENT AND WORKERS ONLY WITH
SITE TRANSPORT4.
COST TO THE DEPARTMENT.
FOR 7 DAYS OR LONGER. TEMPORARY SEEDING AND BLANKET ARE NO ADDITIONAL
TEMPORARY SEEDING OVER DISTURBED AREAS IF THE AREAS ARE LEFT EXPOSED
CONTRACTOR SHALL PROVIDE TEMPORARY EROSION CONTROL BLANKET AND
EROSION CONTROL3.
OR WITHIN THE SITE AT LOCATIONS APPROVED BY THE ENGINEER.
STORAGE OF EQUIPMENT AND MATERIALS IS TO BE LOCATED EITHER OFF THE SITE,
STAGING2.
EXISTING STRUCTURE TO BE REMOVED.
CROSSINGS AND RESTORE THE CREEK SHALL BE INCLUDED IN THE COST OF THE
SIDES OF THE CREEK. THE COST TO CONSTRUCT, MAINTAIN, REMOVE CREEK
CREEK CROSSINGS AT THE CONSTRUCTION SITE IS REQUIRED TO ACCESS BOTH
THE ACCESS ROUTES PROVIDED ARE WITHIN THE PARK AND PUBLIC RIGHT-OF-WAY.
ACCESS1.
HAVE SPECIAL REQUIREMENTS AND LIMITATIONS THAT INCLUDE:
STAIRWAY WITHIN THE WELDON SPRINGS STATE PARK. OPERATIONS WITHIN THE PARK
THIS PROJECT INVOLVES REMOVAL AND CONSTRUCTION OF TRAIL BRIDGE AND A
NOTES
CP #1
BALLARD IN ROAD
MAINTENANCE ROAD
END OF CULVERT
BM#1
12.73'
27.44'
BM#7
CP #3
6" ELM
ROAD
MAINTENANCE
WALNUT
10"
CP #6
14.66'
4" TREE
10.56'
LOT
PARKING
CORNER
NORTHWEST
POST
LATCH
GATE
CP #7
2.30'
51.80'
POST
SIGN
STOP
11.53'
8.62'
CP #8
4" TREE
10" TREE
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 100.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
W e ld o n
T ie s -B e n c h m a rk s .d g n
F
IL
E N
A M
LEL
LTM
CONTROL TIES AND BENCH MARKS
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOISM
O
D E
L
E 818332.14
N 1257862.30
ELEVATION = 693.61
20D NAIL IN 10" WALNUT TREE
BENCHMARK #7
E 819288.55
N 1257451.04
ELEVATION = 713.26
PARKING LOT OF "UNION SCHOOL"
CORNER OF PICNIC TABLE PAD 1ST
CHISELED "SQ" SOUTHWEST
BENCHMARK #2
E 818145.61
N 1257655.26
ELEVATION = 713.99
SOUTHWEST CORNER OF LAKE
ROAD FROM PARKING LOT AT
SOUTH SIDE OF ROAD ACROSS THE
CHISELED "X" ON EAST END OF CMP,
BENCHMARK #1
PARK RD
.6
.4
73.18
BENCHMARKS
BENCHMARK #1 (BM#1) BENCHMARK #7 (BM#7)
STRUCTURE 3
STRUCTURE 2
BENCHMARK #2 (BM#2)
CONTROL POINTS
EL 698.11
E 819118.808
N 1257465.693
IRON PIN
CP#8
EL 717.00
E 819194.528
N 1257282.456
IRON PIN
CP#7
EL 715.04
E 819216.578
N 1257437.996
IRON PIN
CP#6
EL 692.45
E 818307.542
N 1257876.989
IRON PIN
CP#3
EL 712.81
E 818196.949
N 1257743.959
RR SPIKE
CP#1
PROVIDE NEW CONTROL POINTS, IF REQUIRED.
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND
2. CONTROL POINTS PROVIDED FOR INFORMATION ONLY. IT IS
ALIGNMENT SURVEYS AND STAKING.
BENCHMARKS SHOULD NOT BE USED FOR HORIZONTAL
TO ASSIST CONTRACTOR IN LOCATING BENCHMARKS.
1. NORTHING AND EASTINGS FOR BENCHMARKS ARE PROVIDED
NOTES
STRUCTURE 3
STRUCTURE #3
#2
STRUCTURE
CORNER CONCRETE PAD
BM#2-SOUTHWEST
STRUCTURE #3
LEGEND
IDNR
TO REMAIN IN PLACE
EXISTING 36' BRIDGE
STRUCTURE #1
BM#4
BM#3
RECREATIONAL TRAIL
STAIRWAY WITH HANDRAILS
STAIRWAY. CONSTRUCT NEW
REMOVE EXISTING 59' X 6' WASHBOARD
STRUCTURE #2
BM#2
TRAIL
ROUTE PROVIDED ALONG EXISTING
ACCESS FROM PARKING LOT
ACCESS #2
BM#1
BM#7
BM#6
BM#5
TO REMAIN IN PLACE
EXISTING 52' BRIDGE
STRUCTURE #4
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 500.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n S h e e ts
\0 W e ld o n E x is ti n g S it e P la n .d g n
F
IL
E N
A M
LTM
EXISTING SITE PLAN
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOISM
O
D E
L
EXISTING STEPS
EXISTING BRIDGE
EXISTING PIPE CULVERT
SITE ACCESS
S T
A T
E P
A R
K R
D
MEADOW VIEW LANE
L O
O K
O U T P
O
IN
T L
A N E
W E L D
O N S
P R
IN
G S L
A K E
STATE PARK RD
W E
L D
O N
S P
R
IN
G S
R D
S P
R
IN
G R
D
LANE
CAMPGROUND
S T A T E P
A R
K R
D
SPRINGS RD
WELDON
PAD
D
LEBO
AT R
D
C O
U N
T Y
R O
A D
TRAIL
ROUTE PROVIDED ALONG EXISTING
ACCESS FROM PARKING LOT
ACCESS #3
TIMBER STRUCTURE
CONSTRUCT NEW
TO BE REMOVED.
EXISTING 68' BRIDGE
STRUCTURE #3
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 200.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-1
W e ld o n
T ra ff ic C o n tr o lP la n -S
.d g n
F
IL
E N
A M
LTM
TRAFFIC CONTROL PLAN - STRUCTURE 2
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOISM
O
D E
STRUCTURE #2
CONTRACTOR STAGING AREA
BARRICADE
R11-2 ON TYPE III
BARRICADE
R11-2 ON TYPE III
TYPE III BARRICADE
TYPE II BARRICADE
SIGN(S) AND SIGN POST
SITE ACCESS
W1-6
ROAD CLOSED
W20-3
W1-6
ROAD CLOSED
W20-3
R9
R9
CAMPGROUND LANE
S T A T E P
A R
K R
O A
D
L O
O K
O U T P
O
IN
T L
A N E
MEADOW VIEW LANE
CLOSED
ROAD
CLOSED
ROAD
0 100 200
SCALE IN FEET
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 200.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-2
W e ld o n
T ra ff ic C o n tr o lP la n -S
.d g n
F
IL
E N
A M
LTM
TRAFFIC CONTROL PLAN - STRUCTURE 3
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOISM
O
D E
STRUCTURE #3
TYPE III BARRICADE
R11-2 ON EACH
TYPE III BARRICADE
R11-2 ON EACH
TYPE III BARRICADE
TYPE II BARRICADE
SIGN(S) AND SIGN POST
SITE ACCESS
R9
R9
S T A T E P
A R
K R
O A
D
STA
TE
PARK R
OAD
STA
TE
P
AR
K
R O
AD
CAMPGROUND LANE
CLOSED
ROAD
CLOSED
ROAD
0 100 200
SCALE IN FEET
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 20.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-3
W e ld o n
T ra ff ic C o n tr o lP la n D e ta il .d g n
F
IL
E N
A M
LTM
TRAFFIC CONTROL PLAN - DETAILS
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOISM
O
D E
TRAFFIC CONTROL NOTES
NUMBER OF SIGNS AND BARRICADES REQUIERED
CLOSED
ROAD
TYPE III BARRICADES
TYPE II BARRICADES
W20-3*
STRUCTURE 2
W1-6
ALL BARRICADES SHALL HAVE A WARNING LIGHT MOUNTED ON TOP OF THE BARRICADE.4.
TRAFFIC CONTROL DEVICES SHALL BE NEW OR LIKE NEW CONDITION.3.
TRAFFIC CONTROL DEVICES SHALL CONFORM TO IDOT STANDARD 701901.2.
LOCATIONS OF TRAFFIC CONTROL DEVICES SHALL BE ACCEPTABLE TO THE ENGINEER. 1.
(DIRECTION AS NEEDED)
W1-6
* MODIFIED TO OMIT DISTANCE
W20-3*
CLOSED
TRAIL
R9 (24"X12")
SIGN OR BARRICADE STRUCTURE 3
R9 (24"X12") 2 2
CLOSED
ROAD
R11-2
R11-2 2 4
ID
N R
0 5
SCALE IN FEET
10 15
NO. 2.
REMOVAL OF EXISTING STRUCTURE
MATERIALS FROM SITE. PAID AS
NEW STEPS. REMOVE ALL
THAT INTERFERES WITH PIERS FOR
STEPS AND REBAR HOLDING STEPS
REMOVE TIMBER WASHBOARD
A
B
B
A
DEWITT 19 9
TOTAL
SHEETS
SHEET
NO.
STATE OF ILLINOIS
OFFICE OF REALITY AND CAPITAL PLANNING
IDNR 3-23-001
RECREATIONAL TRAIL AND BRIDGE IMPROVEMENTS PROJECT
WELCON SPRINGS STATE PARK
EXISTING STRUCTURE 2 - REMOVAL PLANM
O
D E
L
USER NAME =
PLOT SCALE = 10.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O
O w rP ro jI m p l\
P ro je c ts
\W e ld o n S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n S h e e ts
\0 W e ld o n P
P -S tr u c t2
-E x .d g n
F
IL
E N
A M
EXISTING STRUCTURE NO. 2.
REMOVE ALL MATERIALS FROM SITE. PAID AS REMOVAL OF
STEPS THAT INTERFERES WITH PIERS FOR NEW STEPS.
REMOVE TIMBER WASHBOARD STEPS AND REBAR HOLDING
W/STEPPING STONES
WALKING PATH, UNPAVED
EXISTING PROFILE
WALKING PATH, UNPAVED
LOT EDGE
PARKING
WALKING PATH�
TO BE REMOVED AS NEEDED
EXISTING WASHBOARD STAIRWAY,
BOTTOM STEP, EL 693.97
693.86±
WALKING PATH
6" OAK
4" CHERRY
TO BE REMOVED
10" HICKORY
REMOVED
TO BE
24" OAK TREE,
MULTI-6",8" HICKORY
REMOVED
TO BE
20" OAK TREE
4" HACKBERRY
3" HICKORY
3" MAPLE
TO BE REMOVED13" OAK,
26" OAK
5" WALNUT
4" OAK 5" HICKORY
16" WALNUT
POINT TIE 6C N/C
4" HACKBERRY, CONTROL
IRON PIN
EL 715.04
CONTROL POINT 6,
CONCRETE
CORNER
SOUTHWEST
TIE 6B
CONTROL POINT 714.23±
WALKING PATH
TO BE REMOVED
26" OAK TREE,
REMOVED AND REPLACED
TO BE PROTECTED AND OR
CONCRETE STEPPING STONES,
WALKING PATH UNPAVED W/
MULTI-3",5" HICKORY
BARRIER (20')
EROSION
PERIMETER
BARRIER (25')
PERIMETER EROSION
BARRIER (20')
EROSION
PERIMETER
BARRIER (20')
EROSION
PERIMETER
TREE TRUNK PROTECTION
TREE REMOVAL
.3
6"X6" TIMBERS (24±)
WASHBOARD STEPS
55.68'
BILL OF MATERIALS
ITEM UNIT QUANTITY
EACH
EACH
TREE TRUNK PROTECTION
REMOVAL OF EXISTING STRUCTURES NO. 2
UNIT 23TREE REMOVAL (6 TO 15 UNITS DIAMETER)
UNIT 70TREE REMOVAL (OVER 15 UNITS DIAMETER)
FOOT 85PERIMETER EROSION BARRIER
(NO PVC NETTING).
BE SEDIMAX FR OR APROVED EQUAL
PERIMETER EROSION BARRIER SHALL 1.
NOTE:
R
0 5
SCALE IN FEET
10 15
200+00 200+50 201+00
COUNTY
DEWITT 19 10
TOTAL
SHEETS
OFFICE OF REALITY AND CAPITAL PLANNING
IDNR 3-23-001
RECREATIONAL TRAIL AND BRIDGE IMPROVEMENTS PROJECT
WELDON SPRINGS STATE PARK
PROPOSED STRUCTURE 2 - PLAN AND PROFILE
D e f a u lt
M O
D E
USER NAME =
PLOT SCALE = 10.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
W e ld o n
P
P -S tr u c t2
-P r.
d g n F
IL
E
N A
M
715 715
W/STEPPING STONES
WALKING PATH, UNPAVED
EXISTING PROFILE
WALKING PATH, UNPAVED
LOT EDGE
PARKING
WALKING PATH�
IRON PIN
EL 715.04
CONTROL POINT 6,
REMOVED AND REPLACED
TO BE PROTECTED AND OR
CONCRETE STEPPING STONES,
WALKING PATH UNPAVED W/
OVER FILTER FABRIC
8" STONE DUMPED RIPRAP, CLASS A3
OVER FILTER FABRIC
8" STONE DUMPED RIPRAP, CLASS A3
EMBANKMENT (CAISSON EXCAVATION SOIL)
2:1
SECTION A-A
EMBANKMENT
RIPRAP, CLASS A3
8" STONE DUMPED
FABRIC
FILTER
GROUND
EXISTING
FABRIC
FILTER
54'-6" "4 36'-11"2
16'-1"2 17'-3"2
16'-1 6'-5""2
17'-3"2 16'-1"4
36'-9
"4
6'-11"2
6'-1"2
7'-3"2
6'-16'-5""2
7'-3"2
6'-1"4
6'-9
11"
(P2,P5,P7)
CROSS BRACING
8"
8"
LA� P1� P2� P3� P4� P5� P6� P7� UA�
7'-0" LANDING13'-9" 7'-0" LANDING12'-10" 14'±7'-0" LANDING6'-5"
STAIRS SHALL BE CONSTRUCTED AT 7" RISERS AND 11" TREADS.2.
RIPRAP.
SEPARATELY, BUT SHALL BE INCLUDED IN THE COST OF THE
EXCAVATION FOR RIPRAP WILL NOT BE MEASURED AND PAID 1.
NOTE:
BILL OF MATERIALS
ITEM UNIT QUANTITY
TON
SQ YD
STONE DUMPED RIPRAP, CLASS A3
FILTER FABRIC
ABBREVIATIONS
UA= UPPER ABUTMENT
P#= PIER #
LA= LOWER ABUTMENT
SHEET 14
(P1, P4)
SEE DETAIL 3
CU YD
F.B.M.
4.7
CONCRETE STRUCTURES
TREATED TIMBER
POUND 1080REINFORCEMENT BARS
.5 :1
.5 :1
2%
(P2, P5, P7)
SEE DETAIL 2, SHEET 13
7 TREADS14 TREADS15 TREADS
POUND 430FURNISHING AND ERECTING STRUCTURAL STEEL
2:1
FOOT 88PIPE HANDRAIL, SPECIAL
A
A
5'-0"
1'-6"
3.5
3.5
(P2, P5, P7 SHOWN LOOKING UPHILL)
POST BRACING DETAIL
UPPER STAIR ABUTMENT
SECTION B-B
LOWER STAIR ABUTMENT
SECTION A-A
LOWER STAIR ABUTMENT PLAN (LA) UPPER STAIR ABUTMENT PLAN (UA)
P1,P3,P4,P6)
CAISSON 90° FOR
WASHERS (ROTATE
WASHERS, LOCK
Ø BOLTS, NUTS, "8
(2)
CBST44Z (ZMAX) W/
COLUMN BASE,
SIMPSON STRONG-TIE
SLOUGHING OF SOIL. CASING OR SONOTUBE SHALL BE REMOVED.
TEMPORARY CASING OR SONOTUBE IF NECISSARY TO PREVENT
CONCRETE CAISSON FOOTING, 2 AS SHOWN. PROVIDE
SLOUGHING OF SOIL. CASING OR SONOTUBE SHALL BE REMOVED.
TEMPORARY CASING OR SONOTUBE IF NECISSARY TO PREVENT
CONCRETE CAISSON FOOTING, 2 AS SHOWN. PROVIDE
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 2.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-1
W e ld o n
D e ta il -S tr u c t2
-S u p .d g n
F
IL
E N
A M
LEL
PROPOSED STRUCTURE 2 - STAIRS DETAILS 1
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
HANDRAIL
BOTTOM OF
"Ø HOLE IN 4
DRILL
TO 2X6 RAILING
RETURN HANDRAIL
HANDRAIL (A53)
COATED STEEL
"Ø POWDER 4
FILL VOID WITH GROUT
E 819151.033
N 1257467.073
E 819154.936
N 1257473.478
E 819201.473
N 1257445.116
E 819197.570
N 1257438.712
COLOR PER PROJECT MANAGER
POWDER COATED STEEL HANDRAIL
2X6 RAILING
" SS SCREWS2
(2) #10 X 3
SLOUGHING OF SOIL.
NECESSARY TO PREVENT
CASING OR SONOTUBE IF
FOOTING PROVIDE STEEL
CONCRETE CAISSON
LA�
"Ø BOLT THRU STRINGER2
SIDE OF STRINGER,
CHEMICAL ADHESIVE EACH
"Ø STAINLESS STEEL 2
"X3" GALV.4
1 4X4X
UA�
HEADER)
(2X12 "2
" SS SCREWS2
1#10 X 3
END OF DECK JOISTS W/3
2X12 HEADER FASTEN TO
X6 DECK BOARDS4
2X6 WOOD RAILING
2X6 WOOD RAILING
" TOOLED RADIUS4
" CHAMFER4
THRU STRINGER
"Ø BOLT2
1 SIDE OF STRINGER,
CHEMICAL ADHESIVE EACH
"Ø2
1"X3" GALV. 4
1 4X4X
NUTLOCK WASHER &
"Ø GALV. BOLT, WASHERS, 2
A
A
B
B
C C
"=1'-0"2
1SCALE: 1 "=1'-0"2
1SCALE: 1
7'-6"
2'-0"3'-6"2'-0"
"1
2'-0"3'-6"2'-0"
7'-6"
"1
"=1'-0"2
1SCALE: 1 "=1'-0"2
1SCALE: 1
1'-4"�
6"
"2 16'-0
"4 13'-0"4
13'-0
CASING
1'-6"�
B E
L O
W F
IN
IS
H E
D G
R A
D E
T
O P
O F
R A
IL
H
E
IG
H T
V A
R
IE
S
"8 71'-4"8
71'-4"8 71'-4"8
71'-4
H
A N
D R
A
IL
"4
165'-0" CLEARANCE"4
"2 16'-0
6'-4"
"2
"2
"=1'-0"2
1SCALE: 1
2X6 BRACING REQUIRED AT PEIRS 2,5 AND 7.4.
GROUT SHALL COMPLY WITH SECTION 1024 OF THE STANDARD SPECIFICATIONS.3.
COST OF CONCRETE CAISSON.
GROUT WILL NOT BE MEASURED FOR PAYMENT. GROUT SHALL BE INCLUDED IN THE 2.
REBAR WILL BE MEASURED AND PAID AS REINFORCEMENT BARS.
CONCRETE CAISSON SHALL BE MEASURED AND PAID AS CONCRETE STRUCTURES. 1.
NOTES:
C L
2" CL
2" CL
C L
3" CL3" CL
3" CL (MIN)
C L
1'-4"� 1'-4"�
CASING
1'-6"�
CASING
1'-6"�
1'-4"�
CASING
1'-6"�
11"
(1
C A
IS
S
O N
S
(5 t
T
IE
S
P A
C E
S
C L
EXTENSION
1'-0" HANDRAIL
2X12
2%
SEE SHEET 9
7'-0" LANDING
L A
N D
IN
G
EX GR
EX G
R
ABUTMENT�
ABUTMENT�
2X12 STAIR STRINGER
(8) #4 t2 @ 12"
(6) #6 h3, (2 CAISSONS)
WITH STANDARD 90° HOOK
(6) #6 v1
(2 CAISSONS)
(4) #4 t1 TIES @ 10"SLOUGHING OF SOIL.
NECESSARY TO PREVENT
CASING OR SONOTUBE IF
FOOTING PROVIDE STEEL
CONCRETE CAISSON
5/4"X6" DECK BOARDS
POST
4X4 POST
EARTH TRAIL
(1) #6 h3
(8) #4 n @12"
(8) #4 t3 TIES @ 12"
(6) #6 h3, 90° HOOK (2 CAISSONS)
(6) #6 v3 WITH STANDARD
(2 CAISSONS)
(4) #4 t1 TIES @ 10"
2X12 DECK JOISTS
(1) #4 t3 TIE
(6) #6 v2
NUTWASHER &
WASHERS, LOCK
GALV. BOLT,
"Ø 2
1 BLOCKING AND
4X4X0'-6"
ABUTMENT�
FILL VOID WITH GROUT
WITH GROUT
FILL VOID
ABUTMENT�
SEE NOTE 4
2X6 BRACE
NUTWASHER &
WASHERS, LOCK
"Ø GALV. BOLT, 2
SECTION C-C
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 0.1666 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
OFFICE OF REALITY & CAPITAL PROGRAMS
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-2
W e ld o n
D e ta il -S tr u c t2
-S u p .d g n
F
IL
E N
A M
LEL
PROPOSED STRUCTURE 2 - STAIR DETAILS 2
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
#4 t1 TIES #6 v2
FILL VOID WITH GROUT
ELEVATION - RAIL TO POST CONNECTION
B18.22.1)
WASHER (ANSI/ASME
SCREW (A307) &
Ø LAG "2
HOLE AND
"Ø 16
CENTERLINE
"Ø BENT ROD (A36)8
SIDE VIEW - RAIL TO POST CONNECTION
HANDRAIL (A53)
"Ø STD PIPE4
" RADIUS4
Ø X 2" LAG SCREW & WASHER"2
4X4 TIMBER POST
" X 3" (A36)4
PLATE
4X4 TIMBER POST
CENTERLINE POST, HOLE & PLATE
" X 3" (A36)2
" X 24
PLATE
2X6 TOP RAIL
2X6 SIDE RAIL
ROD (A36)
"Ø BENT 8
ELEVATION VIEW - RAIL TO POST CONNECTION
TOP VIEW - RAIL TO POST CONNECTION
" SCREW W/ROLLED THREADS2
#10 X 3
SIDE VIEW - RAIL TO SIDERAIL POST CONNECTION
HANDRAIL (A53)
"Ø STD PIPE4
LAG SCREW & WASHER"2
Ø X 3"2
4X4 TIMBER POST
" X 3" (A36)2
" X 24
PLATE
2X6 TOP RAIL
2X6 SIDE RAIL
" RADIUS4
"Ø BENT ROD (A36)8
" SCREW W/ROLLED THREADS2
#10 X 3
ELEVATION VIEW - RAIL SPLICE CONNECTION
4X4 POST
4X4 POST
2X6 TOP RAIL
2X6 SIDE RAIL
4X4 POST
" SCREW (4 AS SHOWN)2
#10 X 3
2X6 RAIL
BAR NO. LENGTH SHAPESIZE
2 ABUTMENTS (UPPER AND LOWER) & 7 PIERS
7'-2"
2'-4"
3'-10"
4'-5"
3'-7" h3 n t1 v1 v2
BAR LIST
BAR t1
10"
BAR DETAILS
DEPARTMENT.
SPECIFICATIONS AT NO ADDITIONAL COST TO THE
ACCORDANCE WITH ARTICLE 502.10 OF THE STANDARD
BACKFILL EXCAVATED AREAS FOR ABUTMENTS IN 1.
NOTES:
1'-6"� CASING
3" CL
1'-0" v
BAR v1
1'-4"�
SCALE: 1"=1"
"2 11"2
3"Ø
"Ø
"=1"2
1SCALE:
PIERS 2, 5, 7
" CL2
"2
BE POWDER COATED TO MATCH RAILING PANELS.
HANDRAIL, BENT ROD, PLATE AND LAG SCREW SHALL
NOTE:
"2
1"
"2
1"
"2
'-3
12"
BAR t3
BAR t2
"2
4'-1"t2 8 4
1"
1"
"=1"2
1SCALE:
PIERS 1,3,4,6 AND LA
" CL2
2"
1" 1" v t3 t2
5'-1"t3 8 4
4'-11"v3 12 6
INTERIOR STRINGER CONNECTION
DETAIL 2 - STAIR TO LANDING
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 0.6670 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\0
-3
W e ld o n
D e ta il -S tr u c t2
-S u p .d g n
F
IL
E N
A M
LEL
PROPOSED STRUCTURE 2 - STAIR DETAILS 3
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
2X12X6'-4"
" HOLE16
WASHER (GALV),
"Ø BOLT, NUT, LOCK WASHER & 2
OF INTERIOR 2X12 JOIST
6" EACH SIDEX4
1 3X3XX6 DECK BOARDS4
ALUMINUM SCREWS 1'-0" CTS MAX.
" LONG 4
3 ATTACH TO STAIR TREADS WITH
HOLES, 1" LIP X 3" DEPTH X 5'-0" LONG.
SURFACE AND PREDRILLED COUNTERSUNK
ALUMINUM STAIR NOSING WITH NON-SLIP
4X4 POST
EXTERIOR STRINGER CONNECTION
DETAIL 2 - STAIR TO LANDING
2X12X6'-4"
EACH LEG OF ANGLE ALL ANGLES
" HOLE 16
9& WASHER (GALV),
"Ø BOLT, NUT, LOCK WASHER 2
1 �
OF EXTERIOR 2X12
6" EACH SIDEX4
1 3X3X
PIER�X6 DECK BOARDS4
2X12X6'-4"
X6 DECK BOARDS4
ALUMINUM SCREWS 1'-0" CTS MAX.
" LONG 4
3 ATTACH TO STAIR TREADS WITH
HOLES, 1" LIP X 3" DEPTH X 5'-0" LONG.
SURFACE AND PREDRILLED COUNTERSUNK
ALUMINUM STAIR NOSING WITH NON-SLIP
"Ø HOLE16
9"Ø BOLT, NUT, LOCK WASHER & WASHER (GALV),2
1 �
"Ø HOLE16
9"Ø BOLT, NUT, LOCK WASHER & WASHER (GALV),2
1 �
INTERIOR STRINGER CONNECTION
DETAIL 1 - STAIR TO LANDING
EXTERIOR STRINGER CONNECTION
DETAIL 1 - STAIR TO LANDING
"Ø HOLE16
9(GALV),
"Ø BOLT, NUT & WASHER 2
1 �
" SS SCREW, 1 EACH INTERIOR CONNECTION2
1#8 X 2
EACH SIDE OF INTERIOR 2X12
GAGE, "4
31'-2" (GALV) 1X4
1 3X3X
2X12X6'-4"
PIER�
X6 DECK BOARDS4
"Ø HOLE16
9"Ø BOLT, NUT, LOCK WASHER & WASHER (GALV),2
1 �
"Ø HOLE16
9"Ø BOLT, NUT, LOCK WASHER & WASHER (GALV),2
1 �
SIDE OF EXTERIOR 2X12
6" (GALV) EACH X4
1 3X3X
EXTERIOR JOIST
" SS SCREW, 2 EACH 2
1#8 X 2
EXTERIOR 2X12
GAGE, "4
31'-2" (GALV) 1X4
1 3X3X
INTERIOR 2X12 STRINGER
6" EACH SIDE OF X4
1 3X3X
OF INTERIOR 2X12 JOIST
6" (GALV) EACH SIDE X4
1 3X3X
4X4 HANDRAIL POST
INTERIOR STRINGER
" SS SCREW, 1 EACH 2
1#8 X 2
PIER�
PIER�
" SS SCREW, 1 EACH INTERIOR STRINGER2
1#8 X 2
STRINGER
2 EACH EXTERIOR
" SS SCREW, 2
1#8 X 2
EXTERIOR 2X12 STRINGER
6" EACH SIDE OF X4
1 3X3X
EXTERIOR STRINGER
" SS SCREW, 2 EACH 2
1#8 X 2
LOCK WASHER & WASHER (GALV)
BOLT, NUT, "Ø 2
1JOIST WITH (2)
6" (GALV) OTHER SIDE OF X4
1 3X3X 4X4 POST
"4 11"4
JOIST
2X12
"4 11 "4
STRINGER
2X12
"4
"4 11"4
JOIST
2X12
"4 11 "4
STRINGER
2X12
"4
"2
"2
"4
JOIST
2X12
"4
"2
STRINGER
2X12
"4
"4
JOIST
2X12
"2
" STRINGER
2X12"4
"Ø HOLE16
9& WASHER (GALV),
"Ø BOLT, NUT, LOCK WASHER 2
1 �
SEE PROFILE SHEET 9
7'-0" LANDING
LANDING EL 702.67
LANDING EL 710.83
LANDING EL 714.92
LANDING EL 702.67
LANDING EL 710.83
SEE PROFILE SHEET 9
7'-0" LANDING
R
IS
E
11" TREAD
SEE PROFILE SHEET 9
7'-0" LANDING
LANDING EL 702.67
LANDING EL 710.83
LANDING EL 714.92
LANDING EL 702.67
LANDING EL 710.83
SEE PROFILE SHEET 9
7'-0" LANDING
(PIERS 1 AND 4)
DETAIL 3 - EXTERIOR STRINGER SUPPORT DETAIL
4X4 POST
OF STRINGER
2X12 BEAM. CUT TOP AT ANGLE
2X12 STAIR STRINGER
4X4 POST
WASHER & WASHER
"Ø GALV. BOLT, NUT, LOCK 2
(3)
STRINGER TO POST
CONNECT EXTERIOR
LOCK WASHER & WASHER
Ø GALV. BOLT, NUT, "2
(2)
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 1.3340 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n S h e e ts
\1 B
W e ld o n D e ta il -S tr u c t2
-S u p .d g n
F
IL
E N
A M
LEL
PROPOSED STRUCTURE 2 - STAIR DETAILS 4
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
OF STRINGER
2X12 BEAM. CUT TOP AT ANGLE
2X12 STAIR STRINGER
PIER�
(PIERS 1 AND 4)
DETAIL 3 - INTERIOR STRINGER SUPPORT DETAIL
" GAGE4
3X1'-2" (GALV) 14
1 3X3X
WASHER & WASHER
"Ø GALV. BOLT, NUT, LOCK 2
1(4)
" GAGE4
3X1'-6" (GALV) 14
1 3X3X
"4
6'-11"2
6'-1"2
7'-3"2
6'-16'-5""2
7'-3"2
6'-1"4
6'-9
54'-6"
"=1'-0"2
1SCALE: 1
"=1'-0"2
1SCALE: 1
R
A
B
0 5
SCALE IN FEET
10 15
B
A
LEGEND
COUNTY
DEWITT 19 15
TOTAL
SHEETS
OFFICE OF REALITY AND CAPITAL PLANNING
IDNR 3-23-001
RECREATIONAL TRAIL AND BRIDGE IMPROVEMENTS PROJECT
WELDON SPRINGS STATE PARK
EXISTING STRUCTURE 3 - REMOVAL PLAN
D e f a u lt
M O
D E
USER NAME =
PLOT SCALE = 10.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O
O w rP ro jI m p l\
P ro je c ts
\W e ld o n S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n S h e e ts
\1 W e ld o n P
P -S tr u c t3
-E x .d g n
F
IL
E N
A M
7" OAK
IRON PIN
CONTROL POINT 3, EL 692.45
BRIDGE DECK 695.22
20" OAK
24" COTTON WOOD
LOW TIMBER 694.58
PIER
BRIDGE DECK 695.25
PIER
BRIDGE DECK 694.99
LOW TIMBER 694.34
5" OAK
7" ELM
4" OAK
BRIDGE DECK 695.00
6" ELM
6" OAK
8" OAK
BRIDGE DECK 695.15
BRIDGE DECK 695.09
WALKING PATH, UNPAVED
WATER EDGE
WATER EDGE
LOW GROUND 691.00|
LOW TIMBER 694.34|
12" WALNUT
6" ELM
CONTROL POINT TIE 3B
6" ELM
BRIDGE DECK 695.49
695.24
BRIDGE DECK
PIER
PIER
10" OAK
BRIDGE DECK 695.18
LOW TIMBER 694.62
LOW GROUND 691.70
13" OAK
695.04
WALKING PATH
694.14
WALKING PATH
UNPAVED
WALKING PATH,
REMOVE ALL MATERIALS FROM SITE.
ABUTMENTS, SUPERSTRUCTURE, ETC..
CONCRETE FOOTINGS, SUB-STRUCTURE,
REMOVE ENTIRE TIMBER BRIDGE INCLUDING
REMOVAL OF EXISTING STRUCTURES NO. 03.
TREE TRUNK PROTECTION
REMOVAL OF EXISTING STRUCTURES NO. 3
5'-0"
BILL OF MATERIALS
ITEM UNIT QUANTITY
EACH
EACH
TREE TRUNK PROTECTION
REMOVAL OF EXISTING STRUCTURES NO. 3
9 6
WALKING PATH, UNPAVED
EXISTING GROUND
NR
ELEVATION
PLAN
EL 691.1
EXISTING STREAMBED
2X10X12'-0" STRINGER (TYP)
2X6 BRACING (TYP)
EXISTING STREAMBED, EL 691.9
4X4 POST (TYP)
2X10X 12'-0" STRINGER (TYP)
2X10X 5'-10" JOIST (TYP)
EXISTING GROUND
ELEVATION SECTION A-A
2X12 X 5'-10" JOIST (TYP)
EL 696.50
TOP OF DECK
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 10.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\1
W e ld o n
D e ta il -S tr u c t3
-G e n e ra l- T im b e r.
d g n F
IL
E
N A
M
LEL
PROPOSED STRUCTURE 3 - GENERAL PLAN AND ELEVATION, TIMBER BRIDGE
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
(P3 & P7)
(TYP)
BRACING
2X6
E. 818287.809
N. 1257848.573
BACK OF ABUTMENT
BRIDGE�E. 818282.201
N. 1257914.794
BRIDGE�
EL 696.50
TOP OF DECK
SHEET 18
SEE DETAIL 5
OVER FILTER FABRIC
8" STONE DUMPED RIPRAP CLASS A3
FILTER FABRIC
RIPRAP CLASS A3 OVER
8" STONE DUMPED
EMBANKMENT (CAISSON EXCAVATION SOIL)
2:1
SHEET 18
SEE DETAIL 8
SHEET 18
SEE DETAIL 9
OVER FILTER FABRIC
RIPRAP CLASS A3
8" STONE DUMPED
SECTION B-B
EMBANKMENT
RIPRAP, CLASS A3
8" STONE DUMPED
FABRIC
FILTER
GROUND
EXISTING
FABRIC
FILTER
A
A
CAISSON
CONCRETE
1'-6"Ø
5'-0"
10'-0"
12 SPA @ 5'-0" = 60'-0""2
15'-6 8'-6"
12 SPA @ 5'-0" = 60'-0"
"2 15'-6
"2 15'-6
F L
O W
F L
O W
BILL OF MATERIALS
ITEM UNIT QUANTITY
4X4� 4X4�
P2�
CU YD
F.B.M.
POUND
5.2
CONCRETE STRUCTURES
TREATED TIMBER
REINFORCEMENT BARS
PAID SEPARATELY. THE COST SHALL BE INCLUDED IN TREATED TIMBER.
THE COST OF ALL HARDWARE INCLUDING ANCHOR BOLTS SHALL NOT BE 1.
NOTES:
2%
P1
P2 P3
P4 P5 P6
P7
ABUTMENT
EAST
PIER� PIER�
4X4 POST�
POUND 340FURNISHING AND ERECTING STRUCTURAL STEEL
TON 10STONE DUMPED RIPRAP, CLASS A3
SY 28FILTER FABRIC
.5 :1
.5 :1
2:1
SEE SHEET 18
2:1
B
B
5'-0"
1'-6"
3.5
3.5
POST BRACING DETAIL (PIERS 3 & 7)
SECTION C-C
ELEVATION - BRACE DETAIL
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 2.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n S h e e ts
\1 W e ld o n D e ta il -S tr u c t3
-S u p -T im b e r.
d g n
F
IL
E N
A M
LEL
PROPOSED STRUCTURE 3 - TIMBER BRIDGE DETAILS 1
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
EACH SIDE OF BRIDGE
2X6 BRACE 2X12 JOIST
2X10 STRINGER
WASHER
WASHER, LOCK
DIA GALV BOLT, NUT,
" 8
4X4 BLOCKING W/
WASHER AND NUT (GALV)
BOLT, WASHERS, LOCK
"Ø8
BLOCKING AND
(PIERS 3 & 7)
2X6 BRACE
BOARDS
DECK
P4,P5,P6)
CAISSON 90° FOR
WASHERS (ROTATE
WASHERS, LOCK
Ø BOLTS, NUTS, "8
(2)
CBST44Z (ZMAX) W/
COLUMN BASE,
SIMPSON STRONG-TIE
FINISHED GRADE
SEE DETAIL 1
X 1'-2" (GALV)4
3X3X
X 6 DECK BOARD4
2X10 STRINGERS
" SCREW2
SS #8 X 2
2X12 JOIST
DETAIL 1 - INTERIOR JOIST TO STRINGER CONNECTION
"� HOLE)16
9WASHER (
"� BOLT, NUT, & 2
1 �
DECK BOARDS
X 6 4
AS SHOWN
EACH SIDE OF SPLICE
" SS SCREWS 2
1(2) #10 X 3
" SS SCREWS 2
1(2) #10 X 3
" GAGE EACH LEG)4
3(1
X 1'-2"4 1 3X3X v2 AS SHOWN
WASHERS, LOCK WASHER.
"Ø GALV BOLT, NUT, 8
WASHER.
WASHERS, LOCK
"Ø GALV BOLT, NUT, 8
C C
10'-0"
5'-0"
5'-10"
"2 15'-6
5'-0" CLEAR
T
O P
O F
R A
IL
H
E
IG
H T
V A
R
IE
S
"4 12'-9"4
12'-9
"2 15'-6
1'-8"1'-8"1'-8"
"=1'-0"2
1SCALE:
BAR NO. LENGTH SHAPESIZE
1 ABUTMENT (EAST) & 16 CAISSON
6'-1"
4'-5" s1 t1
BAR LIST
BAR s1
DEPARTMENT.
502.10 OF THE STANDARD SPECIFICATIONS AT NO ADDITIONAL COST TO THE
BACKFILL EXCAVATED AREAS FOR ABUTMENTS IN ACCORDANCE WITH ARTICLE 1.
NOTES:
1'-0"
BAR DETAILS
M
IN
B E
L O
W F
IN
IS
H E
D G
R A
D E
(1
C A
IS
S
O N
S
(5 t
T
IE
S
P A
C E
S
C L
C L
3" CL
CASING
1'-8"�
1'-6"� 1'-6"�
CASING
1'-8"�
EL 696.50
TOP OF DECK
"2 11"2
CAISSON & 4X4 POST� CAISSON & 4X4 POST�
4X4� 4X4� 4X4�
"4 11"4
SCALE: 1"=1'-0"
SPLICE RAIL EVERY OTHER POST.
NOTE:
"2
1'-0"
1'- 3"
BAR t1 BAR v1
1'-0"
6'-8"h3 7 6
5'-6"v1 12 6
2'-8"n 7 4
P5 P6
EL 696.50
TOP OF DECK
3'-7"v2 84 6
6'-8"h2 2 6
1'-0"h1 7 6
2X6 TOP RAIL (TYP)
2X6 RAIL (TYP)
4x4 POST
(TYP)
STRINGER
2X10
2X12 JOIST (TYP)
(1) #4 t3 TIE
(6) #6 v2
WITH GROUT
FILL VOID
NON-SLIP STAIR NOSING
2X12 STAIR STRINGER
5/4X6 DECK BOARDS
SCREWS @ 12"
" LONG GALV. 4
TREADS WITH
LONG. ATTACH TO STAIR
HOLES, 1" LIP X 3" DEPTH X 5'-0"
PREDRILLED COUNTERSUNK
NON-SLIP SURFACE AND
ALUMINUM STAIR NOSING WITH
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 1.3340 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\1
B
W e ld o n
D e ta il -S tr u c t3
-S u p -T im b e r.
d g n F
IL
E
N A
M
LEL
PROPOSED STRUCTURE 3 - TIMBER BRIDGE DETAILS 2
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
STAIR STRINGER TO BRIDGE CONNECTION
(BRIDGE)
2X10 HEADER
CONNECT JOISTS TO POST
� GALV. BOLTS TO 2
1(2)
4X4 POST
4X4 POST
STRINGER
2X12 STAIR
2X6 RAIL (BRIDGE)
X 6 DECK BOARD (BRIDGE)4
EXISTING GROUND
PLAN VIEW
STAIR STRINGER CONCRETE FOUNDATION
STRINGER
2X12 STAIR
4X4 POST
FOUNDATION
STRINGER TO CONCRETE
" � GALV. BOLTS CONNECT 2
TO POST
CONNECT STRINGER
" � GALV. BOLTS 2
ELEVATION VIEW
STAIR STRINGER CONCRETE FOUNDATION
#6 h2
#6 h1
#5 h2
(2) #6 h2
EXISTING GROUND
EL 694.67
TOP OF CONCRETE
WASHER, LOCK WASHER
� GALV BOLT, NUT, 2
1 (2)
ALL FOUR SIDES
" TOOLED RADIUS 4
" SS SCREW, 2 EACH INTERIOR STRINGER2
1#8 X 2
EL 694.67
TOP OF CONCRETE
EXISTING GROUND
COMPACT SUBGRADE
EACH STRIGNER AS SHOWN
"Ø CHEMICAL ADHESIVE (4" MIN EMBED) 2
" Ø HOLE)16
9GAGE FOR
" 4
3OF EACH STRINGER. (1
X3" LONG EACH SIDE 4
1 3X3X
DETAIL 5 - PARTIAL PLAN FOR RAIL POST BLOCKING
SPACE)"2
1JOINT @ 3
" SS SCREW (2 EACH 2
1#10 X 3
2 X 10 STRINGER
2 X 10 STRINGER
2 X 10 X 0'-6" SHIM (6 LOCATIONS)
WASHERS AND LOCK WASHER (GALV) (4" SPACE)
"Ø BOLT, NUT, 2
1 4X4 RAIL POST AND (2)�
STRINGER (12 LOCATIONS)
" IN CENTER OF 2X10 2
12X6X 1'-6
NUTS, WASHERS, LOCK WASHERS
"Ø BOLTS, 8
5CBST44Z (ZMAX) W/(2)
SIMPSON STRONG-TIE COLUMN BASE,
RIPRAP, CLASS A3
8" STONE DUMPED
FILTER FABRIC
EMBANKMENT
CLASS A3
RIPRAP,
DUMPED
8" STONE
FILTER FABRIC
AS SHOWN
" SS SCREW2
1#8 X 2
" SS SCREW2
1#10 X 3
X 6" EACH SIDE OF EACH STRINGER4
1 3X3X
INTERIOR STAIR STRINGER TO BRIDGE CONNECTION
STRINGER
2X12 STAIR
4X4 �
OF EACH STRINGER
X 6" EACH SIDE 4
1 3X3X
" CL2
STRINGER CONNECTION
DETAIL 9 - INTERIOR
2X12X6'-4"
HOLE
" 16
9WASHER (GALV),
LOCK WASHER &
"Ø BOLT, NUT, 2
1 �
OF INTERIOR 2X12 JOIST
6" EACH SIDEX4
1 3X3X
4X4 POST
STRINGER CONNECTION
DETAIL 8 - EXTERIOR
2X12X6'-4"
OF ANGLE ALL ANGLES
" HOLE EACH LEG 16
9(GALV),
WASHER & WASHER
"Ø BOLT, NUT, LOCK 2
1 �
EXTERIOR 2X12
EACH SIDE OF
6" X4
1 3X3X
PIER�
PIER�
1'-0" HANDRAIL EXTENSION
"=1'-0"2
1SCALE: 1
3"
"=1'-0"2
1SCALE: 1
11"11"
1'-4"
7'-0"
"4 38"2
15'-6"4
"2 12"2
11'-8"4 110"4
110"2 11'-8"2
7'-0"
6"(7) #6 h1 @ 12"6"
EL 696.50
TOP OF DECK
4:1
FIN G
R
"2
FIN
GR 2
:1
FIN
GR 2
:1
6"6"
2X6� 2X6�
"4 11"4
JOIST
2X12
"4
"4 11"4
JOIST
2X12
"4
ELEVATION - EAST ABUTMENT
ABUTMENT
SECTION B-B
PLAN - EAST ABUTMENT
SLOUGHING OF SOIL. CASING OR SONOTUBE SHALL BE REMOVED.
TEMPORARY CASING OR SONOTUBE IF NECISSARY TO PREVENT
CONCRETE CAISSON FOOTING, 2 AS SHOWN. PROVIDE
COUNTY
TOTAL
SHEETS
SHEET
NO.
USER NAME =
PLOT SCALE = 2.0000 ' / in.
PLOT DATE = DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
O w rP ro jI m p l\
P ro je c ts
\W e ld o n
S p ri n g s T ra il
B ri d g e s \C
A D
D \P la n
S h e e ts
\1
C
W e ld o n
D e ta il -S tr u c t3
-S u p -T im b e r.
d g n F
IL
E
N A
M
LEL
PROPOSED STRUCTURE 3 - EAST ABUTMENT DETAILS
JTC
IDNR 3-23-001
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
STATE OF ILLINOIS
S H
E E
T P
L A
N N e w
M O
D E
E 818291.297
N 1257848.868
E 818284.322
N 1257848.278
(2 PER RAIL)
" SS SCREWS2
#10 X 3
SLOUGHING OF SOIL.
NECESSARY TO PREVENT
CASING OR SONOTUBE IF
FOOTING PROVIDE STEEL
CONCRETE CAISSON
� CAISSON
" (2X10X 5'-10" HEADER)2
" SS SCREWS2
1W/3 #10 X 3
END OF DECK STRINGERS
2X10 HEADER FASTEN TO
DECK BOARDS
" SPCE BETWEEN 2
X6 DECK BOARDS4
2X6 WOOD RAILING
BOARDS
DECK
2X10 STRINGER
" SS SCREWS2
1(2) #10 X 3
" CHAMFER4
" CHAMFER EACH SIDE OF ABUTMENT4
EACH SIDE AS SHOWN
X3" (GALV)4
1 4X4X
" CHAMFER4
" CHAMFER EACH 4
BOLT THRU STRINGER
"Ø 2
1SIDE OF STRINGER AND
CHEMICAL ADHESIVE EACH
"Ø 2
1 "X3" GALV. W/4
1 4X4X
"Ø HOLE W/3" GAGE EACH LEG)16
9(
X3" (GALV) EACH STRINGER EACH SIDE AS SHOWN 4
1 4X4X
8" STONE DUMPED RIPRAP, CLASS A3
FILTER FABRIC
RIPRAP, CLASS A3
8" STONE DUMPED
FILTER FABRIC
(6) #6 h3, B
B
"=1'-0"2
1SCALE:
7'-0"
"=1'-0"2
1SCALE:
1'-6"�
6"
"=1'-0"2
1SCALE:
" SPACE BETWEEN DECK BOARDS.2
1 PROVIDE5.
SPECIFICATIONS.
GROUT SHALL COMPLY WITH SECTION 1024 OF THE STANDARD 4.
INCLUDED IN THE COST OF CONCRETE CAISSON.
GROUT WILL NOT BE MEASURED FOR PAYMENT. GROUT SHALL BE 3.
BE INCLUDED IN OTHER PAY ITEMS.
EXCAVATION WILL NOT BE PAID FOR SEPARATELY. THE COST SHALL 2.
REINFORCEMENT BARS.
STRUCTURES. REBAR WILL BE MEASURED AND PAID AS
CONCRETE CAISSON SHALL BE MEASURED AND PAID AS CONCRETE 1.
NOTES:
2" CL
C L
3" CL
CASING
1'-8"�
5'-10"
"2 15'-6
5'-0" CLEAR
T
O P
O F
R A
IL
1'-8"10"10"1'-8"
EL 696.50
TOP OF DECK
"2 11"2
2'-0"3'-0"2'-0"
"2 15'-6
CAISSON� CAISSON�
BRIDGE�
1'-6"1'-6"
2%
3"
FIN
GR 3.
5:1
FIN GR 3.5:1
CAISSON� CAISSON�
E 818287.809
N 1257848.573
4X4 POST
FINISHED EARTH TRAIL
(1) #6 h3
(7) #4 n
(7) #4 s1 TIES @ 12"
90° HOOK (2 CAISSONS)
(6) #6 v1 WITH STANDARD
(2 CAISSONS)
(4) #4 t1 TIES @ 10"
2X10 DECK STRINGER
ABUTMENT�
FILL VOID WITH GROUT
2X6 TOP RAIL (TYP)
2X6 RAIL (TYP)
4x4 POST
(TYP)
STRINGER
2X10
EXISTING GROUND
EXISTING GROUND
5" MIN EMBED (2 PER STRINGER AS SHOWN)
"Ø SS CHEMICAL ADHESIVE2
" TOOLED RADIUS4
| 01_Weldon_CoverSheet-SIGNED |
| 02_Weldon_SOQ |
| 03_Weldon_Ties-Benchmarks |
| 04_Weldon_ExistingSitePlan |
| 04-1_Weldon_TrafficControlPlan-S2 |
| 04-2_Weldon_TrafficControlPlan-S3 |
| 04-3_Weldon_TrafficControlPlanDetail |
| 04-4_Weldon_GeneralNotesStructural-SIGNED |
| 05_Weldon_PP-Struct2-Ex |
| 06_Weldon_PP-Struct2-Pr |
| 08-1_Weldon_Detail-Struct2-Sup |
| 08-2_Weldon_Detail-Struct2-Sup |
| 08-3_Weldon_Detail-Struct2-Sup |
| 13B_Weldon_Detail-Struct2-Sup |
| 15_Weldon_PP-Struct3-Ex |
| 17_Weldon_Detail-Struct3-General-Timber |
| 18_Weldon_Detail-Struct3-Sup-Timber |
| 18B_Weldon_Detail-Struct3-Sup-Timber |
| 18C_Weldon_Detail-Struct3-Sup-Timber |
File details come from the government source that posted it. Updated .