Attachment 1 - Project 561A4-18-119 - Final Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24222B0003
About this file
This pre-solicitation notice is for an upcoming solicitation seeking a general contractor to provide construction services for the gut renovation of an audiology and eye clinic at a VA medical center campus. The project scope includes all labor, materials, equipment, tools, and supervision to complete upgrades outlined in project specifications and drawings. The project location is Building 3 at the VA New Jersey Healthcare System campus in Lyons, NJ, with an estimated cost range of $1-2 million and a completion timeframe of 180 days from notice to proceed. The solicitation will be released on or around October 22, 2021 via SAM.gov and is classified under NAICS code 236220 with a size standard of $39.5 million. The procurement is set aside solely for SDVOSB offers and all prospective bidders must be registered in SAM.gov and VIP.vetbiz.gov as verified SDVOSBs by the time of offer submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
UPGRADE AUDIOLOGY AND EYE CLINIC - BLDG. 3
VA MEDICAL CENTER, LYONS CAMPUS
151 KNOLLCROFT ROAD
LYONS, NJ 07939
PROJECT NO: 561A4-18-119
Watson Engineering, P.C.
1112 State Rte. 434
Owego, NY 13827
(607)223-4334
ThinkForm Design Architect LLC
38 East Broad St, Suite 3
Hopewell, New Jersey, 08525
(855) 821-0274
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021
PROJECT AREA
BUILDING 3 - SECOND FLOOR
SITE LOCATION BUILDING 3
B
IM
/5
A
-1 -1
U p g ra d e
A u d io lo g y a n d
E y e
C lin ic
B ld g
/5
A
-1
-1
U p g ra d e A u d ilo g y a n d E y e C lin ic
.r v t
/2
/2
:3
:5
A
M
G-001
TITLE SHEET
EMW MPL
DRAWING INDEX
SHEET
NUMBER SHEET NAME
G-001 TITLE SHEET
G-002 ICRA, CODE NOTES, FLOOR PLAN
AD100 DEMOLITION PLAN
AS100 FLOOR PLAN
AS101 REFLECTED CEILING PLANS
AS102 FINISH PLAN
AS103 INTERIOR PROJECT DETAILS
AS104 INTERIOR ELEVATIONS
AS600 EQUIPMENT PLAN
AS601 EQUIPMENT SCHEDULES
M-001 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS
MD101 SECOND FLOOR MECHANICAL DEMOLITION PLAN
M-100 SECOND FLOOR HVAC ZONING PLAN
M-101 SECOND FLOOR MECHANICAL DUCTWORK PLAN
M-102 SECOND FLOOR MECHANICAL PIPING PLAN
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
E-001 ELEC. ABBREVIATIONS, SYMBOLS AND NOTES
ED101 SECOND FLOOR ELECTRICAL DEMOLITION PLAN
E-101 SECOND FLOOR POWER AND DATA PLAN
E-201 SECOND FLOOR LIGHTING PLAN
E-301 SECOND FLOOR FIRE ALARM PLAN
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL AND PANEL SCHEDULES
P-001 PLUMBING SYMBOLS, NOTES AND ABBREVIATIONS
PD101 PLUMBING DEMOLITION PLAN
P-101 PLUMBING PLAN
P-501 PLUMBING SCHEDULES AND DETAILS
P-601 PLUMBING RISER DIAGRAMS
P-602 PLUMBING RISER DIAGRAMS
FD101 FIRE PROTECTION DEMOLITION PLAN
FX101 FIRE PROTECTION PLAN
BLDG. 3
Revisions: Date:
PROJECT AREA
EXAM #1
S329
PRE-TEST
S331
EXAM #2
S330
PREFAB BOOTH
S337A
CONF. / EDU.
S333
OPTICIAN OFFICE
S332
BOOTH SUITE #2
S337
BOOTH SUITE #1
S336
FITTING #1
S334
FITTING #2
S335
STORAGE
S338
OFFICE
S339
PREFAB BOOTH
S336A
STAIR
A124
STAIR
A109
TEST CORRIDOR
S328
BOOTH
CORRIDOR
S340
132' - 7"
2 HR. FIRE RATED
PARTITION
1 HR. FIRE RATED
SMOKE PARTITION
DEAD END
100' - 2"
FEC #1
NFPA 10 6.2.1.2.2
FEC #2
NFPA 10 6.2.1.2.2
TRAVEL DISTANCE
TRAVEL DISTANCE
C O
M M
O N
P
AT
H O
F
TR
AV
EL
9' - 7"
0"
1 HR. FIRE RATED
PARTITION
1 HOUR FIRE RESISTANT RATED SMOKE BARRIER
1 HOUR FIRE RESISTANT RATED FIRE BARRIER
2 HOUR FIRE RESISTANT RATED FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:4
PM
G-002
ICRA, CODE NOTES, FLOOR PLAN
INFECTION CONTROL NOTES
THE PURPOSE OF INFECTION CONTROL PROCEDURES IS TO MINIMIZE THE POTENTIAL FOR THE SPREAD OF INFECTIONS DUE TO DEGRADED AIR QUALITY, ENVIRONMENTAL CONTAMINATION, OR CONTAMINATION OF WATER. IT IS THE POLICY OF THIS MEDICAL CENTER THAT A SYSTEMATIC APPROACH BASED ON ASSESSMENT AND PLANNING WILL EFFECTIVELY MANAGE THE ISSUE OF TRANSMISSION OF INFECTIOUS DISEASES AND THE AGGRAVATION OF ALLERGIES. THE OVERALL APPROACH RELIES ON PRE-CONSTRUCTION ASSESSMENT, MANAGEMENT OF HVAC SYSTEMS, AND AGGRESSIVE USE OF A VARIETY OF BARRIERS. CONTRACTOR IS TO WORK CLOSELY WITH THE VA FACILITY MANAGEMENT SERVICE. THE INFECTION CONTROL PROGRAM STAFF AND THE SAFETY AND OCCUPATION HEALTH MANAGER TO HAVE IN PLACE A MONITORING A PROGRAM TO ASSURE RIGOROUS IMPLEMENTATION OF THE REQUIRED MEASURES. REFER TO PROJECT SPECIFICATIONS.
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL INFECTION CONTROL REQUIREMENTS WITH THE DEMOLITION AND NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCOVERIES TO THE OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO
BEGINNING.
B. CONTRACTOR TO INSTALL BARRIERS AND OTHER MEASURES. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF-CLOSING. PROVIDE DUST CONTROL AND CONTAINMENT STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT CONSTRUCTION ENTRY. PROVIDE MANOMETER
MONITORS FOR ALL CONSTRUCTION BARRIERS.
C. CONTRACTOR TO DISPOSE OF MATERIALS BEFORE 8:00AM OR AFTER 4:00PM UNLESS ARRANGED WITH THE VA TO DISPOSE OF DURING NORMAL HOURS. USE ROUTE AGREED UPON BY ICRA TEAM AND COTR FOR TRANSPORT OF TRANSPORT CONTAINERS THROUGH THE FACILITY. CONTRACTORS CAN ONLY DEVIATE TO NORMAL HOURS WITH THE APPROVAL OF THE INFECTION CONTROL NURSE AND COR DUE TO PARTICULAR CIRCUMSTANCES THAT MAY OBSTRUCT PROGRESS. A CLEAR PLAN WILL HAVE TO BE SUBMITTED AND
PRECAUTIONARY INFECTION CONTROL MEASURES IMPLEMENTED.
D. CONTRACTOR TO COVER CARTS AND WEAR BOOTIES WHEN DISPOSING MATERIALS.
E. CONTRACTOR TO CHANGE MATS MULTIPLE TIMES A DAY AS NEEDED AND MOP FLOORS BEHIND THEM
MULTIPLE TIMES A DAY.
F. CONTRACTOR TO MAINTAIN CONTINUOUS NEGATIVE AIR PRESSURE WITHIN THE WORK SITE UTILIZING WINDOW EXHAUST FANS STRATEGICALLY LOCATED OR PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING. CONTRACTOR TO INCLUDE MONITORING MANOMETER AT
ANTEROOM SO THE NEGATIVE PRESSURE CAN BE INSPECTED.
1/16" = 1'-0"G-002 1 Building 3 - Egress Plan
CODE NOTES
A. 1. PRIMARY APPLICABLE CODES AND STANDARDS - EXISTING BUILDING / RECONSTRUCTION
THE DEPARTMENT OF VETERANS AFFAIRS HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW
STRUCTURE.
a. NFPA 101 LIFE SAFETY CODE, 2021 EDITION
b. NFPA NATIONAL FIRE CODES (WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900)
c. NATIONAL ELECTRIC CODE (NEC)
d. INTERNATIONAL PLUMBING CODE (IPC)
e. ASME BOILER AND PRESSURE VESSEL CODE
f. ASME CODE FOR PRESSURE PIPING
g. ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
h. ENERGY POLICY ACT (EPAct)
i. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON
THE TECHNICAL INFORMATION LIBRARY (TIL)
j. VA MENTAL HEALTH DESIGN GUIDE
k. INTERNATIONAL BUILDING CODE (IBC) - ONLY WHEN SPECIFICALLY REFERENCE IN VA DESIGN DOCUMENTS
l. OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
m. PHYSICAL SECURITY DESIGN MANUAL (PSDM)
2. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE RATING FOR ALL LOAD BEARING STRUCTURAL ELEMENTS IS 2 HOURS. IF DURING CONSTRUCTION, ANY DAMAGE TO EXISTING FIREPROOFING IS OBSERVED OR IF DISCOVERED THAT ANY FIRE PROTECTION IS MISSING, THE
CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION.
3. THE NEW AUDIOLOGY AND EYE CLINIC AREAS OCCUPIES 2,453 SQ FT OF THE SECOND FLOOR IN LYONS VAMC BUILDING 3.
NFPA 101 REVIEW
B. CHAPTER 38 NEW BUSINESS OCCUPANCIES
1. (38.1.1.1) THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO NEW BUILDINGS OR PORTIONS THEREOF USED AS BUSINESS OCCUPANCIES.
2. (38.1.5) CLASSIFICATION OF HAZARD OF CONTENTS: THE CONTENTS OF BUSINESS OCCUPANCIES SHALL BE CLASSIFIED AS ORDINARY HAZARD IN
ACCORDANCE WITH SECTION 6.2.
C. MEANS OF EGRESS - CHAPTER 38 AND CHAPTER 7
1. (38.2.1.1) ALL MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH CHAPTER 7 & THIS CHAPTER.
2. (38.2.3.1) THE CAPACITY OF MEANS OF EGRESS SHALL BE IN ACCORDANCE WITH SECTION 7.3:
A. TABLE 7.3.1.2 OCCUPANCY LOAD FACTOR FOR BUSINESS = 150 SF PER PERSON.
2,453 SF / 150 = 16 OCCUPANTS
3. (38.2.3.2) THE CLEAR WIDTH OF ANY CORRIDOR OR PASSAGEWAY SERVING AN OCCUPANT LOAD OF 50 OR MORE SHALL NOT BE LESS THAN 44 INCHES.
4. (38.2.5.2) LIMITATIONS ON COMMON PATH OF TRAVEL SHALL BE IN ACCORDANCE WITH 38.2.5.2.1, 38.2.5.2.2, AND 38.2.5.2.3.
A. (38.2.5.2.1) COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT (30 M) IN A BUILDING PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.1(1).
5. (38.2.5.3.1) DEAD END CORRIDORS SHALL NOT EXCEED 50' IN BUILDINGS PROTECTED BY SPRINKLER SYSTEM.
6. (38.2.6.3) TRAVEL DISTANCE SHALL NOT EXCEED 300' IN BUSINESS OCCUPANCIES PROTECTED BY SPRINKLER SYSTEM.
7. (7.1.3.1) EXIT ACCESS CORRIDORS. CORRIDORS USED AS EXIT ACCESS AND SERVING AN AREA HAVING AN OCCUPANT LOAD EXCEEDING 30 SHALLBE SEPARATED FROM OTHER PARTS OF THE BUILDING BY WALLS HAVING NOT LESS THAN A 1-HOUR FIRE RESISTANCE RATING IN ACCORDANCE
WITH SECTION 8.3, UNLESS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING:
A. THIS REQUIREMENT SHALL NOT APPLY TO EXISTING BUILDINGS, PROVIDED THAT THE OCCUPANCY CLASSIFICATION DOES NOT CHANGE.
8. (7.1.5.1) MEANS OF EGRESS SHALL BE DESIGNED AND MAINTAINED TO PROVIDE HEADROOM NOT LESS THAN 7 FT 6 IN, UNLESS OTHERWISE SPECIFIED
BY ANY OF THE FOLLOWING:
A. IN EXISTING BUILDINGS, THE CEILING HEIGHT SHALL NOT BE LESS THAN 7 FT FROM THE FLOOR, WITH PROJECTIONS FROM THE CEILING
NOT LESS THAN 6 FT 8 IN NOMINAL ABOVE THE FLOOR.
9. (7.2.1.2.3.2) DOOR OPENINGS IN MEANS OF EGRESS SHALL NOT BE LESS THAN 32 IN. IN CLEAR WIDTH.
1. (7.2.1.4.3.2) WHEN FULLY OPEN, ANY DOOR LEAF IN A MEANS OF EGRESS SHALL NOT PROJECT MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY OR A LANDING, UNLESS THE DOOR LEAF IS EQUIPPED WITH AN APPROVED SELF-CLOSING DEVICE AND IS NOT REQUIRED BY THE PROVISIONS OF 7.2.1.4.2 TO SWING IN THE DIRECTION OF EGRESS TRAVEL..
E. FIRE PROTECTION EQUIPMENT - CHAPTER 38 AND CHAPTER 9
1. THE EXISTING SECOND FLOOR IS FULLY PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM.
2. (38.3.5) EXTINGUISHMENT REQUIREMENTS. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN EVERY BUSINESS OCCUPANCY IN ACCORDANCE
WITH SECTION 9.9.
A. (9.9) WHERE REQUIRED BY ANOTHER SECTION OF THIS CODE, PORTABLE FIRE EXTINGUISHERS SHALL BE SELECTED, INSTALLED, INSPECTED, AND MAINTAINED IN ACCORDANCE WITH NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS.
F. INTERIOR FINISHES - CHAPTER 38 AND SECTION 10.2
1. (38.3.3.2.1) INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING WITH SECTION 10.2 SHALL BE CLASS A OR CLASS B IN EXITS AND IN EXIT
ACCESS CORRIDORS.
2. (38.3.3.2.2) INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B, OR CLASS C IN AREAS OTHER THAN THOSE SPECIFIED IN 38.3.3.2.1..
0.
110 SF
MALE TOILET
62 SF
FEMALE TOILET
PRETESTING,
FITTING, &
DISPENSING
NURSE /
SCREENING
D4
11D1
1D1
D2
2D2
D2
3D3
AREA OF WORK
OPTOM. OFF.PHOTOGRAPHY
LOW VISION
TRAINING
VISUAL FIELDS
ROOM
MAS
SUPERVISOR
MAS
SUPERVISOR
CHIEF
AUDIOLOGIST
OFFICE /
THERAPY ROOM
TRAINING CONF.
ROOM
STAFF TOILET
H.A.C.
CLEAN SOILED OFFICE OFFICE
STAFF
WORKROOM
SOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE OFFICE
STAFF TOILET
PROCEDURE
ROOM
WC TOILET
STO.
OFFICE
MECHANICAL
ROOM STAIR
H.A.C.
VEST.
NURSE OFFICE /
SCREENING
IRM ELEC. ROOM
D1
D4
C
LE
AR
5'
0" M
IN
C
LE
AR
5'
0" M
IN
1HR. RATED
TEMP. CONSTRUCTION BARRIER
- SEE 2/AD100 & G002 FOR
INFECTION CONTROL NOTES
1HR. RATED
TEMP. CONSTRUCTION BARRIER
- SEE 2/AD100 & G002 FOR
INFECTION CONTROL NOTES
EXISTING FE
EXISTING FE
2 3
D6D5
D336FD337E
EXISTING SMOKE BARRIER PARTITION
NOTE:
ADD 5/8" TYP X GYP BD & BATT INSULATION
TO EXISTING PARTITIONS. NEW FINISH TO
EXTEND UP TO UNDERSIDE OF DECK
D4D4
CONTAIN AREA DURING DEMOLITION OF
WALL. GC TO COORDINATE WITH VA
INFECTION CONTROL.
LINE OF STRUCTURE ABOVE
SEALANT
CEILING TRACK
DRYWALL CASING
CEILING
5/8" FIRE-RATED
GYP BD BOTH SIDES
- PUBLIC SIDE PTD WHITE
TRACK-ATTACH WITH
ANCHORS 2'-0" O.C. MAX
FLEXIBLE SEALANT
NOTES:
1. PARTITION TO BE FULL HT
FLOOR SLAB TO STRUCTURE
ABOVE, PASSING THRU.
INTERSTITIAL SPACE.
CONTRACTOR RESPONSIBLE
FOR COORDINATING
WORKING AROUND EXISTING
CONDITIONS AND/OR
REROUTING EXISTING
SYSTEMS TO ACHIEVE A
TIGHT BARRIER.
2. GYP BD TO HAVE A MIN LEVEL
3 FINISH ON THE PUBLIC SIDE.
3. PUBLIC SIDE OF TEMP
BARRIER TO BE DECORATED
WITH APPLIED GRAPHICS.
4. CONTRACTOR TO PLACE VA
SIGNAGE (ON THE PUBLIC
SIDE) STATING THE PROJECT
NAME, NUMBER, COTR NAME,
CONTRACTOR NAME AND VA
CONTACT NUMBERS.
SIGNAGE TO BE PUT UP IN
PLAQUES,
• 5/8" SHEETROCK FIRECODE CORE GYPSUM PANELS
• 3 5/8" 25 GAUGE STEEL STUDS @ 24" O.C.
• TEST NO. UL DES U419
5"
FR 1R F1
2" 2"
2"
3' - 0" 3' - 0"
7'
0"
1 HOUR FIRE RESISTANT RATED SMOKE BARRIER
1 HOUR FIRE RESISTANT RATED FIRE BARRIER
2 HOUR FIRE RESISTANT RATED FIRE BARRIER
WALL TO BE DEMOLISHED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:3
PM
AD100
DEMOLITION PLAN
3/16" = 1'-0"AD100
1 Building 3 - Demolition Plan
1 1/2" = 1'-0"AD100
2 1 HR. RATED TEMPORARY CONSTRUCTION BARRIER
GENERAL DEMOLITION NOTES
A. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD AND COORDINATE ALL REMOVAL ACTIVITIES WITH NEW CONSTRUCTION. THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO THE OWNER'S REPRESENTATIVE FOR RESOLUTION PRIOR TO
BEGINNING REMOVALS.
B. PROTECT ALL CONSTRUCTION TO REMAIN FROM DAMAGE DURING REMOVAL OF ADJACENT CONSTRUCTION. REPAIR/REPLACE CONSTRUCTION TO REMAIN THAT WAS DAMAGED DURING DEMOLITION TO MATCH THE QUALITY OF THE NEW WORK. PROVIDE DUST CONTROL AND CONTAINMENT
MATS, FLOOR AND WALL PROTECTION.
C. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT. INCIDENTAL WORK MAY ALSO BE NECESSARY IN AREAS NOT SHOWN ON THE ARCHITECTURAL DRAWINGS DUE TO CHANGES AFFECTING EXISTING ELECTRICAL, OR OTHER SYSTEMS. SUCH INCIDENTAL WORK IS ALSO A PART OF THE CONTRACT. CONTRACTOR SHALL INSPECT THOSE AREAS AND ASCERTAIN WORK NEEDED AND DO THAT WORK IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS AND AT NO ADDITIONAL COST TO THE OWNER.
D. DO NOT DRILL OR CUT EXISTING FLOOR JOISTS, BEAMS, COLUMNS OR OTHER STRUCTURAL ELEMENTS UNLESS SPECIFICALLY NOTED. MAKE OPENINGS OF PROPER SIZE FOR CONDUITS AND PIPING AND OTHER ITEMS PASSING THROUGH OPENINGS.
E. REPAIR, PATCH AND FINISH, OR REFINISH AS APPLICABLE, TO MATCH ADJACENT EXISTING FINISHES DAMAGED OR NEWLY EXPOSED DURING THE
PERFORMANCE OF THE WORK OF THIS CONTRACT.
F. WHERE CUTTING OF EXISTING SURFACES OR REMOVAL OF EXISTING FINISHES IS REQUIRED TO PERFORM THE WORK UNDER THIS CONTRACT, AND A NEW FINISH IS NOT INDICATED, FILL RESULTING OPENINGS AND PATCH THE SURFACE AFTER DOING THE WORK, AND FINISH TO MATCH
ADJACENT EXISTING SURFACES.
G. WHERE A NEW CEILING IS NOT SCHEDULED, INSTALL CONDUITS AND PIPING IN EVERY CASE ABOVE THE CEILING. REMOVE EXISTING CEILING AS NECESSARY. AFTER INSTALLATION OF CONCEALED WORK, REINSTALL REMOVED CEILING AND PATCH AND REFINISH TO MATCH ADJACENT UN-
REMOVED CEILINGS.
H. WORK SHOWN IS NEW UNLESS SPECIFICALLY NOTED OR OTHERWISE INDICATED AS EXISTING.
I. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH NEW AND EXISTING WALLS AND PARTITIONS.
J. WHERE "MATCH EXISTING" IS INDICATED, NEW CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE NOTE, SHALL MATCH THE EXISTING IN THE
PARTICULAR.
K. PROVIDE HEADERS/LINTELS OVER EVERY OPENING IN BOTH NEW AND EXISTING WALLS AND PARTITIONS.
L. WHERE "MATCH EXISTING" IS INDICATED, NEW CONSTRUCTION OR FINISHES, AS APPROPRIATE TO THE NOTE, SHALL MATCH THE EXISTING IN THE
PARTICULAR.
M. DEFINITIONS
M1. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR EXISTING.
M2. SALVAGE: ITEMS INDICATED TO BE SALVAGED SHALL REMAIN THE OWNER'S PROPERTY. REMOVE, CLEAN AND PACK OR CRATE ITEMS TO PROTECT AGAINST DAMAGE. IDENTIFY CONTENTS OF CONTAINERS AND DELIVER TO OWNER'S DESIGNATED STORAGE AREA.
M3. REINSTALL: REMOVE ITEMS INDICATED. CLEAN SERVICE AND OTHERWISE PREPARE THEM FOR REUSE. STORE AND PROTECT AGAINST
DAMAGE. REINSTALL ITEMS IN THE SAME LOCATIONS OR IN LOCATIONS INDICATED.
M4. EXISTING: ORIGINAL ITEM TO REMAIN. PROTECT CONSTRUCTION INDICATED AS EXISTING AGAINST DAMAGE AND SOILING DURING
SELECTIVE DEMOLITION.
M5. RESTORE: ITEMS INDICATED SHALL BE BROUGHT BACK TO THEIR ORIGINAL CONDITION. ORIGINAL CONDITION IS THE CONDITION THAT
THE REFERENCED ITEM WAS IN WHEN THE BUILDING WAS FIRST CONSTRUCTED.
M6. REPLACE: EXISTING ITEM TO BE REMOVED. PROVIDE NEW ITEM TO MATCH EXISTING.
# DEMOLITION KEYNOTE
GENERAL DEMOLITION NOTES CONTINUED
N. CONTRACTOR TO ABIDE BY ALL THE ICRA INFECTION CONTROL REGULATIONS.
O. CONTRACTOR SHALL KEEP THE SITE CLEAN AT ALL TIMES AND COORDINATE TRASH REMOVAL WITH THE VA.
TEMPORARY CONTINUOUS CONSTRUCTION BARRIER MUST BE IN PLACE PRIOR TO ANY DEMOLITION. G.C. TO DETERMINE LOCATION FOR TEMPORARY CONSTRUCTION BARRIER DOOR ACCESS. CONSTRUCTION BARRIER DOOR(S) MUST BE SELF- CLOSING. PROVIDE STICKY MATS ON ALL ACCESS DOORS INTO CONSTRUCTION AREA. ANTE-ROOM REQUIRED AT
CONSTRUCTION ENTRY. PAINT PUBLIC FACE OF TEMP BARRIER WHITE.
P. PROVIDE MANOMETER MONITORS FOR ALL CONSTRUCTION BARRIERS.
Q. PROVIDE NEGATIVE PRESSURE AIR HEPA UNITS AND EXHAUST TO EXTERIOR OF THE BUILDING
R. THE CONSTRUCTION CLASSIFICATION IS TYPE II (222). THE MINIMUM FIRE RATING FOR ALL LOAD-BEARING STRUCTURAL ELEMENTS IS 2HRS. IF DURING CONSTRUCTION, ANY DAMAGE TO SPRAY-ON FIREPROOFING IS OBSERVED OR IF DISCOVERED THAT ANY FIRE PROTECTION IS MISSING THE AREA OF WORK, THE CONTRACTOR SHALL REPAIR TO MAINTAIN FULL PROTECTION.
S. PROVIDE FIRESTOPPING AT ALL RATED WALL AND FLOOR PENETRATIONS.
DOOR FRAME TYPE - TEMPORARY CONSTRUCTION DOOR LEAF TYPE - TEMPORARY CONSTRUCTION BARRIER
DOOR LEAF DOOR FRAME
TEMPORARY CONSTRUCTION BARRIER DOOR SCHEDULE
NO. LOCATION WIDTH HEIGHT MATERIAL STYLE
FRAME
TYPE
FRAME
MATERIAL HDW SET REMARKS
D336F PROJECT AREA 3' - 0" 7' - 0" WD F1 FR 1R HM 5F 45 MIN, NOTE D1
D337E PROJECT AREA 3' - 0" 7' - 0" WD F1 FR 1R HM 5F 45 MIN, NOTE D1
NOTES: D1. TEMP CONSTRUCTION BARRIER DOORS TO BE PROVIDED W/ SELF CLOSER AND STOREROOM LOCK FUNCTION AND LOCK LOCAL
ALARM WHEN DOOR IS OPEN
DEMOLITION KEYNOTES
D1 REMOVE EXISTING INTERIOR PARTITIONS AS REQUIRED FOR NEW OPENINGS.
D2 REMOVE EXISTING DOOR AND FRAME IN THEIR ENTIRETY.
D3 SURVEY THE UNFINISHED FLOOR AREA, CLEAN UP ALL DEBRIS & PREP SLAB AS
REQUIRED TO RECEIVE NEW FINISH.
D4 PROVIDE WALK-OFF MATS AT THE CONSTRUCTION ENTRY POINT BOTH SIDES.
FOLLOW ALL INFECTION CONTROL REQUIREMENTS AS NOTED ON SHEET G003 AND
WITHIN THE SPECIFICATIONS.
D5 REMOVE LOW WALL.
D6 REMOVE INTERIOR PARTITION.
5' - 10"
5'
0"
15' - 11" ± 9' - 11 1/2"
9'
/2
7' - 5 1/2"3' - 2 1/2"
/2
11' - 5" 11' - 3 1/2" 14' - 4 1/2"
8'
1/
2"
2' - 7 1/2"
7'
1"
14' - 5"9' - 10"
9'
4"
14' - 2"
PREFAB BOOTH
S337A
BOOTH SUITE #2
S337
BOOTH SUITE #1
S336
CONF. / EDU.
S333 FITTING #1
S334
STORAGE
S338
OFFICE
S339
FITTING #2
S335
EXAM #2
S330
PRE-TEST
S331
OPTICIAN OFFICE
S332
EXAM #1
S329
PREFAB BOOTH
S336A
CLEAN SOILED OFFICE OFFICE
STAFF
WORKROOM
SOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE OFFICE
STAFF TOILET
PROCEDURE
ROOM
WC TOILET
STO.
OFFICE
MECHANICAL
ROOM
S207
STAIR
H.A.C.
S206
NURSE OFFICE /
SCREENING
S202 IRM ELEC. ROOM
VEST.
S209
D333A
D330
D329
D331
D333B
D336A
D338 D339
D334 D335
D337AD337B
D336BD328
2A
55 55
TEST CORRIDOR
S328 BOOTH
CORRIDOR
S340
D332
D340
3' - 0"
D
7D
D
7C
D
6C
D
6D
5'
0"
2A
2A
VESTIBULE
S341
EXIST
FEC #1
NFPA 10 6.2.1.2.2
EXIST
FEC #2
NFPA 10 6.2.1.2.2
2 3
AS103
TYP
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
N
S
EW
AS104
3'
8"
AS103
TYP
TYP.
1.1
11' - 0 1/2"
SIM
1.1
N
S
E W
AS104
7' - 5"
1' - 0"
9'
3" 9'
4"
TYP.
AS103
INFILL GYPBOARD AT AREA
OF WALL DEMOLITION TO
MATCH EXISTING.
F HG
3'
8"
FR 1
2"2"
2"
VARIES
FR 1R
2" 2"
2"
VARIES
STRUCTURE ABOVE
EDGE BEAD AND
FLEXIBLE SEALANT
LINE OF CEILING
5/8" GYP BD - BOTH SIDES
FLEXIBLE SEALANT -
BOTH SIDES
FLOOR SLAB
3-1/2" SOUND
ATTENUATION BLANKET
3-5/8" STUD FRAMING 16" O.C.
4 7/8"
3-5/8" METAL STUDS, TYP.
STRUCTURE ABOVE
EDGE BEAD AND
FLEXIBLE SEALANT
3-1/2" SOUND
ATTENUATION
BLANKET
3-5/8" STUD
FRAMING 16" O.C.
5/8" TYPE X GYP BD -
BOTH SIDES
FLEXIBLE
SEALANT -
BOTH SIDES
FLOOR SLAB
4 7/8"
2 U419 1 HOUR RATED ASSEMBLY
3-5/8" METAL
STUDS, TYP.
2A SAME AS "2" 5/8 BUT ADD
"SOUNDBREAK GYP BD ON BOTH SIDES
6 1/8"
2A
F1
RATED
N1
RATED
3'
8"
STRUCTURE ABOVE
EDGE BEAD AND
FLEXIBLE SEALANT
LINE OF CEILING
5/8" SOUNDBREAK
GYP BD - BOTH SIDES
FLEXIBLE SEALANT -
BOTH SIDES
FLOOR SLAB
3-1/2" SOUND
ATTENUATION BLANKET
3-5/8" STUD FRAMING 16" O.C.
6 1/8"
3-5/8" METAL STUDS, TYP.
5/8" GYP BD - BOTH SIDES
BOOTH
INTERIOR
3/8" THICK HARD
RUBBER PAD BY MANUF.
1/8" THICK STEEL (TYP.)
INTERIOR OF BOOTH BY MANUF.
1/ 2"
FLOOR CHANNEL
HEAVY BEAD LATEX
CAULK (2 PLCS)
ULTRA-LITE
ACOUSTIC FILL
(2 LAYERS)
VINYL BASE
1/
2"
WALL PANEL
CONCRETE
ANCHOR @ 18" O.C.
EXISTING SUBSTRATE
EXISTING
STRUCTURE
ABOVE
EDGE BEAD
AND FLEXIBLE
SEALANT
LINE OF CEILING
NEW 5/8" GYP BD -
INTERIOR FACE
FLEXIBLE SEALANT
EXISTING
FLOOR SLAB
EXISTING 3-5/8"
METAL STUD
FRAMING
CONNECTED TO
EXISTING
STRUCTURE ABOVE
EDGE BEAD AND
FLEXIBLE SEALANT
LINE OF CEILING
NEW 5/8" GYP BD -
INTERIOR FACE
FLEXIBLE SEALANT
FLOOR SLAB
NEW 3-5/8" METAL
STUD FRAMING
EBF SEAL
EXISTING SUBSTRATE
THRESHOLD
STRUCTURE ABOVE
EDGE BEAD AND
FLEXIBLE SEALANT
LINE OF CEILING
5/8"
SOUNDBREAK
GYP BD
FLEXIBLE SEALANT
FLOOR SLAB
3-1/2" SOUND
ATTENUATION
BLANKET
EXISTING 3-5/8"
STUD FRAMING
5/8" GYP BD
1 HOUR FIRE RESISTANT RATED SMOKE BARRIER
1 HOUR FIRE RESISTANT RATED FIRE BARRIER
2 HOUR FIRE RESISTANT RATED FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:3
PM
AS100
FLOOR PLAN
3/16" = 1'-0"AS100
2 Building 3 - Audiology and Eye Clinic x x
TITLE
SHEET
X x x x x x x x x
N
E
S
W
WINDOW TYPE
REVISIONS
ROOM NAME
ROOM NUMBER
DATUM LINE
DETAIL NUMBER
SHEET NUMBER
PARTITION TYPE
DOOR NUMBER
KEYNOTE
SECTION
SHEET NUMBER
BUILDING ELEVATION
SHEET NUMBER
INTERIOR ELEVATIONS
SHEET NUMBER
DETAIL
SHEET NUMBER
DOOR LEAF DOOR FRAME
DOOR SCHEDULE
NO. LOCATION WIDTH HEIGHT MATERIAL STYLE
Frame Type
Frame Material HDW SET REMARKS
D328 2ND FLOOR CORRIDOR TO TEST CORRIDOR 4' - 0" 7' - 0" WD N1 FR 1 HM HW1L
D329 TEST CORRIDOR TO EXAM #1 3' - 0" 7' - 0" WD F FR 1 HM HW1L
D330 TEST CORRIDOR TO EXAM #2 3' - 0" 7' - 0" WD F FR 1 HM HW1L
D331 TEST CORRIDOR TO PRE-TEST 3' - 0" 7' - 0" WD F FR 1 HM HW1L
D332 2ND FLOOR CORRIDOR TO OPTICIAN OFFICE 3' - 0" 7' - 0" WD F FR 1 HM HW1L
D333A 2ND FLOOR CORRIDOR TO CONF. / EDU. 3' - 0" 7' - 0" WD F FR 1 HM 4J
D333B PRE-TEST TO CONF. / EDU. 3' - 0" 7' - 0" WD F FR 1 HM 4J
D334 BOOTH CORRIDOR TO FITTING #1 3' - 6" 7' - 0" WD F FR 1 HM 3F
D335 BOOTH CORRIDOR TO FITTING #2 3' - 6" 7' - 0" WD F FR 1 HM 3F
D336A BOOTH CORRIDOR TO BOOTH SUITE #1 4' - 0" 7' - 0" WD F FR 1 HM 3
D336B FITTING #2 TO BOOTH SUITE #1 3' - 6" 7' - 0" WD F FR 1 HM 3F
D336C PREFAB BOOTH TO BOOTH SUITE #1 3' - 0" 7' - 0" WD F PRE-FAB PRE-FAB PRE-FAB D336D BOOTH SUITE #1 TO PREFAB BOOTH 3' - 0" 7' - 0" WD F PRE-FAB PRE-FAB PRE-FAB
D337A BOOTH CORRIDOR TO BOOTH SUITE #2 4' - 0" 7' - 0" WD F FR 1 HM 3
D337B FITTING #1 TO BOOTH SUITE #2 3' - 6" 7' - 0" WD F FR 1 HM 3F
D337C PREFAB BOOTH TO BOOTH SUITE #2 3' - 6" 7' - 0" N4 PRE-FAB PRE-FAB PRE-FAB
D337D BOOTH SUITE #2 TO PREFAB BOOTH 3' - 6" 7' - 0" N4 PRE-FAB PRE-FAB PRE-FAB
D338 BOOTH CORRIDOR TO STORAGE 3' - 0" 7' - 0" WD F FR 1 HM 5 45 MIN.
D339 BOOTH CORRIDOR TO OFFICE 3' - 0" 7' - 0" WD F FR 1 HM 3E
D340 2ND FLOOR CORRIDOR TO BOOTH CORRIDOR 4' - 0" 7' - 0" WD HG FR 1R HM HW1R
DOOR LEAF TYPES
DOOR FRAME TYPES
1 1/2" = 1'-0"
WALL PARTITION TYPES
1 1/2" = 1'-0"AS100
3 Audiometric Booth - Floor Detail
NOTES:
1. ALL HM INTERIOR DOOR FRAMES TO BE PAINTED.
2. ALL INTERIOR WOOD DOORS TO BE FACTORY STAINED & FINISHED UNLESS NOTED OTHERWISE.
3. ALL DOOR HARDWARE SHALL BE INSTALLED BY CONTRACTOR AND BE COMPATIBLE WITH SARGENT SYSTEM.
ABBREVIATIONS:
AL ALUMINUM
EX EXISTING
HM HOLLOW METAL
WD WOOD
12" = 1'-0"AS100
4 Audiometric Booth Threshold Detail
9' - 0"9' - 0"
9' - 0"
9' - 0" 9' - 0"
9' - 0" 9' - 0"
9' - 0"
8' - 0"
8' - 0"
9' - 0"
9' - 0"
9' - 0"
PRE-TEST
S331
EXAM #2
S330
EXAM #1
S329
OPTICIAN OFFICE
S332
CONF. / EDU.
S333
FITTING #1
S334
STORAGE
S338
OFFICE
S339
FITTING #2
S335
MALE TOILET
FEMALE TOILET
PREFAB BOOTH
S336A
BOOTH SUITE #1
S336
BOOTH SUITE #2
S337
PREFAB BOOTH
S337A
9' - 0"
VEST.
MECHANICAL
ROOM
H.A.C.
STAIR
ELEC. ROOMIRM
NURSE OFFICE /
SCREENING
OFFICE
STO.
WC TOILET
PROCEDURE
ROOM
STAFF TOILET
OFFICESOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE
SOCIAL WORKER
OFFICE
STAFF
WORKROOM
CLEAN SOILED OFFICE OFFICE
VESTIBULE
S341
2 31
TEST CORRIDOR
S328
BOOTH
CORRIDOR
S340EQ EQ
EQ EQ
EQ
EQ
EQ
EQ
EQ
ALIGN
FULL TILE
EQ EQ
EQ
EQ
EQ
EQ
EQ EQ
START
FULL
TILE
EQ
EQ
EQ EQ
EQ
EQ
EQ EQ
EQ EQ
EQ EQ
EQ
EQEQ
EQ
EQ EQ
EQ EQ
EQ
EQ
EQ EQ
ALIGNALIGN
START ON
FULL TILE
INFILL CEILING AT AREA OF DEMOLISHED
WALL - MATCH AND ALIGN WITH EXISTING
LIGHTING AS REQUIRED.
EQ EQ
RETURN DIFFUSER - SEE MECHANICAL DRAWINGS
SUPPLY DIFFUSER - SEE MECHANICAL DRAWINGS
2X2 LED RECESSED LIGHT FIXTURE
- SEE ELECTRICAL DRAWINGS
RECESSED LED LIGHT FIXTURE
- SEE ELECTRICAL DRAWINGS
SPRINKLER - SEE FIRE PROTECTION DRAWINGS
CEILING HEIGHT
2X2 ACOUSTICAL CEILING TILE
-SEE FINISH SCHEDULE
UNDER CABINET LIGHTING
1 HOUR FIRE RESISTANT RATED SMOKE BARRIER
1 HOUR FIRE RESISTANT RATED FIRE BARRIER
2 HOUR FIRE RESISTANT RATED FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:4
PM
AS101
REFLECTED CEILING PLANS
3/16" = 1'-0"AS101
2 Building 3 - Audiology and Eye Clinic
159 SF
S329
164 SF
EXAM #2
S330
65 SF
TEST CORRIDOR
S328
253 SF
PRE-TEST
S331
137 SF
OPTICIAN OFFICE
S332
259 SF
CONF. / EDU.
S333
182 SF
BOOTH SUITE #2
S337
92 SF
PREFAB BOOTH
S337A
131 SF
FITTING #1
S334
91 SF
STORAGE
S338
131 SF
BOOTH
CORRIDOR
S340
183 SF
BOOTH SUITE #1
S336
137 SF
FITTING #2
S335
116 SF
OFFICE
S339
92 SF
PREFAB BOOTH
S336A
21 SF
VESTIBULE
S341
2 31
RUBBER TILE
LUXURY VINYL TILE
FINISH LEGEND
RESILIENT FLOORING
1 HOUR FIRE RESISTANT RATED SMOKE BARRIER
1 HOUR FIRE RESISTANT RATED FIRE BARRIER
2 HOUR FIRE RESISTANT RATED FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:0
PM
AS102
FINISH PLAN
3/16" = 1'-0"AS102
1 Building 3 - Audiology and Eye Clinic Finish Plan
BASE WALL FINISHES
ROOM FINISH SCHEDULE
ROOM NO. ROOM NAME
FLOOR
MAT. MAT. HT. N E S W
CEILING
MAT. NOTES
S328 TEST CORRIDOR LVT-1 RB-2 4" PT-1 PT-1 PT-1 PT-1 2X2 ACT
S329 EXAM #1 RF-1 RB-2 4" PT-5 PT-4 PT-4 PT-4 2X2 ACT
S330 EXAM #2 RF-1 RB-2 4" PT-4 PT-5 PT-4 PT-4 2X2 ACT
S331 PRE-TEST RF-1 RB-2 4" PT-4 PT-4 PT-5 PT-4 2X2 ACT
S332 OPTICIAN OFFICE LVT-1 RB-2 4" PT-2 PT-1 PT-1 PT-1 2X2 ACT
S333 CONF. / EDU. LVT-1 RB-2 4" PT-1 PT-1 PT-1 PT-1 2X2 ACT
S334 FITTING #1 RF-1 RB-2 4" PT-5 PT-4 PT-4 PT-4 2X2 ACT 1.
S335 FITTING #2 RF-1 RB-2 4" PT-5 PT-4 PT-4 PT-4 2X2 ACT 1.
S336 BOOTH SUITE #1 RF-1 RB-2 4" PT-5 PREFAB PT-4 PT-4 2X2 ACT 1.
S336A PREFAB BOOTH RT-1 RB-1 2 - 1/2" PREFAB / PT PREFAB / PT PREFAB / PT PREFAB / PT PREFAB
S337 BOOTH SUITE #2 RF-1 RB-2 4" PT-5 PT-4 PT-4 PREFAB 2X2 ACT 1.
S337A PREFAB BOOTH RT-1 RB-1 2 - 1/2" PREFAB / PT PREFAB / PT PREFAB / PT PREFAB / PT PREFAB
S338 STORAGE RF-1 RB-2 4" PT-4 PT-4 PT-4 PT-4 2X2 ACT
S339 OFFICE LVT-1 RB-2 4" PT-1 PT-3 PT-1 PT-1 2X2 ACT
S340 BOOTH CORRIDOR LVT-1 RB-2 4" PT-1 PT-1 PT-1 PT-1 2X2 ACT
S341 VESTIBULE LVT-1 RB-3 4" PT-4 PT-4 -- PT-4 2X2 ACT
NOTES:
1. REFER TO AS104 FOR ROOM ELEVATIONS AND LOCATION OF SOUND SOAK ACOUSTICAL WALL PANELS. FABRIC: GUILFORD OF MAINE, SPRITE 2671 SERIES, COLOR: LINEN 7010.
FINISH SCHEDULE ABBREVIATIONS
MATERIAL PRODUCTS NAMED ARE BASIS OF DESIGN ONLY, CONTRACTOR TO SELECT SAME OR EQUAL - SEE SPECIFICATIONS
FLOOR PREFAB - PRE-FABRICATED FLOORING SYSTEM BY IAC ACOUSTICS
LVT - LUXURY VINYL TILE - MANNINGTON, SPATIA, WOOD, COLOR: SUN BLEACHED OAK
RT-1 - RUBBER TILE - ECORE, 601 Mr. SLATE.
RF-1 - RESILIENT FLOORING: MANNINGTON, PARADIGM II, INTERSECT, COLOR: ORIGIN
BASE PREFAB - PRE-FABRICATED FLOORING CHANNEL BY IAC ACOUSTICS
RB-1 - RUBBER BASE - BLACK COVE BASE MOLDING BY IAC ACOUSTICS
RB-2 - RUBBER BASE - TARKETT/JOHNSONITE, "CANVAS" JODC 114X
RB-3 - RUBBER BASE - MATCH EXISTING IN CORRIDOR S213
WALL PREFAB - PRE-FABRICATED WALL PANEL SYSTEM BY IAC ACOUSTICS (SUBMIT FULL RANGE OF MFR COLORS)
PT-1 - PAINT - SHERWIN-WILLIAMS SW 7015 REPOSE GRAY
PT-2 - PAINT - SHERWIN-WILLIAMS SW 6423 RYEGRASS
PT-3 - PAINT - SHERWIN-WILLIAMS SW 6219 RAIN
PT-4 - PAINT - SHERWIN-WILLIAMS SW 7004 SNOWBOUND
PT-5 - PAINT - SHERWIN-WILLIAMS SW 7506 LOGGIA
CEILING ACT - ACOUSTIC CEILING TILE
PREFAB - PRE-FABRICATED ROOF PANEL SYSTEM BY IAC ACOUSTICS
EXISTING EXTERIOR
WALL CONSTRUCTION
EXISTING INTERIOR
WALL FRAMING
EXISTING EXTERIOR
WALL CONSTRUCTION
EXISTING INTERIOR
WALL FRAMING
EXISTING WINDOW
NEW GYP
BD FINISH
APPLY BLACK-OUT
FILM TO EXISTING
GLAZING
NEW RIGID INSULATION
NEW INFILL MTL
STUD FRAMING
EXISTING EXTERIOR
WALL CONSTRUCTION
NEW INTERIOR FINISH
NEW INTERIOR FINISH
EXISTING WINDOW
EXISTING EXTERIOR
WALL CONSTRUCTION
NEW INTERIOR
FINISH
NEW SOLID
SURFACE SILL
GWB FINISH - SEE
PARTITION DETAILS FOR
WALL CONSTRUCTION
WALL MOUNTED Z-CLIP
FASTENED PER
MANUFACTURE'S
RECOMMENDATION.
2" THK ACOUSTIC WALL
PANELS, FABRIC
WRAPPED, MOUNTED WITH
IMPALING Z-CLIPS
0' - 2"
AT
C
EI
LI
N G
0'
1" C
LE
AR
AN
C
E
CEILING AS SCHEDULE
AS REQ'D STEEL
STUD
STEEL
STUD
TRACK
1-5/8"
4"
1. THESE ANCHORING DETAILS ARE SHOWN AS TYPICAL AND ARE NOT
INTENDED TO BE ALL INCLUSIVE. PROVIDE STEEL BACKING IN PARTITIONS
FOR WALL HUNG ITEMS, SUCH AS WALL CABINETS, TOILET ACCESSORIES,
SHELVING, DOOR HOLD OPENS AND DOOR STOPS.
2. USE THE FOLLOWING ASSUMED LOADS TO DETERMINE BLOCKING AND
FASTENER REQUIREMENTS UNLESS GREATER LOADS ARE KNOWNS.
A. PAPER TOWEL DISPENSERS, TOILET PAPER HOLDERS, MIRRORS,
COAT HOOKS, TOWEL BARS, MOP HOLDERS, ETC. USE 100 LBS
B. HAND RAIL, BUMPER RAILS, USE 200 LBS CONCENTRATED LOADS
C. GRAB BARS, USE 200 LBS CONCENTRATED LOADS
D. WALL CABINETS: USE WEIGHTS OF CABINETS, PLUS 100 LB PER
LINEAR FOOT OF SHELF.
E. COUNTERTOPS: USE WEIGHT OF COUNTERTOPS PLUD 55LBS PER
FOOT OF COUNTER.
F. 12" ADJ SHELVES- USE 83 LBS PER BRACKET
G. 18" ADJ SHELVES- USE 55 LBS PER BRACKET
H. 24" ADJ SHELVES- USE 40 LBS PER BRACKET
I. TV / MONITORS- COORDINATE WITH VA
14 GA. BREAK METAL
CLOSURE PLATE
3/4" DOUBLE
SIDED ADHESIVE
TAPE
BOOTH WALL PANEL
ADJACENT
FACILITY WALL
2'
2' - 1"
REMOVABLE ADA COMPLIANT
PIPING COVER
PLAS LAM PANEL
SOLID SURFACE COUNTER
AND BACKSPLASH WITH 3/8"
CHAMFERED EDGES
0'
1/
2"
2'
2' - 1"
BASE CABINET DRAWERS &
FILING CABINETS W/
PLAS LAM FINISH
SOLID SURFACE COUNTER
AND BACKSPLASH WITH 3/8"
CHAMFERED EDGES0'
1/ 2"
8" 8"
1'
1/
2" 4"
3/4" FIRE RATED
MDF WITH PLAS LAM FINISH
UPPER CABINETS, DOORS
& ADJUSTABLE SHELVING
UNDER CABINET LIGHTING
SLOPED TOP
AS103
SIM
AS103
TYP
3' - 7 1/4" 2' - 0"
2'
6" 1'
8"
2'
REFER TO
PLUMBING DWG'S
& SPECS FOR SINK
3/4" FIRE TREATED
MDF WITH PLAS
LAM FINISH, UPPER
CABINETS, DOORS,
SHELVING
2' - 0"
PROVIDE PLAS LAM
FINISHED END
SOLID SURFACE
WORKING
COUNTER AND
INTEGRAL
BACKSPLASH
5' - 7 1/4"
SLOPE TOP
AS103
SIM
AS103
TYP
1' - 9" 2' - 7"
4' - 5"
2'
1'
8" 2'
6"
1' - 9"
0'
2"
0' - 1"
3/4" FIRE TREATED
MDF WITH PLAS
LAM FINISH, UPPER
CABINETS, DOORS,
SHELVING
REFER TO
PLUMBING DWG'S
& SPEC FOR SINK
SOLID SURFACE
WORKING
COUNTER AND
INTEGRAL
BACKSLPASH
PROVIDE PLAS LAM
FINISHED END
WALL
SLOPE TOP
5' - 2 3/4"2' - 0" 2' - 6"
AS103
TYP
2'
"EQEQ
AS103
SIM
SOLID SURFACE
COUNTERTOP
PROVIDE PLAS
LAM END WALL
PANELS AT
WORK COUNTER
OPEN END
HEAVY DUTY
BRACKETS AT 32"
O.C. MAX- PROVIDE
FRAMING/BLOCKIN
G WITHIN WALLS
PLAS LAM
FININSHED BASE
DRAWERS WITH
CABINET LOCKS
9' - 11 1/2"
3' - 4" 2' - 0" 3' - 3"
2'
0'
2"
AS103
TYP
AS103
SIM
8' - 8"
SOLID SURFACE
COUNTERTOP
PROVIDE PLAS
LAM END WALL
PANELS AT
SINK COUNTER
OPEN END
PLAS LAM
FINNISHED BASE
DRAWERS WITH
CABINET LOCKS
EQ EQ
2'
2' - 0"5' - 5"
7' - 5"
0'
2"
SOLID SURFACE
COUNTERTOP
HEAVY DUTY
BRACKETS AT 32"
O.C. MAX- PROVIDE
FRAMING/BLOCKING
WITHIN WALLS
DRAWER BASE
FURNITURE BY VA -
GC TO COORDINATE
NOTE: ALL WOOD PRODUCTS (PLYWOOD (WHERE
NOTED), BLOCKING, FRAMING, ETC.) USED IN
MILLWORK AND GENERAL CONSTRUCTION MUST
BE FIRE RETARDANT TREATED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:0
PM
AS103
INTERIOR PROJECT DETAILS
1 1/2" = 1'-0"AS103
1 Existing Window Infill - Film
1 1/2" = 1'-0"AS103
2 Existing Window - Finish Detail
3" = 1'-0"AS103
4 Wall Mounted Sound Adsorption Panel
3" = 1'-0"AS103
3 Typical Wall Blocking Detail
1 1/2" = 1'-0"AS103
5 Closure Strip Details
3/4" = 1'-0"AS103
6 Section at ADA Sink
3/4" = 1'-0"AS103
7 Section at Drawers / Overhead Cabinet
1/2" = 1'-0"AS103
8 CASEWORK- BOOTH SUITE
1/2" = 1'-0"AS103
9 CASEWORK - FITTING ROOM
1/2" = 1'-0"AS103
10 CASEWORK - EXAM ROOM 1
1/2" = 1'-0"AS103
11 CASEWORK - EXAM ROOM 2
1/2" = 1'-0"AS103
12 CASEWORK - OPTICIAN OFFICE
9'
0"
F01 F164'
6"
AS103
TYP
2'
F04
F02
F23
F11
F07
F08 F20
F09
F05 F17
F21 F11
AS103
4'
6"
F03
F10
F12
F06
F19
F18 11
7'
0"
8'
0"
F24 F03
F13
F28
8 F35
F17F05
F30 F33
6 F09
F34
F13
F29
F14,F15
9'
0"
F16 F01
4'
6"
AS103
TYP
F06
F19
F18
F12
F03
4'
6"
F10
F05
F23
F02 F04 F07
F09
F20
F08
F17
F21 F11
AS103
Sim
F05
9'
0"
2'
F23
F06
F04
F02 F07
F08 F20
F37
F194'
6"
F16
1 2
AS103
Sim
F11
F12
F42
6 F03
F09
F39
AS103
TYP
9'
0"
F12
F03
F11
F10
F04
F01 F06 F09
F44
F38
9'
0"
F05
4'
6"
4'
6"
F39
F03
F09
F38 F12
F42
F11
4'
6"
F06 F19
F23
F02
F04 F07
F20
F16
F08
F01
F37
AS103
9'
0"
F95
F86
F94
3'
5"
F91
F53
F97
F100
F14,F15
F98 F12
F05
F45
F89
9'
0"
F109
F47
F14,F15
F53
F101
F104
F83
F109
AS103
F105
F56
F106
F48 F12F110
F09
F108
9'
0"
F38 F12
F03 F05
5'
0"
4'
4"
F48
F47
F02 F04
F49
F14
F11
F53
F45
F56 F65
F63 F50
F59
F49
F09
F57
F63 F47 F53 F68
9'
0"
F38 F49
F11 F67F77
F09
F57
F03
F05
F37
F02
F07
F04
F06 F83
F80
F69
F12
AS103
F38
F09
9'
0"
F68 F77 F11
F49
F47
F37F04 F06
F83
F02
F63
F69
AS103
F03
F12
F05 F57
F67
F### = KEYED EQUIPMENT - SEE SHEETS AS600 & AS601
# = LEYNOTE - SEE BELOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:2
PM
AS104
INTERIOR ELEVATIONS
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S337 BOOTH SUITE #2 (AUDE2)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S337A PREFAB BOOTH (PEHS2)
3/16" = 1' - 0"AS104
1.1
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S336 BOOTH SUITE #1 (AUDE2)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S335 FITTING #2 (HAFR1)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S339 OFFICE (OFA09)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S334 FITTING #1 (HAFR1)
3/16" = 1' - 0"AS104
6 S333 CONF. / EDU. (CLR10)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S332 OPTICIAN OFFICE (OFA09)
3/16" = 1' - 0"AS104
8 S331 PRE-TEST (OPPT1)
3/16" = 1' - 0"AS104
NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
S330 EXAM #2 (OPET1)
3/16" = 1' - 0"AS104
10 S329 EXAM #1 (OPET1)
3/16" = 1' - 0"AS104
1. ALL DIMENSIONS ARE TO FINISH FACE OR CENTERLINE, UNLESS NOTED OTHERWISE.
2. COORDINATE CLEARANCES FOR EQUIPMENT.
3. FLOOR FINISH AND BASE TO EXTEND UNDER CABINETS.
4. FINISH AT ALL EXPOSED CABINET SIDES TO MATCH FINISHED CABINET FACE WITH BASE CONTINUOUS AT ALL
EXPOSED SIDES.
5. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING FIXTURE TYPES AND MOUNTING HEIGHTS.
6. PROVIDE BLOCKING AS REQUIRED FOR INSTALLATION OF PLUMBING FIXTURE(S) ACCESSORIES, EQUIPMENT, AND CASE WORK.
7. REFER TO ROOM FINISH SCHEDULE, AS102.
8. REFER TO AS600 AND AS601 FOR FF&E TAG REFERENCES.
KEYNOTES
1 2" THICK SOUND ABSORPTIVE WALL TREATMENT - 0.90 NRC, RATING AND MIN. 0.65 SOUND COEFFICIENT AT 250 Hz.
2 SPECULA DISPENSER (OTOSCOPE ACCESSORY)
3 MONITOR WITH WEBCAM CAPABILITY
4 SPEAKER, COMPONENT OF DIAGNOSTIC AUDIOMETER. VA TO COORDINATE SIZE OF SPEAKER AND LOCATION PRIOR
TO PROCUREMENT.
5 WIRE MANAGER STRIP (TO JACK PANEL)
6 OPTIONAL LOCATION FOR Z0015, OTOSCOPE, DIAGNOSTIC.
7 HOOKS TO ACCOMMODATE HEADPHONES AND WIRES, QUANTITY TO BE PER FACILITY NEED.
8 JACK PANEL, COMPONENT PART OF AUDIOMETRIC BOOTH.
9 36" x 48" VIEW WINDOW
10 CLOSURE STRIP
11 CEILING LINE OF PREFABRICATED SOUND SUITE BEYOND
MIRROR LAYOUT APPLIES TO S336A PREFAB BOOTH
1-6
PREFAB BOOTH
S337A
BOOTH SUITE #2
S337
BOOTH SUITE #1
S336
CONF. / EDU.
S333
FITTING #1
S334
STORAGE
S338
OFFICE
S339
FITTING #2
S335
EXAM #2
S330
PRE-TEST
S331
OPTICIAN OFFICE
S332
EXAM #1
S329
PREFAB BOOTH
S336A
BOOTH
CORRIDOR
S340
VESTIBULE
S341
F01F10
F02
F03
F04
F05
F06
F07
F08
F09
F24
F03
F11
F12 F13
F30
F14
F15
F15
F16 F17
F32
F33
F05
F19
F35
F01
F02
F03
F04F05
F06
F07
F08
F09
F09
F03
F29
F11
F12
F13
F30
F14
F15
F15
F16
F17
F32
F33
F05
F19
F35
F09
F09 F36
F37
F03
F08
F06
F14 F15
F10
F39
F05
F40
F09
F09
F10
F44
F36F06
F14
F15
F05
F12
F03
F12
F47
F05 F03
F04
F45
F48
F02
F15
F51
F53
F65
F56
F57
F09
F09 F36
F02
F03
F04
F06
F14 F15
F08
F11
F39
F05
F37
F42 F41
F07
AD
F92 F93
F99
F15
F12
F98
F88
F87
F38
F85 F86 F90 F91
F05
F96
F12
F14
F15
F09
F14
TEST CORRIDOR
S328
F09F34
F29
F28
F10
F28
F34
F110
F101
F106
F67
F09
F77
F83
F80
F69
F06
F73 F61 F70
F48
F49
F05
F38
F12
F14 F15
F57
F78
F83
F06 F07
F09 F67
F77
F80
F48
F49
F05
F38
F12
F14 F15
F69
F73 F61 F70
F78
F50
F83
F06
F48
F09
F102
F104
F105 F107
F108
F109
F100
F97
F95 F94
F38
F24
F10
F20 F23
F21
F21
F18
F18
F04
F07 F02
F38
F38
F11 F42 F41
F19
F19
F12
F12
F16
F16
F17
F17
F40
F23 F21
F21
F23
F29
F54
F111
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:3
PM
AS600
EQUIPMENT PLAN
1/4" = 1'-0"AS600
1 Building 3 - Audiology and Eye Clinic Equipment Plan
SEE AS601 FOR EQUIPMENT SCHEDULES
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FOR CONSTRUCTIONOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Watson Engineering, P.C.
1112 State Rte. 434 Owego, NY 13827 (607)223-4334
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021 TB DN
SYMBOL LEGEND:
KEYNOTES:
GENERAL NOTES:
PROJECT AREA
BUILDING 3 - SECOND FLOOR
\\T F-
D C
\U se rs
\D an ie l\D oc um en ts
\V
AM
C L yo ns
_B ui ld in g 3_
M as te r_
TF
A-
LI
C
EN
SI
N G
2.
rv t 7/
/2
2:
:3
PM
AS601
EQUIPMENT SCHEDULES
C = CONTRACTOR SUPPLIED AND/OR CONTRACTOR INSTALLED
V = VA SUPPLIED AND/OR VA INSTALLED
AIR TERMINAL SYMBOLS
TERMINAL UNIT WITH REHEAT COIL
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
FT FLOW TRANSMITTER
H7
A
DRAWING SYMBOLS
26-SF-3
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
MECHANICAL EQUIPMENT TAG
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
DUCTWORK SYMBOLS
FC
10x8
FLEXIBLE CONNECTION,
EQUIPMENT,VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE
OR RECTANGULAR ELBOWS WITH VANES EVEN IF SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
FIRE DAMPER
FD
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
SUPPLY
RETURN
45°
STANDARD BRANCH SUPPLY OR RETURN, NO SPLITTER
(45 TAP)
45°
F/S DPR
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
LIMIT OF DEMOLITION
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE (WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE
CONNECTOR
VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
GENERAL PIPING SYMBOLS
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PIPE UP
PIPE DOWN
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENTAV
MANUAL AIR VENT
MV
PC AIR TERMINAL UNIT CONTROLLER
W WATTS
Wb WET-BULB (TEMPERATURE)
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VHA VETERANS HEALTH ADMINISTRATION
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
DB DECIBELS
Db DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT (SUBMISSION1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DPS DIFFERENTIAL PRESSURE SENSOR
CD-2 CONSTRUCTION
DOCUMENTS (SUBMISSION2)
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CEILING REGISTER
CV CONSTANT VOLUME
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AF AIR FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
ASME AMERICAN SOCIETY OF
MECHANICAL ENGINEERS
CD CEILING DIFFUSER
CD-1 CONSTRUCTION
DOCUMENTS (SUBMISSION1)
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
FA FREE AREA
FC FLEXIBLE CONNECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
GAL GALLONS
GPM GALLONS PER MINUTE
HSTAT HUMIDISTAT
HW HOT WATER
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
FT FEET
OA OUTSIDE AIR
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MIN MINIMUM
MM MILLIMETER
MVD MANUAL VOLUME DAMPER
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR)
L/m LITERS PER MINUTE (OR LITERS/MINUTE)
L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LWT LEAVING WATER TEMPERATURE
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SP STATIC PRESSURE
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RHC REHEAT COIL
PD PRESSURE DROP
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
MECHANICAL ABBREVIATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE:
Watson Engineering, P.C.
1112 State Rte. 434
Owego, NY 13827
(607)223-4334
ThinkForm Design Architect LLC
38 East Broad St, Suite 3
Hopewell, New Jersey, 08525
(855) 821-0274
UPGRADE AUGIOLOGY AND
EYE CLINIC - BLDG. 3
LYONS VA MEDICAL CENTER
561A4-18-119
BUILDING 3
07/02/2021
PROJECT AREA
BUILDING 3 - SECOND FLOOR
B
IM
/5
A
-1 -1
U p g ra d e
A u d io lo g y a n d
E y e
C lin ic
B ld g
/5
A
-1
-1
U p g ra d e A u d ilo g y a n d E y e C lin ic
.r v t
/2
/2
:3
:0
A
M
M-001
MECHANICAL SYMBOLS, NOTES,
AND ABBREVIATIONS
JWE MPL
1. UNLESS SPECIFICALLY NOTED AS EXISTING, ALL ITEMS, EQUIPMENT, AND WORK SHOW IS NEW AND SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
2. DURING THE EXECUTION OF THIS CONTRACT, THE SITE AND BUILDINGS WILL BE OCCUPIED AND IN USE. WORK DONE UNDER THIS CONTRACT SHALL BE PERFORMED WITHOUT INCONVENIENCE TO THE OWNER INSOFAR AS POSSIBLE. ALL WORK SHALL BE COORDINATED WITH
THE CONTRACTING OFFICER’S REPRESENTATIVE AND IS SUBJECT TO HIS CONTINUOUS APPROVAL.
3. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR ALL CHARACTERISTICS OF THE EQUIPMENT THAT HE INTENDS TO INSTALL. IF THERE ARE ANY DIFFERENCES IN THE EQUIPMENT SHOWN ON THE DESIGN DRAWINGS AND THE EQUIPMENT TO BE INSTALLED, THE
CONTRACTOR SHALL MAKE ALL CHANGES AND ADJUSTMENTS TO ACCOMMODATE THE NEW EQUIPMENT AT NO ADDITIONAL COST TO THE OWNER. THIS APPLIES TO ALL SUPPORT SERVICES AND FACILITIES NECESSARY TO PROPERLY INSTALL THE EQUIPMENT TO FUNCTION ADEQUATELY AS PART OF THE SYSTEMS FOR WHICH THEY WERE DESIGNED AND SELECTED. THESE CHARACTERISTICS INCLUDE SUCH THINGS AS WEIGHT, DIMENSIONS, ELECTRICAL, MECHANICAL, PLUMBING, AND UTILITY SERVICES, ETC. ACCOMMODATING SERVICES INCLUDE SUCH THINGS AS DIMENSIONS, LOCATIONS, AND SIZES OF SUPPORTING MEMBERS, PIPE, CONNECTION SIZES, ELECTRICAL SERVICE SIZE AND PROTECTION, ELECTRICAL CONNECTION LOCATION, UTILITY AND PLUMBING CONNECTION SIZES AND LOCATIONS, ETC. ALL REQUIRED CHANGES TO THE CONTRACT DRAWINGS AND SPECIFICATIONS SHALL BE DESIGNED AND STAMPED BY REGISTERED ENGINEERS IN THE APPROPRIATE DISCIPLINE EMPLOYED BY THE CONTRACTOR AND SHALL BE INCLUDED AS PART OF THE EQUIPMENT SUBMITTALS. ALL CHANGES SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT A/E AND THE CONTRACTING OFFICER’S REPRESENTATIVE.
4. PRELIMINARY AIR AND WATER BALANCE REPORT. AT THE BEGINNING OF THE WORK IMMEDIATELY AFTER RECEIVING NOTICE TO PROCEED, THE CONTRACTOR SHALL MEASURE AND SUBMIT A PRELIMINARY BALANCE REPORT IN COMPLIANCE WITH THE SPECIFICATIONS FOR THE TERMINAL UNITS, AIR HANDLING UNITS, AND HYDRONIC HEATING WATER PUMPS ASSOCIATED WITH THE WORK OF THIS PROJECT. MEASURE ALL SUPPLY, RETURN, AND EXHAUST AIR QUANTITIES. MEASURE AHU IN FULL COOLING, MAX AIR FLOW, AT THE AHU, AND MAX AIR FLOW AT ALL ZONES AND ALL DIFFUSERS; MEASURE THE DISCHARGE STATIC PRESSURE AT THE AHU AND THE SUCTION STATIC PRESSURE AT THE AHU. THEN EACH ZONE SHALL BE SET TO FULL REHEAT AND THE AIR QUANTITY MEASURED AT EACH OUTLET AND THE WATER FLOWS AND TEMPERATURES MEASURED AT EACH REHEAT BOX. THE EXISTING MECHANICAL DRAWINGS WILL BE PROVIDED BY THE FACILITY ENGINEERING DEPARTMENT AT THE VA. SUBMIT A BLANK BALANCE REPORT FOR APPROVAL PRIOR TO BEGINNING THE PRELIMINARY AIR
BALANCE.
5. BEFORE ANY DEMOLITION OR CONSTRUCTION WORK IS BEGUN, THE CONTRACTOR AND THE CONTRACTING OFFICER’S REPRESENTATIVE SHALL SURVEY THE EXISTING CEILINGS TO BE REMOVED AND REPLACED FOR THEIR EXISTING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .