Attach 1_000110 Specification TOC.pdf

PDF 124 KB Posted

Attached to
Y1DA--561A4-18-119 - Upgrade Audiology & Eye Clinic Lyons Bldg. 3
Solicitation number
36C24222B0003
Issued by

About this file

This document contains a federal contract opportunity and related project specification table of contents. The contract opportunity is for project number 561A4-18-119 to upgrade the Audiology and Eye clinics in Building 3 at the VA New Jersey Health Care System in Lyons, NJ. The project scope involves gut renovations and updates to expand the space used by the Audiology and Eye clinics, which was originally constructed in 1990 and has not been renovated since. The contract is set aside exclusively for service-disabled veteran-owned small businesses. The cost estimate range for the project is $1 to $2 million. The period of performance is 180 days from notice to proceed. The solicitation will be released on October 22, 2021 on SAM.gov. The related specification table of contents outlines the divisions and sections for architectural, mechanical, electrical, and other requirements for the upgrade project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-01-21

Lyons VA Medical Center UPGRADE AUDIOLOGY AND EYE CLINIC – BLDG 3

151 Knollcroft Rd. VA Project No.: 561A4-18-119

Lyons, NJ 07939

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 Shop Drawings, Product Data, and Samples

01 35 26 Safety Requirements

01 42 19 Reference Standards

01 45 00 Quality Control

01 57 19 Temporary Environmental Controls

01 58 16 Temporary Interior Signage

01 74 19 Construction Waste Management

01 81 13 Sustainable Construction Requirements

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry

06 20 00 Finish Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames

08 14 00 Interior Wood Doors

08 31 13 Access Doors and Frames

08 71 00 Door Hardware

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes

09 06 00 Schedule for Finishes

09 22 16 Non-Structural Metal Framing

00 01 10-2

09 29 00 Gypsum Board

09 51 00 Acoustical Ceilings

09 65 13 Resilient Base and Accessories

09 65 19 Resilient Tile Flooring

09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 14 00 Signage

10 26 00 Wall and Door Protection

10 44 13 Fire Extinguisher Cabinets

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components

13 21 49 Audiology Booth

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System

21 13 13 Wet-Pipe Sprinkler Systems

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing

22 05 23 General-Duty Valves for Plumbing Piping

22 07 11 Plumbing Insulation

22 11 00 Facility Water Distribution

22 13 00 Facility Sanitary and Vent Piping

22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 11 HVAC and Boiler Plant Insulation

23 08 00 Commissioning of HVAC Systems

23 09 23 Direct-Digital Control System for HVAC

23 21 13 Hydronic Piping

23 31 00 HVAC Ducts and Casings

23 36 00 Air Terminal Units

23 37 00 Air Outlets and Inlets

23 82 16 Air Coils

00 01 10-3

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations

26 05 19 Low-Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Systems

26 08 00 Commissioning of Electrical Systems

26 09 23 Lighting Controls

26 27 26 Wiring Devices

26 29 21 Enclosed Switches and Circuit Breakers

26 51 00 Interior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations

27 05 26 Grounding and Bonding for Communications Systems

27 05 33 Raceways and Boxes for Communications Systems

27 08 00 Commissioning of Communications Systems

27 10 00 Control, Communication and Signal Wiring

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 00 Fire Detection and Alarm

File details come from the government source that posted it. Updated .