ATTACHMENT 1 - Price Schedule.pdf
PDF 283 KB Posted
- Attached to
- Gavins Point Vegetative Spraying Federal contract opportunity
- Solicitation number
- W9128F26QA010
About this file
This is a Price Schedule for Chemical Vegetative Control Services at Gavins Point Project, a U.S. Army Corps of Engineers (USACE) facility located in Yankton County, South Dakota and Cedar County, Nebraska.
The contract consists of a base period from the date of award through April 14, 2027, with an active performance period from award through October 30, 2026, and an inactive period from November 1, 2026 through April 14, 2027. Four option periods follow, each spanning one year from April 15 through April 14 of the respective years (2028, 2029, 2030, and 2031). The contractor must provide chemical weed control services across 21 work units covering approximately 100+ acres of project land, including boat yards, maintenance yards, campgrounds, lake shorelines, dam slopes, fishing areas, power facilities, and roadways. Work Unit 1 through 20 address specific geographic areas with estimated spraying frequencies ranging from one to twenty applications per year, depending on location and vegetation growth patterns. Work Unit 21 encompasses treatment of emerging invasive and noxious plant species across all previously defined areas, requiring approximately twenty additional sprayings throughout each year. Pricing is on a unit price basis, with contractors submitting per-application costs for each work unit. The total contract value across the base period and all four option periods will be calculated by multiplying submitted unit prices by the estimated quantities (number of sprayings) for each work unit, with separate totals required for each contract period.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFIs and Responses Gavins Point Vegetative Spraying Contract_W9128F26QA010.pdf | ||
| Solicitation Amendment W9128F26QA0100001 SF 30.pdf | ||
| Solicitation - W9128F26QA010 Professional Appearance.pdf | ||
| ATTACHMENT 2 - PWS GP Vegetative Spraying 2026-2031.pdf | ||
| ATTACHMENT 4 - WD 2015-5375 Rev27_Yankton Co..pdf | ||
| ATTACHMENT 3 - WD 2015-5361 Rev29_Cedar Co..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 1
PRICE SCHEDULE
CHEMICAL VEGETATIVE CONTROL SERVICES
AT GAVINS POINT PROJECT
BASE PERIOD – Date of Award through April 14, 2027.
Active Period of Performance: Date of Award through 30 October 2026.
Inactive Period of Performance: 01 November 2026 through 14 April 2027.
0001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at four (4).
Unit Price Quantity Unit Total
Each
0002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at four (4).
0004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).
0005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400 +/- sq. ft. Historically, the number of sprayings needed for this area is estimated at three (3).
0006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately
9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).
0007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.
+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).
0008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at three (3).
0009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).
0010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at four (4).
0012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
0013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0016- Work Unit 16: Chemical Weed Control services a Relief Well Outfalls, approximately 13,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).
0018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
0019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at one (1).
0020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at twenty (20).
0021- Work Unit 21 This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.
Approximately twenty (20) sprayings will be needed throughout the year.
Unit Price Unit Price Unit Price Unit Price
TOTAL BASE PERIOD (Units 0001-0021) = $ ________________
OPTION PERIOD I – April 15, 2027 through April 14, 2028.
Active Period of Performance: 15 April 2027 through 30 October 2027.
Inactive Period of Performance: 01 November 2027 through 14 April 2028.
1001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is
1002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area
1004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of sprayings. Historically, the number of sprayings needed for this area is estimated at five (5).
1005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400
1006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately
9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for
1007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.
+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number
1009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
1010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 1012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
1013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).
1016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
1018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
1019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of
1020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
1021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.
TOTAL OPTION PERIOD 1 (Units 1001-1021) = $ ________________
OPTION PERIOD 2 – April 15, 2028 through April 14, 2029.
Active Period of Performance: 15 April 2028 through 30 October 2028.
Inactive Period of Performance: 01 November 2028 through 14 April 2029.
2001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is
2002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area
2004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).
2005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400
2006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately
9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for
2007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.
+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number
2009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
2010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 2012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
2013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at
2016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
2018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
2019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of
2020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
2021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.
TOTAL OPTION PERIOD 2 (Units 2001-2021) = $ ________________
OPTION PERIOD 3 – April 15, 2029 through April 14, 2030.
Active Period of Performance: 15 April 2029 through 30 October 2029.
Inactive Period of Performance: 01 November 2029 through 14 April 2030.
3001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is
3002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area
3004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).
3005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400
3006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately
9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for
3007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.
+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number
3009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
3010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 3012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
3013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at
3 Each $_______________
3016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
3018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
3019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of
3020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
3021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.
TOTAL OPTION PERIOD 3 (Units 3001-3021) = $ ________________
OPTION PERIOD 4 – April 15, 2030 through April 14, 2031.
Active Period of Performance: 15 April 2030 through 30 October 2030.
Inactive Period of Performance: 01 November through 14 April 2031.
4001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is
4002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area
4004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).
4005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400
4006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately
9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for
4007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 43,500 sq. ft.
+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number
4009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
4010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 4012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed
4013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at
4016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
4018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is
4019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of
4020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of
4021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.
TOTAL OPTION PERIOD 4 (Units 4001-4021) = $ ________________