ATTACHMENT 1 - Price Schedule.pdf

PDF 283 KB Posted

Attached to
Gavins Point Vegetative Spraying Federal contract opportunity
Solicitation number
W9128F26QA010
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

This is a Price Schedule for Chemical Vegetative Control Services at Gavins Point Project, a U.S. Army Corps of Engineers (USACE) facility located in Yankton County, South Dakota and Cedar County, Nebraska.

The contract consists of a base period from the date of award through April 14, 2027, with an active performance period from award through October 30, 2026, and an inactive period from November 1, 2026 through April 14, 2027. Four option periods follow, each spanning one year from April 15 through April 14 of the respective years (2028, 2029, 2030, and 2031). The contractor must provide chemical weed control services across 21 work units covering approximately 100+ acres of project land, including boat yards, maintenance yards, campgrounds, lake shorelines, dam slopes, fishing areas, power facilities, and roadways. Work Unit 1 through 20 address specific geographic areas with estimated spraying frequencies ranging from one to twenty applications per year, depending on location and vegetation growth patterns. Work Unit 21 encompasses treatment of emerging invasive and noxious plant species across all previously defined areas, requiring approximately twenty additional sprayings throughout each year. Pricing is on a unit price basis, with contractors submitting per-application costs for each work unit. The total contract value across the base period and all four option periods will be calculated by multiplying submitted unit prices by the estimated quantities (number of sprayings) for each work unit, with separate totals required for each contract period.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

PRICE SCHEDULE

CHEMICAL VEGETATIVE CONTROL SERVICES

AT GAVINS POINT PROJECT

BASE PERIOD – Date of Award through April 14, 2027.

Active Period of Performance: Date of Award through 30 October 2026.

Inactive Period of Performance: 01 November 2026 through 14 April 2027.

0001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at four (4).

Unit Price Quantity Unit Total

Each

0002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at four (4).

0004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).

0005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400 +/- sq. ft. Historically, the number of sprayings needed for this area is estimated at three (3).

0006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately

9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).

0007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.

+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).

0008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at three (3).

0009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).

0010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at four (4).

0012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

0013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0016- Work Unit 16: Chemical Weed Control services a Relief Well Outfalls, approximately 13,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).

0018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

0019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of sprayings needed for this area is estimated at one (1).

0020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at twenty (20).

0021- Work Unit 21 This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.

Approximately twenty (20) sprayings will be needed throughout the year.

Unit Price Unit Price Unit Price Unit Price

TOTAL BASE PERIOD (Units 0001-0021) = $ ________________

OPTION PERIOD I – April 15, 2027 through April 14, 2028.

Active Period of Performance: 15 April 2027 through 30 October 2027.

Inactive Period of Performance: 01 November 2027 through 14 April 2028.

1001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is

1002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area

1004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of sprayings. Historically, the number of sprayings needed for this area is estimated at five (5).

1005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400

1006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately

9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for

1007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.

+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number

1009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

1010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 1012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

1013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at three (3).

1016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

1018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

1019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of

1020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

1021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.

TOTAL OPTION PERIOD 1 (Units 1001-1021) = $ ________________

OPTION PERIOD 2 – April 15, 2028 through April 14, 2029.

Active Period of Performance: 15 April 2028 through 30 October 2028.

Inactive Period of Performance: 01 November 2028 through 14 April 2029.

2001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is

2002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area

2004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).

2005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400

2006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately

9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for

2007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.

+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number

2009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

2010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 2012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

2013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at

2016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

2018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

2019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of

2020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

2021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.

TOTAL OPTION PERIOD 2 (Units 2001-2021) = $ ________________

OPTION PERIOD 3 – April 15, 2029 through April 14, 2030.

Active Period of Performance: 15 April 2029 through 30 October 2029.

Inactive Period of Performance: 01 November 2029 through 14 April 2030.

3001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is

3002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area

3004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).

3005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400

3006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately

9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for

3007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 3,500 sq. ft.

+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number

3009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

3010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 3012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

3013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at

3 Each $_______________

3016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

3018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

3019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of

3020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

3021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.

TOTAL OPTION PERIOD 3 (Units 3001-3021) = $ ________________

OPTION PERIOD 4 – April 15, 2030 through April 14, 2031.

Active Period of Performance: 15 April 2030 through 30 October 2030.

Inactive Period of Performance: 01 November through 14 April 2031.

4001- Work Unit 1: Chemical Weed Control services at Boat Yard, approximately 1.3 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area is

4002- Work Unit 2: Chemical Weed Control services at Maintenance Yard, approximately 5.5 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4003- Work Unit 3: Chemical Weed Control services at Rock Storage Piles, approximately 3.1 +/- acres at Gavins Point Project, Yankton County, South Dakota. Historically, the number of sprayings needed for this area

4004- Work Unit 4: Chemical Weed Control services at Lewis and Clark Lake shoreline, approximately 6.5 +/-acres at Gavins Point Project, Yankton County, South Dakota and Cedar County, Nebraska. Five (5) estimated number of spraying. Historically, the number of sprayings needed for this area is estimated at five (5).

4005- Work Unit 5: Chemical Weed Control services at Cottonwood Campground and Nebraska Tailwaters Campgrounds. 77 impact pads and 1 pump station enclosure in Cottonwood Campground and 6 impact pads in Nebraska Tailwaters at Gavins Point Project, Cedar County, Nebraska. Impact pads average approximately 400

4006- Work Unit 6: Chemical Weed Control services at north bank of Missouri River shoreline, approximately

9.9 +/- acres at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for

4007- Work Unit 7: Chemical Weed Control services at Training Dike Fishing Pier approximately 43,500 sq. ft.

+/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4008- Work Unit 8: Chemical Weed Control services at Fishing Jetty north of Cottonwood Day Use area, approximately 3,200 sq. ft. +/- at Gavins Point Project, Yankton County, South Dakota. Historically, the number

4009- Work Unit 9: Chemical Weed Control services at Cottonwood Day Use area fishing jetty, approximately 3,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

4010- Work Unit 10: Chemical Weed Control services at slope along Powerhouse Road, approximately 1.2 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4011- Work Unit 11: Chemical Weed Control services at Powerhouse area, approximately 3.25 +/- acres solid coverage and 1.3 acres +/- spot spraying coverage at Gavins Point Project, Cedar County, Nebraska. Historically, 4012- Work Unit 12: Chemical Weed Control services at Radio Tower/weather station area, approximately 2,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed

4013- Work Unit 13: Chemical Weed Control services at Nebraska Tailwaters - West, approximately 2.5 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4014- Work Unit 14: Chemical Weed Control services at Nebraska Tailwaters - East, approximately 1.6 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4015- Work Unit 15: Chemical Weed Control services at the sewage lagoons, approximately 1 acre +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is estimated at

4016- Work Unit 16: Chemical Weed Control services at Relief Well Outfalls, approximately 13,000 sq. ft. +/-at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4017- Work Unit 17: Chemical Weed Control services at Nebraska Tailwaters fish cleaning station, approximately 6,000 sq. ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

4018- Work Unit 18: Chemical Weed Control services at Lake Yankton Swim Beach, approximately 1.25 acres +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of sprayings needed for this area is

4019- Work Unit 19: Chemical Weed Control services at Dam slope/embankment, approximately 45 acres. +/-at Gavins Point Project, Cedar County, Nebraska and Yankton County, South Dakota. Historically, the number of

4020- Work Unit 20: Chemical Weed Control services at Project roadways, trails, sidewalks, misc. spraying, approximately 500 linear ft. +/- at Gavins Point Project, Cedar County, Nebraska. Historically, the number of

4021- Work Unit 21: This unit will include the previous Units (1-20) of this Performance Work Statement. The contractor shall chemically treat any and all emerging invasive and noxious plant species on USACE project lands defined in the units above. Size of area will vary but will be approximately 500 linear ft. +/-, each spraying.

TOTAL OPTION PERIOD 4 (Units 4001-4021) = $ ________________

File details come from the government source that posted it. Updated .