Attachment 1_Price Schedule.docx

DOCX document 31 KB Posted

Attached to
Waste removal from Sauvage Bayou
Solicitation number
12639526Q0091
Issued by

About this file

This is a Price Schedule template for RFQ 12639526Q0091, a waste removal project at Bayou Sauvage in New Orleans under the Department of Agriculture Animal and Plant Health Inspection Service (APHIS). The schedule itemizes pricing for three phases of work: Phase 1 Site Preparation and Mobilization (items 0001-0006), Phase 2 Earthwork and Hydrological Controls (items 0007-0012), and Phase 3 Site Restoration (items 0013-0015).

The project scope requires contractors to secure a property lease for the dump site entry point, submit required plans including safety, quality control, stormwater and pollution control measures, and obtain necessary permits. Phase 2 work includes swamp mat placement, coffer dam installation, waste sorting and removal, excavation and dewatering, soil filling with decompaction, and substrate management. Phase 3 encompasses wetland seeding, removal of temporary controls, and final site closeout. All line items are priced as lump sum (LS) amounts with a total price to be supplied by the offeror. The waste removal is necessary to prevent the spread of APHIS-regulated plant pests and pathogens, with contaminated waste requiring deep burial at a landfill facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 12639526Q0091, Waste Removal at Bayou Sauvage Attachment 1

PRICE SCHEDULE

Item Description Unit Amount

Phase 1 Site Preparation and Mobilization

0001 Secure property lease LS ____________ agreement

0002 Submittal of plans: safety, LS ____________ QC, stormwater and pollution control

0003 Secure permits LS ____________

0004Site layout, staking, office
trailer and equipment
mobilizationLS____________

0005 Utility locates LS ____________

0006 Erosion and sediment LS ____________ controls

Phase 2 Earthwork and Hydrological Controls

0007 Swamp mat placement LS ____________

0008 Construction/installation LS ____________ of coffer dam

0009 Waste sorting and removal LS ____________

0010 Excavation and dewatering LS ____________

0011 Soil filling and Decompaction LS ____________

0012 Substrate management LS ____________

Phase 3 Site Restoration (after site investigation by others)

Item Description Unit Amount

0013 Wetland seeding LS ____________

0014Removal of temporaryLS____________
controls

0015 Site closeout LS ____________

Total ____________