Attachment 1 Performance Work Statement_(PWS) JBSA_METC Bldg 3312.docx
DOCX document 51 KB Posted
- Attached to
- Bldg 3312, METC Furniture Relocation and Storage
- Solicitation number
- FA301626Q3312
About this file
This is a Performance Work Statement (PWS) for dormitory furniture disassembly, relocation, climate-controlled storage, and reinstallation services at Joint Base San Antonio (JBSA) Fort Sam Houston, Building 3312. The contractor must manage the complete removal, preservation, and phased return of approximately 5,711 government-owned dormitory furniture items including 1,072 beds, 1,208 underbed storage units, 1,198 nightstands, 1,596 mattresses, 600 wardrobes, and miscellaneous other furniture. All items must be removed from Building 3312 by the firm, non-negotiable deadline of October 15, 2026. The contractor is responsible for providing all personnel, equipment, tools, logistics, materials, transportation, and an off-site climate-controlled warehouse facility maintaining temperature controls between 60°F and 80°F and relative humidity not exceeding 60% year-round.
The PWS establishes six performance phases: Phase I requires a 100% joint pre-move inventory and condition assessment with the Contracting Officer's Representative (COR) prior to any disassembly; Phase II mandates sanitation, disassembly, hardware accountability, and protective wrapping to prevent damage; Phase III covers loading and transit logistics with strict protection of base infrastructure; Phase IV requires submission of a searchable Warehouse Master Inventory Log within five business days of storage intake; Phase V addresses phased recall delivery within thirty calendar days of electronic Task Delivery Notices over a three-year storage window; and Phase VI covers post-move housekeeping and final acceptance. Key performance thresholds include zero defects in milestone schedule compliance, asset preservation with zero new damage, 100% inventory reconciliation accuracy, on-time delivery of recalled items within 30 days, and no more than one defect per building in site cleanliness. The contractor must comply with OSHA regulations, Air Force Safety Standards, DBIDS security credentials, and submit mandatory deliverables including pre-move inventory assessments, quarterly environmental storage logs, recall/reinstallation status reports, and accident/damage incident reports within specified timeframes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ METC Furniture Relocation Bldg 3312.docx | DOCX document | |
| Attachment 4 Questions Answers.docx | DOCX document | |
| Attachment 2 Wage Determination 2015-5253 Rev 31.pdf | ||
| Attachment 3 Photos Furniture.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
DORMITORY FURNITURE DISASSEMBLY, RELOCATION, CLIMATE-CONTROLLED STORAGE, AND REINSTALLATION SERVICES JOINT BASE SAN ANTONIO (JBSA) – FORT SAM HOUSTON, TEXAS
BLDG 3312
1.0 GENERAL INFORMATION
1.1 Scope of Work
The Contractor shall provide all management, personnel, supervision, equipment, tools, logistics, materials, transportation, and climate-controlled storage facilities necessary to disassemble, clean, inventory, transport, store, and return/reinstall approximately 5,711 government-owned dormitory furniture located at Joint Base San Antonio (JBSA) – Fort Sam Houston, Texas. The Contractor shall accomplish all requirements in accordance with commercial standards, base operating procedures, and the measurable thresholds defined herein.
1.2 Background
JBSA requires the complete, damage-free removal and long-term secure preservation of dormitory furniture from Buildings 3312 prior to scheduled structural and interior facility renovations and abatement/demolition timelines. Due to phased renovation schedules across the installation, stored assets will be recalled and reinstalled incrementally over a three-year storage window. Multi-contractor activity will occur concurrently across these facilities, requiring precise coordination, strict operational security, and rigorous adherence to the milestone schedule.
1.3 Period of Performance (PoP) & Operational Hours
All items must be fully removed from the buildings no later than 15 October 2026. This is a firm, non‑negotiable deadline. Performance will begin immediately upon contract award. If the contractor has not removed all required items by 15 October, any remaining items will stay in the building, and the contract will be modified to reflect the updated unit count. The contractor will only be permitted to invoice for the items actually removed. Storage will be at an off-site climate-controlled warehouse facility.
Hours of Operation: Work hours are unrestricted. Standard shifts may be conducted Monday through Friday, 0700–1700 hours. Work on weekends, national holidays, or extended shifts is authorized provided the Contractor coordinates with and notifies the Contracting Officer’s Representative (COR) and Civil Engineering Point of Contact (CE POC) at least twenty-four (24) hours in advance to guarantee facility and inspector availability.
2.0 SPECIFIC TASKS & PERFORMANCE REQUIREMENTS
2.1 Phase I: Site Assessment, Inventory Control, and Staging Coordination
2.1.1 Joint Pre-Move Inventory & Condition Assessment: Prior to handling or disassembling any furniture asset, the Contractor shall conduct a 100% joint walkthrough with the COR and building managers. The Contractor shall document all pre-existing cosmetic or structural, or mechanical damage on an Initial Joint Inventory Log & or Condition Matrix. Any undocumented damage discovered post-removal shall be deemed contractor-caused.
2.1.2 Staging Operations: The Contractor shall establish secure exterior and interior staging zones approved by the CE POC/Facility Manager that do not obstruct emergency egress paths, fire hydrants, loading lanes, or concurrent building trade activities.
2.2 Phase II: Sanitation, Disassembly, Hardware Control, and Protective Packaging
2.2.1 Sanitation & Surface Decontamination: Prior to disassembly, packaging, or wrapping, the Contractor shall wipe down all surfaces of each furniture asset to remove dust, biological contaminants, dirt, and debris. Items shall not be wrapped or placed into storage in a soiled state. The Contractor shall disassemble bed frames (wood and metal), headboards, and footboards without structural damage, striping, or splitting. Monolithic solid items (such as bar stools and select casegoods) that do not require disassembly shall be prepped directly.
2.2.2 Component Preservation & Hardware Accountability: All mounting hardware (bolts, pins, screws, cam locks, brackets, washers) shall be accounted for, sealed inside minimum 4-mil heavy-duty plastic bags, clearly labeled with room and item numbers, and firmly strapped/taped directly to the parent furniture frame component. Loss of hardware is unacceptable.
2.2.3 Protective Wrapping: All finished wood and metal surfaces shall be fully wrapped in clean industrial-grade furniture pads and stretch film to eliminate transit abrasion, chipping, gouging, and denting. All mattresses shall be encapsulated in tear-resistant, heavy-duty polyethylene mattress bags and sealed watertight to maintain strict hygienic conditions during transport and multi-year storage.
2.3 Phase III: Loading, Multi-Floor Egress, and Transit Logistics
2.3.1 Vertical Egress Under Degraded Conditions: The Contractor shall execute vertical egress/ingress using trained manual carrying teams across multi-story stairwells. Personnel shall use appropriate material handling equipment (straps, stair-climbing dollies, hand trucks) equipped with non-marking wheels. The Contractor shall prevent damage to facility walls, handrails, stair treads, door jams, and thresholds during removal. Any damage caused to base real property shall be repaired to original condition at the Contractor’s sole expense.
2.3.2 Transit Security: Furniture shall be loaded into clean, weatherproof, fully enclosed commercial moving vans/trailers. Loads shall be secured with logistics straps, tie-downs, and decking beams to prevent internal shifting, load friction, or tipping during transit.
2.4 Phase IV: Warehouse Receipt & Climate-Controlled Storage
2.4.1 Storage Facility Standards: The Contractor shall provide commercial off-base warehouse storage maintaining temperature controls between 60°F and 80°F and relative humidity levels not exceeding 60% year-round. This is mandatory to prevent mold, warping, laminate peeling, rust, and fabric degradation over the 3-year period.
2.4.2 Warehouse Master Inventory Log: Within five (5) business days following final intake at the storage facility, the Contractor shall provide the COR with a searchable electronic Warehouse Master Inventory Log. The log shall detail appliance type, building/room of origin, assigned warehouse aisle/bay/rack location code, and initial condition grade.
2.5 Phase V: Recall, Re-delivery, and Reinstallation Services
2.5.1 Phased Recall Order Response: Throughout the 3-year storage period, the CE POC will issue electronic Task Delivery Notices requesting the return of specific quantities and types of items to renovated rooms at JBSA Fort Sam Houston.
2.5.2 Timetable for Delivery: Upon receipt of an electronic Task Delivery Notice, the Contractor shall pull, inspect, transport, and reinstall the designated items within thirty (30) calendar days.
2.5.3 Reinstallation Standards: The Contractor shall unpack, wipe down, position, level, and reinstall units in designated dormitory rooms according to provided room layout diagrams. Reassembled bed frames, bunk configurations, and wardrobes shall be level, rigid, plumb, and structurally sound. All mechanical fasteners and safety bolts shall be torqued to manufacturer specifications. All items shall receive a post-assembly wipe-down to ensure immediate move-in readiness for METC dormitory residents.
2.5.4 Inventory Log Reconciliation: The Contractor shall submit an updated Warehouse Master Inventory Log to the CE POC within three (3) calendar days of every recall execution, noting remaining stored assets and signed field delivery receipts.
2.6 Phase VI: Post-Move Housekeeping and Final Acceptance
2.6.1 Daily Waste Management: The Contractor shall collect, contain, and remove all contractor-generated packing materials, stretch film, cardboard, banding, and debris from the work site daily. All disposal shall take place off-base in licensed disposal/recycling facilities at the Contractor’s expense.
2.6.2 Facility Protection: The Contractor shall protect door jambs, stairwell handrails, walls, and flooring along transit routes using edge guards or neoprene runners. Any damage inflicted to government facilities shall be repaired to pre-existing condition at the Contractor's sole expense.
2.6.3 Final Inspection & Sign-off: The Contractor and COR shall conduct a joint closeout inspection following initial building clearance and subsequent room installations. Formal acceptance occurs only upon COR execution of the Final Inspection Sign-Off Sheet.
3.0 WORKLOAD ALLOCATION & LOCATION MATRIX
The Contractor shall execute removal and reinstallation operations across the following designated facilities at JBSA Fort Sam Houston, Texas:
Building 3312 3380 WILLIAMS WAY JBSA, FSH 78234- Bldg has 4 floors
| Building |
| 3312 |
| Total |
| Bed |
| 1,072 |
| 1,072 |
| Underbed Storage |
| 1,208 |
| 1,208 |
| Nightstand |
| 1,198 |
| 1,198 |
| Mattress |
| 1,596 |
| 1,596 |
| Wardrobes |
| 600 |
| 600 |
| High Table |
| 7 |
| 7 |
| Bar Stool Chairs |
| 27 |
| 27 |
| Credenza Storage |
| 3 |
| 3 |
| Total |
| 5,711 |
| 5,711 |
4.0 Service Summary
The contract service requirements are summarized in performance objectives that relate directly to essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) provides information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures set forth in the RFO 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies.
SERVICES SUMMARY (SS)
PERFORMANCE OBJECTIVES AND THRESHOLDS
| Performance Objective |
| PWS Ref. |
| Monthly Performance Threshold |
| 1. Milestone Schedule Compliance |
| 1.3, 2.3 |
| 0 defects. |
100% of inventory (5,831 units) completely removed from Bldg 3312 staged/relocated by 15 Oct 2026.
| 2. Asset Preservation & Damage Control |
| 2.2, 2.3 |
| 0 defects |
All appliances packed, wrapped, and transported with zero new structural, cosmetic, or mechanical damage.
| 3. Inventory Reconciliation |
| 2.1, 2.4, 2.5 |
| 0 defects. |
Deliverable logs accurately track 100% of serial numbers, origin rooms, warehouse coordinates, and return status.
| 4. Phased Recall Deployment |
| 2.5 |
| on-time delivery metric over the 3-year performance period. |
Deliver and reassemble designated appliances within thirty (30) calendar days of electronic tasking.
| 5. Site Cleanliness & Housekeeping |
| 2.6 |
| No more than one (1) defect per building, Remove 100% of packaging debris, trash, and residue from military grounds daily; zero facility structural defacement. |
This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s service schedule. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, or monthly) and may be adjusted, based on quality trends. The monthly service schedule shall be used as the basis for the COR to schedule surveillance. Any unsatisfactory surveillance inspection (defect) result shall be recorded on a locally developed inspection report, and the contractor shall re-perform the service correct the deficiency after notification within twenty four hours. Failing to meet the performance threshold for any of these performance objectives shall constitute an immediate Progress Meeting with members of the MFT. Failing to meet the performance threshold as outlined in the SS of these performance objectives during the contract period may result in a letter of concern from the CO. All remedies shall be IAW the RFO 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance. Corrected deficiencies allow the contractor to be paid for the service; however, it does not invalidate the inspection/surveillance by the COR.
4.1 Non-Service Summary Items
The Contractor is required to provide all services identified in the PWS. The COR is required to inspect non-service summary items on a periodic basis.
4.2 Certification of Services
At the end of each contract payment period as defined in the resulting award of this acquisition, the COR shall certify the services were received IAW contract payment terms and conditions.
4.3 Unacceptable Services.
The COR shall determine the cause of contractor unacceptable services:
Government Responsible If any government action, or lack of action, caused or contributed to the unacceptable performance, the performance will not be counted against the contractor. The COR will take steps to ensure the government does not interfere with the contractor’s performance in the future.
4.4 Discrepancy Report
When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.
4.5 Quality Assurance
The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with the requirements set forth in this contract. The COR shall inspect by validating actual work performance, physically checking the attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service within 24 hours of notification, at no additional cost to the government after notification by the CO or COR. Results of the validation then become the official Air Force record of the Contractor’s performance.
When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the Contracting Officer a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the Contracting Officer within 10 calendar days of receipt. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in anyone-month period shall constitute an immediate Progress Meeting with members of the Multi-functional Team. All remedies shall be in accordance with the RFO 52.212-4(a), Contract Terms and Conditions- Commercial Items, Inspection/Acceptance.
4.6 Government Inspection
The contractor performance is subject to surveillance by the COR to ensure compliance with this task order to include all elements of the Service Summary and Inspection of Services clause(s) in the contract. The task order identifies two types of non-conformances: minor and major. All records of non-conformance and corrective actions will be documented in Corrective Action Reports (CAR), COR Surveillance Reports and Contract Performance Assessment Ratings (CPAR).
5.0 GOVERNMENT-FURNISHED PROPERTY, EQUIPMENT, AND SERVICES (GFP/GFS)
The Government will provide the following to facilitate contract execution:
5.1 Facility Access: Unrestricted physical access to Building 3312 during agreed operating shifts. Escort personnel will be furnished in restricted-access sections as designated by installation security.
5.2 Operational Utilities: Active electrical service at source facilities for charging tools, diagnostic testing, and work lighting.
5.3 Staging & Parking Areas: Exterior apron parking and vehicle staging space adjacent to exterior concrete stairwells and primary ground-floor loading zones.
5.4 Environmental & Facility Limitation Disclosures:
Buildings are scheduled for future renovation/demolition and may possess minimal or inoperative HVAC systems, poor ventilation, and potential ambient interior heat or odor.
Passenger/freight elevators are intermittently nonfunctional and shall not be relied upon. If operational, elevators may be utilized at the Contractor’s discretion; however, downtime shall not constitute grounds for schedule adjustment or equitable cost adjustments.
6.0 CONTRACTOR-FURNISHED ITEMS AND RESPONSIBILITIES
The Contractor shall furnish all necessary resources, including but not limited to:
6.1 Key Personnel & Supervision:
Project Manager (PM): Dedicated single POC with full authority to act on behalf of the Contractor, resolve logistical delays, and conduct joint sign-offs with the COR.
Logistics & Safety Coordinator: Dedicated specialist managing base access passes, vehicle safety inspections, hazardous conditions, and OSHA/DoD safety protocols.
Assembly / Technical Team: Trained moving and installation technicians proficient in heavy stairwell carriage, appliance leveling, hardware assembly, and electrical connection safety.
6.2 Environmental & Physical Welfare Equipment: Comprehensive heat-stress mitigation resources, including personal hydration supplies, cooling equipment, PPE, and communication devices suitable for hot or poorly ventilated buildings.
6.3 Packaging & Handling Equipment: Heavy-duty stair-climbing hand trucks, appliance dollies, edge-protection padding, cargo straps, industrial stretch wrap, heavy-gauge poly bags, and climate-controlled commercial moving vehicles.
6.4 Commercial Storage: A fully licensed, bonded, insured, and climate-controlled storage warehouse meeting all municipal commercial building and fire codes.
7.0 SECURITY, INSTALLATION ACCESS, AND SAFETY
7.1 Installation Physical Access
7.1.1 DBIDS Credentials: Contractor personnel shall undergo criminal background screening to obtain Defense Biometric Identification System (DBIDS) access credentials or visitor passes.
7.1.2 Citizenship Verification: All employees performing under this contract shall be legal U.S. citizens or legal permanent residents possessing valid Real ID-compliant federal/state photographic identification.
7.1.3 Commercial Vehicle Gate Protocols: All contractor vehicles entering JBSA shall present current registration, proof of insurance, and submit to physical inspections at commercial vehicle inspection gates.
7.2 Safety & OSHA Compliance
The Contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA) regulations (29 CFR 1910 and 29 CFR 1926) and Air Force Safety Standards (AFMAN 91-203). The Contractor shall halt operations immediately upon identification of an imminent fall, lifting, or electrical hazard.
8.0 DELIVERABLES SCHEDULE
The Contractor shall generate and submit the following mandatory contract deliverables:
| Deliverable |
| Frequency |
| Format |
| Submittal Recipient |
| Pre-Move Inventory Assessment |
| Prior to initial unit movement |
| Electronic (Excel / PDF) |
| COR & CE POC |
| Warehouse Master Inventory Log |
| Five (5) business days post-storage intake |
| Electronic (Excel / Searchable Database) |
| COR & Contracting Officer (CO) |
| Environmental Storage Logs |
| Quarterly |
| Electronic (PDF temperature/humidity readouts) |
| COR |
| Recall / Reinstallation Status Report |
| Within 3 calendar days of each recall tasking completion |
| Electronic signed acceptance receipt & updated inventory |
| COR & CE POC |
| Accident / Damage Incident Reports |
| Within four (4) hours of any safety or property damage incident |
| Formal Written Report via Email |
| CO, COR, & Installation Safety Office |
| Contract Closeout Re-inventory |
| Ten (10) business days prior to end of 3-year PoP |
| Electronic audited inventory sign-off |
| CO & COR |