This is a Performance Work Statement (PWS) for Lightning and Grounding Annual Inspection services at the 179th Cyberspace Wing (179 CW).

The contractor shall conduct comprehensive inspections of lightning protection and grounding systems across multiple facilities in compliance with NFPA 780 and AFMAN 32-1065 standards. Specific inspection requirements include: visual inspection, testing, and analysis of lightning protection and grounding components on six buildings (164, 412, 416, 522, 602, and 801); 18 antenna support structures located at Cantonment and Enclave locations; and two ARMAG (ammunition and explosives storage) locations on the Cantonment. Services shall be performed between 0700–1600, Monday through Friday, excluding recognized U.S. holidays and facility closures, with telework explicitly prohibited. The Period of Performance is one base year of 12 months plus four optional 12-month extension years. The contractor must provide all personnel, equipment, tools, materials, and supervision necessary for performance.

The deliverable is a comprehensive inspection report in digitally searchable PDF format, submitted as a draft within 28 days of inspection completion and as a final report within 7 days of receiving Government comments. The report must include a title page, executive summary, detailed facility-by-facility findings with compliance status, deficiency details with photographic evidence and code references, facility sketches for explosives sites, and appendices containing test results, photo logs, and contractor certifications. Lead inspectors must hold active certifications from the Lightning Protection Institute (Master Installer/Designer), UL (Certified Lightning Protection Professional), or equivalent, with a minimum of five years of experience in lightning protection and grounding inspections. All contractor personnel require Antiterrorism Level I training within 15 calendar days of contract start, facility access credentials, and compliance with base security regulations. A Quality Control Plan must be submitted to the Contracting Officer Representative within 10 days of contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Lightning and Grounding Annual Inspection

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to provide, Lightning and Grounding Annual Inspection as defined in this PWS.

1.1.1 Objectives

1.1.1.1 To conduct comprehensive inspections of lightning protection and grounding systems for all designated facilities, ensuring they comply with all applicable standards.

1.1.1.2 To produce a final, detailed inspection report that documents all findings, clearly identifies any deficiencies or non-compliant items, and provides actionable recommendations for necessary repairs.

1.2 Background: In accordance with NFPA 780, Standard for the Installation of Lightning Protection Systems, and Air Force Manual (AFMAN) 32-1065, Grounding and Electrical Systems, all facilities must undergo regular inspection and maintenance of their lightning protection systems to ensure personnel safety and protection of government assets.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and four 12-month option years.

1.4 General Information:

1.4.1 Place and Performance of Services: Place and Performance of Services: The contractor shall provide services between the hours of 0700 – 1600, Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at multiple locations throughout the 179 CW.

The contractor shall, at all times, maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1 Reserved

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation.

Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance.

The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with

5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1 Reserved

1.4.5.1.1 Reserved

1.4.5.1.2 Reserved

1.4.5.1.3 Reserved

1.4.5.1.4 The contractor shall manage requests for new or base access in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the COR or KO.

1.4.5.1.5 Within 7 working days following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the issuing office or the location specified by local policy/directives. A receipt for each returned card shall be provided to the TA/COR.

1.4.5.1.6 For an Air Contractor that need access to the Army network this can be done by going to: http://www.us.army.mil and registering as an "Army Guest," with the sponsor being the COR or a COR- designated individual if the COR is ineligible to Serve as an AKO Sponsor.

1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.4 Reserved.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.

Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Reserved

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Reserved

1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter.

General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.

1.4.5.12 Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Key Control. NOTE: All references to keys include key cards. The contractor shall establish and implement methods of ensuring that no keys/key cards issued by the Government are lost or misplaced or are used by unauthorized persons. No keys issued by the Government shall be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.

1.4.6.1.1 The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the COR.

1.4.6.1.2 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government replaces or re-keys the locks, the Government will deduct the total cost of lock replacement or re-keying from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government will replace all locks and keys for that system, and will deduct the total cost from the monthly payment due the contractor.

1.4.6.1.3 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.6.2 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.4.7 General Qualifications: All contractor personnel performing inspection and testing tasks shall be thoroughly familiar with test equipment operation, lightning protection, and grounding theory and practices.

1.4.7.1 Lead Inspector Certifications. The lead inspector(s) responsible for overseeing the inspection and certifying the final report shall possess, at a minimum, one of the following active certifications:

• Lightning Protection Institute (LPI) - Master Installer/Designer

• UL (Underwriters Laboratories) - Certified Lightning Protection Professional

• An equivalent, nationally recognized third-party certification approved by the

Contracting Officer's Representative (COR) prior to the start of work.

1.4.7.2. Experience. The contractor firm shall have a minimum of five (5) years of experience in performing lightning protection and grounding inspections for commercial or government facilities.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract;

procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Reserved

1.4.13 Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the

KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation

CW Cyberspace Wing CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Reserved

3.2 Reserved

3.3 Reserved

3.4 Reserved

3.5 Reserved

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Reserved

4.3 Reserved

5.0 Requirements:

5.1 Contractor shall conduct a comprehensive inspection of Lightning protection and grounding systems located at 179th CW. The Grounding Resistance and Continuity Tests, Visual Inspections of Grounding Points, and Visual Inspection of Lightning Protection Systems shall be conducted to meet the requirements of AFMAN32-1065. The contractor shall provide all personnel, equipment, tools, supervision, all other required items, and services necessary to ensure that the inspection is completed on all systems at listed below.

5.1.1 Conduct visual inspection, testing and analysis of lightning protection and grounding components on buildings 164, 412, 416, 522, 602 and 801.

5.1.2 Conduct visual inspection, testing and analysis of lightning protection and grounding components on 18 antenna support structures located on Cantonment and Enclave locations.

5.1.3 Conduct visual inspection, testing and analysis of grounding components at two ARMAG locations on the Cantonment.

5.2 Final Inspection Report. The contractor shall provide a comprehensive inspection report in a digitally searchable PDF format. The report shall be professionally formatted and include the minimum sections outlined below.

5.2.1 Title Page. The report shall include a title page containing:

5.2.1.1 Contract Number.

5.2.1.2 Project Title: "Lightning Protection and Grounding System Inspection".

5.2.1.3 Installation Name: "179th Cyberspace Wing".

5.2.1.4 Date of Inspection and Date of Report Submission.

5.2.2 Executive Summary. The report shall contain a high-level summary that includes:

5.2.2.1 A one-page overview of the findings.

5.2.2.2 A master list of all facilities inspected.

5.2.2.3 A summary count of compliant vs. non-compliant facilities.

5.2.2.4 A brief statement on the general condition of the installation's lightning protection systems.

5.2.3 Detailed Findings. This section shall be organized on a facility-by-facility basis.

5.2.3.1 For each facility inspected, the report must clearly state whether the system is “Compliant” or “Non-Compliant.”

5.2.3.2 Facility Sketch for Explosives Sites. For any facility designated by the Government as an explosives storage or handling area (ARMAGs), the report shall include a dedicated page containing a clear and legible sketch of that facility's lightning protection and grounding systems.

The sketch does not need to be a formal engineering drawing but must accurately depict:

• The layout of the lightning protection and grounding systems.

• The location of all designated electrical test points.

• The location where electrical/utility services enter the facility.

• A note or diagram indicating the general location of the test probes during the ground resistance test.

5.2.3.3 Visual Inspection Findings. For each facility, the report must document the results of a comprehensive visual inspection, noting the condition of, at a minimum:

• All air terminals (lightning rods).

• All conductors and bonding jumpers.

• The security of attachment for all system components.

• Any evidence of corrosion on system components and corrosion protection measures.

5.2.4 Deficiency Details. For every “Non-Compliant” finding, the contractor must provide the following details:

5.2.4.1 Clear Description: A plain-language explanation of the problem (e.g., “Broken air terminal on the northwest corner of the roof”).

5.2.4.2 Precise Location: A description of where the issue is located on the facility.

5.2.4.3 Photographic Evidence: At least one clear, high-resolution photograph of the deficiency.

5.2.4.4 Code Reference: The specific section of NFPA 780 or AFMAN 32-1065 that is being violated.

5.2.4.5 Recommended Corrective Action: A clear, concise recommendation for how to fix the deficiency.

5.2.4.6 On-the-Spot Corrections. A description of any minor corrective actions performed by the inspection team at the time of the inspection (e.g., tightening of loose mechanical connections).

5.2.5 Appendices. The report shall include the following appendices:

5.2.5.1 Appendix A - Test Results: A table of all continuity and ground resistance readings for each test point, organized by facility.

5.2.5.2 Appendix B - Photo Log: A complete log of all photographs taken during the inspection.

5.2.5.3 Appendix C - Contractor Certifications: Copies of the certifications for the personnel who performed the inspection.

5.3 Test Procedures

The contractor shall perform all testing in accordance with the procedures outlined in AFMAN 32-1065. At a minimum, this shall include:

5.3.1 Ground Resistance Testing. Ground resistance testing for all ground rods and systems shall be performed using the Fall-of-Potential method.

5.3.2 Continuity Testing. A continuity test shall be performed to verify the integrity of the lightning protection system, ensuring that all components provide a continuous electrical path.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Mandator y or

Advisory

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/curr ent/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelre g.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/28/2020 http://www.esd.whs.mil/Directives/issuances/do dm

Federal Information Processing Standards (FIPS) Publication 201-

Personal Identity Verification

(PIV) of Federal Employees and Contractors

(paragraph 9)

August http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIP S.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuances/d odm/

DoDI 5200.46

DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC)

09/09/14 (Change 1:

05/04/2018 https://www.esd.whs.mil/Directives/issuances/d odi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common

Identification Standard for Federal Employees and Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs

01/29/2019 odi/

DoD 5400.11-R

Department of Defense Privacy Program

05/14/2007 https://www.esd.whs.mil/Directives/issuances/d odm/ DoDD 8140.01

Cyberspace Workforce Management

10/05/2020 odd/

DoD 8570.01-M

Information Assurance Workforce Improvement Program

12/19/2005 (Change 4:

11/10/2015

DoD 5220.22-M National Industrial Security Program Operating Manual

(NISPOM)

02/28/2006 (Change 2:

05/18/2016

Army Directive 2014-05 Policy and Implementation

Procedures for Common Access Card Credentialing and

Installation Access for Uncleared Contractors

03/07/2014 https://armypubs.army.mil/ProductMaps/PubFo rm/ArmyDir.aspx

AR 25-2

Information Assurance

04/04/2019 http://armypubs.army.mil/ProductMaps/PubFor m/AR.aspx

AR 530-1

Operations Security

09/26/2014 http://armypubs.army.mil/ProductMaps/PubFor m/AR.aspx

AR 525-13

Antiterrorism

12/09/2019 http://armypubs.army.mil/ProductMaps/PubFor m/AR.aspx

AR 381-12

Threat Awareness and Reporting

Program (TARP) (Section II, ¶ 2-4.b)

06/01/2016 http://armypubs.army.mil/ProductMaps/PubFor m/AR.aspx

AFI 10-245

Antiterrorism

03/28/2013 (Certified current 03/30/2017 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

AFI 31-101

Security Forces Standards and

Procedures

08/18/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

AFMAN 31-113

Security Forces Standards and Procedures

03/05/2013 Change 1:

12/02/2015 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1& series=-1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website

DD 1172-2

Application for Identification

Card/DEERS Enrollment

Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility

Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i- 9.pdf

DD 441

Department of Defense Security Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms000 1-0499.htm

DD 250

Material Inspection and

Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method / By

Whom

5.1.1 Facility

Grounding &

Lightning Protection

Conduct visual inspection, testing, and analysis of lightning protection and grounding components on Buildings 164, 412, 416, 522, 602, and 801.

100% compliance with NFPA 780 and IEEE standards. No missed components.

Periodic Inspection/COR

5.1.2 Antenna

Support

Structures

Conduct visual inspection, testing, and analysis of lightning protection and grounding components on 18 antenna support structures (Cantonment and

Enclave).

95% compliance (no more than 1 structural site report rejected due to inadequate testing/data).

Periodic Inspection/COR

5.1.3. ARMAG

Locations

Conduct visual inspection, testing, and analysis of grounding components at two Cantonment ARMAG locations.

Zero-tolerance safety standard (100% compliant). Grounding readings must be fully verified and documented.

Periodic Inspection/COR

5.1.4 Comprehensive

Inspection Deliverables

Submit a detailed inspection report containing findings, photographic evidence, maps, recommendations, and a corrective action plan (CAP).

100% accuracy and clarity. Deliverable submitted within agreed contract timeline

5.2 Detailed

Inspection

Report

Provide a detailed inspection report with findings documented by photographs and

Submitted within the timeline defined in

Technical Exhibit 2;

initial draft must be at maps, recommendations, and a corrective action plan. The report shall incorporate all Government feedback and be prepared in accordance with PWS

Section 5.2.

least 90% free of technical/administrative errors, and 100% of Government-provided comments must be successfully incorporated into the final version.

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.3 AT Level

1 Awareness

Training Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

KO

4.0 - Contractor Personnel

Certifications

NLT 10 calendar days prior to commencement of on-site work.

1 Electronic Submission

COR

5.1 Draft

Inspection Report

Submit NLT 28 days after inspection completion

1 Electronic Submission

COR

5.1 Final

Inspection Report

Submit Final Report NLT 7 days after receipt of Government comments.

1 Electronic Submission

COR