Attachment 1 - Performance Work Statement.pdf

PDF 482 KB Posted

Attached to
Davis-Monthan AFB Air Show Fencing Rental
Solicitation number
FA487725QA117
Issued by

About this file

This Performance Work Statement outlines requirements for fencing rental services at Davis-Monthan Air Force Base for the FY25 Thunder and Lightning Over Arizona event. The contractor must provide 13,117 linear feet of bicycle fencing in 6.5-foot sections, with all necessary personnel, equipment, tools, materials, vehicles, and supervision for delivery and pickup.

Key requirements include delivering the fencing to BAMA Park by March 18, 2025, and picking it up no later than March 25, 2025. The fencing must be in good working condition and stand upright without external support. The contractor must access the base through Swan Gate along Golf Links Road, obtain necessary base passes and vehicle clearances 10 business days before work starts, provide appropriate PPE for employees, and comply with all base regulations including traffic laws and safety requirements. All contractor personnel are subject to random searches and must follow base protocols regarding cell phone use, speed limits, and seat belt requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FY25 Thunder and Lighting Over Arizona Fencing

1.0 Description of Services: The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to deliver and pickup fencing rental services at Davis Monthan AFB (DMAFB). The contractor shall perform to the standards in the contract as well as all local, state, and federal regulations

2.0 Requirements: The fencing required for the 2025 Thunder and Lighting Over Arizona is 13,117 linear feet (6.5 ft sections) of bicycle fencing. The sections need to be in good working condition and stand upright without any external assistance.

2.1 Contractor Responsibilities. Provide appropriate personal protective equipment for employees.

The Contractor shall deliver all rental fencing materials by Tuesday, 18 March 2025 to be dropped off at BAMA Park. Also, the contractor shall pick up all rental materials no later than Tuesday, 25 March 2025 at BAMA Park.

3.0 Route Parameters. The contractor should plan access routes to the base through Swan Gate along Golf Links Road for entrance to the Installation.

4.0 Contractor/Employee Base Pass and Identification, Special Clearances and Vehicle Passes. The contractor shall ensure that all necessary pass and identification items required for contract performance are obtained for contractor employees and non-Government owned vehicles prior to the start of work. The contractor shall comply with all requirements and procedures IAW FAR 5353.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted 10 business days prior to the start of work.

5.0 Random Personnel and Vehicle Searches. Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.

6.0 Traffic Laws. Contractor employees shall comply with all base traffic regulations. Contractor employees are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of seat belts is mandatory for all vehicle occupants. The use of cell phones is prohibited while driving on base, unless the phone is a hands-free cell phone.

7.0 Safety. The contractor shall comply with all local, state and federal laws and safety regulations.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor, and the Government will assume no liability or responsibility for the contractor’s compliance or noncompliance with such responsibilities. The contractor is responsible for furnishing all contractor employees with all necessary personal protective equipment to perform services.

File details come from the government source that posted it. Updated .