This document is a Performance Work Statement (PWS) for the acquisition of a Predictive Road and Environmental Conditions System by the Department of the Air Force Global Strike Command. The PWS outlines the key objectives and requirements for the system, which include providing accurate and timely information on road and environmental conditions to support mission planning and operations. The system must be able to integrate data from various sources, including weather sensors, satellite imagery, and traffic reports, to generate predictive models and visualizations. Specific requirements cover areas such as system architecture, data ingestion and processing, user interface, and maintenance and support. No solicitation details, pricing terms, or set-aside information is provided in this PWS document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_Predictive Weather Software_12June24_v2.xlsx | XLSX spreadsheet | |
| QA_Predictive Weather Software_12June24.xlsx | XLSX spreadsheet | |
| QA_Predictive Weather Software_11June24.xlsx | XLSX spreadsheet | |
| QA_Predictive Weather Software_10June24.xlsx | XLSX spreadsheet | |
| COMBO_Amendment 001.pdf | ||
| Amendment 001.pdf | ||
| QA_Predictive Weather Software.xlsx | XLSX spreadsheet | |
| Missile Field Site Map.pdf | ||
| Attch 3. Installation Perimeter Access Control.pdf | ||
| Attachment 2_Past Performance Questionnaire.xlsx | XLSX spreadsheet | |
| COMBO.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
for
Predictive Road and Environmental Conditions System
Malmstrom Air Force Base, Montana
10 May 2024
1. DESCRIPTION OF SERVICES
1.1 SCOPE OF WORK
The contractor shall provide services according to the requested in the final contract. The service or system will provide a prediction in real-time or near real-time of environmental factors and road conditions for Malmstrom’s primary, secondary, and tertiary routes. These routes are in Montana, centralized around Malmstrom AFB and its 150 Launch Facilities (LFs) and 15 Missile Alert Facilities which are located within a 160-mile radius of Great Falls, MT, however nationwide coverage is required to ensure the safety of personnel traveling outside of the missile complex as well as inbound and outbound shipments of DoD assets.
1.3 SUMMARY OF WORK FOR EACH ELEMENT(S) CALLED OUT IN THE
CONTRACT
1.3.1 Environmental
1.3.1.1 Flood: The system shall provide information on the likelihood of the 341 Missile Wing (MW) Area of Responsibility (AOR) flooding. Flooding is defined as the possibility for ground water to reach above ground level causing flooding, rivers, creeks, or streams to crest or leave their banks and any cycle of thaw/melt/freeze that could cause any of the previously mentioned conditions. The system shall provide information on areas that have flooded or have a historic or probable reason to flood based on predicted weather information from inside the program. Accuracy will be assumed accurate to within 50% probability based on current and historic modeling to provide a minimum of 24-hour notice prior to any expected flooding event.
Flooding prediction modeling should be presumed accurate within 10 miles of a Launch Facility (LF) and 5 miles of a Missile Alert Facility (MAF.) 341 MW will provide AOR specific historical flood data as requested by the contractor.
1.3.1.2: Wind: The system shall provide real-time or near real-time and up to a 7-day forecasts for wind conditions effecting the 341 MW AOR. All LF’s and MAF’s as well as Primary and Alternate routes in the AOR must be covered by the provided service.
1.3.1.3: Lightning: The system shall provide real-time or near real-time updates to lighting strikes within 15-mile radius of 341 MW LF’s and MAF’s. This will include a lightning hit counter as well as lightning duration tracker. Lightning data should be presumed accurate within ¾ mile within a 2-mile grid and refresh at least once every 3 minutes.
1.3.1.3 Snow: The system shall provide snowfall predictions for each LF and MAF as well as all Primary and Alternate routes in the AOR to show linear snowfall projections over a 7-day period.
1.3.1.5 Wildfire: The system shall provide current wildfire conditions (danger/probability) within the AOR and the possibility of wildfire range of any active wildfires.
1.3.1.6 Power Outage: The system shall provide probability of a future power outage for all LF’s and MAF’s.
1.3.2 Road Conditions
1.3.2.1 The system shall provide predictive road conditions for all potential routes utilized by 341 MW personnel for Mission requirements.
1.3.2.1.1 All primary and secondary routes shall be covered by the system. Predictability should be assumed accurate within a 2-mile individual road segment for heavily traveled main roadways and 5-mile segment for secondary roadways.
1.3.2.1.2 Estimated time of arrivals shall be provided based on user entered data.
Arrivals times will be based on real time weather, traffic, and road conditions.
1.3.2.1.3 The system will provide the ability to load/track numerous locations (all LF’s and MAF’s) within the AOR as well as round trip planning for any/all additional specific locations input by the user.
1.3.2.2 The system shall provide a method to update road conditions in real-time or near real-time.
1.3.2.3 The system shall conform to a “Green, Yellow, Red” convention. The contractor may use scaling shades for differencing subtle differences in conditions. However, the system shall provide a legend to understand the different scales.
1.3.3 Sustainment
1.3.3.1: The Contractor shall provide all sustainment actions for their systems. As new technology and collaborations opportunities appear, the Contractor may integrate those into the services provided to the Government with coordination with the WOC.
1.3.3.2 The Contractor shall provide general tech support via over the phone services.
The Contractor will conduct any and all actions required to ensure that the service remain functional during the period of performance.
1.3.4 Security
1.3.4.1: The Contractor and the system shall adhere to industry standards of security protocols and procedures.
1.3.5 Accounts usage and Training
The Contractor shall provide login information for fifteen (15) standard user accounts and training for a “Train the Trainer” program. The accounts should be able to be generic or tied to an Email Org-box. The information used to train the trainer will be given to the 341 Wing Operation Center for the purpose of continuity. These accounts will be accessible from anywhere, as the services must be web based. Service updates resulting in a system outage lasting more than 15 minutes must be conducted between the hours of 11:00 pm MST Saturday and 3:00 am MST on Sunday within that 4-hour window. Any outage lasting longer than 4 hours will be reported to the Contracting Officer.
1.4 GENERAL REQUIREMENTS
1.4.1 Emergency Rights of the Government
The Government reserves the right to perform or supplement performance of mission critical contract functions with Government personnel during periods of disaster, war, or emergency.
The Contractor shall not be due payment for any functions not performed by the Contractor. The Contracting Officer (CO) may enact this right through written notification to the contractor which shall state, at the minimum, the contract functions to be performed by Government personnel, the period of performance, and the applicable contract line items, to include the extent they may be affected.
2. SERVICE SUMMARY (SS)
2.1 SUMMARY OF REQUIRED SERVICES.
The service shall provide real-time or near real-time updates to all road conditions within the 341 Missile Wing’s operating area. The service shall provide real-time or near real-time updates to conditions for wing (gust and sustained), wildfires, flooding, and lighting within the operating area of the 341 Missile Wing.
2.1.1 Initial Placement
The Contractor shall provide the Government representative and the Wing Operations Center’s (WOC) Director all required login information within 15 days of the contract's first payment being made.
2.1.2 Replacement of System
If there are changes to the web portal, changes in login information by the Contractor, or requests from the WOC’s designated representative for a login rest, the Contractor will notify or assist within 1 hour.
2.1.3 Required Documentation
The Contractor shall provide all documentation for system utilization to the Wing Operations Center.
2.1.4 Locations Include
Malmstrom AFB and its 150 Launch Facilities (LFs) and 15 Missile Alert Facilities (MAF) which are located within a 160-mile radius of Great Falls, MT.
2.1.5 Privacy Act
Work on this project requires that personnel have access to Privacy Information. Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.
2.1.6 Base Passes/Contractor Badge
The contractor shall acquire all necessary base passes for contractor personnel. The contractor is required to provide identification badges to their employees. All contractor personnel will wear these badges while on duty on the Government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as contractor. Size, color, style, etc., are to be mutually agreed upon by the contractor and Government.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 GOVERNMENT FURNISHED FACILITIES/EQUIPMENT
As the contract does not require contractor personnel to operate Government Equipment or on a Government installation, there are no requirements to provide the Contractor any equipment or facilities.
4. GENERAL INFORMATION
4.1 INSPECTION
4.1.1 Inspection of Services
The Government has the right to inspect all services identified within by the contract (SDS and Non-SDS items), to the extent practicable at all times and places during the term of the contract.
4.1.2 Contractor Discrepancy Report (CDR)
When the Contractor fails to meet contract performance requirements, the 341st Contracting Squadron may prepare a CDR. This report is forwarded to the CO for review, and subsequently processed through the Contractor for action/explanation before being returned to the CO. Upon receipt, the CO will review the response and determine whether to accept the Contractor's position, determine corrective action (reduction in the monthly payment due to unacceptable performance, cure notice, show cause, etc.), or take other appropriate contractual action. The Government reserves the right to make a partial payment for services performed prior to receipt and evaluation of the Contractor's response to a CDR.
5. APPENDICES
The government will make all publications, forms, references, and report formats listed available. Publications can be accessed on-line at http://www.e-publishing.af.mil/. Supplements or amendments to listed publication from any organizational level may be issued during the life of the contract. The Contractor shall immediately implement those changes in publications, which result in a decrease, or no change in the contract price. Prior to implementing any such revision, supplement, or amendment that will result in an increase in contract price, the Contractor shall submit to the CO a revised quote and obtain prior approval.
0 5 10 15 20 Miles
0 7.5 15 22.5 30 Kilometers
B l a i n eB l a i n e
P h i l l i p sP h i l l i p s
P o n d e r aP o n d e r a
C h o u t e a uC h o u t e a uT e t o nT e t o n
L e w i s a n dL e w i s a n d C l a r kC l a r k
F e r g u sF e r g u s
C a s c a d eC a s c a d e
P e t r o l e u mP e t r o l e u m
P o w e l lP o w e l l
J u d i t h B a s i nJ u d i t h B a s i n
M e a g h e rM e a g h e r
B r o a d w a t e rB r o a d w a t e r
G o l d e n V a l l e yG o l d e n V a l l e y
M u s s e l s h e l lM u s s e l s h e l l
W h e a t l a n dW h e a t l a n d
J e f f e r s o nJ e f f e r s o n
S w e e t G r a s sS w e e t G r a s s
!430
!386
!399
!229
!387
!454
!518
!453
!231
!547
!551
!565
!300
!259
!331
!541
!239
!427
!400
!220
!226
!223
!280
!435
!227
!564
!564=
!379
!379
!434
!434
!360
!360
!408
!408
!431
!431
!207
!207
!221
!221
!426
!426
!294
!294
!330
!330
!330
!225
!225
!225
!297
!297
!297
!279
!279
!279
!284
!284
!284
!228
!228
!228
!238
!238
!238
!238
!238
!236
!236
!236
!236
!236
³±69
³±200
³±200
³±200
³±200
³±200
³±200
³±200
³±200
³±200
³±66
³±200
³±200
³±200
³±200
³±200
³±3
³±19
³±19
³±81
³±81
³±81
³±80
³±80
³±80
³±80
³±80
£¤87
£¤191
£¤12
£¤12
£¤12
£¤12
£¤87
£¤89
£¤191 £¤89
£¤191
£¤89
£¤89
£¤89
£¤89
£¤89
£¤191
£¤191
£¤191
£¤191
£¤191
£¤12
£¤12
£¤12
£¤12
£¤12
£¤12
£¤12 £¤12
£¤89
£¤89
£¤89
£¤87
£¤87
£¤87
£¤287
£¤287
£¤287
£¤287
£¤87
£¤87
£¤87
£¤87
£¤87
£¤87 £¤87
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
§̈¦15
E-02E-02
E-04E-04E-11E-11
E-03E-03 E-05E-05E-10E-10
E-06E-06
E-07E-07
E-08E-08
E-09E-09
C-05C-05
B-06B-06
B-07B-07
B-08B-08 D-06D-06
D-07D-07D-08D-08
D-03D-03
D-04D-04
D-05D-05
D-09D-09
C-11C-11
B-05B-05
B-02B-02
B-03B-03
D-10D-10
D-02D-02
D-11D-11
B-04B-04
C-02C-02 C-03C-03
C-04C-04
C-10C-10
C-09C-09
C-08C-08
C-07C-07
C-06C-06
B-09B-09
B-11B-11B-10B-10
A-03A-03
A-10A-10
A-11A-11 A-02A-02
A-09A-09
A-08A-08 A-04A-04
A-05A-05A-06A-06
A-07A-07
F-02F-02 F-10F-10
F-11F-11F-09F-09
F-03F-03 F-08F-08
F-06F-06
F-07F-07
F-05F-05 H-08H-08
H-06H-06
H-04H-04
H-05H-05 H-09H-09
F-04F-04
H-03H-03 J-10J-10
H-02H-02 H-11H-11
H-10H-10
I-11I-11
I-06I-06
I-08I-08
I-10I-10
J-08J-08
J-09J-09
J-05J-05
J-07J-07J-06J-06
J-04J-04J-03J-03 J-02J-02
J-11J-11
G-03G-03
G-05G-05
G-04G-04
H-07H-07
G-02G-02 G-11G-11
G-06G-06G-07G-07 G-08G-08
G-10G-10
G-09G-09
I-02I-02
I-03I-03
I-05I-05
I-04I-04
I-09I-09
I-07I-07
M-11M-11
M-06M-06
L-03L-03 L-04L-04
L-05L-05 L-06L-06
L-07L-07
L-10L-10
L-08L-08
L-02L-02
K-02K-02
K-04K-04
K-05K-05
K-07K-07
K-06K-06
K-08K-08
K-09K-09
K-11K-11
K-10K-10
K-03K-03
N-08N-08 N-07N-07
N-06N-06
N-05N-05
N-04N-04
N-03N-03 N-02N-02
N-09N-09
N-11N-11
N-10N-10
O-06O-06
O-05O-05
O-04O-04
O-03O-03
O-09O-09
O-08O-08
O-02O-02
O-07O-07
O-10O-10
O-11O-11
M-08M-08
L-09L-09
L-11L-11
M-07M-07
M-09M-09
M-10M-10
M-02M-02 M-03M-03
M-04M-04
M-05M-05 M-01M-01
J-01J-01
O-01O-01
A-01A-01
D-01D-01
N-01N-01
E-01E-01
B-01B-01
C-01C-01
L-01L-01
I-01I-01
K-01K-01
G-01G-01
F-01F-01
H-01H-01
Helena
Eagleton
Heath
Leroy
Rothiemay
Fort Harrison
Armington
Calvert
Corbin
Deerfield Colony
Giffen
Greenfield
Hardy
Iliad
Manchester
Milford Colony
Nelson
New Rockport Colony
Sapphire Village
Sieben
Silver City
Springdale Colony
Wickes
Woods Crossing
Denton
Fairfield Geraldine
Judith Gap
Moore
Neihart
White Sulphur Springs
Hobson
Ryegate
Stanford
Highwood
Power
Roy
Sand Coulee
Simms
Sun River
Augusta
Geyser
Austin
Benchland
Buffalo
Bynum
Canyon Creek
Centerville
Checkerboard
Coffee Creek
Collins
Danvers
Eden
Elkhorn
Elliston
Fergus
Floweree
Forestgrove
Fort Shaw
Garneill
Hilger
Kolin
Loma
Maiden
Martinsdale
Marysville
Moccasin
Monarch
Montague
Portage
Raynesford
Rimini
Ringling
Ross Fork
Shawmut
Shonkin
Sixteen
Square Butte
Stockett
Tracy
Unionville
Utica
Windham
Winston
York
Tyler
Dutton
Vaughn
Wolf Creek
Alhambra
Christina
Harlowton
Townsend
Choteau
Boulder
Lewistown
Great Falls
Basin
Montana City
Two Dot
Canyon Ferry
Cascade
Ulm
Belt
Fife
East Helena
Black Eagle
Craig
Carter
Fort Benton
Lavina
Winifred
Suffolk
Hays
Grass Range
Cushman
Clancy
Jefferson City
12th
10th
490th
341st Missile Wing This map is for reference and planning purposes only and is not meant to be used for engineering or survey work. Every reasonable effort has been made to ensure the accuracy of this map and associated data.
Information safeguarding is the responsibility of the individual, agency and/or company requesting and taking possession of this map.
Release or reproduction of this map, or any part of it is prohibited except for official use only. No public publication of this map by any means is authorized. This map must be destroyed properly. Direct any questions in regards to this policy to the 341 CES/CEN at COMM 406-731-7249. Information safeguarding requirements are per AFMAN 37-104, AFI 33-332, DoD Reg 5400.11 and Executive Order 12958 (when applicable).
DO NOT DUPLICATE THIS MAP
FOR OFFICIAL USE ONLYMONTANA±
Highways
Interstate U.S. Highway Primary State Route Secondary State Route Other Route
MilitaryRoutes
PRIMARY, PAVED
PRIMARY, GRAVEL
SECONDARY, PAVED
SECONDARY, GRAVEL
DRY USE ONLY
Site
10th
12th 490th
LF
MAF
Squadron
March 2024
Installation Geospatial Information & Services
IGI&S
341st Civil Engineer Squadron Contact GeoBase Office
COMM: (406) 731-7249
DSN: 632-7249
341CES.GeoBase@us.af.mil For interactive web mapping applications and online work requests please visit https://maps.af.mil
File details come from the government source that posted it. Updated .