12 Igloos Demolition Statement of Work

U. S. Meat Animal Research Center

GENERAL INFORMATION

1.0 Background and Purpose:

The ammunition bunkers (igloos) were constructed in the 1940s-50s in support of the

Naval Ammunition Depot that was located on this property prior to the establishment of the

U. S. Meat Animal Research Center. The purpose of this effort is to demolish 12 of these bunkers. We reserve the right to award all 12, less, or none, dependent on available funds.

CONTRACTOR REQUIREMENTS

2.0 Technical Requirements/Tasks:

The Contractor shall provide all tools, equipment, parts, and labor to demolish 12 igloos as noted below; and remove and/or dispose of all debris from the property. Demolition of the igloos shall include blow walls, slabs, foundations, and all other igloo material.

Working hours shall be from 7:00 A.M. to 5:00 P.M. on dates mutually agreed to by contractor and owner.

3.0 Deliverable / Schedule:

Repair to be completed within one year of award.

Facility Location:

U.S. Meat Animal Research Center

P.O. Box 166

833 Road 313

Clay Center NE 68933

4.0 Government Furnished:

1) Access to the facility during normal business operations (Monday through Friday, 7:30 am to 5 pm)

2) Location of 12 igloos.

5.0 Performance Requirement Measures:

A one-time demolition of 12 igloos per the requirements within the expected time.

6.0 Total Price:

N/A.

7.0 Property/Safety Requirements:

a. Work shall satisfy all local, state, and federal requirements.

b. Contractor shall control debris while work is being performed.

c. Safety and health matters as they relate to the work, are the responsibility of the contractor.

8.0 Toilet:

Contractor shall provide their own toilet facilities.

9.0 Utilities:

Connections to temporary utilities will not be furnished to the contractor by the government.

10.0 Attachment:

Technical drawing.

Performance Work Statement Igloos.pdf
SKM_C284e22122110300.pdf