Attachment 1 - Performance Work Statement 14 July 2025.pdf

PDF 1 MB Posted

Attached to
Amendment 4 - Solicitation - Removal Waste Material at Spangdahlem AB, Germany
Solicitation number
FA560625Q0005
Issued by

About this file

This Performance Work Statement (PWS) details the requirements for removal of wastewater and sewage services at Spangdahlem Air Base in Germany, covering a base year from 01 December 2025 to 31 November 2026 with an option year extension until 31 May 2028. The contractor must provide comprehensive wastewater management services including cleaning and disposal of oil/water separators, grease separators, sewage holding tanks, rainwater retention basins, and industrial wastewater tanks, with estimated annual workloads ranging from 20 to 6,100 cubic meters across various service categories.

Key contractor responsibilities include performing services according to German and European commercial standards, conducting monthly and semi-annual self-inspections, providing detailed reporting, maintaining quality control, and ensuring emergency response capabilities within one hour of notification. The services must comply with multiple German regulations and standards, with work primarily conducted between 0700-1800 hours Monday through Friday, excluding federal and German holidays. The contractor must also provide certified personnel, maintain appropriate safety standards, and handle all sampling, laboratory analysis, and proper disposal of collected wastewater and sewage materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

(PWS) FOR

Removal of Wastewater and Sewage at Spangdahlem Air Base

PERFORMANCEWORKSTATEMENT(PWS) FOR REMOVAL OF WASTEWATER AND SEWAGE

Current as of 14 July 2025 Page 2 of 29

Table of Contents

1. DESCRIPTION OF SERVICES

1. 1. OBJECTIVES & SCOPE

1.1.1. SAMPLING AND LABORATORY ANALYSIS

1.1.2. REPORTS

1.1.3. SUPERINTENDENCE BY CONTRACTOR

2. SERVICE SUMMARY

2.1. PLACE OF PERFORMANCE

2.2. PERIOD OF PERFORMANCE

2.3. HOURS OF OPERATION

2.4. FEDERAL HOLIDAYS

2.5. EMERGENCY OR SPECIAL EVENTS SERVICES

2.5.1. AUTHORIZED PERSONNEL TO PLACE EMERGENCY CALLS

2.6. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS

2.7. PERFORMANCE OF SERVICE DURING CRISIS DECLARED BY THE SECRETARY OF DEFENSE OR OVERSEAS

COMBATANT COMMANDER

2.8. SERVICE TASKS

2.8.1. CLEANING OF OIL/WATER SEPARATORS WITH AND WITHOUT COALESCENCE FILTERS AND

SAND/SLUDGE TRAPS

2.8.2. CLEANING OF GREASE SEPARATORS

2.8.3. CLEANING OF HOLDING SEWAGE TANKS, PACKAGE WASTEWATER TREATMENT PLANTS, AND SEWAGE

LIFT STATIONS

2.8.4. CLEANING OF RAIN RETENTION BASINS (RRB)

2.8.5. REMOVAL OF HOLDING TANK/SEWAGE TREATMENT PLANT SLUDGE

2.8.6. CLEANING OF DOME SHAFTS

2.8.7. EMPTYING OF INTERNAL POL-STORAGE TANK BOTTOMS

2.8.8. CLEANING OF STORM WATER DRAIN INLETS, DRAINAGE LINES, AND DRAIN GUTTERS

2.8.9. CLEANING OF PORTABLE TOILETS

2.8.10. TRANSPORTATION OF WASTE AND FUEL

2.8.11. REMOVAL OF INDUSTRIAL WASTEWATER IN HOLDING TANKS

2.8.12. FLUSH AND CLEAN OF STORM DRAINAGE AND SEWAGE LINES

2.8.13. GENERAL INSPECTION AND TIGHTNESS TEST OF OIL/WATER SEPARATORS AND GREASE SEPARATORS

2.8.14. TIGHTNESS TEST OF SEWAGE HOLDING TANKS AND SEWAGE LIFT STATIONS

Current as of 14 July 2025 Page 3 of 29

2.8.15. PFT TESTING

2.8.16. Self-Monitoring/Inspection

2.8.17. DISPOSAL OF OTHER HAZARDOUS MATERIAL FROM RAINWATER CATCH/RETENTION BASINS

2.8.18. REMOVAL, TRANSPORTATION, AND DISPOSAL OF DE-WATERED SEWAGE SLUDGE

3. QUALITY CONTROL

3.1. QUALITY ASSURANCE

4. Personnel, EMPLOYEE HEALTH, SAFETY AND QUALIFICATIONS

4.1 CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL CLEARANCES AND VEHICLE PASSES

4.2. SAFETY AND HEALTH STANDARDS

4.3. SPECIAL QUALIFICATIONS

4.4. KEY PERSONNEL

4.5. IDENTIFICATION OF CONTRACTOR EMPLOYEES

4.6. ORGANIZATIONAL CONFLICT OF INTEREST (OCI)

4.7. CONTRACTING OFFICER REPRESENTATIVE (COR)

5. GOVERNMENT FURNISHED ITEMS AND SERVICES

5.1. WATER AND ELECTRICITY

5.2. STORAGE PROPERTY

5.3. OTHER PROPERTY, EQUIPMENT AND SERVICES

6. ACRONYMS AND DEFINITIONS

6.1. ACRONYMS

6.2. DEFINITIONS

6.3 APPLICABLE PUBLICATIONS

APPENDICES

APPENDIX A – LOCATIONS OF BUILDINGS/SERVICES

APPENDIX B – LANGUAGE PROFICIENCY LEVELS

TABLE A1-1 – LOCATION OF ACTIVE FACILITY OIL/WATER SEPARATORS

TABLE A1-2 – LOCATIONS OF ACTIVE FACILITY OIL/WATER SEPARATORS

TABLE A2 – LOCATIONS OF INACTIVE FACILITY OIL/WATER SEPARATORS

TABLE A3 – LOCATIONS OF GREASE SEPARATORS

TABLE A4 – LOCATIONS OF SEWAGE HOLDING TANKS

TABLE A5 – LOCATION OF LIST STATIONS

TABLE A6 – LOCATIONS OF PACKAGE WASTEWATER TREATMENT PLANTS

Current as of 14 July 2025 Page 4 of 29

TABLE A7 – LOCATIONS OF RAINWATER RETENTION BASINS AND CATCHMENT BASINS

Current as of 14 July 2025 Page 5 of 29

1. DESCRIPTION OF SERVICES

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the Removal of Wastewater Material for routine service and emergency cases as defined in this Performance Work Statement, except for those items specified as government furnished property and services.

The Contractor shall perform to the standards in this contract. Work shall comply with German and European commercial standards and shall be performed in accordance with (IAW) all applicable laws, regulations mentioned in paragraph 6.3..

1.1. OBJECTIVES & SCOPE

The Contractor shall remove wastewater and sewage from oil/water separators, grease traps, holding tanks, water retention basins, sewer lines, drain lines, package plants, portable toilets, waste oil holding tanks, aircraft wash racks, sewage lift stations and industrial wastewater tanks located at Spangdahlem Air Base to ensure they remain fully operational. See Appendix A for location, size, and frequency of cleaning of oil/water separators, grease traps, and aforementioned components. The Government reserves the right to add/remove facilities and service locations as needed throughout the performance of this contract.

1.1.1. SAMPLING AND LABORATORY ANALYSIS

The Contractor shall provide sampling and laboratory analytical services for process control and to support Base Civil Engineer and Regulatory Agency Operating requirements IAW German and International Sampling and Analytical Standards with certification for this sampling and analysis service. Such sampling and testing procedures shall be accomplished IAW applicable operating permit requirements and conditions and as directed by the Contracting Officer (CO).

1.1.2. REPORTS

A copy of the EVN-Entsorgungs Ordnungsnachweis, Entsorgungsnachweis IAW the Verordnung über die Nachweisführung bei der Entsorgung von Abfällen (NachwV) (Proof of Proper Disposal) shall be provided to the 52 CES/CEOIU, “Wasserwerk”, Bldg. 2016, WWTP. An electronic and paper copy of the logbooks (Betriebstagebuecher) for the Oil/Water Separators, Grease Separators shall be maintained by the Contractor. Additionally, an electronic copy shall be submitted by the Contractor, semi-annually to 52 CES/CEOIU – Water and Fuel Systems Maintenance, Bldg. 2016, WWTP.

The Contractor shall retain a complete set of laboratory records for all laboratory tests including:

sampling protocols including at least date and time of sampling, name of sampler (incl. signature), type of sample, name of sample, location of sampling, environmental conditions during sampling (e.g. water flow rate, color, temperature, water temperature, weather conditions), type of sampling bottles, test parameter standards, performed test results incl. units and test results for a period of 3 years on file.

Additionally, an electronic copy shall be submitted at least semi-annually by the Contractor to the Spangdahlem Air Base Environmental Element (52 CES/CEIE, Building 119, Room 113, Spangdahlem Air Base, DSN 452-7257).

Current as of 14 July 2025 Page 6 of 29

At a minimum, the following reports shall be provided electronically:

- 2.8.13. GENERAL INSPECTION AND TIGHTNESS TEST OF OIL/WATER SEPARATORS AND

GREASE SEPARATORS

- 2.8.14. TIGHTNESS TEST OF SEWAGE HOLDING TANKS AND SEWAGE LIFT STATIONS

- 2.8.15. PFT TESTING

- 2.8.17. DISPOSAL OF OTHER HAZARDOUS MATERIAL FROM RAINWATER

CATCH/RETENTION BASINS

- 2.8.18. REMOVAL, TRANSPORTATION, AND DISPOSAL OF DE-WATERED SEWAGE SLUDGE

- [And further reports if environmental concerns addressed / applicable for Environ-mental Element]

1.1.3. SUPERINTENDENCE BY CONTRACTOR

The Contractor shall, at all times, provide adequate supervision of his employees to ensure complete and satisfactory performance of all work IAW the terms of the contract. Contractor personnel shall be certified to meet federal and local certification requirements to perform stated service.

Current as of 14 July 2025 Page 7 of 29

2. SERVICE SUMMARY

2.1. PLACE OF PERFORMANCE

The work required under this contract shall be performed at the locations mentioned in Appendix A.

Regarding the Emergency or Special Events Service, these may take place anywhere at the installation. The Contractor should ask where exactly to go to when he receives the notification. For further questions, the non-emergency contact information of Spangdahlem AB Fire Emergency Services Flight and Security Forces will be given to the Contractor after contract award.

2.2. PERIOD OF PERFORMANCE

Base Year 01 December 2025 - 31 November 2026 Option Year I Option Period - Extension

01 December 2026 01 December 2027

- 31 November 2027

- 31 May 2028

2.3. HOURS OF OPERATION

The Contractor is responsible for conducting business between the hours of 0700 hours through 1800 hours, Monday thru Friday, except Federal and German holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contractor shall report within 1 hour of an emergency or special event call properly made under paragraph 2.5. regardless of the time of day.

Depending on military requirements, interruptions of work are possible in certain areas and at different times. Interruptions lasting more than 1 hour shall be approved in writing by the COR.

2.4. FEDERAL HOLIDAYS

The following is a list of Federal holidays observed by the installation

2.4.1. AMERICAN FEDERAL HOLIDAYS

1. New Year’s Day, January 1 or the Friday preceding or Monday following

2. Martin Luther King Day, 3rd Monday in January

3. Presidents’ Day, 3rd Monday in February

4. Memorial Day, Last Monday in May

5. Juneteenth, June 19 or the Friday preceding or Monday following

6. Independence Day, July 4 or the Friday preceding or Monday following

7. Labor Day, First Monday in September

8. Columbus Day, 2nd Monday in October

9. Veteran’s Day, November 11 or the Friday preceding or Monday following

10. Thanksgiving Day, 4th Thursday in November

11. Christmas Day, December 25 or the Friday preceding or Monday following Note: When the holiday is on a Saturday, the preceding Friday shall be the U.S. holiday.

When the holiday is on a Sunday, the following Monday shall be the U.S. holiday.

2.4.2. GERMAN HOLIDAYS

1. New Year’s Day

2. Good Friday

Current as of 14 July 2025 Page 8 of 29

3. Easter Monday

4. Labor Day

5. Ascension Day

6. White Monday

7. Corpus Christi Day

8. Day of Unity

9. All Saints Day

10. Christmas

11. Second Day of Christmas

2.5. EMERGENCY OR SPECIAL EVENTS SERVICES

Services may be required to support an activation or exercise of contingency plans, natural disaster or another emergency. Emergency services refer to work required to address immediate threats to safety, security, or operational continuity. Such events may occur outside the normal daily work schedule or after normal duty hours.

In emergency cases, the contractor shall respond within 1 hour of notification, Monday through Sunday and on German/American holidays. This shall be a 24/7 emergency service for Spangdahlem Air Base, and all other GSUs and off-base sites in a radius of 20 kilometers from Spangdahlem Air Base.

If emergency services are required to address unforeseen circumstances or critical issues, the Contractor shall notify the Contracting Officer immediately. Emergency services shall not commence without prior written authorization from the Contracting Officer. A formal contract modification will be executed to define the scope, cost, and terms of the emergency services. The Contractor shall provide a detailed proposal for the emergency work within 3 business days of notification.

The contractor shall provide the COR and Contracting Officer with a preliminary pricing structure for emergency services within 30 days of contract award for streamlining of the modification and expectation of necessary funds needed.

2.5.1. AUTHORIZED PERSONNEL TO PLACE EMERGENCY CALLS

Should an emergency arise, the COR will notify the Contractor as soon as practicable. The Contractor shall respond within 1 hour, but shall NOT commence any work until authorized by the CO. No other individuals have the authority to direct work for emergencies.

2.6. POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The CO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

2.7. PERFORMANCE OF SERVICE DURING CRISIS DECLARED BY THE SECRETARY

OF DEFENSE OR OVERSEAS COMBATANT COMMANDER

Current as of 14 July 2025 Page 9 of 29

IAW DFARS Subpart 237.76 Continuation of Essential Contractor Services, DoDI 3020.37 Continuation of Essential DoD Contractor Services During Crisis and unless otherwise directed by an authorized Government representative, it is determined that services as identified in this PWS are NOT essential for performance during a crisis.

2.8. SERVICE TASKS

The Contractor shall provide services for the Removal of Wastewater and Sewage. The Contractor shall be a certified company according to all updated German legal and commercial regulations and standards.

Current as of 14 July 2025 Page 10 of 29

2.8.1. CLEANING OF OIL/WATER SEPARATORS WITH AND WITHOUT COALESCENCE FILTERS

AND SAND/SLUDGE TRAPS

*Requirement for sewage collection within the line*

Perform cleaning of all oil/water separators (OWS) and sand/sludge traps IAW regulation DIN 1999- 100/ DIN EN 858 (see paragraph 6.3.). Draw off, transport and dispose of oil and sludge and inspect system for proper operation. The Contractor is also responsible, on behalf of the US Government, for the following tasks in DIN 1999-100, mentioned in paragraphs: 14.3 Self-control (Eigenkontrolle);

14.4 Maintenance (Wartung); 14.5 Disposal (Entsorgung); 14.4 General Inspection (Überprüfung/Generalinspektion); and 14.7 Operation Book (Betriebstagebuch). Any discrepancy from service stated in this paragraph, or unusual finding, shall be reported to the COR the same duty day.

Two-Phase Separators. Including, but not limited to, the following manufacturers: Dywidag, AWAS, Buderus and Bene systems. The same procedures apply and shall be performed IAW applicable regulations. Any equipment malfunction(s) shall be reported to the COR the same duty day.

The Contractor is responsible for the obtaining the manufacturing/technical manuals (Herstelleranweisungen/ Betriebstagebücher) of all separators, if still available. The Contractor shall provide an electronic copy of the manufacturing/technical manuals of all separators to 52 CES/CEOIU personnel annually.

A proof of disposal (Entsorgungsnachweis und Begleitschein) shall be established and signed digitally IAW S.A.M. The Contractor shall ensure coalescent filter packages are renewed as appropriate for the different kind of coalescent filters. Filter package renewal includes proper disposal of the used filter material. The cleaning service includes the functional testing of the separators and cleaning/changing of existing coalescent filters. All sludge, sediments, oil, oil residue, and other waste from the sand traps, separators, and coalescing filters shall be removed. The separators must be drained completely. All parts need to be inspected. If there are any deficiencies, pictures need to be taken and the issues clearly summarized in detail. A map shall be included by the Contractor, which clearly describes the connected surface and inlets which drain to the oil/water separator. The report shall be sent to 52 CES/ CEOIU personnel. The separators need to be washed, drained and filled with clear water as required for the unique configuration of the separator. Additionally, the Contractor shall transport all materials IAW the ADR (Agreement for Transport of Dangerous Goods) from oil/water separators to an approved off-base oil recovery and storage/disposal facility.

2.8.2. CLEANING OF GREASE SEPARATORS

*Requirement for sewage collection within the line*

Perform cleaning service of all grease traps to include removal, transportation, and proper disposal of contents IAW DIN 4040-100, DIN EN 1825. Residual or recharge water must be higher than lower inlets. The Contractor is also responsible for the following tasks in DIN 4040-100, mentioned in

Current as of 14 July 2025 Page 11 of 29 paragraphs: 12.2 Disposal (Entsorgung); 12.3 Maintenance (Wartung); 12.4 General Inspection (Überprüfung/Generalinspektion); and 12.5 Operation Book (Betriebstagebuch). Any discrepancy from service stated in this paragraph or unusual finding shall be reported to the COR the same duty day.

The Contractor is responsible for the acquisition of the manufacturing/technical manuals (Herstelleranweisungen/ Betriebstagebücher) for all grease separators. The Contractor shall provide a copy of the manufacturing/technical manuals of all grease separators to the 52 CES/ CEOIU personnel, annually.

2.8.3. CLEANING OF HOLDING SEWAGE TANKS, PACKAGE WASTEWATER TREATMENT

PLANTS, AND SEWAGE LIFT STATIONS

Perform cleaning service of sewage holding tanks, sewage lift stations, and package wastewater treatment plants (WWTP) IAW DIN 4261 and manufacturer’s operations and technical manuals. The Contractor shall transport and discharge contents of sewage holding tanks at Spangdahlem Air Base to the WWTP at building 2016, or discharge it to a designated manhole as specified by the COR.

Estimated quantity to be removed per year is in Appendix A. Any discrepancy from service stated in this paragraph or unusual finding shall be reported to the COR the same duty day.

2.8.4. CLEANING OF RAIN RETENTION BASINS (RRB)

*Requirement for sewage collection within the line*

Rainwater retention basins shall be cleaned annually. Filter systems and sand traps shall be inspected and cleaned according to the manufacturer’s manuals. The Contractor is responsible for the removal, transportation and proper disposal of content within retention basins. Any discrepancies from the service stated in this paragraph or unusual findings shall be reported to the COR on the same duty day.

2.8.5. REMOVAL OF HOLDING TANK/SEWAGE TREATMENT PLANT SLUDGE

If a sewage holding tank has reached its 75% filling capacity, or the compact WWTP is not fully operational and the contents of sewage holding tanks, portable toilets and/or compact WWTP cannot be stored and/or treated, the Contractor shall remove, transport, and dispose the sewage sludge to the Spangdahlem Air Base WWTP, or discharge it to a designated manhole as specified by the COR, IAW DIN 4261. For sewage holding tank locations, refer to Appendix A.

2.8.6. CLEANING OF DOME SHAFTS

Empty and clean dome shafts from underground storage tanks and from above ground storage tanks completely of oil, water, oil/water mixtures and/or sludge. Number of and locations of dome shafts are located in Appendix A. Any discrepancy from service stated in this paragraph or unusual finding shall be reported to the COR the same duty day. Estimated quantities to be removed per year are

Current as of 14 July 2025 Page 12 of 29 found at Appendix C and are estimated on an hourly basis, considering the following: travel time to/from oil tanks, suction (pumping) time, and transfer time from truck into government holding tank or processing/treatment system.

2.8.7. EMPTYING OF INTERNAL POL-STORAGE TANK BOTTOMS

Remove water and oily water from POL-storage tank bottoms. Tank locations are outlined in Appendix A. Services shall be performed IAW German commercial standards. Any discrepancies from the service stated in this paragraph or unusual findings shall be reported to the COR on the same duty day.

2.8.8. CLEANING OF STORM WATER DRAIN INLETS, DRAINAGE LINES, AND DRAIN GUTTERS

*Requirement for sewage collection within the line*

The Contractor shall clean, transport and properly dispose of all sediments and debris from Storm Water Drain Inlets (SWDI), drainage lines and drainage gutters, including the runway and airfield taxiways. Services shall be performed IAW German commercial standards and will include flushing drainage lines; cleaning debris from drain gutters base wide, as needed; and cleaning up and removing debris and sediments from drain inlets at the airfield pavement areas. Those inlets which are secured by screws must be secured after service performance. Missing screws shall be replaced by the Contractor. Any discrepancy from service stated in this paragraph or unusual findings shall be reported to the COR the same duty day. Performance execution must be coordinated at least 2 weeks prior with the COR for access coordination to the airfield. Estimated quantities to be removed per year are found at Appendix C and estimates travel time to/from the SWDIs and cleaning of the same.

2.8.9. CLEANING OF PORTABLE TOILETS

The Contractor must ensure portable toilets are all clean, disinfected, and refilled to ensure they meet German commercial standards. Transport and discharge content of toilets at the Spangdahlem WWTP at Building 2016. Any equipment malfunction shall be reported to the COR the same duty day.

The COR will make calls/appointments for toilette service. Estimated workload data is included at Appendix C. Estimated workload data is calculated on an hourly basis, considering the following:

travel time to/from portable toilets, suction (pumping) time and transfer time from truck into SAB to WWTP, or discharge it to a designated manhole as specified by the COR.

2.8.10. TRANSPORTATION OF WASTE AND FUEL

As directed by the COR, remove waste oil and fuel sludge from holding containers, drums, tanks, maintenance pits, and waste oil tanks. Transport and empty contents into designated holding tank(s) at buildings 208 and 765, or to other tanks specified by the COR, on Spangdahlem Air Base. All service(s) shall be performed IAW TRbS Nr 1201 and the German Federal and State Water Laws and ordnances.

2.8.11. REMOVAL OF INDUSTRIAL WASTEWATER IN HOLDING TANKS

Current as of 14 July 2025 Page 13 of 29

Fully empty and clean holding tanks of: waste/water mixture; water; oil/water mixtures and/or sludge, to include cleaning and flushing of a trough (if existing); and proper disposal of the waste material. Any discrepancy from service stated in this paragraph or unusual findings shall be reported to the COR the same duty day.

2.8.12. FLUSH AND CLEAN OF STORM DRAINAGE AND SEWAGE LINES

*Requirement for sewage collection within the line*

The Contractor shall conduct a flush or clean the storm drainage and sewage lines when blocked to ensure proper run off. When roots block a drainage line the Contractor must remove the roots by cutting them inside of the drainage line. Services shall be performed IAW German commercial standards. Any discrepancy from service stated in this paragraph or unusual findings shall be reported to the COR the same duty day.

2.8.13. GENERAL INSPECTION AND TIGHTNESS TEST OF OIL/WATER SEPARATORS AND

GREASE SEPARATORS

Perform general inspection and test all parts and connections of OWS systems including the associated pipes (DIN 1986) on tightness according to DIN 1999-100/DIN EN 858 and according to DIN 4040-100 with DIN EN 1825-1 and DIN EN1825-2 for grease separators. Contractor is required to develop a plan for inspection of approximately 30 separator systems per year. Results shall be reported in the operations and inspections manual for all systems, as recommended in the “Merkblatt Mineralölhaltige Abwässer und Abfälle aus Betriebsstätten zur Wartung, Reinigung, Betankung und Demontage von Fahrzeugen” / ”Pamphlet for industrial waste water/material contaminated with oil for maintenance, cleaning, refilling and demounting of vehicles”. Major deficiencies shall be immediately reported to 52 CES/CEOIU. One copy each of the complete status report or detected deficiencies report must be forwarded to 52 CES/CEOIU within 5 working days.

After testing and servicing, separator systems shall be put back into operational condition.

2.8.14. TIGHTNESS TEST OF SEWAGE HOLDING TANKS AND SEWAGE LIFT STATIONS

For all systems at Spangdahlem Air Base and its GSUs, each tank is required to have all parts and connections be inspected and tested for tightness every five (5) years. Schedule will be shared post-award. The capacity of each tank to be tested (approximately five (5) tanks per year) is between 10 and 20 cbm. Results shall be reported to 52 CES/CEOIU. Major dificiencies shall be immediately reported to the COR. The report shall include data about the area drained through the separator, a side map, flow direction of the water within this area and recommendations for repair in case of deficiencies. One copy of each of the completed status reports or detected deficiency reports shall be forwarded to 52 CES/CEOIU within five (5) working days.

2.8.15. PFT TESTING

The contractor shall perform PFT testing upon notification by the COR. The following parameters must be displayed in the report: 24 each single PFOS/PFT sampling parameters IAW required analytical method DIN 38407-F42 (AN-LG004) and lowest measurement value of 0.1 ng/l PFOS/PFCs:

Current as of 14 July 2025 Page 14 of 29

Perfluorbutan-Acid (PFBA), Perfluoroctan-Acid (gPFOA), Perfluoroctansulfon-Acid (gPFOS), Perfluorundecan-Acid (PFUnA), Perfluorpentan-Acid (PFPeA), PerfluorhexansulfonAcid (gPFHxS), Perfluorhexan-Acid (PFHxA), Perfluorheptan-Acid (PFHpA), Perfluornonan-Acid (PFNA), Perfluordecan- Acid (PFDA), Perfluordodecan-Acid (PFDoA), Perfluorbutansulfon-Acid (gPFBS), Perfluordecansulfon- Acid (PFDS), Perfluoroctansulfonamid (PFOSA), Perfluorheptansulfon-Acid (PFHpS), Perfluorpentansulfon-Acid (PFPeS), 1H,1H,2H,2H-Perfluoroctansulfon-Acid (H4PFOS), 7H- Dodecanfluorheptan-Acid (HPFHpA), 2H,2H-Perfluordecan-Acid (H2PFDA), 2H,2H,3H,3H- Perfluorundecan-Acid (H4PFUnA), 3,7-Dimethylperfluoroctan-Acid (3,7-DMPFOA), Perfluortridecan- Acid (PFTDA), Perfluortetradecan-Acid (PFTeA), H4-Perfluordecansulfon-Acid (8:2

FTS)

The analysis result shall be submitted to 52 CES/CEOUI within one week after the analysis result is available.

2.8.16. Self-Monitoring/Inspection

The Contractor shall perform, on behalf of the US-Government, monthly and semi-annual monitoring/ inspections (Eigenkontrolle) of all listed/included separators in paragraph 2.8.1 and 2.8.2 of this PWS IAW DIN 1999-100 and DIN 4040-100. Any discrepancy from service stated in this paragraph or unusual finding shall be reported to the COR on the same duty day.

2.8.17. DISPOSAL OF OTHER HAZARDOUS MATERIAL FROM RAINWATER CATCH/RETENTION

BASINS

When the sludge waste in the basin is identified as hazardous. The service must be performed IAW the mentioned laws and regulations in paragraph 6.3. of this PWS. Any discrepancy from service stated in this paragraph or unusual finding shall be reported to the COR on the same duty day.

2.8.18. REMOVAL, TRANSPORTATION, AND DISPOSAL OF DE-WATERED SEWAGE SLUDGE

De-watered sewage sludge is stored in metal containers (each container has a capacity of 10 cbm) at the WWTP, Building 2016, SAB. After notification by the COR, remove full containers within 3 working days and properly dispose the de-watered sludge. Clean empty containers and return them to Building 2016 within 4 working days. The Contractor shall have a location (see para. 5.2 – Storage Property) to store sludge during the periods that it cannot be properly disposed of or is awaiting results from samples taken to determine its overall contents. The removal, transportation, and proper disposal of the de-watered sewage sludge shall be performed IAW the “Düngemittel-Verordnung” - Fertilizer Regulation, and the “Klaerschlammverordnung”- Directive for Utilization of the County of Bitburg-Pruem and the “Bundes- Bodenschutzgesetz” – Soil Protection Act, dated 1 March 1999.

Current as of 14 July 2025 Page 15 of 29

3. QUALITY CONTROL

The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed IAW this PWS and German commercial standards, laws and regulations. The Contractor shall develop and implement procedures for the items that are not regulated by a law or DIN regulation to identify, prevent, and ensure non-recurrence of defective services.

The Contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The QCP shall be delivered within 30 days after contract award. After acceptance of the QCP, the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.

3.1. QUALITY ASSURANCE

The government shall evaluate the Contractor’s performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the maximum acceptable defect rate(s).

Current as of 14 July 2025 Page 16 of 29

4. Personnel, EMPLOYEE HEALTH, SAFETY AND QUALIFICATIONS

4.1 CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL

CLEARANCES AND VEHICLE PASSES

The Contractor shall comply with all requirements and procedures IAW DAFFARS 5352.249-9000 Contractor Access to Department of the Air Force Installations. All documentation shall be initially submitted and as personnel changes during contract performance with enough time to guarantee services can start at the given POP and continue without interruption.

4.2. SAFETY AND HEALTH STANDARDS

The Contractor shall initiate and maintain such programs as to comply with the provisions of the Occupational Safety and Health Standard (OSHA) Act and Globally Harmonized System. Additionally, any applicable European and/or German law, contract clauses, other directives, and/or regulations.

4.3. SPECIAL QUALIFICATIONS

4.3.1. The Contractor shall be responsible for obtaining all certifications, licenses, permits and associated documentation to perform all services listed in this PWS. The Contractor shall be responsible for all certifications, costs, and licenses pertaining to the (SAM) Sonderabfall- Management-Gesellschaft Rheinland-Pfalz mbH – Special Refuse Management.

4.3.2. The Contractor shall be responsible for obtaining the training for all of his employees on flight line driving procedures and shall ensure that his employees are in possession of a valid flight line driving permit. The Contractor shall be responsible for safeguarding all government property provided for Contractor use. The Contractor shall establish and implement methods of making sure all keys issued to him by the Government are not lost, misplaced, and/or used by unauthorized persons.

4.3.4. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer (CO), re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

4.4. KEY PERSONNEL

The Contractor shall provide a designated Foreman who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the Foreman is absent, shall be designated in writing to the CO. The Foreman or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

The Foreman or alternate shall be available between 0700 through 1800 hrs, Monday thru Friday, except Federal and German holidays, or when the government facility is closed for administrative

Current as of 14 July 2025 Page 17 of 29 reasons. The contractor shall be available for emergency calls 24/7 IAW Section 2.5.

Key personnel shall be able to speak and understand English at the below listed level:

o Speaking Ability - Level 1: Contractor can ask/answer questions on topics very familiar to them within the scope of the very limited language experience. Contractor can understand simple questions and statements allowing for slowed speech, repetition or paraphrase.

4.5. IDENTIFICATION OF CONTRACTOR EMPLOYEES

All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties, are required to identify themselves as Contractor Employees to avoid creating an impression in the minds of members of the public that they are Government officials. All documents or reports produced by the Contractor or Contractor’s employees shall be suitably marked as Contractor products or Contractor participation appropriately disclosed.

4.6. ORGANIZATIONAL CONFLICT OF INTEREST (OCI)

The Contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI. The contractor is not allowed to perform/execute repair projects from equipment if they already execute maintenance and general inspection during the performance period of this contract (e.g. IAW new DIN 1999-100 in the case of oil-water separators).

4.7. CONTRACTING OFFICER REPRESENTATIVE (COR)

The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions for a quality assurance evaluation: assure that the Contractor performs the technical requirements of the contract; perform random inspections necessary in connection with contract performance;

maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the CO and Contractor of any deficiencies; coordinate availability of Government Furnished Property (GFP), and provide site entry of Contractor personnel. A Letter of Designation (LoD) issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, particularly with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract or orders.

Current as of 14 July 2025 Page 18 of 29

5. GOVERNMENT FURNISHED ITEMS AND SERVICES

5.1. WATER AND ELECTRICITY

The Contractor is authorized to use water and electricity provided by the Government for the purpose of cleaning Government facilities and equipment on an as needed basis.

5.2. STORAGE PROPERTY

The Contractor shall have an appropriate location, for everything that is going to be disposed of, as stated in paragraph 2.8.18., to store designated types of waste during periods in which it cannot properly be disposed of or is awaiting results from samples taken to determine its overall contents.

5.3. OTHER PROPERTY, EQUIPMENT AND SERVICES

Except as stated in paragraph 5.1., the Contractor will furnish all property, equipment, and services necessary in the performance of this contract.

Current as of 14 July 2025 Page 19 of 29

6. ACRONYMS AND DEFINITIONS

6.1. ACRONYMS

CBM Cubic Meter CO Contracting Officer COR Contracting Officer Representative DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DIN Deutsches Institut für Normung – “German Institute for Norming” DO Delivery Order DOD Department of Defense FAR Federal Acquisition Regulation GFP Government Furnished Property GSU Geographical Separated Unit IAW In Accordance With OCI Organizational Conflict of Interest OWS Oil Water Separator PFT Perflourotensides POC Point of Contact POL Petroleum, Oil and Lubricate PWS Performance Work Statement QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SAB Spangdahlem Air Base S.A.M. Sonder Abfall Management – “Special Refuse Management” SWDI Storm Water Drain Inlets WWTP Wastewater Treatment Plant (Bldg. 2016)

Current as of 14 July 2025 Page 20 of 29

6.2. DEFINITIONS

CONTRACTOR A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the Prime Contractor.

CONTRACTING OFFICER (CO) A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

CONTRACTING OFFICER REPRESENTATIVE (COR) An employee of the U.S. Government appointed by the CO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

DEFECTIVE SERVICE A service output that does not meet the standard of performance associated with the PWS.

DELIVERABLE Anything that can be physically delivered but may include non-manufactured things such as meeting minutes and reports.

KEY PERSONNEL Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in Best Value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

PHYSICAL SECURITY Actions that prevent the loss or damage of Government property.

QUALITY ASSURANCE The Government procedures to verify that services being performed by the

Contractor are performed according to acceptable standards.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

QUALITY CONTROL (QC) All necessary measures taken by the Contractor to assure that the quality of an end product of service shall meet contract requirements.

SUBCONTRACTOR One that enters into a contract with a Prime Contractor. The Government does not have privity of contract with the subcontractor.

WORKDAY The number of hours per day the Contractor provides service IAW the contract.

WORKWEEK Monday through Friday, unless specified otherwise.

6.3 APPLICABLE PUBLICATIONS

The Contractor shall perform his service IAW all updated (“jeweils aktuelle Fassung”) applicable regulations, publications, manuals, local policies, and procedures:

6.3.1. Klaerschlammverordnung (AbfKlaerV), Directive for Utilization of the County of Bitburg- Prüm;

6.3.2. DIN 1999-100/DIN EN 858 – Abscheider für Leichtfluessigkeiten

6.3.3. DIN 4040-100 – Anforderungen an die Abscheideanlagen fuer Fette und DIN EN 1825-1 and

1825- 2

6.3.4. DIN 4261 – Kleinklaeranlagen

6.3.5. DIN 1610 – Zulaufleitungen

Current as of 14 July 2025 Page 21 of 29

6.3.6. Bundes – Bodenschutzgesetz, BBodSchG, Soil Protection Act

6.3.7. Bodenschutz ALEX-Informationsblatt 29

6.3.8. TRbS Nr 1201 – Prüfungen von Arbeitsmitteln und überwachungsbedüftigen Anlagen

6.3.9. German Water Act

6.3.10. Water Law of the State of Rheinland-Pfalz

6.3.11. Gesetz zur Förderung der Kreislaufwirtschaft und Sicherung der umweltverträglichen Bewirtschaftung von Abfällen (Kreislaufwirtschaftsgesetz – KrWG

6.3.12. Environmental Final Governing Standards of Germany, FGS-G

6.3.13. Merkblatt: Mineralölhaltige Abwässer und Abfälle aus Betriebstätten zur Wartung, Reinigung, Betankung und Demontage von Fahrzeugen

6.3.14. Verdingungsordnung fuer die Lieferung von Leistungen, VOL

6.3.15. § 191 Wasserhaushaltsgesetz – Water Act

6.3.16. RAL – Quality sign GZ-961 for maintenance of sewage lines (inspection, tightness test and cleaning) and DIN EN 1825-1 and 1825-2ADR – European Agreement to transport dangerous goods/hazardous materials by road

*In all cases, the Contractor shall adhere to the most stringent interpretation of the above documents.

**If the publications become obsolete, or a more current version is available, the Contractor is responsible for adhering to most current version.

Current as of 14 July 2025 Page 22 of 29

APPENDICES

APPENDIX A – LOCATIONS OF BUILDINGS/SERVICES

Please note, the number of facilities and their locations may vary due to removal or new installation

Table A1 Locations of Active Facility Oil/Water Separators (x2) Table A2 Locations of Inactive Facility Oil/Water Separators Table A3 Locations of Grease Separators Table A4 Locations of Sewage Holding Tanks Table A5 Locations of Lift Stations Table A6 Locations of Rainwater Retention Basins (RRB) and Catchment Basins (CB) (x2) Table A7 Locations of Industrial Wastewater Holding Tanks and Spill Containment Tanks

APPENDIX B – LANGUAGE PROFICIENCY LEVELS

Criteria are derived from NATO standard (ATrainP-5, Edition A, Version 2, May 2016)

Table B1 Listening Comprehension Table B2 Speaking Table B3 Reading comprehension Table B4 Writing

APPENDIX C – ESTIMATED QUANTITIES OF WORK

Table C1 Estimated Quantities of Workload

Current as of 14 July 2025 Page 23 of 29

TABLE A1-1 – LOCATION OF ACTIVE FACILITY OIL/WATER SEPARATORS

BUILDING UNITS MARKED WITH “C” ARE COALESCENCE

FILTERS

REGULATION

Tank 5 (T-10) C DIN 1999-100 & DIN EN 858

16 C DIN 1999-100 & DIN EN 858

47 C DIN 1999-100 & DIN EN 858

58 C DIN 1999-100 & DIN EN 858

Motor Pool RRB C DIN 1999-100 & DIN EN 858

64 N/A DIN 1999-100 & DIN EN 858

73 C DIN 1999-100 & DIN EN 858

99 C DIN 1999-100 & DIN EN 858

101 N/A DIN 1999-100 & DIN EN 858

110 C DIN 1999-100 & DIN EN 858

111 C DIN 1999-100 & DIN EN 858

155 I C DIN 1999-100 & DIN EN 858

155 II C DIN 1999-100 & DIN EN 858

158 N/A DIN 1999-100 & DIN EN 858

168 C DIN 1999-100 & DIN EN 858

169 N/A DIN 1999-100 & DIN EN 858

185 C DIN 1999-100 & DIN EN 858

189 C DIN 1999-100 & DIN EN 858

193 C DIN 1999-100 & DIN EN 858

198 N/A DIN 1999-100 & DIN EN 858

204 C DIN 1999-100 & DIN EN 858

208 C DIN 1999-100 & DIN EN 858

219 C DIN 1999-100 & DIN EN 858

221 N/A DIN 1999-100 & DIN EN 858

222 C DIN 1999-100 & DIN EN 858

250 C DIN 1999-100 & DIN EN 858

257 C DIN 1999-100 & DIN EN 858

260 C DIN 1999-100 & DIN EN 858

263 C DIN 1999-100 & DIN EN 858

307 N/A DIN 1999-100 & DIN EN 858

311 C DIN 1999-100 & DIN EN 858

364 C DIN 1999-100 & DIN EN 858

442 C DIN 1999-100 & DIN EN 858

550 C DIN 1999-100 & DIN EN 858

561 C DIN 1999-100 & DIN EN 858

562 C DIN 1999-100 & DIN EN 858

570 C DIN 1999-100 & DIN EN 858

634/5-I C DIN 1999-100 & DIN EN 858

634/5-II C DIN 1999-100 & DIN EN 858

640 C DIN 1999-100 & DIN EN 858

645 C DIN 1999-100 & DIN EN 858

645-de 1&2 C DIN 1999-100 & DIN EN 858

645-I C DIN 1999-100 & DIN EN 858

Current as of 14 July 2025 Page 24 of 29

645-II C DIN 1999-100 & DIN EN 858

645-III N/A DIN 1999-100 & DIN EN 858

TABLE A1-2 – LOCATIONS OF ACTIVE FACILITY OIL/WATER SEPARATORS

BUILDING UNITS MARKED WITH “C” ARE

COALESCENCE FILTERS

REGULATION

645-IV C DIN 1999-100 & DIN EN 858

645-V C DIN 1999-100 & DIN EN 858

645-VI C DIN 1999-100 & DIN EN 858

645-VII C DIN 1999-100 & DIN EN 858

645-VIII C DIN 1999-100 & DIN EN 858

655 C DIN 1999-100 & DIN EN 858

660 C DIN 1999-100 & DIN EN 858

690 C DIN 1999-100 & DIN EN 858

695 C DIN 1999-100 & DIN EN 858

757 C DIN 1999-100 & DIN EN 858

759 C DIN 1999-100 & DIN EN 858

760 C DIN 1999-100 & DIN EN 858

765 C DIN 1999-100 & DIN EN 858

773 C DIN 1999-100 & DIN EN 858

784 C DIN 1999-100 & DIN EN 858

919 C DIN 1999-100 & DIN EN 858

920 C DIN 1999-100 & DIN EN 858

2024 N/A DIN 1999-100 & DIN EN 858

3003 C DIN 1999-100 & DIN EN 858

3011 C DIN 1999-100 & DIN EN 858

3012 C DIN 1999-100 & DIN EN 858

3014 C DIN 1999-100 & DIN EN 858

3015 C DIN 1999-100 & DIN EN 858

3021 C DIN 1999-100 & DIN EN 858

3023 C DIN 1999-100 & DIN EN 858

3024-I N/A DIN 1999-100 & DIN EN 858

3024-II N/A DIN 1999-100 & DIN EN 858

3025 N/A DIN 1999-100 & DIN EN 858

3057 C DIN 1999-100 & DIN EN 858

New Washrack N/A DIN 1999-100 & DIN EN 858 FB Kammerforst N/A DIN 1999-100 & DIN EN 858 FB Sued I C DIN 1999-100 & DIN EN 858 FB Sued II C DIN 1999-100 & DIN EN 858 FB Housing N/A DIN 1999-100 & DIN EN 858 RRB Munilager C DIN 1999-100 & DIN EN 858 Old Main Gate RRB C DIN 1999-100 & DIN EN 858 RRB Welscherwiesenb. N/A DIN 1999-100 & DIN EN 858 Kailbach wells Pumphouse N

C DIN 1999-100 & DIN EN 858

Kailbach wells Pumphouse S C DIN 1999-100 & DIN EN 858

Current as of 14 July 2025 Page 25 of 29

TABLE A2 – LOCATIONS OF INACTIVE FACILITY OIL/WATER SEPARATORS

BUILDING UNITS MARKED WITH “C” ARE

COALESCENCE FILTERS

REGULATION

225 C/B DIN 1999-100 & DIN EN 858

330 C DIN 1999-100 & DIN EN 858

733 C DIN 1999-100 & DIN EN 858

3000 C DIN 1999-100 & DIN EN 858

3001 C DIN 1999-100 & DIN EN 858

3002 C DIN 1999-100 & DIN EN 858

3004 C DIN 1999-100 & DIN EN 858

3005 C DIN 1999-100 & DIN EN 858

3006 C DIN 1999-100 & DIN EN 858

3007 C DIN 1999-100 & DIN EN 858

3008 C DIN 1999-100 & DIN EN 858

3009 C DIN 1999-100 & DIN EN 858

3016 C DIN 1999-100 & DIN EN 858

3017 C DIN 1999-100 & DIN EN 858

3019 C DIN 1999-100 & DIN EN 858

3020 C DIN 1999-100 & DIN EN 858

3022L C DIN 1999-100 & DIN EN 858

3062 C DIN 1999-100 & DIN EN 858

3067 C DIN 1999-100 & DIN EN 858

3068 C DIN 1999-100 & DIN EN 858

3069 N/A DIN 1999-100 & DIN EN 858

3071 C DIN 1999-100 & DIN EN 858

TABLE A3 – LOCATIONS OF GREASE SEPARATORS

BUILDING REGULATION

42 DIN 4040-100 & DIN EN 1825

117 DIN 4040-100 & DIN EN 1825

124 DIN 4040-100 & DIN EN 1825

147 DIN 4040-100 & DIN EN 1825

160 DIN 4040-100 & DIN EN 1825

173 DIN 4040-100 & DIN EN 1825

300 DIN 4040-100 & DIN EN 1825

439 DIN 4040-100 & DIN EN 1825

441 DIN 4040-100 & DIN EN 1825

443 DIN 4040-100 & DIN EN 1825

500 DIN 4040-100 & DIN EN 1825

RMTP Flt Kit DIN 4040-100 & DIN EN 1825

560 DIN 4040-100 & DIN EN 1825

570 - BX DIN 4040-100 & DIN EN 1825

Current as of 14 July 2025 Page 26 of 29

TABLE A4 – LOCATIONS OF SEWAGE HOLDING TANKS

BUILDING BUILDING DESIGNATION REGULATION

T-04 POL Pump Station DIN 4261

T-13 LFM DIN 4261

31 AAFES Gas Station DIN 4261 157 Crash Recovery DIN 4261

204 AGE DIN 4261

364 Hangar 4 DIN 4261 383 Res FR Team Fac DIN 4261

725 WSA DIN 4261

729 SP Team Shelter DIN 4261 740 Army Maintenance DIN 4261 751 Vulcan Area DIN 4261 759 P&E Vehicle Maintenance DIN 4261

762 P&E DIN 4261

769 SP Shack DIN 4261 780 Munitions DIN 4261 784 Missile Maintenance DIN 4261 839 Missile Maintenance DIN 4261 840 Missile Maintenance DIN 4261 2300 Grosslittgen Water Plant DIN 4261 N/A End of Runway Build (EOR) DIN 4261

TABLE A5 – LOCATION OF LIST STATIONS

BUILDING

19 446 58 559 77 600 101 690 119 701 152 730 158 777 187 3030 332 3032 340 6032 371 Ramp 5

TABLE A6 – LOCATIONS OF PACKAGE WASTEWATER TREATMENT PLANTS

157 HG Maintenance DIN 4261 204 Shp A/SE Store Fac DIN 4261 780 Mun. Maintenance Admin DIN 4261

Current as of 14 July 2025 Page 27 of 29

TABLE A7 – LOCATIONS OF RAINWATER RETENTION BASINS AND CATCHMENT BASINS

2501 2501 RRB, Old Main Gate

(Altes Haupttor)

Para. 4.4 PWS & Part 5 PWS

2502 2502 RRB, WWTP (Klaeranlage) Para. 4.4 PWS & Part 5 PWS 2503 2503 RRB, Old Motorpool Para. 4.4 PWS & Part 5 PWS

2504 2504 RRB,

Welscherwiesenbuesch Para. 4.4 PWS & Part 5 PWS

2505 2505 RRB, NATO Parallel (Parallelrollbahn)

Para. 4.4 PWS & Part 5 PWS

2506 2506 RRB, Kammerforst Para. 4.4 PWS & Part 5 PWS 2507 2507 RRB, Munitions/P&E Area

(Munilager) Para. 4.4 PWS & Part 5 PWS

2509 2509 RRB, South Para. 4.4 PWS & Part 5 PWS 2510 2510 RRB, Wachenbach Para. 4.4 PWS & Part 5 PWS 2511 2511 RRB, Housing East 1 (Ost

I) Para. 4.4 PWS & Part 5 PWS

2512 2512 RRB, East 2 (Ost II) Para. 4.4 PWS & Part 5 PWS 2513 2513 RRB, Discharge 81/82, BX

Commissary

Para. 4.4 PWS & Part 5 PWS

2601 2601 CB, WWTP Old Main Gate Para. 4.4 PWS & Part 5 PWS 2602 2602 CB, VSM Basin at WWTP Para. 4.4 PWS & Part 5 PWS 2603 2603 RÜB, Mixed Water Basin Para. 4.4 PWS & Part 5 PWS 2604 2604 CB, Nato Parallel Para. 4.4 PWS & Part 5 PWS 2605 2605 CB, Kammerforst (small

Basin) Para. 4.4 PWS & Part 5 PWS

2606 2606 CB, Kammerforst (large Basin)

Para. 4.4 PWS & Part 5 PWS

2607 2607 CB/former Soil Filter Kammerforst

Para. 4.4 PWS & Part 5 PWS

2608 2608 CB, South (small basin) Para. 4.4 PWS & Part 5 PWS 2609 2609 CB, South (large basin) Para. 4.4 PWS & Part 5 PWS 2610 2610 CB, South, Earth Basin

West Para. 4.4 PWS & Part 5 PWS

2611 2611 CB, South, Earth Basin East

Para. 4.4 PWS & Part 5 PWS

2612 2612 CB, South, Soil Filter South

Para. 4.4 PWS & Part 5 PWS

2613 2613 CB, Housing Para. 4.4 PWS & Part 5 PWS 2614 2614 CB, Concrete Basin

(Concrete Backup Basin TG 14)

Para. 4.4 PWS & Part 5 PWS

2615 2615 CB, WWTP, Backup Para. 4.4 PWS & Part 5 PWS

Current as of 14 July 2025 Page 28 of 29

2616 2616, CB,

Welscherwiesenbuesch Para. 4.4 PWS & Part 5 PWS

2701 2701 IEB, WWTP Para. 4.4 PWS & Part 5 PWS 2702 2702 IEB, F15 Crash Site Para. 4.4 PWS & Part 5 PWS

BUILDING BUILDING DESIGNATION REGULATION

2704 2704 IEB,South Gate Small

Pont Para. 4.4 PWS & Part 5 PWS

2705 2705 IEB, South, Back/CTR Gate, Outside Pond

Para. 4.4 PWS & Part 5 PWS

2706 2706 IEB, Inflow to RRB, South

Para. 4.4 PWS & Part 5 PWS

2707 2707 IEB, Inflow to RRB, South

Para. 4.4 PWS & Part 5 PWS

2708 2708 IEB, Inflow to RRB, South

Para. 4.4 PWS & Part 5 PWS

2709 2709 IEB, Inflow to RRB, South

Para. 4.4 PWS & Part 5 PWS

2710 2710 IEB, Housing North 1 of 4 Para. 4.4 PWS & Part 5 PWS 2711 2711 IEB, Housing North 2 0f 4 Para. 4.4 PWS & Part 5 PWS 2712 2712 IEB, Housing North 3 of 4 Para. 4.4 PWS & Part 5 PWS 2713 2713 IEB, Housing North 4 of 4 Para. 4.4 PWS & Part 5 PWS 2714 2714 IEB, Main Gate Small Para. 4.4 PWS & Part 5 PWS 2715 2715 IEB, Main Gate Large Para. 4.4 PWS & Part 5 PWS 2716 2716 IEB, Dorm Parking Dorm

Parking (Bldg. 506)

Para. 4.4 PWS & Part 5 PWS

2717 2717 IEB, Club Eifel Para.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .