This document is a comprehensive project specification from the Michigan Department of Transportation (MDOT) for a roadway maintenance and improvement project on M-46 in Saginaw County, specifically the westbound lane from the Saginaw River to Michigan Avenue. The project involves 0.21 miles of roadway and is scheduled for completion between September 8 and September 30, 2025, with work to be completed in 5 consecutive days. The scope includes 2-inch cold milling of the HMA surface, 2-inch HMA 5EML High Stress paving for the 2-lane and 3-lane roadway, ADA ramp improvements, and temporary and permanent pavement markings. The contractor must provide a notice at least three calendar days prior to beginning work and will be responsible for maintaining traffic flow with specific restrictions on lane closures and work hours.
The project is a maintenance-funded initiative with strict financial terms, explicitly stating there will be no overpayment or extras, and all material, labor, and mobilization must be included in the bid. MDOT will review and approve the low bid for funding and reserves the right to reject unqualified bids. The work will be conducted in accordance with the 2020 Standard Specifications for Construction, with specific attention to ADA ramp improvements at intersections like Hamilton Street and Niagara Street. The project also involves coordination with the Huron and Eastern Railway, requiring specific insurance provisions, railroad protection, and careful management of work near railroad crossings. The contractor will need to provide Railroad Protective Liability Insurance and follow detailed guidelines for working near railroad property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| standard-contract-terms-short-form (7) (7) (1).docx | DOCX document | |
| 2025 MDHHS 5679 Official Receipt Book BID REQUEST 8-25.docx | DOCX document | |
| State of Michigan Print Mail Management Terms Conditions (1).docx | DOCX document | |
| MDHHS-5679 Consecutive Numbering Example.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W E B S T E R
S T
S
H A R R I S
O N
S T
LOCATION
PROJECT
M I C
H I
G
N
V E
I
A G
A R
A
S
F
A Y E T T E
S T
H
M I L T
O N
S
SAGINAW COUNTY
CITY OF SAGINAW
ROUTE: M-46
MICHIGAN DEPARTMENT OF TRANSPORTATION
S A
G
IN
A W
R
IV
E R
S T E P H E
N S
S T
W I L L I A
M S
S T
JN:
DRAWING SHEET
TSC: DATE:DESIGN UNIT: MATULA 7-28-25 BAY CITY
FILE:TITLE SHEET.DGN
M-46 WESTBOUND (MICHIGAN AVE TO SAGINAW RIVER)NO SCALE
Michigan Department of Transportation
SECT
N
COLD MILL AND RESURFACE HMA, ADA RAMP IMPROVEMENTS
TITLE SHEET
CS: 73073
MDOT Maintenance Project Log
General:
This project is a Maintenance funded project, which means that there will be absolutely no overpayment or extras. All material, labor and mobilization shall be included in the bid.
MDOT will have the low bid reviewed and approved for funding. MDOT reserves the right to reject any bid that appears to be unqualified. Before the award, MDOT may request a site plan review meeting with the low bid contractor.
The work will be done in accordance with the 2020 Standard Specifications for Construction.
Job Location:
Westbound M-46 (Saginaw River to Michigan Ave) 0.21 miles, City of Saginaw, Saginaw County.
POB is at HMA/Conc pavement edge (west of Saginaw River)
POE is 5-foot east of the stop bar at the east leg of Michigan Avenue and Westbound M-46.
Project Schedule:
Work may begin immediately after receiving approval from MDOT. Work to be completed between September 8, 2025 to September 30, 2025. Once work starts, it must be completed in 5 consecutive days. Notice must be provided to Dan Senske at 989-233-1053 a minimum of three (3) calendar days prior to beginning work.
Temporary pavement markings will be placed at the end of the days work, prior to opening to traffic.
Permanent pavement markings will completed within 7 days of completion of HMA paving.
Description of work:
HMA Work:
The work will consist of 0.21 miles of 2-inch Cold Milling HMA Surface, 2-inch HMA, 5EML, High Stress paving of the 2-lane and 3-lane roadway, ADA ramps, temporary and permanent pavement markings. Work will be done in a manner not to damage any existing curb and gutter.
On the northeast and southwest approaches of Niagara Street, cold mill and pave up to concrete pavement, as shown on attached railroad pavement marking sheet.
On the northeast and southwest approaches of Hamilton Street, cold mill and pave to 35-foot from the centerline of Westbound M-46 or as directed by the Engineer.
Concrete Sidewalk Work:
At the west quadrant of Westbound M-46 and Hamilton Street remove the existing concrete sidewalk as shown in the attached plan. Payment for this item of work will be Curb, Rem. The back of concrete curb will be removed to provide a 5-foot wide opening for the ADA ramp requirements per MDOT Standard Plan R-28-K.
At the north, east, and south quadrants of Westbound M-46 and Hamilton Street, place detectable warning surface as shown on the attached MDOT Standard Plan R-28-K.
Cold Milling Concrete Pavement Work:
Cold Milling Concrete Pavement approximately 12-foot by 12-foot on the west corner of Westbound M-46 and Hamilton Street as shown on the attached ADA ramp plan.
Permanent pavement markings will be installed per section 811 of the 2020 Standard Specifications for Construction.
Maintaining Traffic:
Night work will not be allowed.
Traffic control devices and equipment will be supplied and laid out by the contractor and should be maintained per typical m240a and m0730a.
Work on Saturdays and Sundays will be at the Engineers discretion and require preapproval.
Crossroads and driveways will remain open to traffic at all times.
GRASS
GRASS
CONC
CONC
CONC
.0
.0
.0
.2
.6
.3 ' 4.4'
5.0'
6.7'
6.7'
97.30
97.19
97.00 96.58
96.67
97.15 97.39
97.50 97.57
97.69
97.80
97.96
98.04
97.86 97.25
97.1997.62
97.11
97.35
97.35
BM #1
WMV
5.0'
5.0' .1
.2
.4
.2
.6
.0
.7
.4
.2
.8
.3
2.20%
3.60%
3.80%
2.13%
1.82%
12.09%
12.39%
3.60%
3.20%
2.20%
5.80%
GRASS
HMA
CONC
CONC
CONC
GRASS
GRASS
GRASS
CONC
CONC
CONC
.0
5.0'
97.30
97.19
97.96
98.04
BM #1
WMV
.6
2.20%
GRASS
HMA
CONC
CONC
CONC
ASSUMED ELEV = 100.00
OF M-46 & WILLIAMS ST
HYDRANT IN NORTHWEST QUADRANT
ARROW ON DOME OF
BM #1
SIDEWALK REMOVAL
CURB RAMP TYPE
SURFACE
DETECTABLE WARNING
CURB RAMP
LANDING
RAMP
97.34 EXIST ELEV OR SLOPE
PROP ELEV OR SLOPE
5.00%
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
M-46
ADA
73062
TSC: DATE:DESIGN UNIT: 7/28/25 MATULA BAY CITY
FILE:M-46 AT HAMILTON.DGN.dgn
ADA RAMP
0 10
HORZ. (FT)
Michigan Department of Transportation
SECT
CS: M-46 WESTBOUND AT HAMILTON ST
NORTHWEST QUADRANT
REMOVAL CONSTRUCTION
CR-R
LEGEND
97.55 5.00%
2.00%
2.00%
.0
.0
8.3%
5.37%
.8 %5 .0
5.00'
2.00%
.7
.8
(PAID FOR AS CURB, REM)
SECTION THROUGH CURB RAMP OPENING)
(SEE STANDARD PLAN R-28,
TO PROVIDE 5' MIN OPENING
SAWCUT BACK OF TYPE C CURB
(PAID FOR AS CURB, REM)
SECTION THROUGH CURB RAMP OPENING)
(SEE STANDARD PLAN R-28,
TO PROVIDE 5' MIN OPENING
SAWCUT BACK OF TYPE C CURB
.0
WARNING SURFACE
INSTALL 24" DETECTABLE
WARNING SURFACE
INSTALL 24" DETECTABLE
CR-R
CR-R
EXISTING CURB & GUTTER
CONTRACTOR WILL NOT DAMAGE
NOTE:
R A
M P
R A
M P
.0
5.00'
5.00'
97.19
97.62
97.11
97.35
96.67
97.15
96.58
97.00
97.23
97.13
97.03
97.13
97.55
97.64 8.10%
8.10%
8.3%
8.3%
5.0'
5.0'
.6
.0
.0 ' 6.7'
6.7'
.8 %5 .0
Excavation, EarthCyd 3
Sidewalk, RemSyd 22
Curb, RemFt 4
REMOVAL QUANTITIES FOR INFO ONLY
Curb Ramp, Conc, 4 inchSft 198
Detectable Warning SurfaceFt 10
Subbase, CIPCyd 3
CONSTRUCTION QUANTITIES FOR INFO ONLY
COLD MILLING CONC PAVT
- K
GRASS
CONC
CONC
WMV
96.91
96.74 97.02
97.22
97.65 97.22
97.42
97.62
97.76
97.79
97.62
97.34
97.18
97.30
97.21
96.97
96.81
97.30
97.24
97.05
96.86
.0
5.0'
.3
4.0'
7.65'
5.80' 2.61%
4.83%
5.0'
5.0'
.0
.9
.1
.9
.0
.0
3.20%
5.60%
3.40%
4.00%
8.00%
2.80%
.2
.1
%4 .2
.9
.2
.4
.3
%2 .8
.8
.8
.0
.6
0.00%
0.60%
1.60%
1.00%
GRASS
GRASS
GRASS
CONC
CONC
WMV
96.91
96.74 97.02
97.22
97.65 97.22
97.42
97.62
97.76
97.79
97.62
97.34
97.18
97.30
97.21
96.97
96.81
97.30
97.24
97.05
96.86
.0
5.0'
.3
4.0'
7.65'
5.80' 2.61%
4.83%
5.0'
5.0'
.0
.9
.1
.9
.0
.0
3.20%
5.60%
3.40%
4.00%
8.00%
2.80%
.2
.1
%4 .2
.9
.2
.4
.3
%2 .8
.8
.8
.0
.6
0.00%
0.60%
1.60%
1.00%
ASSUMED ELEV = 100.00
OF M-46 & WILLIAMS ST
HYDRANT IN NORTHWEST QUADRANT
ARROW ON DOME OF
BM #1
HMA OVER CURB & SIDEWALK
RAMP
CURB RAMP TYPE
SURFACE
DETECTABLE WARNING
97.34 EXIST ELEV OR SLOPE5.00%
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
FILE:M-46 AT HAMILTON.DGN.dgn
ADA RAMP
0 10
HORZ. (FT)
Michigan Department of Transportation
SECT
NORTHEAST QUADRANT
REMOVAL
CONSTRUCTION
WARNING SURFACE
INSTALL 24" DETECTABLE
(SEE FORM 0370)
CR-R
Detectable Warning SurfaceFt 14
CONSTRUCTION QUANTITIES FOR INFO ONLY
CR-R
LEGEND
EXISTING CURB & GUTTER
CONTRACTOR WILL NOT DAMAGE
FULL WIDTH OF RAMP
24" DETECTABLE WARNING SURFACE ACROSS
CLEAN CONCRETE THOROUGHLY, INSTALL
REMOVE SOIL FROM SIDEWALK, RAMP, AND GUTTER.
NO CONCRETE WORK NEEDED IN THIS QUADRANT.
.0
.0
.0
.0
5.0'
4.8'
5.0'
4.2'
5.2'
5.0'
4.8'
5.0'
5.
0'
4.2'
3.6'
5.0'
5.0'
5.0'
5.0'
.0
.0
.2
.2
.0
.0
.9
.4
H M
A
GRASS
GRASS
BLDG
GRASS
GRASS
CONC
BM #2
.0 ' 6 .0
.8
95.19
95.46
95.20
95.13 95.43
95.57
95.65
95.21
95.51
95.31
95.24
95.79 95.69
96.01
95.91
96.01
95.94 95.82
95.95
96.02
96.01
95.93
95.67
.5
0.21%
4.60%
4.62%
95.80
95.71
.5
.2
.0 '1 .0
.7
.4
6.87%
3.60%
4.71%
.0
.4
.1
.2
.4
.4
3.
.4
0.40%
0.56%
2.00%
1.40%
1.60%
5.0 '6.0
0%
5.0
9.0 0%
RAMP
.0
.0
.0
.0
5.0'
4.8'
5.0'
4.2'
5.2'
5.0'
4.8'
5.0'
5.
0'
4.2'
3.6'
5.0'
5.0'
5.0'
5.0'
.0
.0
.2
.2
.0
.0
.9
.4
H M
A
GRASS
GRASS
BLDG
GRASS
GRASS
CONC
BM #2
.0 ' 6 .0
.8
95.19
95.46
95.20
95.13 95.43
95.57
95.65
95.21
95.51
95.31
95.24
95.79 95.69
96.01
95.91
96.01
95.94 95.82
95.95
96.02
96.01
95.93
95.67
.5
0.21%
4.60%
4.62%
95.80
95.71
.5
.2
.0 '1 .0
.7
.4
6.87%
3.60%
4.71%
.0
.4
.1
.2
.4
.4
3.
.4
0.40%
0.56%
2.00%
1.40%
1.60%
5.0 '6.0
0%
5.0
9.0 0%
RAMP
ASSUMED ELEV = 100.00
OF M-46 & WILLIAMS ST
HYDRANT IN NORTHWEST QUADRANT
ARROW ON DOME OF
BM #1
CURB RAMP TYPE
SURFACE
DETECTABLE WARNING
97.34 EXIST ELEV OR SLOPE5.00%
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
H A
M
ILT
O N S
T
W
IL
L
IA
M S S
T
M -4
FILE:M-46 AT HAMILTON.DGN.dgn
ADA RAMP
0 10
HORZ. (FT)
Michigan Department of Transportation
SECT
SOUTHEAST QUADRANT
CONSTRUCTION
WARNING SURFACE
INSTALL 24" DETECTABLE
(SEE FORM 0370)
Detectable Warning SurfaceFt 6
CONSTRUCTION QUANTITIES FOR INFO ONLY
CR-R
CR-R
LEGEND
EXISTING CURB & GUTTER
CONTRACTOR WILL NOT DAMAGE
FULL WIDTH OF RAMP
24" DETECTABLE WARNING SURFACE ACROSS
CLEAN CONCRETE THOROUGHLY, INSTALL
CONC
GRASS
CONC
CONC
CONC
.5
.3
.3
.2
.2
.0
5.0'
6.0'
5.0'
6.0'
6.0'
.2
.2
.6
5.0'
96.26
95.81
95.82
96.25
96.26 96.06
95.78
95.65 95.90
95.99
96.01 96.08
96.1496.1496.16
96.2696.12
96.11
96.23
96.26 96.13
96.07
96.070 .2
.9
.2
.4
.4
.1
.5
.0
2.20%
2.40%
5.50%
4.17%
.0
.7
.0
.6
0.40%
1.20%
2.40%
2.80%
1.17%
.8
GRASS
CONC
GRASS
CONC
CONC
CONC
.5
.3
.3
.2
.2
.0
5.0'
6.0'
5.0'
6.0'
6.0'
.2
.2
.6
5.0'
96.26
95.81
95.82
96.25
96.26 96.06
95.78
95.65 95.90
95.99
96.01 96.08
96.1496.1496.16
96.2696.12
96.11
96.23
96.26 96.13
96.07
96.070 .2
.9
.2
.4
.4
.1
.5
.0
2.20%
2.40%
5.50%
4.17%
.0
.7
.0
.6
0.40%
1.20%
2.40%
2.80%
1.17%
.8
ASSUMED ELEV = 100.00
OF M-46 & WILLIAMS ST
HYDRANT IN NORTHWEST QUADRANT
ARROW ON DOME OF
BM #1
CURB RAMP TYPE
SURFACE
DETECTABLE WARNING
97.34 EXIST ELEV OR SLOPE5.00%
W
IL
L
IA
M S S
T
M -4
H A
M
ILT
O N S
T
H A
M
ILT
O N S
T
W
IL
L
IA
M S S
T
M -4
FILE:M-46 AT HAMILTON.DGN.dgn
ADA RAMP
0 10
HORZ. (FT)
Michigan Department of Transportation
SECT
SOUTHWEST QUADRANT
CONSTRUCTION
Detectable Warning SurfaceFt 10
CONSTRUCTION QUANTITIES FOR INFO ONLY
WARNING SURFACE
INSTALL 24" DETECTABLE
WARNING SURFACE
INSTALL 24" DETECTABLE (SEE FORM 0370)
(SEE FORM 0370)
' L
IM
IT
CR-R
CR-R
CR-R
LEGEND
EXISTING CURB & GUTTER
CONTRACTOR WILL NOT DAMAGE
FULL WIDTH OF RAMP
24" DETECTABLE WARNING SURFACE ACROSS
CLEAN CONCRETE THOROUGHLY, INSTALL
RAILROAD TRACKS
EXISTING
P A V
IN
G
LIM
IT
S
C O
LD
M
ILLIN
G A
D
P
V
IN
G
LIM
IT
S
C O
LD
M
ILLIN
G A
D
C O
N C
C O
N C
C O
N C
H M
A
H M
A
H M
A
H M
A
E X S
W K
E X S
W K
E X S
W K
E X S
W K
R R S
IG
N A L
R R G
ATE
R
R
R
R
N
IA
G A R
A S
T
PMRK
TSC: DATE:DESIGN UNIT: 7/31/25 MATULA BAY CITY
FILE:RR SYMBOL.DGN
RAILROAD SYMBOL PAVEMENT MARKINGS
0 40
HORZ. (FT)
Michigan Department of Transportation
SECT
CS: WESTBOUND M-46 AT HAMILTON ST
AND DETECTABLE WARNING SURFACE PLACEMENT
RR
EXISTING W10-1
RR
EXISTING W10-1
EXISTING W10-1
RR
EXISTING W10-1
RR
(W
IL
L
IA
M S S
T
M -4 W
E S T B
O U
N D
N
(SEE PAVE-965-D)
WITH THE EXISTING W10-1 SIGNS.
THE BOTTOM OF THE "X" WILL BE EVEN
WHEN PLACING THE RAILROAD SYMBOLS,
NOTE:
' F
R O
M R
A
IL
W A R
N
IN
G S
U R F A C E
IN
S
TA
L L 2
" D
E T E C
TA
B L
' F
R O
M R
A
IL
W A R
N
IN
G S
U R F A C E
IN
S
TA
L L 2
" D
E T E C
TA
B L
R
N
IN
G S
U R
FA
C E
IN
S
TA
LL 24" D
E T E C
TA
B
LE
R
N
IN
G S
U R
FA
C E
IN
S
TA
LL 24" D
E T E C
TA
B
LE
Pavt Mrkg, Ovly Cold Plastic, Railroad SymEa 4
Detectable Warning SurfaceFt 20
CONSTRUCTION QUANTITIES FOR INFO ONLY
RAILROAD SYMBOL
PAVT MRKG, OVLY COLD PLASTIC,
RAILROAD SYMBOL
PAVT MRKG, OVLY COLD PLASTIC,
20TM100(A015)
MICHIGAN
DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION
FOR
WORK NEAR RAILROAD CROSSING
RAL:DGT 1 of 1 APPR:CRB:JJG:05-18-21
a. Description. This work consists of the Contractor consulting with the representative of the Huron and Eastern Railway Company (herein after called the Railroad) to determine the necessity for, the type of, and cost of protection required for ensuring the safety and continuity of Railroad traffic and payment to the Railroad for protective services when doing work on, above, or below the Railroad property.
b. Materials. None specified.
c. Construction. Contact the Railroad 30 calendar days prior to starting work in the vicinity of their tracks. Provide documentation to the Engineer with the details of the contact including the person contacted, phone number or email used and the specific time and date. Ensure construction methods are in compliance with the requirements in the contract and as directed by the Engineer.
Pay (or pre-pay when required by the Railroad) the cost for right of entry permit, flagpersons, watchpersons, training, and other protective services and devices furnished or required by the Railroad and made necessary in the judgment of the representative of the Railroad because of the Contractors’ operations which are within 50’ of each side of centerline of track or impacted by traffic control operations. All Railroad bills for such protection costs must be paid within 14 calendar days if not prepaid.
Monitor and provide immediate preference to clearing any traffic which backs up over the crossing as a result of flag control away from the crossing.
d. Measurement and Payment. Review the accuracy of costs from the Railroad and resolve any inconsistencies prior to submitting to Engineer for reimbursement. Submit satisfactory evidence or certification to the Engineer indicating all bills for protective services and devices furnished by the Railroad have been paid.
The Department will reimburse the Contractor for the costs incurred that have satisfactory evidence of payment to the Railroad using the following pay item.
Pay Item Pay Unit
Railroad Protection, at Grade Crossing, Huron and Eastern Railway .......... Dollar
HURON AND EASTERN RAILWAY
RAILROAD INSURANCE REQUIREMENTS
RAL:DGT 1 of 2 APPR: JLD:SMR: 08-01-2021
a. Description. This work consists of providing Railroad Protective Liability Insurance before work is commenced and kept in effect until all work required to be performed under the terms of the contract is satisfactorily completed as evidenced by the formal acceptance by the Michigan Department of Transportation (Department).
b. Insurance Requirements. To carry the following insurance, in a form, and with an insurer or insurers, acceptable to the Department and Huron and Eastern Railway (Railroad), its parent companies, and affiliates, on all insurance forms listed below with railroad contact information as noted in the Coordination Clause for Work on Railroad Property.
1. Railroad Protective Liability Insurance in behalf of Huron and Eastern Railway, its parent companies and affiliates, as the named insured.
The Contractor must furnish to the Department and to the Railroad copies of policies as evidence that, with respect to Contractor or Subcontractor operations standard Railroad Protective Liability Insurance is carried providing for limits of liability in the amount of two million dollars ($2,000,000) combined single limit per occurrence for bodily injury, death, and property damage with an aggregate limit of six million dollars ($6,000,000) applying separately to each annual period. Said Railroad Protective Liability Insurance must conform to the regulations prescribed therefore in the Federal-Aid Policy Guide, Part 646, Subpart A of the Federal Highway Administration dated December 9, 1991, and amendments thereto.
2. Provide insurance as required in subsection 107.10 of the Standard Specifications for Construction except with the modifications stated herein. Provide Commercial General Liability Insurance.
A. Single occurrence limit is two million dollars ($2,000,000).
B. Aggregate limit is six million dollars ($6,000,000).
C. List Huron and Eastern Railway, its parent companies, and affiliates, as additional insured on automobile insurance policy.
D. Shall contain Insurance Services Office Standard Endorsement CS 2417 or its equivalent.
E. A waiver of subrogation in favor of the railroad must also be shown as an endorsement to the policy.
The Contractor must furnish to the Department evidence of any reductions in the limits of liability herein described as determined by the Railroad.
RAL:DGT 2 of 2 08-01-2021
The policy must contain the following endorsement:
"It is hereby agreed that 30 days prior written notice of cancellation, expiration, termination, or reduction of coverage provided by this policy will be given to the MDOT and Huron and Eastern Railway".
c. Construction. If any of the insurance is canceled, the Contractor and all subcontractors must cease operations as of the date of cancellation and cannot resume operations until new insurance is in force.
d. Measurement and Payment. The Contractor must pay for all railroad insurance.
Insurance costs as described in this special provision will be included as part of other pay items.
MICHIGAN DEPARTMENT OF TRANSPORTATION
COORDINATION CLAUSE
WORK ON RAILROAD PROPERTY
RAL:MIP Page 1 of 1 07/29/2025 The following information may be pertinent to the determination of construction methods and railroad protective insurance rates.
RAILROAD
Huron and Eastern Railway
Contact: Chad Heinz - Roadmaster Phone: (989) 225-7032 Address: 3366 East Soper Rd
Bad Axe, MI 48413
TRAIN MOVES
Williams St / M-46 (NI# 511982L) There are approximately 2 daily freight moves at 10 mph and 2 daily switching moves. Maximum timetable speed is 10 mph.
The train movement and speed information does not represent a commitment by the Railroad and is subject to change without notice.
RAILROAD UTILITY COORDINATION
Railroad utilities are not covered under the current Miss Dig provisions and supplemental coordination with the operating railroad is required. The Contractor shall contact the Railroad, 30 days prior to any underground activities or soil disturbance on/or adjacent to the railroad right-of-way and request for railroad utilities be located and marked. The Contractor shall provide specific limits of desired utilities to be located and marked by the Railroad to ensure locates are visible and current.
The Contractor shall cooperate and coordinate construction activities with the operating railroad as stated in Section 104.08 of the 2020 MDOT Standard Specifications for Construction. In addition, for the protection of underground utilities, the Contractor shall follow the requirements in Section 107.12 of the 2020 MDOT Standard Specifications for Construction. Contractor delay claims, resulting from a railroad utility, will be determined based upon Section 109.05 of the 2020 MDOT Standard Specifications for Construction.
Any damage caused by the Contractors work operations to the railroad property will be the Contractors responsibility to fix and/or replace to Railroad specifications.
Special Considerations at Railroad Crossings.
1. Any work (or equipment being staged onsite during the work) performed at or near a railroad crossing must not obstruct the view of railroad protective warning devices (signs, flashing light units or gates) to oncoming traffic at any time.
2. Do not extend lane closure taper(s) through the crossing. Traffic lane shifts cannot transition over the crossing.
3. Do not place construction traffic control devices in the railroad crossing or closer than 25 feet from the outside rail on either crossing approach.
4. Do not direct traffic over crossing in opposing direction than normal.
20SP-403A-02
ADJUSTING DRAINAGE STRUCTURE, CASE 1, MODIFIED
CFS:DMG 1 of 3 APPR:TES:DBP:03-08-22
FHWA:APPR:03-22-22
a. Description. This work consists of adjusting drainage structures, including utility manhole covers, in accordance with section 403 of the Standard Specifications for Construction, as shown on the plans, as directed by the Engineer, and as stated herein.
b. Materials. Furnish materials in accordance with subsection 403.02 of the Standard Specifications for Construction with the following exceptions:
Furnish Concrete, Grade 3500 or Grade P-NC as directed by the Engineer in accordance with sections 1004 and 1006 of the Standard Specifications for Construction, respectively. Furnish epoxy anchored lane ties in accordance with section 914 of the Standard Specifications for Construction. Ensure the lane ties are #5 bar size with a nominal length of 18 inches. Ensure the circular bar for the rotary cut application is epoxy coated #5 bar of a diameter that will center it between the structure cover and the existing surrounding pavement. Select epoxy for anchoring lane ties into the concrete from section 712.03J of the Qualified Products List. Furnish hot-poured joint sealant in accordance with section 914 of the Standard Specifications for Construction.
For concrete curb, concrete curb and gutter, or concrete traffic island repairs furnish materials in accordance with the standard specifications.
c. Construction. For structures within the pavement area remove pavement adjacent to the drainage structure cover using a rotary or sawing method. When using a rotary coring method, remove a minimum 4 foot diameter section of pavement around the drainage structure frame and cover. If the frame outside diameter measurement is greater than 36 inches, use a rotary coring head to remove a minimum 4.5 foot diameter section of pavement. When using a sawing method, saw cut clean and remove a 6 foot by 6 foot pavement square.
For structures within the curb line, saw cut and remove a 4 foot by 6 foot section of pavement around the frame with the 6 foot dimension measured along the curb line. Remove curb and/or curb and gutter associated with the adjustment of structures, as directed by the Engineer.
For structures located adjacent to concrete traffic control islands, remove concrete island full-width or up to 6 feet wide to facilitate adjustment of the drainage structure cover frame, as directed by the Engineer.
Prior to setting the frame, compact exposed soil using a method approved by the Engineer.
Support the cover frame over the structure matching the adjacent roadway cross slope. Secure the frame in-place to allow for placement of concrete using brick or block as required on a full bed of mortar without altering frame position.
CFS:DMG 2 of 3 03-08-22
Install epoxy anchored lane ties in accordance with section 603 of the Standard Specifications for Construction to anchor the concrete to adjacent composite pavement. Install circular epoxy coated bar as detailed herein. For structures within the pavement area, replace pavement around the frame with Concrete, Grade 3500 or Grade P-NC as directed by the Engineer matching the finished elevation and cross-slope of the roadway. Construct plane of weakness joint as directed by the Engineer.
For structures within the curb line, replace pavement around the frame with Concrete, Grade 3500 or Grade P-NC as directed by the Engineer and HMA top course as shown on the detail herein.
Install epoxy anchored lane ties to anchor the concrete to adjacent composite pavement for curb drainage structures located in curbed areas. Replace concrete curb, concrete curb and gutter, or concrete traffic control islands in-kind in accordance with Standard Plan R-30 Series and section 802 of the Standard Specifications for Construction.
Immediately remove any debris that falls into drainage structures or other utility manholes due to Contractor operations.
Ensure saw overcuts are cleaned and sealed with hot-poured joint sealant.
d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:
Dr Structure Cover, Adj, Case 1, Modified ................................................................. Each
Dr Structure Cover, Adj, Case 1, Modified includes furnishing all materials, saw cutting, removal and disposal of existing pavement and curb or curb and gutter, adjustment of cover to required elevation and cross-slope, installation of epoxy anchored lane ties and epoxy coated circular bars, placement and finishing of new curb or curb and gutter, placement and finishing of new concrete and HMA, placement and removal of temporary HMA wedging for maintaining traffic, if required, placement of cover on open structures to prevent accumulation of debris and cleaning existing drainage structures due to Contractor operations.
CFS:DMG 3 of 3 03-08-22
20SP-811C-01
PAVEMENT MARKING EQUIPMENT
PMK:MKB 1 of 2 APPR:MWB:DBP:06-07-23
FHWA:APPR:06-20-23
Delete subsection 811.03.A on page 623 of the Standard Specifications for Construction in its entirety and replace it with the following:
A. Equipment. Provide self-propelled equipment certified by the Department in accordance with MDOT’s Equipment Certification Guidelines – Pavement Markings for longitudinal striping on roadways. Certification is effective for 2 years. The Engineer may approve other equipment for special markings, parking lots, or areas inaccessible to self-propelled pavement marking equipment.
Apply longitudinal lines using certified self-propelled pavement marking equipment equipped with at least two binder tanks (plus a third catalyst tank for plural component materials) each having a capacity of at least 100 gallons and, if a double drop of two different optics is required, at least two optics tanks that may be utilized at the same time and have enough capacity to match the operating duration of 100 gallon binder tanks.
Operate marking equipment at no greater than the certified speed. The Engineer will assume that a striper operating above the certified working speed has operated at that speed for the entire day.
The Department may inspect the equipment at any time.
Use equipment capable of uniformly applying material to the required length and width.
Combination lines (double solid, solid and broken, double broken) must be placed in a single pass utilizing a multi-gun system. If the project calls for 4-inch width centerlines, provide equipment for placing centerlines equipped to apply three 4-inch-minimum-width lines on a two-lane road in one pass. If applying multiple centerlines, use three spray guns positioned 6 inches on center. If the project calls for 6-inch width centerlines, provide equipment for placing centerlines equipped to apply two 6-inch-minimum-width lines on a two-lane road in one pass. If applying multiple centerlines, use two spray guns positioned 10 inches on center. For two-lane freeways, apply the lane line from the left lane. For freeways with at least three lanes, apply the right lane line with the right edgeline when the right lane line and edgeline are the same material.
Use an easily adjusted, dashing mechanism to retrace existing lane or centerline markings.
Use a self-propelled pavement marker equipped to mark pavement in either direction on a roadway. Provide equipment setup to apply markings off both sides of the truck simultaneously when not striping in a recess. The driver’s side carriage must be equipped with a dedicated white gun along with the yellow guns. The truck must also be
20SP-811C-01
PMK:MKB 2 of 2 06-07-23 equipped with blowers in front of the gun carriages with the air supply produced by a minimum 185 cfm compressor. If striping contraflow to traffic, a lane closure must be utilized. Use a continuous skip cycle. Do not zero or return the cycle control unit to the beginning or start of a new cycle.
Provide a distance meter to measure the length of each line.
The Engineer may check the calibration of metering devices at any time. If the Engineer determines that the equipment is unsatisfactory, use other methods approved by the Engineer.
Use equipment for placing hot-applied thermoplastic and sprayable thermoplastic material that can maintain the temperature recommended by the material manufacturer.
Allow time for the Engineer to inspect traffic control devices as shown in MDOT’s Pavement Marking Convoy Typicals or the project plans prior to marking applications and make any corrections as directed by the Engineer before continuing. If applying markings on a roadway closed to traffic, the traffic control devices specified in MDOT’s Pavement Marking Convoy Typicals are not required, unless otherwise directed by the Engineer.
The equipment must have the following minimum safety equipment: a backup camera;
strobes on the front, rear and midpoint of the truck bed; flood lights for night work; and flashers on the gun carriages.
20SP-811D-01
RECESSED PAVEMENT MARKINGS
PMK:MKB 1 of 1 APPR:MWB:DBP:11-09-23
FHWA APPR:11-20-23
Delete subsection 811.03.G.1 on page 8-69 of the Standard Specifications for Construction in its entirety and replace it with the following:
1. Grooving Concrete and Hot Mix Asphalt Pavement. If there are no markings on the pavement, it is the Contractor’s responsibility to layout and groove exactly where the permanent markings will be placed. If there are temporary painted pavement markings in the correct location, use these lines as a template for the grooving operation. If there are existing permanent pavement markings in place, remove them in accordance with subsection 812.03.F prior to grooving operations. The removal of any existing pavement markings will be paid for separately.
Use equipment and methods approved by the manufacturer of the pavement marking material to be recessed for forming grooves in pavement surfaces. Dry-cut the grooves in a single pass using self-vacuuming equipment capable of producing a finished groove ready for pavement marking material installation. Utilize stacked diamond cutting heads on all new HMA and PCC surfaces. Substituting polycrystalline diamond (PCD) cutting heads is allowable for HMA and PCC pavements that have been in place for over 1 year and on high friction surfacing installations of any age.
Ensure that the bottom of the groove has a fine corduroy finish. If a coarse tooth pattern results, increase the number of blades and decrease the spaces on the cutting head until the required finish is achieved.
20SP-811H-01
CONSTRUCTION REQUIREMENTS FOR OVERLAY COLD PLASTIC PAVEMENT
MARKINGS
PMK:MKB 1 of 1 APPR:GJD:KJK:03-24-25
FHWA:APPR:03-24-25
Delete subsection 811.03.D.4, on page 8-65 of the Standard Specifications for Construction
4. Cold Plastic. Prepare the pavement surface and apply the cold plastic tape in accordance with the manufacturer’s specifications.
Remove curing compound from new concrete surfaces before applying cold plastic tape. For pavements with two or more layers of existing overlay cold plastic marking material or any other non-compatible materials, remove the existing marking material before installing the new cold plastic markings.
Install cold plastic tape longitudinal lines, symbols, legends, crosswalks, cross hatching, guide lines, and stop bars, as shown on the MDOT Standard Plans, unless otherwise required on the plans or directed by the Engineer.
Provide adhesive-backed cold plastic for all installations. The use of surface preparation adhesive is required for all recessed cold plastic markings, all cold plastic guide line pavement markings, any time either the air or pavement temperature is below 60 °F at the time of cold plastic application, and for any other application where required by the manufacturer of the cold plastic.
When constructing a 24-inch cold plastic stop bar, utilizing 4- or 6-inch-wide cold plastic tape is prohibited and the stop bar must instead be made from 12-inch minimum width material.
Ensure that the weather has been dry for at least 24 hours and that the pavement surface is dry before applying the cold plastic tape marking. Clean the pavement surface using an air compressor with at least 185 cfm air flow and 120 psi. On all pavement surfaces, prevent damage to transverse and longitudinal joint sealers.
Immediately after placement, roll transverse and special markings at least six times with a roller weighing at least 200 pounds. The Engineer will not require additional rolling for longitudinal applications if the equipment installing the line is equipped with a roller.
20SP-812Q-01
CONNECTED LIGHTED ARROW, TYPE C
COS:SAH 1 of 2 APPR:CRB:KJK:12-05-24
FHWA:APPR:12-05-24
a. Description. This work consists of furnishing, operating, maintaining, relocating, and the removal of Connected Arrow Board (CAB) at locations shown in the contract.
The Contractor is responsible for coordinating with any work in adjacent work zone projects.
b. Materials. Furnish a Type C Lighted Arrow Board meeting the requirements of subsection
922.07 of the Standard Specifications for Construction, the MMUTCD section 6F.61 and the requirements below:
1. Ensure all hardware components of this system are crashworthy in accordance with the NCHRP 350 or MASH.
2. Ensure arrow board or associated system can produce real-time status for remote monitoring using the required elements of Version 4.0 or greater of the USDOT Workzone Data Exchange Swz Device Feed (WZDx Device Feed).
c. Construction. Install the CAB in accordance with the manufacturer’s recommendations, subsection 812.03.D.8 of the Standard Specifications for Construction, the plans, and the following requirements:
1. Ensure boards are connected at all times during operation.
2. Traditional arrow boards may be upgraded to a CAB.
3. If requested at any time during the project, furnish reports that indicate the location and display history of each CAB, including a log of all power and communication errors and/or failures. Ensure the report data is in a common spreadsheet format (comma-separated values (CSV), Excel, etc.) or as directed by the Engineer.
4. If requested, upon project completion furnish a single complete report which includes a full summary for all CABs utilized on the project. At a minimum the report must include the complete location and display history of each CAB, including a log of all power and communication errors and/or failures. Ensure the report data is in a common spreadsheet format (CSV, Excel, etc.) or as directed by the Engineer.
5. Furnish secure access to real-time WZDx Device Feed for the connected arrow board.
6. Ensure the status of the arrow board is communicated at the following rates and intervals as described below:
20SP-812Q-01
COS:SAH 2 of 2 12-05-24
A. Display changes within 1 minute.
B. Movement greater than 250 feet, within 1 minute.
C. Status check every 30 minutes.
d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay items:
Connected Arrow Board, Type C, Furn................................................................. Each Connected Arrow Board, Type C, Oper ................................................................ Each
1. Connected Arrow Board, Type C, Furn includes furnishing and installing one connected arrow board. The Department will pay for the maximum number of connected arrow boards in use at one time on the project.
2. Connected Arrow Board, Type C, Oper includes operating, furnishing valid real-time device feed and removing one connected arrow board. No additional payment will be made for relocating the device on the project. All communication costs and reporting requirements are considered included in the unit price.
20SP-900A-01
INDUSTRIAL BY-PRODUCTS AND BENEFICIAL RE-USE
HYD:HLZ 1 of 1 APPR:JJG:JFS:04-02-20
FHWA:APPR:04-03-20
a. Description. For this project, regardless of the application, the use of industrial by-products covered in 2014 PA 178 is prohibited unless the use and application of a particular material is covered elsewhere in the contract.
20SP-902A-01
AGGREGATE, 46G
CFS:JJG 1 of 1 APPR:SAG:DMG:02-15-22
FHWA:APPR:02-16-22
Delete the last row of Table 902-2 in subsection 902 of the Standard Specifications for Construction in its entirety and replace with the following:
Open-graded aggregates
46G 80 45 ___ ___ ___
20SP-920A-02
WET REFLECTIVE PAVEMENT MARKINGS
PMK:MKB 1 of 1 APPR:MWB:DBP:11-09-23
FHWA:APPR:11-20-23
Delete subsection 920.02.C on page 9-170 of the Standard Specifications for Construction
C. General Requirements for Wet Reflective Optics. For surface applications or retracing over existing pavement markings select wet reflective optics from the Qualified Products List or a Department-approved alternative that meets or exceeds the retroreflectivity requirements specified in Table 920-3. When installing wet reflective pavement markings in a new recess, select wet reflective optics from one of the below products.
3M, Connected Roads All Weather Elements Series 50/51 3M, Reflective Elements Series All Weather 50/51
Prior to application, submit certification from the wet reflective optics manufacturer that when applied according to the manufacturer’s application recommendations, the wet reflective optics meet the requirements in Table 920-3.
Table 920-3:
General Wet Reflective Requirements: Average Initial Retroreflectivity at 30-meter Geometry in mcd/lux/m2
Test Method Color
White Yellow Dry (ASTM E1710) for cold plastic, polyurea, waterborne, regular dry, and sprayable thermoplastic
700 500
Dry (ASTM E1710) for all other materials 550 350
Wet Recovery for all materials (ASTM E2177)
300 225
Wet Continuous for all materials (ASTM E2832)
250 200
Initial retroreflectivity is defined as readings taken no earlier than 7 days and no later than 30 days after material placement.
20SP-920B-01
PAVEMENT MARKING SHELF LIFE
PMK:MKB 1 of 1 APPR:GJD:KK:04-05-24
FHWA:APPR:04-08-24
Delete the fourth paragraph of section 920.01 on page 9-168 of the Standard Specifications for Construction, in its entirety and replace it with the following:
Use both liquid and solid applied pavement marking materials within the shelf life directed by the manufacturer. Provide certification that liquid and solid applied pavement marking materials have been stored per the manufacturer’s requirements. Materials not in compliance will be rejected and removed at the Contractor’s expense.
E-SIGNED by Demetrius Parker on 2024-09-10 07:51:29 EDT
E-SIGNED by JASON GUTTING on 2024-09-24 12:54:17 EDT
12/18/2024
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-5
AHEAD
CLOSED
RIGHT LANE
D D
D
D
L B
W O
R K
A R
E A
V A
R I E
S
S H
O U
L D
E R
S H
O U
L D
E R
KEY
NO SPEED REDUCTION
UNDIVIDED MULTI-LANE ROADWAY,
FOR A ONE-LANE CLOSURE ON AN
TYPICAL TEMPORARY TRAFFIC CONTROL
D D
ROAD WORK
END
ROAD WORK
END
D
D
PLUS ADDITIONAL R2-1’s
THROUGHOUT WORK AREA
BEGINS
ZONE
WORK
R5-18c
BEGINS
ZONE
WORK
R5-18c
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
CON:AE:djf
W4-2
CHANNELIZING DEVICES
LIGHTED ARROW PANEL
TRAFFIC FLOW
1 2 BMM:CRB M0240a
PW RD/TS/Typicals/Signs/MT NON FWY/M0240a.dgn
SIGN = 136 ft2 - TYPE B
OCTOBER 2011
SPEED LIMIT
REFLECTS EXISTING
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
SIGNS ARE NOT IN PLACE.
CROSSROADS IF PERM ANENT
AS INDICATED AND AFTER ALL
PLACE THROUGHOUT W ORK AREA
SIGNS ARE NOT IN PLACE.
M AJOR CROSSROADS IF PERM ANENT
AS INDICATED AND AFTER ALL
PLACE THROUGHOUT W ORK AREA
10/11/2011
MAINTAINING TRAFFIC
TYPICAL
SHEET
Michigan Department of Transportation
FILE:
OF
TRAFFIC AND SAFETY
PLAN DATE:
DRAWN BY:
CHECKED BY:
REV. NOT TO SCALE
NOTES
2. ALL NON-APPLICABLE SIGNING WITHIN THE CIA SHALL BE MODIFIED TO FIT CONDITIONS, COVERED OR REMOVED.
DISTANCES BETWEEN SIGNS, THE VALUES FOR WHICH ARE SHOWN IN TABLE D, ARE APPROXIMATE AND MAY NEED
ADJUSTING AS DIRECTED BY THE ENGINEER.
3.
8.
CONDUCTED IN THE BUFFER AREA.
WHEN BUFFER AREAS ARE ESTABLISHED, THERE SHALL BE NO EQUIPMENT OR MATERIALS STORED OR WORK
26.
OF THE TAPER AS POSSIBLE.
LIMITATIONS RESTRICT ITS PLACEMENT AS INDICATED, THEN IT SHALL BE PLACED AS CLOSE TO THE BEGINNING
THE LIGHTED ARROW PANEL SHALL BE LOCATED AT THE BEGINNING OF THE TAPER AS SHOWN. WHEN PHYSICAL
NO SPEED REDUCTION
UNDIVIDED MULTI-LANE ROADWAY,
FOR A ONE-LANE CLOSURE ON AN
TYPICAL TEMPORARY TRAFFIC CONTROL
21. ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED CHANGES IN TRAFFIC PATTERNS
OR PROPOSED TEMPORARY TRAFFIC MARKINGS, SHALL BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC
PATTERN. EXCEPTION WILL BE MADE FOR DAYTIME-ONLY TRAFFIC PATTERNS THAT ARE ADEQUATELY DELINEATED BY
OTHER TRAFFIC CONTROL DEVICES.
SIGN SIZES
4E. THE MAXIMUM RECOMMENDED DISTANCE(S) BETWEEN CHANNELIZING DEVICES SHOULD BE EQUAL IN FEET TO THE
POSTED SPEED IN MILES PER HOUR ON TAPER(S) AND TWICE THE POSTED SPEED IN THE PARALLEL AREA(S).
R2-1 REGULATORY - 48" x 60"
R5-18c REGULATORY - 48" x 48"
3A. THE "WORK ZONE BEGINS" (R5-18c) SIGN SHALL BE USED ONLY IN THE INITIAL SIGNING SEQUENCE IN THE WORK
ZONE. SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE SHALL OMIT THIS SIGN AND THE QUANTITIES SHALL BE
ADJUSTED APPROPRIATELY.
CON:AE:djf
2 2 BMM:CRB
DIAMOND WARNING - 48" x 48"
OCTOBER 2011
PW RD/TS/Typicals/Signs/MT NON FWY/M0240a.dgn
M0240a
1B. D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
L = MINIMUM LENGTH OF TAPER
B = LENGTH OF LONGITUDINAL BUFFER
M0020aSEE FOR "D," "L," AND "B" VALUES
10/11/2011
6.
FLASHER, SHOWN ON THE WARNING SIGNS, SHALL BE POSITIONED ON THE SIDE OF THE SIGN NEAREST THE ROADWAY.
WHEN CALLED FOR IN THE FHWA ACCEPTANCE LETTER FOR THE SIGN SYSTEM SELECTED, THE TYPE A WARNING
7.
ONLY DESIGNS AND MATERIALS APPROVED BY MDOT WILL BE ALLOWED.
SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS.
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE STANDARD
SHALL MEET NCHRP 350 CRASHWORTHLY REQUIREMENTS STIPULATED IN THE CURRENT EDITION OF THE
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS AND LIGHTING REQUIREMENTS
FOR OVERNIGHT CLOSURES, TYPE III BARRICADES SHALL BE LIGHTED.5.
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
W20-1
ROAD
WORK
AHEAD
W20-5
AHEAD
CLOSED
RIGHT LANE
D D
D L
B W
O R
K A
R E
A V
A R
I E
S
S H
O U
L D
E R
KEY
S H
O U
L D
E R
W20-5
AHEAD
CLOSED
RIGHT LANE
W20-1
ROAD
WORK
AHEAD
ROADWAY, NO SPEED REDUCTION
FOR A ONE-LANE CLOSURE ON A DIVIDED
TYPICAL TEMPORARY TRAFFIC CONTROL
D D
BEGINS
ZONE
WORK
R5-18c
BEGINS
ZONE
WORK
R5-18c
PLUS ADDITIONAL R2-1’s
THROUGHOUT WORK AREA
ROAD WORK
END
ROAD WORK
END
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
SPEED
LIMIT
R2-1
X X
W4-2 W4-2
CON:AE:djf
ARE NOT IN PLACE.
CROSSROADS IF PERMANENT SIGNS
INDICATED AND AFTER ALL MAJOR
PLACE THROUGHOUT WORK AREA AS
CHANNELIZING DEVICES
LIGHTED ARROW PANEL
TRAFFIC FLOW
1 2 BMM:CRB M0730a
PW RD/TS/Typicals/Signs/MT NON FWY/M0730a.dgn
SIGN = 168 ft2 - TYPE B
OCTOBER 2011
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
TYPICAL M0030a-M0080a.
DEPICTED ON THE APPROPRIATE
ADVANCE WORK ZONE SIGNING AS
PLACE THIS SIGN ALONG WITH THE
REFLECTS EXISTING SPEED LIMIT
10/26/2011
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
NOTES
2. ALL NON-APPLICABLE SIGNING WITHIN THE CIA SHALL BE MODIFIED TO FIT CONDITIONS, COVERED OR REMOVED.
DISTANCES BETWEEN SIGNS, THE VALUES FOR WHICH ARE SHOWN IN TABLE D, ARE APPROXIMATE AND MAY NEED
ADJUSTING AS DIRECTED BY THE ENGINEER.
3.
8.
CONDUCTED IN THE BUFFER AREA.
WHEN BUFFER AREAS ARE ESTABLISHED, THERE SHALL BE NO EQUIPMENT OR MATERIALS STORED OR WORK
26.
OF THE TAPER AS POSSIBLE.
LIMITATIONS RESTRICT ITS PLACEMENT AS INDICATED, THEN IT SHALL BE PLACED AS CLOSE TO THE BEGINNING
THE LIGHTED ARROW PANEL SHALL BE LOCATED AT THE BEGINNING OF THE TAPER AS SHOWN. WHEN PHYSICAL
ROADWAY, NO SPEED REDUCTION
FOR A ONE-LANE CLOSURE ON A DIVIDED
TYPICAL TEMPORARY TRAFFIC CONTROL
21. ALL EXISTING PAVEMENT MARKINGS WHICH ARE IN CONFLICT WITH EITHER PROPOSED CHANGES IN TRAFFIC PATTERNS
OR PROPOSED TEMPORARY TRAFFIC MARKINGS, SHALL BE REMOVED BEFORE ANY CHANGE IS MADE IN THE TRAFFIC
PATTERN. EXCEPTION WILL BE MADE FOR DAYTIME-ONLY TRAFFIC PATTERNS THAT ARE ADEQUATELY DELINEATED BY
OTHER TRAFFIC CONTROL DEVICES.
4E. THE MAXIMUM RECOMMENDED DISTANCE(S) BETWEEN CHANNELIZING DEVICES SHOULD BE EQUAL IN FEET TO THE
POSTED SPEED IN MILES PER HOUR ON TAPER(S) AND TWICE THE POSTED SPEED IN THE PARALLEL AREA(S).
SIGN SIZES
3A. THE "WORK ZONE BEGINS" (R5-18c) SIGN SHALL BE USED ONLY IN THE INITIAL SIGNING SEQUENCE IN THE WORK
ZONE. SUBSEQUENT SEQUENCES IN THE SAME WORK ZONE SHALL OMIT THIS SIGN AND THE QUANTITIES SHALL BE
ADJUSTED APPROPRIATELY.
CON:AE:djf
2 2 BMM:CRB
R2-1 REGULATORY - 48" x 60"
R5-18c REGULATORY - 48" x 48"
DIAMOND WARNING - 48" x 48"
PW RD/TS/Typicals/Signs/MT NON FWY/M0730a.dgn
OCTOBER 2011
M0730a
1B. D = DISTANCE BETWEEN TRAFFIC CONTROL DEVICES
L = MINIMUM LENGTH OF TAPER
B = LENGTH OF LONGITUDINAL BUFFER
M0020aSEE FOR "D," "L," AND "B" VALUES
10/26/2011
6.
FLASHER, SHOWN ON THE WARNING SIGNS, SHALL BE POSITIONED ON THE SIDE OF THE SIGN NEAREST THE ROADWAY.
WHEN CALLED FOR IN THE FHWA ACCEPTANCE LETTER FOR THE SIGN SYSTEM SELECTED, THE TYPE A WARNING
7.
ONLY DESIGNS AND MATERIALS APPROVED BY MDOT WILL BE ALLOWED.
SPECIFICATIONS FOR CONSTRUCTION, THE STANDARD PLANS AND APPLICABLE SPECIAL PROVISIONS.
MICHIGAN MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CURRENT EDITION OF THE STANDARD
SHALL MEET NCHRP 350 CRASHWORTHLY REQUIREMENTS STIPULATED IN THE CURRENT EDITION OF THE
ALL TEMPORARY SIGNS, TYPE III BARRICADES, THEIR SUPPORT SYSTEMS AND LIGHTING REQUIREMENTS
FOR OVERNIGHT CLOSURES, TYPE III BARRICADES SHALL BE LIGHTED.5.
MAINTAINING TRAFFIC
OF
TRAFFIC AND SAFETY
PLAN DATE:
09/21/20
09/21/20
PAVEMENT MARKING CONVOY
WATERBORNE PAINT
TYPICALS FOR
CENTER LANE FOR LEFT TURN AND
NON-FREEWAY LANELINES (ALL REGIONS)
1. ALL VEHICLES SHALL BE EQUIPPED WITH:
a. TWO ROTATING YELLOW BEACONS OR
STROBES VISIBLE FROM ANY APPROACH
ANGLE
b. TYPE B OR C FLASHING ARROW PANEL
AS SHOWN
c. "WET PAINT" SIGN AS SHOWN
2. ATTENUATED VEHICLE(S) SHALL WEIGH AT
LEAST 10,000 LBS. AND BE LOCATED AS SHOWN.
6. DASHED LINE DENOTES OPTIONAL VEHICLE.
TYPICAL MIN. 10,000 LBS.
VEHICLE WITH TRUCK
MOUNTED ATTENUATOR
TYPICAL APPLICATION VEHICLE
TYPICAL CONE PLACEMENT
WET PAINT
WET PAINT
WET PAINT
WITH TRUCK MOUNTED ATTENUATOR
WET PAINT
D
IS
T A
N C
E T
O P
R O
V
ID
E
T R
A C
K -F
R E
E L
IN
E
M A
X
IM
U M
TYPICAL CONE RETRIEVAL VEHICLE
M A
X
IM
U M
M A
X
IM
U M
TYPICAL MIN. 10,000 LBS. VEHICLE
VEHICLE
WET PAINT
ABG
pw:rd/ts/signs/pave markings/PMC13e.dgn
11/17/2009 KL PMC13e 1 1
3. BOTH THE CONE PLACEMENT AND CONE RETRIEVAL
VEHICLES MAY BE INCORPORATED INTO THE VEHICLE
EQUIPPED WITH THE TRUCK MOUNTED ATTENUATOR.
CONES SHOULD BE PLACED 100’ APART.
18. LANE LINE MAY NOT BE APPLIED AT THE SAME
TIME AS THE CENTER LINE IN 3 LANE NON-FREEWAY
SECTIONS.
20. REFER TO PMC22e FOR ADDITIONAL CONVOY
SIGNING REQUIREMENTS
TRAFFIC AND SAFETY
DIVISION
File:
Drawn by: OF Rev. Date:
| Title sheet |
| M-46 (Saginaw river to Michigan Westbound) proposal |
| 20SP-403A-02 (adj drainage str) |
| M-46 at Hamilton 20250729 |
| M-46 at Hamilton |
| M-46 at Hamilton |
| M-46 at Hamilton |
| M-46 at Hamilton |
| RR Symbol |
| pave-965-D for RR crossings |
| Pavt Mrkg Convoy |
| m0020a |
| M0020a-001.pdf |
| M0020a-002.pdf |
| m0240a |
| M0240a |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
| M0240a1 |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
| m0730a (2) |
| M0730a |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
| M0730a1 |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
| m0820a |
| M0820a |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
| M0820a1 |
| References |
| Ref, PW_WORKDIR:dms03287 |
| border_ts_mt.dgn |
File details come from the government source that posted it. Updated .