Summary: Large Test Vehicle Replacement Generator Installation Statement of Work
This is a Statement of Work issued by the 746th Test Squadron at Holloman Air Force Base for the installation of a government-furnished replacement generator (Model S10020T4) into a Large Test Vehicle (LTV). The contractor must design and fabricate a custom heavy-duty slide-out shelf rated to support a minimum of 1,462 pounds and a weather-resistant enclosure with an IP66-rated door seal. The generator dimensions are 28.77" H x 24.50" W x 58.18" L, weighing 1,169 lbs, and must be installed into an existing cubby measuring 31" W x 31.5" H x 54.5" L, requiring the contractor to modify and expand the vehicle cutout as necessary. The slide-out drawer must extend a minimum of 100 percent of the generator depth to provide unobstructed access to all maintenance panels and service points, and the enclosure door must feature hinges that maintain an upright position during maintenance and a locking mechanism for the closed position.
Work shall be performed in two phases: Phase 1 requires fabrication and material procurement to be completed within 45 days of order receipt, and Phase 2 requires on-site installation, modification, and testing to be completed within 30 days of vehicle receipt. The primary place of performance is the contractor's facility with transportation via a CDL-licensed driver; alternatively, the government may approve on-site work at Holloman AFB with provided workspace, subject to security vetting and compliance with base regulations. The contractor must ensure all wiring is properly routed and secured with a minimum six-inch clearance from heat sources, install the generator per OEM manuals, perform a 60-minute operational test at 75 percent maximum output load, provide a one-year warranty on workmanship and contractor-supplied components, paint all fabricated components to match existing vehicle color, supply operational and maintenance manuals, and return all unused parts and the old generator to the 746th Test Squadron. Deliverables shall be provided to 746 TS/TGGO, Attn: 2d Lt Nichole Neese at 1644 Vandergrift Road, Building 1265, Holloman Air Force Base, New Mexico 88330.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cover Page FA910126QB059.pdf | ||
| Solicitation - FA910126QB059.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Large Test Vehicle Replacement Generator Installation
Statement of Work
746th Test Squadron
14 April 2026
1.0 PURPOSE
The purpose of this Statement of Work is to contract the installation of a new, government-furnished generator into the 746th Test Squadron's (746 TS) Large Test Vehicle (LTV). This work shall include the custom fabrication and installation of a heavy-duty slide-out shelf and a weather-resistant enclosure for the generator. The primary objective is to restore the LTV to full operational capability and improve long-term serviceability and maintenance access to its onboard power system.
2.0 SCOPE
The Contractor shall deliver the Large Test Vehicle with the new generator installed on a slide out shelf:
2.1.0 Equipment Specifications
The Contractor must utilize the following dimensions and weight to engineer the custom slide-out drawer and weatherproof enclosure.
• New Generator (Model S10020T4): 28.77” H x 24.50” W x 58.18” L.
• New Generator Weight: 1,169 lbs.
• Existing LTV Cubby Dimensions: 31” W x 31 1/2” H x 54 1/2” L.
• Note: As the existing cubby is smaller than the new generator, the Contractor is responsible for modifying and expanding the vehicle cutout as necessary to accommodate the new equipment and ensure proper clearances.
2.1 Physical requirements
2.1.1 A slide out drawer will be installed for generator to sit on
2.1.1.1 Slide out drawer shall be rated to support a minimum of 1,462 lbs. (the 1,169 lb. generator plus a 25% safety margin), both in the closed position and when fully extended.
2.1.1.2 Slide out drawer will have locking mechanisms to prevent drawer from opening unintentionally
2.1.1.3 The slide-out drawer must extend a minimum of 100% of the generator depth from the vehicle frame to ensure unobstructed access to all maintenance panels and service points.
2.1.1.4 The new generator will fit completely inside the Large Test Vehicle when installed on the slide out drawer
2.1.2 A locking door will be installed to enclose space where generator is housed
2.1.2.1 The door will have hinges that keep door in upright position for generator maintenance
2.1.2.2 The door seal must meet an Ingress Protection (IP) rating of at least IP66 to protect against dust and low-pressure water jets.
2.1.2.3 The door will have a lock that will be able to secure door when in the down/closed position
2.1.3 Generator will be installed completely
2.1.3.1 All wiring shall be properly routed, secured in a loom, and protected from chafing. All fuel and exhaust lines must maintain a minimum clearance of 6 inches from heat sources or be appropriately heat-shielded.
2.1.3.2 Generator will be installed IAW OEM manuals and instructions
2.2 Operational requirements
2.2.1 The contractor will have a driver with a CDL to pick up and return the Large Test Vehicle to 1644 Vandergrift Road, Holloman AFB, NM 88330
2.2.2 Upon delivery, the generator must start and run for a minimum of 60 minutes under a simulated load of 75% of max output without overheating or faulting.
2.2.3 Any parts not used will be returned to the 746th Test Squadron
2.2.4 The old generator will be returned to the 746th Test Squadron
2.3 Place of Performance
2.3.1 Primary Place of Performance (Off-Site)
The primary place of performance shall be the contractor's facility. Work performed off-site shall adhere to all requirements outlined in this SOW, including the requirement in section 2.2.1 for the contractor to provide a properly licensed driver to transport the LTV to and from Holloman AFB.
2.3.2 Optional Place of Performance (On-Site at Holloman AFB)
2.3.2.1 The Government may, at its discretion, approve the contractor's request to perform all installation work on-site at Holloman AFB. Should this option be exercised, the following conditions shall apply:
2.3.2.1.1 The Government will provide a designated workspace for the duration of the installation period.
The contractor shall be responsible for verifying the adequacy of the site prior to commencing work.
2.3.2.1.2 The contractor shall be responsible for transporting all necessary tools, equipment, and materials to the on-site workspace.
2.3.2.1.3 All contractor personnel must successfully complete all required security vetting for base access in accordance with Holloman AFB installation security policies. The contractor is responsible for coordinating badging and access for all its employees and subcontractors.
2.3.2.1.4 The contractor shall comply with all Holloman AFB safety, environmental, and facility regulations.
2.3.2.1.5 If the on-site option is selected, the requirement for a CDL driver for transport (section 2.2.1) will be waived.
2.4 General Requirements
2.4.1 Warranty: The contractor shall provide a minimum one-year warranty on all workmanship and on all contractor-supplied components.
2.4.2 Paint/Finish: All newly fabricated components and any areas of the LTV modified during installation shall be painted to match the existing vehicle color.
2.4.3 Documentation: The contractor shall provide copies of any operational and maintenance manuals for newly installed hardware (e.g., slide mechanism, locks).
2.4.4 Security/Base Access: All contractor personnel must successfully complete all required security vetting for base access in accordance with Holloman AFB installation security policies.
3.0 PERIOD OF PERFORMANCE & MILESTONES
The contractor shall perform the work in two phases. The Government Technical Point of Contact (TPOC) and the contractor will coordinate to schedule the start of Phase 2.
3.1 Phase 1: Off-Site Fabrication & Preparation to be completed NLT 45 Days After Receipt of Order
Contractor shall procure all required materials and complete all fabrication of the generator slide-out shelf and door assembly.
Contractor shall provide a notice of fabrication completion to the TPOC to initiate scheduling for Phase 2.
3.2 Phase 2: On-Site Installation & Delivery to be completed NLT 30 Days After Receipt of Vehicle.
The Government Technical POC will make the LTV available on a mutually agreed upon date.
The contractor shall perform all installation, modification, and testing work.
The contractor shall deliver the fully upgraded and tested LTV and all other deliverables back to Holloman AFB.
4.0 DELIVERABLES
The contractor shall deliver all hardware and documentation to 746 TS/TGGO, Attn: 2d Lt Nichole Neese at 1644 Vandergrift Road, building 1265, Holloman Air Force Base, New Mexico 88330.
| 1.0 PURPOSE |
| 2.0 SCOPE |
| 4.0 DELIVERABLES |
File details come from the government source that posted it. Updated .