BLM Little Sheep Cabin Lima, Montana
09-03-2021 Project Title Page 00 0101 1 of 1
SECTION 00 0101
PROJECT TITLE PAGE
PROJECT MANUAL
PREPARED FOR:
UNITED STATES BUREAU OF LAND MANAGEMENT
DENVER FEDERAL CENTER, BUILDING 50
5TH AND MAIN ST
DENVER, CO 80225
PREPARED BY:
JACKOLA ENGINEERING & ARCHITECTURE
2250 HWY 93 S
KALISPELL, MT 59901
END OF SECTION 00 0101
09-03-2021 Seals Page 00 0107 1 of 2
SECTION 00 0107
SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
ARCHITECT
CIVIL ENGINEER
STRUCTURAL ENGINEER
M
ONTANA
No. 73347PE
P R
O F
E S
S
I O N A L EN
G
IN
E E
R
L I C E NS E D
THOMAS M
SAWYER
09-03-2021 Seals Page 00 0107 2 of 2
END OF SECTION 00 0107
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
09-03-2021 Table of Contents 00 0110 1 of 3
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 - Project Title Page
B. 00 0107 - Seals Page
SPECIFICATIONS
2.01 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 1000 - Summary
B. 01 2500 - Substitution Procedures
C. 01 3000 - Administrative Requirements
D. 01 6000 - Product Requirements
E. 01 7800 - Closeout Submittals
2.02 DIVISION 02 -- EXISTING CONDITIONS
A. 02 4100 - Demolition
B. 02 4300 - Structure Moving
2.03 DIVISION 03 -- CONCRETE
A. 03 3000 - Cast-in-Place Concrete
2.04 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 1000 - Rough Carpentry
B. 06 1500 - Wood Decking
C. 06 2000 - Finish Carpentry
D. 06 4200 - Wood Paneling
2.05 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 2100 - Thermal Insulation
B. 07 2500 - Weather Barriers
C. 07 4113 - Metal Roof Panels
D. 07 4623 - Wood Siding
E. 07 6200 - Sheet Metal Flashing and Trim
F. 07 7123 - Manufactured Gutters and Downspouts
2.06 DIVISION 08 -- OPENINGS
A. 08 5400 - Composite Windows
B. 08 7100 - Door Hardware
C. 08 9100 - Louvers
2.07 DIVISION 09 -- FINISHES
09-03-2021 Table of Contents 00 0110 2 of 3
A. 09 2116 - Gypsum Board Assemblies
B. 09 3000 - Tiling
C. 09 6500 - Resilient Flooring
D. 09 9000 - Painting and Coating
2.08 DIVISION 10 -- SPECIALTIES
A. 10 1400 - Signage
B. 10 3100 - Manufactured Fireplaces
C. 10 4400 - Fire Protection Specialties
2.09 DIVISION 11 -- EQUIPMENT
A. 11 3013 - Residential Appliances
2.10 DIVISION 22 -- PLUMBING
A. 22 0553 - Identification for Plumbing Piping and Equipment
B. 22 0719 - Plumbing Piping Insulation
C. 22 1005 - Plumbing Piping
D. 22 1006 - Plumbing Piping Specialties
E. 22 3000 - Plumbing Equipment
2.11 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 0553 - Identification for HVAC Piping and Equipment
B. 23 3100 - HVAC Ducts and Casings
C. 23 3423 - HVAC Power Ventilators
D. 23 3700 - Air Outlets and Inlets
2.12 DIVISION 26 -- ELECTRICAL
A. 26 0519 - Low-Voltage Electrical Power Conductors and Cables
B. 26 0526 - Grounding and Bonding for Electrical Systems
C. 26 0529 - Hangers and Supports for Electrical Systems
D. 26 0533.13 - Conduit for Electrical Systems
E. 26 0533.16 - Boxes for Electrical Systems
F. 26 0533.23 - Surface Raceways for Electrical Systems
G. 26 0548 - Vibration and Seismic Controls for Electrical Systems
H. 26 0553 - Identification for Electrical Systems
I. 26 0583 - Wiring Connections
J. 26 0919 - Enclosed Contactors
K. 26 0923 - Lighting Control Devices
L. 26 2416 - Panelboards
M. 26 2726 - Wiring Devices
09-03-2021 Table of Contents 00 0110 3 of 3
N. 26 2813 - Fuses
O. 26 5100 - Interior Lighting
P. 26 5600 - Exterior Lighting
2.13 DIVISION 31 -- EARTHWORK
A. 31 2200 - Grading
B. 31 2316 - Excavation
C. 31 2316.13 - Trenching
D. 31 2323 - Fill
2.14 DIVISION 32 -- EXTERIOR IMPROVEMENTS
A. 32 1123 - Aggregate Base Courses
B. 32 3223 - Segmental Retaining Walls
END OF SECTION 00 0110
09-03-2021 Summary 01 1000 1 of 1
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: BLM Little Sheep Cabin
B. Owner's Name: United States Bureau of Land Management
C. Architect's Name: Jackola Engineering & Architecture.
D. The Project consists of the alteration of the Little Sheep Cabin Complex .
1.02 DESCRIPTION OF ALTERATIONS WORK
A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100.
B. Scope of alterations work is indicated on drawings.
C. Owner will remove the following items before start of work:
1. All cabin furnishings in Buildings A and D .
1.03 OWNER OCCUPANCY
A. Owner intends to occupy the Project upon Substantial Completion.
END OF SECTION 01 1000
09-03-2021 Substitution Procedures 01 2500 1 of 1
SECTION 01 2500
SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
PART 2 PRODUCTS
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to Owner.
4. Waives claims for additional costs or time extension that may subsequently become apparent.
B. Document each request with complete data substantiating compliance of proposed substitution with
Contract Documents. Burden of proof is on proposer.
C. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
D. Limit each request to a single proposed substitution item.
3.02 RESOLUTION
A. Government may request additional information and documentation prior to rendering a decision.
Provide this data in an expeditious manner.
END OF SECTION 01 2500
09-03-2021 Administrative Requirements 01 3000 1 of 5
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Electronic document submittals.
C. Preconstruction meeting.
D. Progress meetings.
E. Construction progress schedule.
F. Submittals for review, information, and project closeout.
G. Number of copies of submittals.
H. Requests for Interpretation (RFI) procedures.
I. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Section 01 6000 - Product Requirements: General product requirements.
B. Section 01 7800 - Closeout Submittals: Project record documents; operation and maintenance data;
warranties and bonds.
1.03 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 01 7000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Government:
1. Requests for Interpretation (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Applications for payment and change order requests.
6. Progress schedules.
7. Coordination drawings.
8. Correction Punch List and Final Correction Punch List for Substantial Completion.
9. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 ELECTRONIC DOCUMENT SUBMITTAL
A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF) format and transmitted via email.
09-03-2021 Administrative Requirements 01 3000 2 of 5
1. Besides submittals for review, information, and closeout, this procedure applies to Requests for
Interpretation (RFIs), progress documentation, contract modification documents (e.g.
supplementary instructions, change proposals, change orders), applications for payment, field reports and meeting minutes, Contractor's correction punchlist, and any other document any participant wishes to make part of the project record.
2. It is Contractor's responsibility to submit documents in allowable format.
3. All other specified submittal and document transmission procedures apply, except that electronic document requirements do not apply to samples or color selection charts.
3.02 PRECONSTRUCTION MEETING
A. Schedule meeting after Notice of Award.
B. Attendance Required:
1. Owner.
2. Contractor.
C. Agenda:
1. Construction documents
2. Work schedule
3. Government furnished property
4. Notice to proceed
5. Safety
6. Processing of payment
7. Labor provisions
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to
Government, participants, and those affected by decisions made.
3.03 PROGRESS MEETINGS
A. Make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
B. Attendance Required:
1. Contractor.
2. Owner.
C. Agenda:
1. Review of work progress.
2. Field observations, problems, and decisions.
3. Identification of problems that impede, or will impede, planned progress.
4. Review of submittals schedule and status of submittals.
5. Review of RFIs log and status of responses.
6. Maintenance of progress schedule.
09-03-2021 Administrative Requirements 01 3000 3 of 5
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to
Owner, participants, and those affected by decisions made.
3.04 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. Within 10 days after joint review, submit complete schedule.
3.05 REQUESTS FOR INTERPRETATION (RFI)
A. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of the Contract
Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
2. Combine RFI and its attachments into a single electronic file. PDF format is preferred.
B. Content: Include identifiers necessary for tracking the status of each RFI, and information necessary to provide an actionable response.
1. Discrete and consecutive RFI number, and descriptive subject/title.
2. Issue date, and requested reply date.
3. Reference to particular Contract Document(s) requiring additional information/interpretation.
Identify pertinent drawing and detail number and/or specification section number, title, and paragraph(s).
C. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
D. Review Time: Government will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after
12:00 noon will be considered as having been received on the following regular working day.
3.06 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
09-03-2021 Administrative Requirements 01 3000 4 of 5
B. Submit to Government for review for the limited purpose of checking for compliance with information given and the design concept expressed in the contract documents.
C. Samples will be reviewed for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 7800 - Closeout Submittals.
3.07 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for Governments's knowledge as contract administrator.
3.08 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Owner's benefit during and after project completion.
3.09 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
B. Samples: Submit the number specified in individual specification sections
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.10 SUBMITTAL PROCEDURES
A. General Requirements:
1. Use a single transmittal for related items.
09-03-2021 Administrative Requirements 01 3000 5 of 5
B. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting the
Contract Documents and coordinating related work.
2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
C. Samples Procedures:
1. Transmit related items together as single package.
2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.
D. Shop Drawing Procedures:
3.11 SUBMITTAL REVIEW
A. Submittals for Review: Government will review each submittal within 10 days, and approve, or take other appropriate action.
B. Submittals for Information: Government will acknowledge receipt, but will take no other action.
C. Governments's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
D. Governments's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. " Reviewed no exceptions " , or language with same legal meaning .
b. " Reviewed exceptions noted " , or language with same legal meaning .
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
END OF SECTION 01 3000
09-03-2021 Product Requirements 01 6000 1 of 3
SECTION 01 6000
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations.
E. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 REFERENCE STANDARDS
1.03 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
PART 2 PRODUCTS
2.01 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by the Contract Documents.
B. Use of products having any of the following characteristics is not permitted:
1. Containing lead, cadmium, or asbestos.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.
2.03 MAINTENANCE MATERIALS
09-03-2021 Product Requirements 01 6000 2 of 3
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
PART 3 EXECUTION
3.01 TRANSPORTATION AND HANDLING
A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.
B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.
C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.
D. Transport and handle products in accordance with manufacturer's instructions.
E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.
F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.
H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.02 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 01 7419.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.
G. Comply with manufacturer's warranty conditions, if any.
H. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
I. Prevent contact with material that may cause corrosion, discoloration, or staining.
J. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
09-03-2021 Product Requirements 01 6000 3 of 3
K. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
END OF SECTION 01 6000
09-03-2021 Closeout Submittals 01 7800 1 of 2
SECTION 01 7800
CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Project Record Documents.
B. Operation and Maintenance Data.
C. Warranties and bonds.
1.02 RELATED REQUIREMENTS
A. Section 01 3000 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples.
B. Individual Product Sections: Specific requirements for operation and maintenance data.
C. Individual Product Sections: Warranties required for specific products or Work.
1.03 SUBMITTALS
A. Operations and Maintenance Manual:
1. Contractor shall submit three (3) copies of a comprehensive operations manual for review at least
15 days prior to final inspection. Contractor is responsible for making any requested changes and/or edits and resubmitting the manuals at the Government's request.
B. Warranties and Bonds:
1. For equipment or component parts of equipment put into service during construction with
Owner's permission, submit documents within 10 days after acceptance.
2. Make other submittals within 10 days after Date of Substantial Completion, prior to final
Application for Payment.
3. For items of Work for which acceptance is delayed beyond Date of Substantial Completion, submit within 10 days after acceptance, listing the date of acceptance as the beginning of the warranty period.
PART 2 EXECUTION
2.01 OPERATION AND MAINTENANCE DATA
A. Product Data: Mark each sheet to clearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information.
B. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings.
C. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions.
2.02 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS
09-03-2021 Closeout Submittals 01 7800 2 of 2
A. Where additional instructions are required, beyond the manufacturer's standard printed instructions, have instructions prepared by personnel experienced in the operation and maintenance of the specific products.
2.03 ASSEMBLY OF OPERATION AND MAINTENANCE MANUALS
A. Assemble operation and maintenance data into durable manuals for Owner's personnel use, with data arranged in the same sequence as, and identified by, the specification sections.
B. Digital copies of all operations and maintenance manuals in PDF form shall be supplied to the
Government at the same time that paper submissions are received.
C. Where systems involve more than one specification section, provide separate tabbed divider for each system.
D. Binders: Commercial quality, 8-1/2 by 11 inch three D side ring binders with durable plastic covers; 2 inch maximum ring size. When multiple binders are used, correlate data into related consistent groupings.
E. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS;
identify title of Project; identify subject matter of contents.
F. Project Directory: Title and address of Project; names, addresses, and telephone numbers of Architect, Consultants, Contractor and subcontractors, with names of responsible parties.
G. Tables of Contents: List every item separated by a divider, using the same identification as on the divider tab; where multiple volumes are required, include all volumes Tables of Contents in each volume, with the current volume clearly identified.
H. Dividers: Provide tabbed dividers for each separate product and system; identify the contents on the divider tab; immediately following the divider tab include a description of product and major component parts of equipment.
I. Text: Manufacturer's printed data, or typewritten data on 20 pound paper.
J. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.
2.04 WARRANTIES AND BONDS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within 10 days after completion of the applicable item of work. Except for items put into use with Owner's permission, leave date of beginning of time of warranty until Date of Substantial completion is determined.
B. Verify that documents are in proper form, contain full information, and are notarized.
C. Co-execute submittals when required.
D. Retain warranties and bonds until time specified for submittal.
END OF SECTION 01 7800
09-03-2021 Demolition 02 4100 1 of 2
SECTION 02 4100
DEMOLITION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Selective demolition of building elements for alteration purposes.
1.02 RELATED REQUIREMENTS
A. Section 01 1000 - Summary: Description of items to be salvaged or removed for re-use by Contractor.
B. Section 31 2323 - Fill: Fill material for filling holes, pits, and excavations generated as a result of removal operations.
1.03 REFERENCE STANDARDS
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
PART 2 PRODUCTS
2.01 MATERIALS
A. Fill Material: As specified in drawings.
PART 3 EXECUTION
3.01 SCOPE
A. Demolition as required per the drawings.
B. Remove other items indicated, for salvage, relocation, and recycling.
C. On completion of construction of specified materials per drawings fill excavations, open pits, and holes in ground areas generated as result of removals, using specified fill; compact fill as specified in Section
31 2200.
3.02 GENERAL PROCEDURES AND PROJECT CONDITIONS
A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.
1. Obtain required permits.
2. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.
3. Provide, erect, and maintain temporary barriers and security devices.
4. Conduct operations to minimize effects on and interference with adjacent structures and occupants.
5. Do not close or obstruct roadways or sidewalks without permit.
6. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.
09-03-2021 Demolition 02 4100 2 of 2
7. Obtain written permission from owners of adjacent properties when demolition equipment will traverse, infringe upon or limit access to their property.
B. Do not begin removal until receipt of notification to proceed from Owner.
C. Do not begin removal until built elements to be salvaged or relocated have been removed.
D. Protect existing structures and other elements that are not to be removed.
1. Provide bracing and shoring.
2. Prevent movement or settlement of adjacent structures.
3. Stop work immediately if adjacent structures appear to be in danger.
3.03 SELECTIVE DEMOLITION FOR ALTERATIONS
A. Drawings showing existing construction and utilities are based on field observations and rough measurements.
1. Verify that construction and utility arrangements are as indicated.
2. Beginning of demolition work constitutes acceptance of existing conditions that would be apparent upon examination prior to starting demolition.
B. Remove existing work as indicated and as required to accomplish new work.
1. Remove items indicated on drawings.
C. Services (Including but not limited to HVAC, Plumbing, Fire Protection, Electrical, and
Telecommunications ): Remove existing systems and equipment as indicated.
1. Maintain existing active systems that are to remain in operation; maintain access to equipment and operational components.
2. Verify that abandoned services serve only abandoned facilities before removal.
3. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings; remove back to source of supply where possible, otherwise cap stub and tag with identification.
D. Protect existing work to remain.
1. Prevent movement of structure; provide shoring and bracing if necessary.
2. Perform cutting to accomplish removals neatly and as specified for cutting new work.
3. Repair adjacent construction and finishes damaged during removal work.
4. Patch as specified for patching new work.
3.04 DEBRIS AND WASTE REMOVAL
A. Remove debris, junk, and trash from site.
B. Leave site in clean condition, ready for subsequent work.
C. Clean up spillage and wind-blown debris from public and private lands.
END OF SECTION 02 4100
09-03-2021 Structure Moving 02 4300 1 of 2
SECTION 02 4300
STRUCTURE MOVING
PART 1 GENERAL
1.01 ADMINISTRATIVE REQUIREMENTS
A. Pre-Move Meeting: Convene one week before starting work of this section. Discuss the following:
1. Means and methods for lifting structures.
2. Method of determining damage to existing structure and finishes before and after the move.
3. Method and responsibility for repairs after moving.
1.02 QUALITY ASSURANCE
A. Mover Qualifications: Company specializing in relocating building structures with minimum of three years of documented experience.
PART 2 PRODUCTS
2.01 EQUIPMENT AND MATERIALS
A. Transport, Equipment, and Supports: As required to achieve a successful structure move.
B. Fill Materials: As specified in Section 31 2323.
PART 3 EXECUTION
3.01 EXAMINATION
A. Damage Determination:
1. Before the move, inspect existing structure thoroughly and notify Government in writing of visible defects and factors that could affect safe movement of structure to final location.
2. Compile list of existing visible defects to building structure, finishes, accessories. This list will form the basis for determining required repair work after the move.
3.02 PREPARATION
A. Coordinate the work of municipal utility disconnection and reconnection with the work of this section.
B. Disconnect and cap existing site utility services. Remove overhead or exposed utility services to provide clear working and moving space around and below structure.
C. Remove building protrusions prior to move.
D. Secure supplementary framing and bracing to structure.
E. Secure operating, moving, or suspended items such as doors, windows, and light fixtures in a manner to prevent damage to items or to the structure during move.
F. Protect elements surrounding the structure from damage.
3.03 RAISE STRUCTURE
A. Cut structure free of foundation and portions of structure not being moved.
B. Reinforce, brace, and raise structure clear of foundation in manner to prevent damage.
C. Provide necessary framing, bracing, closures, supports, and blocking.
09-03-2021 Structure Moving 02 4300 2 of 2
3.04 REINSTALL STRUCTURE
A. Position and anchor structure over prepared foundation and lower onto new foundation.
B. Remove moving equipment.
C. Leave reinforcing, framing, and bracing intact until structure is fully attached and structure loads are supported by new foundation.
D. Reinstall building protrusions removed prior to move.
3.05 TOLERANCES
A. Maximum Variation from Level and Plumb After Reinstallation: 1/4 inch in 10 ft.
B. Maximum Offset from True Position After Reinstallation: 1/4 inch.
C. Adjust structure on foundation:
1. To permit doors to swing freely.
2. So that floor surfaces are level, walls are plumb.
3.06 DAMAGE REPAIR
A. Repair damage to structure not identified in writing prior to move.
B. Refinish repaired surfaces to match adjacent work.
C. Pay all third party claims for incidental or other damage.
3.07 CLEANING
A. Remove moving equipment and materials from original site, final site, and route of travel.
END OF SECTION 02 4300
09-03-2021 Cast-in-Place Concrete 03 3000 1 of 6
SECTION 03 3000
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Concrete formwork.
B. Slabs on grade.
C. Concrete reinforcement.
D. Miscellaneous concrete elements, including equipment pads, equipment pits, light pole bases, flagpole bases, thrust blocks, and manholes.
E. Concrete curing.
1.02 REFERENCE STANDARDS
A. ACI 117 - Specifications for Tolerances for Concrete Construction and Materials 2010 (Reapproved
2015).
B. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete
1991 (Reapproved 2009).
C. ACI 301 - Specifications for Structural Concrete 2016.
D. ACI 302.1R - Guide to Concrete Floor and Slab Construction 2015.
E. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete 2000 (Reapproved 2009).
F. ACI 305R - Guide to Hot Weather Concreting 2010.
G. ACI 306R - Guide to Cold Weather Concreting 2016.
H. ACI 308R - Guide to External Curing of Concrete 2016.
I. ACI 318 - Building Code Requirements for Structural Concrete 2019, with Errata (2021).
J. ACI 347R - Guide to Formwork for Concrete 2014, with Errata (2017).
K. ASTM C33/C33M - Standard Specification for Concrete Aggregates 2018.
L. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
2021.
M. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete 2021b.
N. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete 2020.
O. ASTM C150/C150M - Standard Specification for Portland Cement 2021.
P. ASTM C260/C260M - Standard Specification for Air-Entraining Admixtures for Concrete 2010a
(Reapproved 2016).
Q. ASTM C330/C330M - Standard Specification for Lightweight Aggregates for Structural Concrete 2017a.
R. ASTM C494/C494M - Standard Specification for Chemical Admixtures for Concrete 2019.
S. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in
Concrete 2019.
09-03-2021 Cast-in-Place Concrete 03 3000 2 of 6
T. ASTM C1240 - Standard Specification for Silica Fume Used in Cementitious Mixtures 2020.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Submit manufacturers' data on manufactured products showing compliance with specified requirements and installation instructions.
1. For curing compounds, provide data on method of removal in the event of incompatibility with floor covering adhesives.
C. Mix Design: Submit proposed concrete mix design.
1. Indicate proposed mix design complies with requirements of ACI 301, Section 4 - Concrete
Mixtures.
2. Indicate proposed mix design complies with requirements of ACI 318, Chapter 5 - Concrete
Quality, Mixing and Placing.
D. Test Reports: Submit report for each test or series of tests specified.
1.04 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI 301 and ACI 318.
B. Follow recommendations of ACI 305R when concreting during hot weather.
C. Follow recommendations of ACI 306R when concreting during cold weather.
PART 2 PRODUCTS
2.01 FORMWORK
A. Formwork Design and Construction: Comply with guidelines of ACI 347R to provide formwork that will produce concrete complying with tolerances of ACI 117.
B. Form Materials: Contractor's choice of standard products with sufficient strength to withstand hydrostatic head without distortion in excess of permitted tolerances.
1. Form Coating: Release agent that will not adversely affect concrete or interfere with application of coatings.
2. Form Ties: Cone snap type that will leave no metal within 1-1/2 inches of concrete surface.
2.02 REINFORCEMENT MATERIALS
A. Reinforcing Steel: ASTM A615/A615M, Grade 60 (60,000 psi).
1. Type: Deformed billet-steel bars.
2. Finish: Unfinished, unless otherwise indicated.
B. Reinforcement Accessories:
1. Tie Wire: Annealed, minimum 16 gage, 0.0508 inch.
2. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for adequate support of reinforcement during concrete placement.
2.03 CONCRETE MATERIALS
09-03-2021 Cast-in-Place Concrete 03 3000 3 of 6
A. Cement: ASTM C150/C150M, Type I - Normal Portland type.
B. Fine and Coarse Aggregates: ASTM C33/C33M.
C. Lightweight Aggregate: ASTM C330/C330M.
D. Fly Ash: ASTM C618, Class C or F.
E. Silica Fume: ASTM C1240, proportioned in accordance with ACI 211.1.
F. Water: ASTM C1602/C1602M; clean, potable, and not detrimental to concrete.
2.04 ADMIXTURES
A. Do not use chemicals that will result in soluble chloride ions in excess of 0.1 percent by weight of cement.
B. Air Entrainment Admixture: ASTM C260/C260M.
C. High Range Water Reducing and Retarding Admixture: ASTM C494/C494M Type G.
D. High Range Water Reducing Admixture: ASTM C494/C494M Type F.
E. Water Reducing and Accelerating Admixture: ASTM C494/C494M Type E.
F. Water Reducing and Retarding Admixture: ASTM C494/C494M Type D.
G. Accelerating Admixture: ASTM C494/C494M Type C.
H. Retarding Admixture: ASTM C494/C494M Type B.
I. Water Reducing Admixture: ASTM C494/C494M Type A.
2.05 ACCESSORY MATERIALS
A. Underslab Vapor Retarder: Sheet material complying with ASTM E1745, Class A; stated by manufacturer as suitable for installation in contact with soil or granular fill under concrete slabs. The use of single ply polyethylene is prohibited.
1. Installation: Comply with ASTM E1643.
2. Accessory Products: Vapor retarder manufacturer's recommended tape, adhesive, mastic, prefabricated boots, etc., for sealing seams and penetrations.
2.06 BONDING AND JOINTING PRODUCTS
A. Slab Isolation Joint Filler: 1/2 inch thick, height equal to slab thickness, with removable top section that will form 1/2 inch deep sealant pocket after removal.
2.07 CURING MATERIALS
A. Curing and Sealing Compound, Low Gloss: Liquid, membrane-forming, clear, non-yellowing acrylic;
complying with ASTM C1315 Type 1 Class A.
1. Vehicle: Solvent-based.
2. VOC Content: OTC compliant.
2.08 CONCRETE MIX DESIGN
A. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.
09-03-2021 Cast-in-Place Concrete 03 3000 4 of 6
B. Concrete Strength: Establish required average strength for each type of concrete on the basis of field experience or trial mixtures, as specified in ACI 301.
1. For trial mixtures method, employ independent testing agency acceptable to Government for preparing and reporting proposed mix designs.
C. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates recommended or required by manufacturer.
D. Normal Weight Concrete:
1. Compressive Strength, when tested in accordance with ASTM C39/C39M at 28 days: As indicated on drawings .
2. Water-Cement Ratio: Maximum 45 percent by weight at interior and exterior slabs, 50 percent by weight at footings and foundation walls.
3. Maximum Aggregate Size: 5/8 inch.
2.09 MIXING
A. Transit Mixers: Comply with ASTM C94/C94M.
B. Adding Water: If concrete arrives on-site with slump less than suitable for placement, do not add water that exceeds the maximum water-cement ratio or exceeds the maximum permissible slump.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels, and dimensions before proceeding with work of this section.
3.02 PREPARATION
A. Formwork: Comply with requirements of ACI 301. Design and fabricate forms to support all applied loads until concrete is cured, and for easy removal without damage to concrete.
B. Verify that forms are clean and free of rust before applying release agent.
C. Coordinate placement of embedded items with erection of concrete formwork and placement of form accessories.
D. Interior Slabs on Grade: Install vapor retarder under interior slabs on grade. Lap joints minimum 6 inches. Seal joints, seams and penetrations watertight with manufacturer's recommended products and follow manufacturer's written instructions. Repair damaged vapor retarder before covering.
3.03 INSTALLING REINFORCEMENT AND OTHER EMBEDDED ITEMS
A. Comply with requirements of ACI 301. Clean reinforcement of loose rust and mill scale, and accurately position, support, and secure in place to achieve not less than minimum concrete coverage required for protection.
3.04 PLACING CONCRETE
A. Place concrete in accordance with ACI 304R.
B. Place concrete for floor slabs in accordance with ACI 302.1R.
09-03-2021 Cast-in-Place Concrete 03 3000 5 of 6
C. Ensure reinforcement, inserts, waterstops, embedded parts, and formed construction joint devices will not be disturbed during concrete placement.
D. Place concrete continuously without construction (cold) joints wherever possible; where construction joints are necessary, before next placement prepare joint surface by removing laitance and exposing the sand and sound surface mortar, by sandblasting or high-pressure water jetting.
E. Finish floors level and flat, unless otherwise indicated, within the tolerances specified below.
3.05 SLAB JOINTING
A. Locate joints as indicated on drawings.
B. Anchor joint fillers and devices to prevent movement during concrete placement.
C. Isolation Joints: Use preformed joint filler with removable top section for joint sealant, total height equal to thickness of slab, set flush with top of slab.
1. Install wherever necessary to separate slab from other building members, including columns, walls, equipment foundations, footings, stairs, manholes, sumps, and drains.
D. Saw Cut Contraction Joints: Saw cut joints before concrete begins to cool, within 4 to 12 hours after placing; use 3/16 inch thick blade and cut at least 1 inch deep but not less than one quarter (1/4) the depth of the slab.
3.06 FLOOR FLATNESS AND LEVELNESS TOLERANCES
A. Maximum Variation of Surface Flatness:
1. Exposed Concrete Floors: 1/4 inch in 10 feet.
2. Under Seamless Resilient Flooring: 1/4 inch in 10 feet.
3. Under Carpeting: 1/4 inch in 10 feet.
B. Correct the slab surface if tolerances are less than specified.
C. Correct defects by grinding or by removal and replacement of the defective work. Areas requiring corrective work will be identified. Re-measure corrected areas by the same process.
3.07 CONCRETE FINISHING
A. Repair surface defects, including tie holes, immediately after removing formwork.
B. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in height.
C. Concrete Slabs: Finish to requirements of ACI 302.1R, and as follows:
1. Surfaces to Receive Thin Floor Coverings: "Steel trowel" as described in ACI 302.1R; thin floor coverings include carpeting, resilient flooring, seamless flooring, resinous matrix terrazzo, thin set quarry tile, and thin set ceramic tile.
2. Other Surfaces to Be Left Exposed: Trowel as described in ACI 302.1R, minimizing burnish marks and other appearance defects.
3.08 CURING AND PROTECTION
09-03-2021 Cast-in-Place Concrete 03 3000 6 of 6
A. Comply with requirements of ACI 308R. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.
B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.
C. Surfaces Not in Contact with Forms:
1. Initial Curing: Start as soon as free water has disappeared and before surface is dry. Keep continuously moist for not less than three days by water ponding, water-saturated sand, water-fog spray, or saturated burlap.
2. Final Curing: Begin after initial curing but before surface is dry.
3.09 FIELD QUALITY CONTROL
A. Submit proposed mix design of each class of concrete to inspection and testing firm for review prior to commencement of concrete operations.
B. Compressive Strength Tests: ASTM C39/C39M, for each test, mold and cure three concrete test cylinders. Obtain test samples for every 100 cubic yards or less of each class of concrete placed.
C. Take one additional test cylinder during cold weather concreting, cured on job site under same conditions as concrete it represents.
D. Perform one slump test for each set of test cylinders taken, following procedures of ASTM
C143/C143M.
3.10 DEFECTIVE CONCRETE
A. Test Results: The testing agency shall report test results in writing to Government and Contractor within 24 hours of test.
B. Defective Concrete: Concrete not complying with required lines, details, dimensions, tolerances or specified requirements.
C. Repair or replacement of defective concrete will be determined by the Architect. The cost of additional testing shall be borne by Contractor when defective concrete is identified.
D. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of
Government for each individual area.
END OF SECTION 03 3000
09-03-2021 Rough Carpentry 06 1000 1 of 4
SECTION 06 1000
ROUGH CARPENTRY
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Structural dimension lumber framing.
B. Non-structural dimension lumber framing.
C. Rough opening framing for doors, windows, and roof openings.
D. Sheathing.
E. Preservative treated wood materials.
F. Miscellaneous framing and sheathing.
G. Concealed wood blocking, nailers, and supports.
1.02 REFERENCE STANDARDS
A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
2016a.
B. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-
Coated (Galvannealed) by the Hot-Dip Process 2020.
C. AWPA U1 - Use Category System: User Specification for Treated Wood 2018.
D. PS 2 - Performance Standard for Wood-Based Structural-Use Panels 2010.
E. PS 20 - American Softwood Lumber Standard 2020.
F. WWPA G-5 - Western Lumber Grading Rules 2017.
1.03 DELIVERY, STORAGE, AND HANDLING
A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.
PART 2 PRODUCTS
2.01 GENERAL REQUIREMENTS
A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.
1. Species: Douglas Fir-Larch, unless otherwise indicated.
2. If no species is specified, provide any species graded by the agency specified; if no grading agency is specified, provide lumber graded by any grading agency meeting the specified requirements.
3. Grading Agency: Any grading agency whose rules are approved by the Board of Review, American
Lumber Standard Committee (www.alsc.org) and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.
B. Lumber fabricated from old growth timber is not permitted.
2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS
A. Grading Agency: Western Wood Products Association; WWPA G-5.
09-03-2021 Rough Carpentry 06 1000 2 of 4
B. Sizes: Nominal sizes as indicated on drawings, S4S.
C. Moisture Content: S-dry or MC19.
D. Stud Framing (2 by 2 through 2 by 6 ):
1. Species: Douglas Fir-Larch.
2. Grade: No. 2.
E. Joist, Rafter, and Small Beam Framing (2 by 6 through 4 by 16 ):
1. Species: Douglas Fir-Larch.
2. Grade: No. 2 .
F. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:
1. Lumber: S4S, No. 2 or Standard Grade.
2. Boards: Standard or No. 3.
2.03 EXPOSED DIMENSION LUMBER
A. Submit manufacturer's certificate that products meet or exceed specified requirements, in lieu of grade stamping.
B. Grading Agency: Western Wood Products Association; WWPA G-5.
C. Sizes: Nominal sizes as indicated on drawings.
D. Surfacing: S4S.
E. Moisture Content: S-dry or MC19.
F. Joist, Rafter, and Small Beam Framing (2 by 6 through 4 by 16 ):
1. Species: Douglas Fir .
2. Grade: No 2 .
2.04 TIMBERS FOR CONCEALED APPLICATIONS
A. Grading Agency: Western Wood Products Association; WWPA G-5.
B. Sizes: Nominal sizes as indicated on drawings, S4S.
C. Moisture Content: S-dry (19 percent maximum) .
D. Beams and Posts 5 inches and over in thickness:
1. Species: Douglas Fir-Larch.
2. Grade: No. 1 .
2.05 EXPOSED TIMBERS
A. Submit manufacturer's certificate that products meet or exceed specified requirements, in lieu of grade stamping.
B. Moisture Content: S-dry (23 percent maximum) .
C. Surfacing: S4S.
D. Species: Douglas Fir .
E. Grade: No. 1 .
09-03-2021 Rough Carpentry 06 1000 3 of 4
2.06 CONSTRUCTION PANELS
A. Roof Sheathing: Any PS 2 type, rated Sheathing.
1. Bond Classification: Exposure 1 .
2.07 ACCESSORIES
A. Fasteners and Anchors:
1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.
B. Joist Hangers: Hot dipped galvanized steel, sized to suit framing conditions.
1. For contact with preservative treated wood in exposed locations, provide minimum G185 galvanizing complying with ASTM A653/A653M.
C. Sill Gasket on Top of Foundation Wall: 1/4 inch thick, plate width , closed cell plastic foam from continuous rolls .
2.08 FACTORY WOOD TREATMENT
A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System for wood treatments determined by use categories, expected service conditions, and specific applications.
1. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an ALSC-accredited testing agency, certifying level and type of treatment in accordance with AWPA standards.
B. Preservative Treatment:
1. Preservative Pressure Treatment of Lumber Above Grade: AWPA U1, Use Category UC3B, Commodity Specification A using waterborne preservative.
a. Kiln dry lumber after treatment to maximum moisture content of 19 percent.
b. Treat lumber exposed to weather.
c. Treat lumber in contact with masonry or concrete.
d. Treat lumber less than 18 inches above grade.
2. Preservative Pressure Treatment of Lumber in Contact with Soil: AWPA U1, Use Category UC4A, Commodity Specification A using waterborne preservative.
a. Preservative for Field Application to Cut Surfaces: As recommended by manufacturer of factory treatment chemicals for brush-application in the field.
PART 3 EXECUTION
3.01 PREPARATION
A. Coordinate installation of rough carpentry members specified in other sections.
3.02 INSTALLATION - GENERAL
A. Select material sizes to minimize waste.
09-03-2021 Rough Carpentry 06 1000 4 of 4
B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.
C. Where treated wood is used on interior, provide temporary ventilation during and immediately after installation sufficient to remove indoor air contaminants.
3.03 FRAMING INSTALLATION
A. Set structural members level, plumb, and true to line. Discard pieces with defects that would lower required strength or result in unacceptable appearance of exposed members.
B. Make provisions for temporary construction loads, and provide temporary bracing sufficient to maintain structure in true alignment and safe condition until completion of erection and installation of permanent bracing.
C. Install structural members full length without splices unless otherwise specifically detailed.
D. Comply with member sizes, spacing, and configurations indicated, and fastener size and spacing indicated, but not less than required by applicable codes and AWC (WFCM) Wood Frame Construction
Manual .
E. Construct double joist headers at floor…
This is the start of the file's text. The full file is on GovTribe.